With economics of scale the installation and material costs for renewable technologies are set to exceed or match the cost per kWh of conventional fossil and nuclear generation plant over the next ten years. Price volatility, political considerations, environmental aspects will mean higher risks and costs for the conventional solutions.
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
The renewable energy developers guide
1. The Renewable Energy Developers Guide
Report Summary
With economics of scale the installation and material costs for renewable technologies are
set to exceed or match the cost per kWh of conventional fossil and nuclear generation plant
over the next ten years. Price volatility, political considerations, environmental aspects will
mean higher risks and costs for the conventional solutions.
Features and benefits
* Identify the leading technologies in the renewable energy sector.
* Analyze ROIs for the leading technologies in the renewable energy sector.
* Analyze the core legislation impacting the sector.
* Help to identify the main opportunities and barriers to renewable energy development.
* Identify the different yields – economic, social, environmental – for renewable energy.
Request a Sample for or Inquire before buying the report Renewable Energy Developers
Guide
Published: January 2012
No.OF Pages: 104
Price: Single User License – US$ 2875 Corporate User License US$ 10781
Highlights
In terms of economic profit the average range of ROI increases with the scale of the
renewable energy project. With capacity above 1,000kW or a 1MW, returns are usually
above 10% to 15%. At the smaller scale due to the construction costs and the reduction in
efficiency of the resource harvesting, ROIs are typically 2% to 8%.
As a result of the uncertainty and technical risk of many renewable technologies,
maintenance costs are high, especially for large-scale projects. Nascent stage Wave energy
is estimated to have a maintenance cost of GBP207,605 per MW. In comparison off-shore
wind has a maintenance cost of GBP70,000 per MW.
Regarding costs, there is still much debate as to who should pay for the reinforcement costs
to the grid of renewable energy. A country such as Denmark, for example, makes TSOs and
DSOs cover the costs of reinforcement. In many other markets, the main issue is that there
individual countries lack a coherent master-plan for grid reinforcement.
2. Major points covered in Table of Contents of this report include:
About the author
EXECUTIVE SUMMARY
Introduction to renewable energy development
Renewable energy systems
Legislation for renewable energy development
Renewable energy yields
Infrastructure for renewable energy development
Future outlook
Appendix
Explore Comprehensive list of Tables & Figures available in the report
http://www.reportsnreports.com/reports/144781-the-renewable-energy-developers-
guide.html
Contact:
Priyank Tiwari
7557 Rambler road,
Suite 727, Dallas, TX 75231
Tel: +1-888-391-5441
sales@reportsandreports.com
Visit our Market Research Blog @ http://www.reportsnreportsblog.com/
Connect With Us: