SlideShare una empresa de Scribd logo
1 de 10
Descargar para leer sin conexión
Engineering
                           SERVICE PORTFOLIO
Madrid

T.   + 34 91 654 55 99
F.   + 34 91 654 56 32

www. enyonfacilities.com
www.enyon.es
Who we are.


enyon is a consultant specializing in industrial engineering for
facilities, energy efficiency and facility management, belonging to
the Enyon Group, founded in 1979 and with extensive experience
in the design, construction and commissioning of facilities in
buildings


Our main goal is to provide society and our customers with the                                  Facilities Engineering
most technologically efficient solutions, with the hallmarks of                                 Facility Audit
innovation, commitment, responsibility and independence.
                                                                                                Project Audit
                                                                                                Technical Assistance at Facilities
Who is evvers intended for?
                                                                                                  Quality Control.

                                                                                                  Commissioning.
Financial institutions, investment funds, project managers,
developers, builders and architectural and engineering firms                                      Energy Certification & Rehabilitation.
which require independent, qualified technical assistance for all
types of investments or projects involving industrial, real estate or
energy facilities.




                                                                  + 34 91 654 55 99
                                                       www.enyonfacilities.com | www.enyon.es
Our Commitment.

                                                                    Fields of Operation.

                                                                         1.- Independence.


                                                                         2.- Reliability. Strictly adhere to deadlines and targets in all
                                                                         projects.
     THERMAL                 ELECTRICAL & CONTROL
                                     LV – Low Voltage
Air Conditioning & Heating                                               3.- Responsibility. Guarantee absolute confidentiality of any
                                  Transformer Substations
         Cooling
                                          Lighting                       documents or information relating to projects in which we
       Ventilation
                                  Photovoltaic Solar Energy
   Thermal Solar Power                                                   participate.
                             Home Automation, Building Automation
            Gas
                                    and City Automation

                                                                         4.- Transparency. Develop clear contracts with no small print,
                       Fields of
                                                                         responding to as many queries as it may be necessary and
                       Operation
                                                                         clearly define services and rates.
   MECHANICAL                           SECURITY
        Plumbing                      Intruder Detection                 5.- Professionalism. Assign the projects to teams in which
        Sanitation                      Fire Protection
                                        Fire Detection
                                                                         each specialist contributes adequate training and experience
     Lifting Devices
     Compressed Air                                                      under the guidance of a Project Manager.


                                                                         6.- Communication. Undertake that the Project Manager will
                                                                         inform the client of any relevant decision or issue, and will
                                                                         provide them with a report of each Meeting Minutes.




                                                       + 34 91 654 55 99
                                            www.enyonfacilities.com | www.enyon.es
Facility Engineering.




        1                        2                                     3                                      4                 5

Conceptualization          Blueprint                           Implementation                           Legalization of     Maintenance
                                                                                                           facilities       Engineering
                                                        Facility Implementation
          Needs
            =
                                                                  Project
        Proposals




                                                          Technical Direction for
                              Technical                                                                  Management of          Inventory
            Sizing
      Initial Schemes     documentation
                                                        Implementation of Facilities                      technical files   Maintenance plan
                            necessary to                                                                 required by the    Contingency plan
                           complete the                                                                       Public           Supervision
                        Architectural Project                                                            Administrations.     Cost Analysis
                          and to obtain a         Assembly
                                                                Construction           Delivery
                          Building Permit.
      Architectural                                Review,                          Quality Control
       Integration                                                 Initiation,
                                                  adaptation                        Testing Control
                                                                coordination and
                                                     and            control.       As Built Document.
                                                  rethinking




                                                           + 34 91 654 55 99
                                                www.enyonfacilities.com | www.enyon.es
Technical Assistance.

                                                                                       Facility Project Audit.



               • Evaluation of technical and legal aspects.                                      Through Due Diligence or Facility Project Auditing services,
               • Recognition of deviations from the regulations.
                                                                                                 the client optimizes its guarantees at the time of developing a
Analysis Stage • Study of alternatives.
                                                                                                 new project, with the support of an independent consultant to
                                                                                                 evaluate the project at all stages.
                 • Project Feasibility Study.
                 • Study the level of expected returns.
                 • Anticipating potential risks in the assembly phase.
Project Stage    • Anticipating potential risks in the operational phase.



                 • Project Monitoring
                 • Check timeliness of project implementation and update planning.
Construction     • Control project certification in every situation that triggers a
                  provision of funding.
   Stage



            • Technical Assistance for Energy Certification .
            • Technical Assistance for Facility Quality Control.
Complements • Technical Assistance for Commissioning.




                                                     plays a role as a company specializing in Facility Engineering
                                                     to support Project Managers and Architects in their projects.



                                                                             + 34 91 654 55 99
                                                                  www.enyonfacilities.com | www.enyon.es
Facility Audit.

                                          Inclusion in Real Estate Purchasing Processes

                                      A due diligence or facility audit optimizes guarantees in real estate or
                                      industrial purchasing processes and provides essential information on the
  Risky      Safe                     actual state of buildings or plants, thus avoiding unforeseen future
Purchase   Purchase                   expenditure or breaches of the Law.


                                      -   Evaluation of all technical and legal aspects (permits, licenses,
                                          authorizations, etc.).


                                      -   Reports of recognition of deviations from the regulations on facilities.


                                      -   Carrying out tests on the operation of the facilities to check their
                                          condition and actual performance.


                                      -   Study of the investment needed to upgrade, improve or repair the
                                          facilities.




            develops the documentation that is required to exactly determine
            the actual condition of the facilities to be acquitred or tested.



                                + 34 91 654 55 99
                     www.enyonfacilities.com | www.enyon.es
Technical Assistance.

                                                             Quality Control.



                                                    MATERIALS QUALITY CONTROL


                                                    Advice to Technical Management on alternatives to materials proposed.


                                                    - Sampling control of materials tested, in accordance with Project
                                                    Specificaction, regulations and UNE Standards.
              Site
           Management
                                                    FACILITY IMPLEMENTATION QUALITY CONTROL

             Facility
            Technical                                Advice to Technical Management on proper implementation and
           Management                               assembly in accordance with:


Facility                Commissioning                       - Current regulations and Project Specification.
Quality                  Technical
Control                 Management                          - Provisions and recommendations of manufacturers.
                                                            - Assembly conditions for optimal maintenance.




                                                   + 34 91 654 55 99
                                        www.enyonfacilities.com | www.enyon.es
Technical Assistance - Commissioning.

                                                             Testing and Commissioning Management.




                                                   - Initial check of the facility according to project provisions.

                                                   - Inventory, catalog for subsequent commissioning and maintenance.

                                                   - Definition of Commissioning plan.

                                                           - Definition of control parameters.
              Site
           Management
                                                           - Definition of commissioning technical procedures.

                                                           - Definition of test protocol (which, when and how).
             Facility
            Technical                                      - Test monitoring.
           Management
                                                           - Checking the values obtained by the installers in the tests defined

Facility                Commissioning                      in the Test Protocol.
Quality                  Technical
Control                 Management                         - Controlled Commissioning.

                                                   - Putting into Operation.

                                                   - Delivery of final commissioning protocols to Technical Management.




                                                   + 34 91 654 55 99
                                        www.enyonfacilities.com | www.enyon.es
Energy Facility Management

                                                                                                 Energy Certification & Rehabilitation.


                  Energy Certification
               Directive 2002/91/CE                                                                                                Energy Rehabilitation
               RD 47/2007 19.01.07                                                                                             CTE – DB-HE1 section 3.2
               CTE 29.09.06 RD 316/2006                                                                                        IDAE Plan E4
               RITE RD1027/2007 20.07.07



                                                                        LEGAL OBLIGATIONS
- In all new buildings.                                                                          - Mandatory for improvements carried out in buildings whose area > 1,000 m2 of which the
- In any real estate purchase / sale.                                                            improved area exceeds 25% of closures.
- Positive discrimination in public contracts.                                                             - Rehabilitation of the envelope of existing buildings.
- Required in buildings with centralized systems of thermal power > 400 Kw,                                - Improving energy efficiency of heating facilities.
- Compulsory to clearly display it in public buildings or institutions providing services to a             - Improving energy efficiency of indoor lighting installations.
large number of people.                                                                                    - Promoting rehabilitation with high energy rating.


                                                                        evvers SOLUTIONS
                                                                                                  1.- Study of the Building:
1.- Adequacy of the project to CTE, the Construction Technical Code In terms of Energy                                    - Envelope.
                                                                                                                                                                   Facility Projects
Saving - DB-HE.                                                                                                           - Thermal Facilities.
                                                                                                                          - Lighting Facilities.
2.- Certification at Project level.                                                               2.- Management of documentation required to qualify for subsidies.
                                                                                                                          - Technical: Compliance with E4+ standards.
3.- Certification at Project completion by making an energy performance certification                                     - Administrative.
available to the purchasers or users.                                                             3.- Energy Certification: Obtaining it to qualify for the financial support lines for highly-
                                                                                                  rated certifications.



                                                                                  + 34 91 654 55 99
                                                                       www.enyonfacilities.com | www.enyon.es
Manzanos, 14B
                                            San Sebastián de los Reyes
Facility Engineering                        28703 – Madrid
Facility Audit
                                            T.   + 34 91 654 55 99
                                            F.   + 34 91 654 56 32
Technical Assistance at Facilities.
   Project Audit.                           www.eyonfacilitiescom
                                            www.enyon.es
   Quality Control.
   Commissioning .
   Energy Certification & Rehabilitation.

Más contenido relacionado

Destacado (11)

Poverty
PovertyPoverty
Poverty
 
Math Integration
Math IntegrationMath Integration
Math Integration
 
Merchant Navy
Merchant NavyMerchant Navy
Merchant Navy
 
Calculus 11.2
Calculus 11.2Calculus 11.2
Calculus 11.2
 
16788 national income_india
16788 national income_india16788 national income_india
16788 national income_india
 
Chapter 4 Integration
Chapter 4  IntegrationChapter 4  Integration
Chapter 4 Integration
 
Calculus
CalculusCalculus
Calculus
 
Rectification of errors for class XI
Rectification of errors for class XIRectification of errors for class XI
Rectification of errors for class XI
 
Application of Mathematics in Business : F 107 - Group K
Application of Mathematics in Business : F 107 - Group KApplication of Mathematics in Business : F 107 - Group K
Application of Mathematics in Business : F 107 - Group K
 
Human Resource Development (HRD)
Human Resource Development (HRD)Human Resource Development (HRD)
Human Resource Development (HRD)
 
Concept and method national income in india 5
Concept and method national income in india  5Concept and method national income in india  5
Concept and method national income in india 5
 

Similar a Eng enyon ingeniería 2011

Enyon information pack
Enyon information packEnyon information pack
Enyon information packEnyon
 
Enyon 2011v5 eng
Enyon 2011v5 engEnyon 2011v5 eng
Enyon 2011v5 engEnyon
 
Neelakandan resume cctv
Neelakandan resume  cctvNeelakandan resume  cctv
Neelakandan resume cctvNeelakandan J
 
Engineering
EngineeringEngineering
EngineeringHaDeGo
 
Dsi Concept Through Commission
Dsi Concept Through CommissionDsi Concept Through Commission
Dsi Concept Through Commissionpmunzen
 
DSI Concept Through Commission
DSI Concept Through CommissionDSI Concept Through Commission
DSI Concept Through Commissiondbirchmeier
 
Big Bear Package Details
Big Bear Package DetailsBig Bear Package Details
Big Bear Package DetailsCharles_Scholz
 
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...McKenney's Inc
 
Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...tom gilb
 
Wintech - Facade Forensics
Wintech - Facade ForensicsWintech - Facade Forensics
Wintech - Facade ForensicsWintech
 
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATIONIBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATIONIRJET Journal
 
UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...Agustin Argelich Casals
 
AZCATEC Services Guide
AZCATEC Services GuideAZCATEC Services Guide
AZCATEC Services Guideazcatec
 
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011creymicolau
 
Reliability roadmap using quality function deployment
Reliability roadmap using quality function deployment Reliability roadmap using quality function deployment
Reliability roadmap using quality function deployment ASQ Reliability Division
 
Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)Giancarlo Mancinelli
 

Similar a Eng enyon ingeniería 2011 (20)

Enyon information pack
Enyon information packEnyon information pack
Enyon information pack
 
Enyon 2011v5 eng
Enyon 2011v5 engEnyon 2011v5 eng
Enyon 2011v5 eng
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
Neelakandan resume cctv
Neelakandan resume  cctvNeelakandan resume  cctv
Neelakandan resume cctv
 
Engineering
EngineeringEngineering
Engineering
 
Dsi Concept Through Commission
Dsi Concept Through CommissionDsi Concept Through Commission
Dsi Concept Through Commission
 
DSI Concept Through Commission
DSI Concept Through CommissionDSI Concept Through Commission
DSI Concept Through Commission
 
Big Bear Package Details
Big Bear Package DetailsBig Bear Package Details
Big Bear Package Details
 
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
 
Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...
 
Wintech - Facade Forensics
Wintech - Facade ForensicsWintech - Facade Forensics
Wintech - Facade Forensics
 
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATIONIBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
 
UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...UC2 International Deployment, Baltimore Society of Communications Technology ...
UC2 International Deployment, Baltimore Society of Communications Technology ...
 
Gary Blakeley CV
Gary Blakeley CVGary Blakeley CV
Gary Blakeley CV
 
AZCATEC Services Guide
AZCATEC Services GuideAZCATEC Services Guide
AZCATEC Services Guide
 
Suresh rajalingam resume
Suresh rajalingam resumeSuresh rajalingam resume
Suresh rajalingam resume
 
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
 
Integrated Solutions
Integrated SolutionsIntegrated Solutions
Integrated Solutions
 
Reliability roadmap using quality function deployment
Reliability roadmap using quality function deployment Reliability roadmap using quality function deployment
Reliability roadmap using quality function deployment
 
Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)
 

Más de Enyon

Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Enyon
 
Eng enyon gestión 2011
Eng enyon gestión 2011Eng enyon gestión 2011
Eng enyon gestión 2011Enyon
 
Guia normativa enyon abril11
Guia normativa enyon abril11Guia normativa enyon abril11
Guia normativa enyon abril11Enyon
 
Enyon dosier informativo
Enyon dosier informativoEnyon dosier informativo
Enyon dosier informativoEnyon
 
Enyon 2011v5
Enyon 2011v5Enyon 2011v5
Enyon 2011v5Enyon
 
Enyon 2011v5
Enyon 2011v5Enyon 2011v5
Enyon 2011v5Enyon
 

Más de Enyon (6)

Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011
 
Eng enyon gestión 2011
Eng enyon gestión 2011Eng enyon gestión 2011
Eng enyon gestión 2011
 
Guia normativa enyon abril11
Guia normativa enyon abril11Guia normativa enyon abril11
Guia normativa enyon abril11
 
Enyon dosier informativo
Enyon dosier informativoEnyon dosier informativo
Enyon dosier informativo
 
Enyon 2011v5
Enyon 2011v5Enyon 2011v5
Enyon 2011v5
 
Enyon 2011v5
Enyon 2011v5Enyon 2011v5
Enyon 2011v5
 

Último

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 

Último (20)

Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 

Eng enyon ingeniería 2011

  • 1. Engineering SERVICE PORTFOLIO Madrid T. + 34 91 654 55 99 F. + 34 91 654 56 32 www. enyonfacilities.com www.enyon.es
  • 2. Who we are. enyon is a consultant specializing in industrial engineering for facilities, energy efficiency and facility management, belonging to the Enyon Group, founded in 1979 and with extensive experience in the design, construction and commissioning of facilities in buildings Our main goal is to provide society and our customers with the Facilities Engineering most technologically efficient solutions, with the hallmarks of Facility Audit innovation, commitment, responsibility and independence. Project Audit Technical Assistance at Facilities Who is evvers intended for? Quality Control. Commissioning. Financial institutions, investment funds, project managers, developers, builders and architectural and engineering firms Energy Certification & Rehabilitation. which require independent, qualified technical assistance for all types of investments or projects involving industrial, real estate or energy facilities. + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 3. Our Commitment. Fields of Operation. 1.- Independence. 2.- Reliability. Strictly adhere to deadlines and targets in all projects. THERMAL ELECTRICAL & CONTROL LV – Low Voltage Air Conditioning & Heating 3.- Responsibility. Guarantee absolute confidentiality of any Transformer Substations Cooling Lighting documents or information relating to projects in which we Ventilation Photovoltaic Solar Energy Thermal Solar Power participate. Home Automation, Building Automation Gas and City Automation 4.- Transparency. Develop clear contracts with no small print, Fields of responding to as many queries as it may be necessary and Operation clearly define services and rates. MECHANICAL SECURITY Plumbing Intruder Detection 5.- Professionalism. Assign the projects to teams in which Sanitation Fire Protection Fire Detection each specialist contributes adequate training and experience Lifting Devices Compressed Air under the guidance of a Project Manager. 6.- Communication. Undertake that the Project Manager will inform the client of any relevant decision or issue, and will provide them with a report of each Meeting Minutes. + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 4. Facility Engineering. 1 2 3 4 5 Conceptualization Blueprint Implementation Legalization of Maintenance facilities Engineering Facility Implementation Needs = Project Proposals Technical Direction for Technical Management of Inventory Sizing Initial Schemes documentation Implementation of Facilities technical files Maintenance plan necessary to required by the Contingency plan complete the Public Supervision Architectural Project Administrations. Cost Analysis and to obtain a Assembly Construction Delivery Building Permit. Architectural Review, Quality Control Integration Initiation, adaptation Testing Control coordination and and control. As Built Document. rethinking + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 5. Technical Assistance. Facility Project Audit. • Evaluation of technical and legal aspects. Through Due Diligence or Facility Project Auditing services, • Recognition of deviations from the regulations. the client optimizes its guarantees at the time of developing a Analysis Stage • Study of alternatives. new project, with the support of an independent consultant to evaluate the project at all stages. • Project Feasibility Study. • Study the level of expected returns. • Anticipating potential risks in the assembly phase. Project Stage • Anticipating potential risks in the operational phase. • Project Monitoring • Check timeliness of project implementation and update planning. Construction • Control project certification in every situation that triggers a provision of funding. Stage • Technical Assistance for Energy Certification . • Technical Assistance for Facility Quality Control. Complements • Technical Assistance for Commissioning. plays a role as a company specializing in Facility Engineering to support Project Managers and Architects in their projects. + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 6. Facility Audit. Inclusion in Real Estate Purchasing Processes A due diligence or facility audit optimizes guarantees in real estate or industrial purchasing processes and provides essential information on the Risky Safe actual state of buildings or plants, thus avoiding unforeseen future Purchase Purchase expenditure or breaches of the Law. - Evaluation of all technical and legal aspects (permits, licenses, authorizations, etc.). - Reports of recognition of deviations from the regulations on facilities. - Carrying out tests on the operation of the facilities to check their condition and actual performance. - Study of the investment needed to upgrade, improve or repair the facilities. develops the documentation that is required to exactly determine the actual condition of the facilities to be acquitred or tested. + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 7. Technical Assistance. Quality Control. MATERIALS QUALITY CONTROL Advice to Technical Management on alternatives to materials proposed. - Sampling control of materials tested, in accordance with Project Specificaction, regulations and UNE Standards. Site Management FACILITY IMPLEMENTATION QUALITY CONTROL Facility Technical Advice to Technical Management on proper implementation and Management assembly in accordance with: Facility Commissioning - Current regulations and Project Specification. Quality Technical Control Management - Provisions and recommendations of manufacturers. - Assembly conditions for optimal maintenance. + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 8. Technical Assistance - Commissioning. Testing and Commissioning Management. - Initial check of the facility according to project provisions. - Inventory, catalog for subsequent commissioning and maintenance. - Definition of Commissioning plan. - Definition of control parameters. Site Management - Definition of commissioning technical procedures. - Definition of test protocol (which, when and how). Facility Technical - Test monitoring. Management - Checking the values obtained by the installers in the tests defined Facility Commissioning in the Test Protocol. Quality Technical Control Management - Controlled Commissioning. - Putting into Operation. - Delivery of final commissioning protocols to Technical Management. + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 9. Energy Facility Management Energy Certification & Rehabilitation. Energy Certification Directive 2002/91/CE Energy Rehabilitation RD 47/2007 19.01.07 CTE – DB-HE1 section 3.2 CTE 29.09.06 RD 316/2006 IDAE Plan E4 RITE RD1027/2007 20.07.07 LEGAL OBLIGATIONS - In all new buildings. - Mandatory for improvements carried out in buildings whose area > 1,000 m2 of which the - In any real estate purchase / sale. improved area exceeds 25% of closures. - Positive discrimination in public contracts. - Rehabilitation of the envelope of existing buildings. - Required in buildings with centralized systems of thermal power > 400 Kw, - Improving energy efficiency of heating facilities. - Compulsory to clearly display it in public buildings or institutions providing services to a - Improving energy efficiency of indoor lighting installations. large number of people. - Promoting rehabilitation with high energy rating. evvers SOLUTIONS 1.- Study of the Building: 1.- Adequacy of the project to CTE, the Construction Technical Code In terms of Energy - Envelope. Facility Projects Saving - DB-HE. - Thermal Facilities. - Lighting Facilities. 2.- Certification at Project level. 2.- Management of documentation required to qualify for subsidies. - Technical: Compliance with E4+ standards. 3.- Certification at Project completion by making an energy performance certification - Administrative. available to the purchasers or users. 3.- Energy Certification: Obtaining it to qualify for the financial support lines for highly- rated certifications. + 34 91 654 55 99 www.enyonfacilities.com | www.enyon.es
  • 10. Manzanos, 14B San Sebastián de los Reyes Facility Engineering 28703 – Madrid Facility Audit T. + 34 91 654 55 99 F. + 34 91 654 56 32 Technical Assistance at Facilities. Project Audit. www.eyonfacilitiescom www.enyon.es Quality Control. Commissioning . Energy Certification & Rehabilitation.