ROBOT CYCLE TIME ANALYSIS
TIME ………………..Every Seconds Count
“TIME IS MONEY.” – BENJAMIN FRANKLIN
1. This is true when applied to industrial manufacturing. The longer a system takes to get back
online, the more money a company loses.
2. Think about it. When you are not producing, you are not making money. The longer
manufacturing and maintenance takes, the more money you lose. It is an ugly fact.
3. However, the faster the tool the faster the job is completed and the faster you get back to
producing.
4. For manufacturing within the specified time you need to operate faster, product should be
perfect and complete in all sense
• CYCLE TIME ANALYSIS :The period required to complete one cycle
of an operation; or to complete a function, job, or task from
start to finish. Cycle time is used in differentiating total duration
of a process from its run time.
A cycle time analysis is any method that collects and analyzes time data for a process to improve
the total process or system.
Benefits of CTA
1. Easy to use
2. Identifies time required to complete specified tasks
3. Allows for easy identification of process improvements and efficiencies
How to Use CTA
Step 1. Identify the process and detail the scope to be studied.
Step 2. Map the process. (Process Chart)
Step 3. Take several time measurements at varying points.
Step 4. Study the process between measuring points to determine if there is wasted time.
Step 5. Analyze the data.
Step 6. Make changes as needed.
Robot Cycle Time Analysis…
Cycle time determines the robot production rate for the job, which is a significant factor in
the economics service Installation.
1. MTM (Methods of the Measurements)
2. RTM (Robot Time and motion) by Nof and Lechtman at Purdue University.
 In this each action of the robot is expressed as different elements so that we can
easily calculate the time of each action.
RTM Elements
These 10 elements can be categorized into
four major group
1. Motion Element : These are manipulator movements performed either with or without load
2. Sensing Element : These are sensory activities performed by robot equipment's with sensing
capabilities (VI & F)
3. End effector Elements : End effector action of the robot (GRi)
4. Delay Elements : These are delay time resulting from waiting and processing conditions in
the work cycle (T & D)
4 Major Approach In RTM
4 major approaches are used to determine the element time and analyze a robot cycle with RTM
1. Table of Elements :- Just recording the time taken for each action from clock. In this time
values are determined for the different elements listed in the table
2. Regression Equation :- In this regression equations are formed for the complicated elements
whose values are functionally related to several factors. Once the equation is developed for
the given elements , the user simply puts the values into the equation to calculate the time.
3. Motion Control :- Motion control is concerned with the kinematics and dynamics analysis of
the manipulator movements. It determines the element time values by considering the
distance moved and velocity to make the move.
4. Path Geometry :- This approach is similar to motion control and requires specification of the
motion path to be followed together with robot joint and arm velocities.
Problem
The work cycle consist of simple task in which the robot must move parts weighing 3lb from one
conveyor to another conveyor. The conveyor delivers a part to a fixed position every 15 seconds
Sequence
1. Robot pick up part from first conveyor.
2. Robot transfer the part to second conveyor and release the part.
3. Robot moves back to ready position at first conveyor.
Conveyor 2
Conveyor
1
Robot
Start position
Pick Up point
Drop Position
1.2 inch (0.12 ft)
1 Feet = 12 inch
Work piece 3lb
Process Flow Chart
The flow process chart in industrial engineering is a graphical and symbolic representation of the
processing activities performed on the work piece.
When to use it ?
1. It is used when observing a physical process, to record actions as they happen and thus get
an accurate description of the process.
2. It is used when analyzing the steps in a process, to help identify and eliminate waste.
3. It is used when the process is mostly sequential, containing few decisions.
Symbols in Process Chart

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Adaptive control System
Adaptive control SystemAdaptive control System
Adaptive control System
 
Robotics sensors
Robotics sensorsRobotics sensors
Robotics sensors
 
Robot applications
Robot applicationsRobot applications
Robot applications
 
Robots
Robots Robots
Robots
 
Velocity sensors in_robotics
Velocity sensors in_roboticsVelocity sensors in_robotics
Velocity sensors in_robotics
 
Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
 
Robotics Endeffectors
Robotics EndeffectorsRobotics Endeffectors
Robotics Endeffectors
 
Unit III-- senors in robotics
Unit III-- senors in roboticsUnit III-- senors in robotics
Unit III-- senors in robotics
 
Robotics unit3 sensors
Robotics unit3 sensorsRobotics unit3 sensors
Robotics unit3 sensors
 
\Transfer Lines
\Transfer Lines\Transfer Lines
\Transfer Lines
 
Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
 
Robot Configuration - 1
Robot Configuration - 1Robot Configuration - 1
Robot Configuration - 1
 
Fundamental of robotic manipulator
Fundamental of robotic manipulatorFundamental of robotic manipulator
Fundamental of robotic manipulator
 
Robot programming
Robot programmingRobot programming
Robot programming
 
Chapter 8 - Robot Control System
Chapter 8 - Robot Control SystemChapter 8 - Robot Control System
Chapter 8 - Robot Control System
 
Automated Production Lines
Automated Production LinesAutomated Production Lines
Automated Production Lines
 
Manufacturing Automation
Manufacturing AutomationManufacturing Automation
Manufacturing Automation
 
Application of industrial robotics
Application of industrial roboticsApplication of industrial robotics
Application of industrial robotics
 
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMINGROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
 
Apt programming
Apt programmingApt programming
Apt programming
 

Destacado

Supercharged Content Marketing
Supercharged Content MarketingSupercharged Content Marketing
Supercharged Content MarketingEric T. Tung
 
Automated Parts Handling
Automated Parts HandlingAutomated Parts Handling
Automated Parts Handlingkezhassan
 
8 automated assembly-systems
8 automated assembly-systems8 automated assembly-systems
8 automated assembly-systemslizard_mn
 
Methods time measurement (mtm)
Methods time measurement (mtm)Methods time measurement (mtm)
Methods time measurement (mtm)soojal
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims studentmrgauravkhadse
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowancePratibha Khemchandani
 
Transfer machines
Transfer machines Transfer machines
Transfer machines Suresh Lal
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’sSudhir Reddy
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineeringrinkimusaddi
 
Bpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentBpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentSwaraj
 
Bpr examples from indian corporate world
Bpr  examples from indian corporate worldBpr  examples from indian corporate world
Bpr examples from indian corporate worldRiTu Karn
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineeringtheairliner
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering CompleteRoy Antony Arnold G
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringNeelkamal Sharma
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringKavindra Singh
 
Designing and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring systemDesigning and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring systemeSAT Publishing House
 
Andanças e Colagens - CPC USP
Andanças e Colagens - CPC USPAndanças e Colagens - CPC USP
Andanças e Colagens - CPC USPAline C Barros
 

Destacado (20)

Supercharged Content Marketing
Supercharged Content MarketingSupercharged Content Marketing
Supercharged Content Marketing
 
Automated Parts Handling
Automated Parts HandlingAutomated Parts Handling
Automated Parts Handling
 
8 automated assembly-systems
8 automated assembly-systems8 automated assembly-systems
8 automated assembly-systems
 
Methods time measurement (mtm)
Methods time measurement (mtm)Methods time measurement (mtm)
Methods time measurement (mtm)
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims student
 
Robotics
RoboticsRobotics
Robotics
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Transfer machines
Transfer machines Transfer machines
Transfer machines
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’s
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineering
 
Bpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentBpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellent
 
Bpr examples from indian corporate world
Bpr  examples from indian corporate worldBpr  examples from indian corporate world
Bpr examples from indian corporate world
 
Bpr ppt
Bpr pptBpr ppt
Bpr ppt
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering Complete
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Designing and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring systemDesigning and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring system
 
Andanças e Colagens - CPC USP
Andanças e Colagens - CPC USPAndanças e Colagens - CPC USP
Andanças e Colagens - CPC USP
 

Similar a ROBOT CYCLE TIME ANALYSIS

Document 14 (6).pdf
Document 14 (6).pdfDocument 14 (6).pdf
Document 14 (6).pdfRajMantry
 
Work Study, Method Study
Work Study, Method StudyWork Study, Method Study
Work Study, Method StudyDr. Mohit Sahu
 
A Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemA Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemIRJET Journal
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxLakshayKumar504432
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling Shivangi Singh
 
SMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedSMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedVIVEK NERURKAR
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxssusera85eeb1
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
Project Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence TechniqueProject Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence Techniqueijtsrd
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
Pick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering ApplicationsPick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering ApplicationsIRJET Journal
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Editor IJARCET
 

Similar a ROBOT CYCLE TIME ANALYSIS (20)

Unit 3 iem part 2
Unit 3  iem part  2Unit 3  iem part  2
Unit 3 iem part 2
 
Document 14 (6).pdf
Document 14 (6).pdfDocument 14 (6).pdf
Document 14 (6).pdf
 
Work Study, Method Study
Work Study, Method StudyWork Study, Method Study
Work Study, Method Study
 
Method study
Method studyMethod study
Method study
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
A Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemA Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control System
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Msms word
Msms wordMsms word
Msms word
 
SMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedSMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - Revised
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docx
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Project Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence TechniqueProject Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence Technique
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
Pick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering ApplicationsPick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering Applications
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185
 

Último

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 

Último (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 

ROBOT CYCLE TIME ANALYSIS

  • 1. NIRMAL THOMAS M.TECH ROBOTICS SRM ROBOTICS BATCH : 2013-2015 ROBOT CYCLE TIME ANALYSIS
  • 2. TIME ………………..Every Seconds Count “TIME IS MONEY.” – BENJAMIN FRANKLIN 1. This is true when applied to industrial manufacturing. The longer a system takes to get back online, the more money a company loses. 2. Think about it. When you are not producing, you are not making money. The longer manufacturing and maintenance takes, the more money you lose. It is an ugly fact. 3. However, the faster the tool the faster the job is completed and the faster you get back to producing. 4. For manufacturing within the specified time you need to operate faster, product should be perfect and complete in all sense
  • 3. • CYCLE TIME ANALYSIS :The period required to complete one cycle of an operation; or to complete a function, job, or task from start to finish. Cycle time is used in differentiating total duration of a process from its run time.
  • 4. A cycle time analysis is any method that collects and analyzes time data for a process to improve the total process or system. Benefits of CTA 1. Easy to use 2. Identifies time required to complete specified tasks 3. Allows for easy identification of process improvements and efficiencies How to Use CTA Step 1. Identify the process and detail the scope to be studied. Step 2. Map the process. (Process Chart) Step 3. Take several time measurements at varying points. Step 4. Study the process between measuring points to determine if there is wasted time. Step 5. Analyze the data. Step 6. Make changes as needed.
  • 5. Robot Cycle Time Analysis… Cycle time determines the robot production rate for the job, which is a significant factor in the economics service Installation. 1. MTM (Methods of the Measurements) 2. RTM (Robot Time and motion) by Nof and Lechtman at Purdue University.  In this each action of the robot is expressed as different elements so that we can easily calculate the time of each action. RTM Elements
  • 6. These 10 elements can be categorized into four major group 1. Motion Element : These are manipulator movements performed either with or without load 2. Sensing Element : These are sensory activities performed by robot equipment's with sensing capabilities (VI & F) 3. End effector Elements : End effector action of the robot (GRi) 4. Delay Elements : These are delay time resulting from waiting and processing conditions in the work cycle (T & D)
  • 7. 4 Major Approach In RTM 4 major approaches are used to determine the element time and analyze a robot cycle with RTM 1. Table of Elements :- Just recording the time taken for each action from clock. In this time values are determined for the different elements listed in the table 2. Regression Equation :- In this regression equations are formed for the complicated elements whose values are functionally related to several factors. Once the equation is developed for the given elements , the user simply puts the values into the equation to calculate the time. 3. Motion Control :- Motion control is concerned with the kinematics and dynamics analysis of the manipulator movements. It determines the element time values by considering the distance moved and velocity to make the move. 4. Path Geometry :- This approach is similar to motion control and requires specification of the motion path to be followed together with robot joint and arm velocities.
  • 8. Problem The work cycle consist of simple task in which the robot must move parts weighing 3lb from one conveyor to another conveyor. The conveyor delivers a part to a fixed position every 15 seconds Sequence 1. Robot pick up part from first conveyor. 2. Robot transfer the part to second conveyor and release the part. 3. Robot moves back to ready position at first conveyor.
  • 9. Conveyor 2 Conveyor 1 Robot Start position Pick Up point Drop Position 1.2 inch (0.12 ft) 1 Feet = 12 inch Work piece 3lb
  • 10. Process Flow Chart The flow process chart in industrial engineering is a graphical and symbolic representation of the processing activities performed on the work piece. When to use it ? 1. It is used when observing a physical process, to record actions as they happen and thus get an accurate description of the process. 2. It is used when analyzing the steps in a process, to help identify and eliminate waste. 3. It is used when the process is mostly sequential, containing few decisions.