The Development of The Lifecycle Function Model
By IDEF0 For Construction Projects
CHEN Yong-qiang, HU Jia
School of Management
Tianjin University
Tianjin, China
E-mail: symbolpmc@vip.sina.com
MO Peng
CCCC First Highway Engineering Co., Ltd
Beijing, China
E-mail: pengmo@hotmail.com
Abstract—The integrated information system is an integral part
of the integrated management for construction projects. Based on
the analysis of the problems of the current construction project
information system and the characteristics of the phases of the
construction lifecycle, this paper develops a lifecycle function
model for construction projects by the IDEF0 modeling
technique that is usually used in the complex industry design.
This model could serve as the foundation of developing the all-
phase integrated management information system and contribute
to the development of the integrated management theory.
Keywords-Construction project; Lifecycle; IDEF0; Integrated
management
I. INTRODUCTION
With the rapid development of modern information
technology, innovation of management theories and changes of
social environment, there are more and more large-scale and
complex construction projects. The process of construction
project is a construction-aimed one composed by interrelated
activities that have commencement and completion dates. The
final goal of the process should accord with the preconcerted
needs of utility and satisfy the constraints of quality, time, cost
and resources required by specifications or owner’s
requirements. Compared with general manufacturing industry,
construction project calls for high-level resource integration. In
fact, because of the difficulties of information integration in
information system, it is required to develop an integrated
information model for construction projects.
II. EXISTING PROBLEMS OF INTEGRATED OF INFORMATION
SYSTEM
Generally speaking, two basic problems should be
considered in the integration of information system. One is
how to solve the problems of information exchange between
different communication protocols. The other is the content of
information, hierarchy and flow that information system needs
to integrate. Similarly, these two problems also exist in the
integrated management information system for construction
projects.
To solve the first problem, one can add hardware or
develop an exchange service for communication protocols with
the software interface. The function of the exchange service is
to transfer information among construction hardware
equipments. However, suppliers and customers of integrated
systems usually lack consideration of the latter problem which
is more significant because the analysis of the content,
hierarchy and flow can have influence on decisions of the
supervisors and directly determine the final construction
performance delivered to owners[1]
. With IDEF (ICAM
DEFinition method) often used in system modeling[2]
, the
lifecycle function model for construction projects are built and
the content and hierarchy of information system integration are
analyzed in this paper. Therefore, the information demands are
identified and the solution to the second problems is proposed.
III. FEASIBILITY ANALYSIS OF IDEF0 MODELS OF
CONSTRUCTION PROJECTS
A. Basic Concept of the IDEF0 Model
An IDEF0 model, usually applied in the complex industrial
design, is composed by a number of activities. Each activity
has the following properties as shown in Fig. 1[3]
:
(1) Inputs and outputs representing the information
exchange between activities.
(2) Controls that constrain the execution of activities
depending on runtime value comparison and on activity states.
(3) Mechanisms where an action can be defined to perform.
(4) Call Arrows used when an activity is needed to call
another activity that is already modeled in another IDEF0
model.
Figure 1. Process Model in IDEF0 Notation
The basic idea of IDEF0 modeling technique is a structured
analysis, which is used to build the model by decomposition
Sponsored by the National Natural Science Foundation of China
(Grant No. 70772057)
978-1-4244-2108-4/08/$25.00 © 2008 IEEE
from top to bottom strictly. According to the level of
decomposition, the activity can represent the whole process, a
sub process or an atomic activity. The main function is
explained on the top and definitive details are gained through
analysis in each level. All models are similarly inside[4]
, as is
shown in Fig. 2.
Figure 2. Decomposition Structure of IDEF0
B. Characteristics of Construction Projects
Construction project is a temporary endeavor, and the
uncertainty is prevalent during its lifecycle. Thus, the project
execution organization usually divides the projects into some
project phases to facilitate more effective management and to
build appropriate relationship with the continuous operation of
project execution. Each project phase is characterized by the
completion of one or more deliverables which are any
verifiable items that must be produced to complete the project,
such as project feasibility study, detailed design, etc.
Deliverables and phases are common and logical parts that
assure correct definitions of products.
C. Applicability of IDEF0 in Modeling of Construction
Projects
As a very special product, the construction process
becomes much complicated. Furthermore, the number of
unforeseeable factors increases to a large degree due to the
open system. In order to build an integrated system, the
information and process of construction projects need fully
understanding and the scope and information during the
lifecycle should be comprehended[5]
. Thus, the whole process
of the construction projects can be clearly defined if IDEF0 is
used to model construction projects.
Through the application of IDEF0, people can deeply
understand the lifecycle of construction projects from initiation,
design and construction to operation and realize the integrated
management of construction projects.
IV. DEVELOPMENT OF THE LIFECYCLE FUNCTION MODEL
FOR CONSTRUCTION PROJECTS BY IDEF0
A. Definition of phases in the Con-struction Project Lifecycle
The lifecycle of projects refers to the whole process from
project conception to project completion. There are four phases
in lifecycle of construction projects[6][7]
: initiation, design,
construction and operation. Each phase can be divided to
subprocedures, which are shown in the Fig. 3.
1) Project Initiation Phrase
In this phase of initiation, through the analysis of
investment opportunity, feasibility study and project evaluation,
varied plans should be carefully compared and the necessity,
possibility, time and implement of project investment should be
scientifically determined. Although not a huge workload, the
phase is crucial to the overall control of project investment.
2) Project Design Phrase
Design includes conceptual design, preliminary design,
detailed design, and preparation of contract, etc. This phase is
the concretion of strategic decisions, which determines whether
the project can be completed successfully and achieve the
original goals with high efficiency.
Figure 3. Lifecycle of Construction Projects
978-1-4244-2108-4/08/$25.00 © 2008 IEEE
3) Project Construction Phrase
The main task of construction is to put the blueprint into
reality and achieve the goals of investors. Therefore, the project
goal should be high-efficiently accomplished within the limit
of the given time, quality and cost. This phase spends the
largest amount of manpower, material and money and requires
the heaviest workload. As a result, it is the most difficult for
the project management.
4) Project Operation Phrase
The phase of operation should comprise but not be limited
to test on completion, commissioning, maintenance, post
evaluation and dismantlement. Even after the commissioning
of the project and the owner’s taking over, project management
still can not be ignored in the step of the project maintenance
As different parts of a whole system, the above phases of
the project lifecycle are interrelated as an indivisible
integration.
B. Establishing the Lifecycle Function Model for the
Construction Project
As is shown in Fig. 4, the lifecycle model of construction
project can be divided into four function modules: initiation
module, design module, construction module and operation
module. The outputs of each function module are the inputs or
controls of the next function module. The inputs of the
lifecycle are existing projects including the project entity and
the past data related to projects. The controls are owner's
requirements and pertinent laws and regulations during the
operation of all modules. Correlative facilities and human
resources are the mechanisms of the model. Product, which is
the goal of construction project, is the final outputs. If the
design or construction does not meet the anticipated
requirements, the project should be redesigned or reconstructed
until these standards are satisfied. Only in this way can the next
module be inputted.
C. Analysis of the Construction Modules in the Lifecycle
Function Model
The specific analysis of the construction module is shown
in Fig. 5. The construction module can be divided into five
submodules: selection of constructors, preparation of
construction methods, civil construction, equipment installation
and test on completion and commissioning. The outputs of
each submodule are controls or inputs of the next submodule.
The original inputs are current facilities. Controls include
owner's requirements and pertinent laws and regulations given
in A0 diagram, as well as contract documents and final design
scheme produced in the design module. Correlative facilities
and human resources are defined as mechanisms. The outputs
of this model are the completed projects and relevant
information. Civil construction, equipment installation and test
on completion and commissioning are three sources of the
information of completed project. Unqualified projects in the
process of civil construction and equipment installation should
be reworked until the projects and information meet the
requirement of controls.
The construction module is taken as an example in this
paper, and the other modules will not be analyzed due to the
similar decomposing procedure based on the analysis of all
phases of the construction project lifecycle. It is necessary for
these modules to be progressively decomposed in order to
build up a feasible and practical lifecycle function model for
construction projects.
标题:节点: 编号: 1A0 The Lifecycle Function Model for Construction Projects
1
Initiation
2
Design
3
Construction
4
Operation
Existing
Projects
Information
about Decision
Laws and
regulations
Final Detailed
Design
Owner’s
Requirements
Completed
Qualified
Project
Unqualited
Design
Unqualified
Project
Information of Completed
Project
Production
Human
Resources
Correlative
Facilities
Conceptual
Design
Diagram Title Code
Figure 4. The lifecycle Function Model for Construction Project
978-1-4244-2108-4/08/$25.00 © 2008 IEEE
Figure 5. Function Model of the Construction Module
V. CONCLUSION
A. Contributions to the development of Integrated
Management Information System for Construction Projects
Developing the lifecycle function model for construction
projects by IDEF0 is a way to explicitly understand the
functions, inputs, outputs and relationships of the modules in
the project lifecycle. Therefore, the integrated management
information system developed based the model will contribute
to the fulfillment of the integrated management of the whole
process, omnibearing and whole staff, and the improvement of
the overall management level for construction projects
especially large-scale ones, as well as the overall economic and
social benefits.
B. Further Research
Though this paper puts up with the method to develop the
lifecycle function model for construction project, the model
built by IDEF0 above needs to be further embodied and
improved to construct the models of information classification
and information integration according to characteristics of the
different construction projects. Therefore, in the future, the
function descriptions of all phases for construction projects
should be more specifically clearly identified. On the other
hand, due to the defects naturally existing in the IDEF0 model,
the effective development of integrated system for complex or
mega construction projects should require more than one
modeling technique, and thus how to combine the function
model developed with other modeling methods and other
models is one possible research direction.
REFERENCES
[1] M. R. M. Halfawy, T. M. Froese, “Component-Based Framework for
Implementing Integrated Architectural-Engineering-Construction Project
Systems”. Journal of Computing in Civil Engineering. Vol. 21, Issue: 6,
pp. 441-452, Nov/Dec 2007
[2] W. A. Liu, J. J. Zhang, “Methods and tools of process modeling in
product development”, Modern Manufacturing Engineering,Issue: 3,
pp. 55-59, March 2006.
[3] B. Karakostas; Y. Zorgios. “Automatic derivation of BPEL4WS from
IDEF0 process models”. Software & Systems Modeling. Vol. 5, Issue: 2,
pp. 208-218, June 2006.
[4] Y. l.Chen, “Modeling Analysis and Design Methods of IDEF”. Beijing:
Tsinghua University Press, 2000.
[5] Y. W. Wang, J. Yang J, Q. P. Shen, “The application of electronic
commerce and information integration in the construction industry”.
International Journal of Project Management. Vol: 25, Issue:2, pp. 158-
163, February 2007.
[6] Chartered Institute of Building, Code of Practice of Project Management
for Construction and Development, 3rd ed., UK: Blackwell Publishing,
2002.
[7] Project Management Institute. A Guide to the Project Management Body
of Knowledge. USA: Project Management Institute, 2004.
[8] Y. Q. Chen, “Modern Information Technology Based Study of
Integration Management of Mega Construction Projects”. PhD Thesis,
Tianjin: Tianjin University, 2004.

Más contenido relacionado

La actualidad más candente

‘O’ Model for Component-Based Software Development Process
‘O’ Model for Component-Based Software Development Process‘O’ Model for Component-Based Software Development Process
‘O’ Model for Component-Based Software Development Processijceronline
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
Application of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism modelApplication of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism modeleSAT Publishing House
 
Functional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF MethodsFunctional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF MethodsMandar Trivedi
 
Paper_19-Software_Architecture_Reconstruction_Method_a_Survey
Paper_19-Software_Architecture_Reconstruction_Method_a_SurveyPaper_19-Software_Architecture_Reconstruction_Method_a_Survey
Paper_19-Software_Architecture_Reconstruction_Method_a_SurveyZainab Nayyar
 
Enhancing planning and scheduling program by using benefits of bim based appl...
Enhancing planning and scheduling program by using benefits of bim based appl...Enhancing planning and scheduling program by using benefits of bim based appl...
Enhancing planning and scheduling program by using benefits of bim based appl...Alexander Decker
 
Presentation - "A comparison of component-based software engineering and mode...
Presentation - "A comparison of component-based software engineering and mode...Presentation - "A comparison of component-based software engineering and mode...
Presentation - "A comparison of component-based software engineering and mode...Nikolay Grozev
 
The Automation of Critical Path Method using Machine Learning: A Conceptual S...
The Automation of Critical Path Method using Machine Learning: A Conceptual S...The Automation of Critical Path Method using Machine Learning: A Conceptual S...
The Automation of Critical Path Method using Machine Learning: A Conceptual S...Dr. Amarjeet Singh
 
Towards Method Engineering of Model-Driven User Interface Development
Towards Method Engineering ofModel-Driven User Interface Development Towards Method Engineering ofModel-Driven User Interface Development
Towards Method Engineering of Model-Driven User Interface Development Jean Vanderdonckt
 
A Review of Feature Model Position in the Software Product Line and Its Extra...
A Review of Feature Model Position in the Software Product Line and Its Extra...A Review of Feature Model Position in the Software Product Line and Its Extra...
A Review of Feature Model Position in the Software Product Line and Its Extra...CSCJournals
 

La actualidad más candente (11)

‘O’ Model for Component-Based Software Development Process
‘O’ Model for Component-Based Software Development Process‘O’ Model for Component-Based Software Development Process
‘O’ Model for Component-Based Software Development Process
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Application of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism modelApplication of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism model
 
Functional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF MethodsFunctional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF Methods
 
Paper_19-Software_Architecture_Reconstruction_Method_a_Survey
Paper_19-Software_Architecture_Reconstruction_Method_a_SurveyPaper_19-Software_Architecture_Reconstruction_Method_a_Survey
Paper_19-Software_Architecture_Reconstruction_Method_a_Survey
 
Enhancing planning and scheduling program by using benefits of bim based appl...
Enhancing planning and scheduling program by using benefits of bim based appl...Enhancing planning and scheduling program by using benefits of bim based appl...
Enhancing planning and scheduling program by using benefits of bim based appl...
 
17CS45_CBCS_Moulde 1 ppt
17CS45_CBCS_Moulde 1 ppt17CS45_CBCS_Moulde 1 ppt
17CS45_CBCS_Moulde 1 ppt
 
Presentation - "A comparison of component-based software engineering and mode...
Presentation - "A comparison of component-based software engineering and mode...Presentation - "A comparison of component-based software engineering and mode...
Presentation - "A comparison of component-based software engineering and mode...
 
The Automation of Critical Path Method using Machine Learning: A Conceptual S...
The Automation of Critical Path Method using Machine Learning: A Conceptual S...The Automation of Critical Path Method using Machine Learning: A Conceptual S...
The Automation of Critical Path Method using Machine Learning: A Conceptual S...
 
Towards Method Engineering of Model-Driven User Interface Development
Towards Method Engineering ofModel-Driven User Interface Development Towards Method Engineering ofModel-Driven User Interface Development
Towards Method Engineering of Model-Driven User Interface Development
 
A Review of Feature Model Position in the Software Product Line and Its Extra...
A Review of Feature Model Position in the Software Product Line and Its Extra...A Review of Feature Model Position in the Software Product Line and Its Extra...
A Review of Feature Model Position in the Software Product Line and Its Extra...
 

Destacado

Business English
Business EnglishBusiness English
Business EnglishYanli Liu
 
EMA WLA (Workload Automation) Radar: A Review of Top Workload Automation Tools
EMA WLA (Workload Automation) Radar: A Review of Top Workload Automation ToolsEMA WLA (Workload Automation) Radar: A Review of Top Workload Automation Tools
EMA WLA (Workload Automation) Radar: A Review of Top Workload Automation ToolsEnterprise Management Associates
 
Startup safary athens 2014 oleg lola
Startup safary athens 2014 oleg lolaStartup safary athens 2014 oleg lola
Startup safary athens 2014 oleg lolaOleg Lola
 
Scheduling System Optimization Project Chater Draft 04 13 11
Scheduling System Optimization Project Chater Draft 04 13 11Scheduling System Optimization Project Chater Draft 04 13 11
Scheduling System Optimization Project Chater Draft 04 13 11msabeva
 
Deflate Workload Pressure in Complex SAP® Environments
Deflate Workload Pressure in Complex SAP® EnvironmentsDeflate Workload Pressure in Complex SAP® Environments
Deflate Workload Pressure in Complex SAP® EnvironmentsCA Technologies
 
An Analysis of Component-based Software Development -Maximize the reuse of ex...
An Analysis of Component-based Software Development -Maximize the reuse of ex...An Analysis of Component-based Software Development -Maximize the reuse of ex...
An Analysis of Component-based Software Development -Maximize the reuse of ex...Mohammad Salah uddin
 
IDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering ModelIDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering ModelMandar Trivedi
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0Mandar Trivedi
 
Product Development
Product DevelopmentProduct Development
Product DevelopmentOleg Lola
 
Hands-On Lab: CA Workload Automation Advanced Integrations and Agents
Hands-On Lab: CA Workload Automation Advanced Integrations and AgentsHands-On Lab: CA Workload Automation Advanced Integrations and Agents
Hands-On Lab: CA Workload Automation Advanced Integrations and AgentsCA Technologies
 
Walmart scm
Walmart scmWalmart scm
Walmart scmartki
 
Supply Chain Management - Walmart
Supply Chain Management - WalmartSupply Chain Management - Walmart
Supply Chain Management - WalmartSweta Ramdas
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Mohamed Sami El-Tahawy
 
Wal-Mart Analysis (Strategic Management)
Wal-Mart Analysis (Strategic Management)Wal-Mart Analysis (Strategic Management)
Wal-Mart Analysis (Strategic Management)Oscar Vadillo
 
Walmart Supply chain management
Walmart Supply chain managementWalmart Supply chain management
Walmart Supply chain managementSagar Morakhia
 
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)fentrekin
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Angelin R
 

Destacado (20)

Business English
Business EnglishBusiness English
Business English
 
EMA WLA (Workload Automation) Radar: A Review of Top Workload Automation Tools
EMA WLA (Workload Automation) Radar: A Review of Top Workload Automation ToolsEMA WLA (Workload Automation) Radar: A Review of Top Workload Automation Tools
EMA WLA (Workload Automation) Radar: A Review of Top Workload Automation Tools
 
Startup safary athens 2014 oleg lola
Startup safary athens 2014 oleg lolaStartup safary athens 2014 oleg lola
Startup safary athens 2014 oleg lola
 
01 2 (lab) - idef0
01 2 (lab) - idef001 2 (lab) - idef0
01 2 (lab) - idef0
 
Scheduling System Optimization Project Chater Draft 04 13 11
Scheduling System Optimization Project Chater Draft 04 13 11Scheduling System Optimization Project Chater Draft 04 13 11
Scheduling System Optimization Project Chater Draft 04 13 11
 
Deflate Workload Pressure in Complex SAP® Environments
Deflate Workload Pressure in Complex SAP® EnvironmentsDeflate Workload Pressure in Complex SAP® Environments
Deflate Workload Pressure in Complex SAP® Environments
 
An Analysis of Component-based Software Development -Maximize the reuse of ex...
An Analysis of Component-based Software Development -Maximize the reuse of ex...An Analysis of Component-based Software Development -Maximize the reuse of ex...
An Analysis of Component-based Software Development -Maximize the reuse of ex...
 
IDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering ModelIDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering Model
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0
 
Product Development
Product DevelopmentProduct Development
Product Development
 
Hands-On Lab: CA Workload Automation Advanced Integrations and Agents
Hands-On Lab: CA Workload Automation Advanced Integrations and AgentsHands-On Lab: CA Workload Automation Advanced Integrations and Agents
Hands-On Lab: CA Workload Automation Advanced Integrations and Agents
 
FESA Planning
FESA PlanningFESA Planning
FESA Planning
 
Walmart scm
Walmart scmWalmart scm
Walmart scm
 
Supply Chain Management - Walmart
Supply Chain Management - WalmartSupply Chain Management - Walmart
Supply Chain Management - Walmart
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 
Wal-Mart Analysis (Strategic Management)
Wal-Mart Analysis (Strategic Management)Wal-Mart Analysis (Strategic Management)
Wal-Mart Analysis (Strategic Management)
 
WalMart Analysis
WalMart AnalysisWalMart Analysis
WalMart Analysis
 
Walmart Supply chain management
Walmart Supply chain managementWalmart Supply chain management
Walmart Supply chain management
 
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 

Similar a The development of_the_lifecycle_function_model_by_idef0_for_construction_projects-libre

IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET Journal
 
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Dr. Amarjeet Singh
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...IRJET Journal
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdf4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdfSemra D.
 
Module-2 bim strategy case study structural project engineer-mikael akkus
Module-2 bim strategy case study  structural project engineer-mikael akkusModule-2 bim strategy case study  structural project engineer-mikael akkus
Module-2 bim strategy case study structural project engineer-mikael akkusmikael akkus
 
Lean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. SubmittedLean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. SubmittedOlufemi Isaac Akinjiyan
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”IRJET Journal
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...IRJET Journal
 
Coordination of Building Services: A Review
Coordination of Building Services: A ReviewCoordination of Building Services: A Review
Coordination of Building Services: A ReviewIRJET Journal
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey BuildingIRJET Journal
 
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERACOMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERAIRJET Journal
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 

Similar a The development of_the_lifecycle_function_model_by_idef0_for_construction_projects-libre (20)

IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
 
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdf4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdf
 
Module-2 bim strategy case study structural project engineer-mikael akkus
Module-2 bim strategy case study  structural project engineer-mikael akkusModule-2 bim strategy case study  structural project engineer-mikael akkus
Module-2 bim strategy case study structural project engineer-mikael akkus
 
Lean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. SubmittedLean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. Submitted
 
F1302033340
F1302033340F1302033340
F1302033340
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
Coordination of Building Services: A Review
Coordination of Building Services: A ReviewCoordination of Building Services: A Review
Coordination of Building Services: A Review
 
Pm chapter 4
Pm chapter 4Pm chapter 4
Pm chapter 4
 
Pm chapter 4...
Pm chapter 4...Pm chapter 4...
Pm chapter 4...
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
 
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERACOMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
concurrent engineering.pdf
concurrent engineering.pdfconcurrent engineering.pdf
concurrent engineering.pdf
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
design of g building.pdf
design of g building.pdfdesign of g building.pdf
design of g building.pdf
 
Software model
Software modelSoftware model
Software model
 

Más de Mandar Trivedi

Houston consumer price_index_houston 2015
Houston consumer price_index_houston 2015Houston consumer price_index_houston 2015
Houston consumer price_index_houston 2015Mandar Trivedi
 
Houston building permits outlook 2015
Houston building permits outlook 2015Houston building permits outlook 2015
Houston building permits outlook 2015Mandar Trivedi
 
Houston aviation industry_outlook_2015
Houston aviation industry_outlook_2015Houston aviation industry_outlook_2015
Houston aviation industry_outlook_2015Mandar Trivedi
 
ANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHART
ANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHARTANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHART
ANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHARTMandar Trivedi
 
California Water Plan IDEF0 example
California Water Plan IDEF0 exampleCalifornia Water Plan IDEF0 example
California Water Plan IDEF0 exampleMandar Trivedi
 
California Water Plan - IDEF0 example
California Water Plan - IDEF0 exampleCalifornia Water Plan - IDEF0 example
California Water Plan - IDEF0 exampleMandar Trivedi
 
Houston economy at_a_glance_vol24
Houston economy at_a_glance_vol24Houston economy at_a_glance_vol24
Houston economy at_a_glance_vol24Mandar Trivedi
 
Houston Crime Rate May 2015
Houston Crime Rate May 2015Houston Crime Rate May 2015
Houston Crime Rate May 2015Mandar Trivedi
 
Houston news feb 2015 criminal records
Houston news feb 2015 criminal recordsHouston news feb 2015 criminal records
Houston news feb 2015 criminal recordsMandar Trivedi
 
Houston News Criminal Data March 2015
Houston News Criminal Data March 2015Houston News Criminal Data March 2015
Houston News Criminal Data March 2015Mandar Trivedi
 
Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...Mandar Trivedi
 
FUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARD
FUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARDFUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARD
FUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARDMandar Trivedi
 
Uml vs-idef-griffithsuniversity
Uml vs-idef-griffithsuniversityUml vs-idef-griffithsuniversity
Uml vs-idef-griffithsuniversityMandar Trivedi
 
Example of IDEF 0 Diagram
Example of IDEF 0 Diagram Example of IDEF 0 Diagram
Example of IDEF 0 Diagram Mandar Trivedi
 
Example IDEF 0 Flow Diagrams
Example IDEF 0 Flow DiagramsExample IDEF 0 Flow Diagrams
Example IDEF 0 Flow DiagramsMandar Trivedi
 
Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...Mandar Trivedi
 
Discreate eventsimulation idef
Discreate eventsimulation idefDiscreate eventsimulation idef
Discreate eventsimulation idefMandar Trivedi
 

Más de Mandar Trivedi (20)

Houston Infographic
Houston InfographicHouston Infographic
Houston Infographic
 
Houston consumer price_index_houston 2015
Houston consumer price_index_houston 2015Houston consumer price_index_houston 2015
Houston consumer price_index_houston 2015
 
Houston building permits outlook 2015
Houston building permits outlook 2015Houston building permits outlook 2015
Houston building permits outlook 2015
 
Houston aviation industry_outlook_2015
Houston aviation industry_outlook_2015Houston aviation industry_outlook_2015
Houston aviation industry_outlook_2015
 
ANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHART
ANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHARTANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHART
ANALYSIS BETWEEN PROCESS MAPPINGS USING IDEF0 AND FLOWCHART
 
California Water Plan IDEF0 example
California Water Plan IDEF0 exampleCalifornia Water Plan IDEF0 example
California Water Plan IDEF0 example
 
California Water Plan - IDEF0 example
California Water Plan - IDEF0 exampleCalifornia Water Plan - IDEF0 example
California Water Plan - IDEF0 example
 
Houston economy at_a_glance_vol24
Houston economy at_a_glance_vol24Houston economy at_a_glance_vol24
Houston economy at_a_glance_vol24
 
Houston Crime Rate May 2015
Houston Crime Rate May 2015Houston Crime Rate May 2015
Houston Crime Rate May 2015
 
Houston news feb 2015 criminal records
Houston news feb 2015 criminal recordsHouston news feb 2015 criminal records
Houston news feb 2015 criminal records
 
Houston News Criminal Data March 2015
Houston News Criminal Data March 2015Houston News Criminal Data March 2015
Houston News Criminal Data March 2015
 
Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...
 
FUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARD
FUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARDFUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARD
FUNCTIONAL AND INFORMATIONAL MODEL OF EXPERT SPECIALIZATION USING IDEF STANDARD
 
Uml vs-idef-griffithsuniversity
Uml vs-idef-griffithsuniversityUml vs-idef-griffithsuniversity
Uml vs-idef-griffithsuniversity
 
Example of IDEF 0 Diagram
Example of IDEF 0 Diagram Example of IDEF 0 Diagram
Example of IDEF 0 Diagram
 
Example IDEF 0 Flow Diagrams
Example IDEF 0 Flow DiagramsExample IDEF 0 Flow Diagrams
Example IDEF 0 Flow Diagrams
 
Idef0
Idef0Idef0
Idef0
 
Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...Armstrong bocast integration_of_systems_engineering_and_software_development_...
Armstrong bocast integration_of_systems_engineering_and_software_development_...
 
Discreate eventsimulation idef
Discreate eventsimulation idefDiscreate eventsimulation idef
Discreate eventsimulation idef
 
Idef v4
Idef v4Idef v4
Idef v4
 

Último

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 

Último (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 

The development of_the_lifecycle_function_model_by_idef0_for_construction_projects-libre

  • 1. 978-1-4244-2108-4/08/$25.00 © 2008 IEEE The Development of The Lifecycle Function Model By IDEF0 For Construction Projects CHEN Yong-qiang, HU Jia School of Management Tianjin University Tianjin, China E-mail: symbolpmc@vip.sina.com MO Peng CCCC First Highway Engineering Co., Ltd Beijing, China E-mail: pengmo@hotmail.com Abstract—The integrated information system is an integral part of the integrated management for construction projects. Based on the analysis of the problems of the current construction project information system and the characteristics of the phases of the construction lifecycle, this paper develops a lifecycle function model for construction projects by the IDEF0 modeling technique that is usually used in the complex industry design. This model could serve as the foundation of developing the all- phase integrated management information system and contribute to the development of the integrated management theory. Keywords-Construction project; Lifecycle; IDEF0; Integrated management I. INTRODUCTION With the rapid development of modern information technology, innovation of management theories and changes of social environment, there are more and more large-scale and complex construction projects. The process of construction project is a construction-aimed one composed by interrelated activities that have commencement and completion dates. The final goal of the process should accord with the preconcerted needs of utility and satisfy the constraints of quality, time, cost and resources required by specifications or owner’s requirements. Compared with general manufacturing industry, construction project calls for high-level resource integration. In fact, because of the difficulties of information integration in information system, it is required to develop an integrated information model for construction projects. II. EXISTING PROBLEMS OF INTEGRATED OF INFORMATION SYSTEM Generally speaking, two basic problems should be considered in the integration of information system. One is how to solve the problems of information exchange between different communication protocols. The other is the content of information, hierarchy and flow that information system needs to integrate. Similarly, these two problems also exist in the integrated management information system for construction projects. To solve the first problem, one can add hardware or develop an exchange service for communication protocols with the software interface. The function of the exchange service is to transfer information among construction hardware equipments. However, suppliers and customers of integrated systems usually lack consideration of the latter problem which is more significant because the analysis of the content, hierarchy and flow can have influence on decisions of the supervisors and directly determine the final construction performance delivered to owners[1] . With IDEF (ICAM DEFinition method) often used in system modeling[2] , the lifecycle function model for construction projects are built and the content and hierarchy of information system integration are analyzed in this paper. Therefore, the information demands are identified and the solution to the second problems is proposed. III. FEASIBILITY ANALYSIS OF IDEF0 MODELS OF CONSTRUCTION PROJECTS A. Basic Concept of the IDEF0 Model An IDEF0 model, usually applied in the complex industrial design, is composed by a number of activities. Each activity has the following properties as shown in Fig. 1[3] : (1) Inputs and outputs representing the information exchange between activities. (2) Controls that constrain the execution of activities depending on runtime value comparison and on activity states. (3) Mechanisms where an action can be defined to perform. (4) Call Arrows used when an activity is needed to call another activity that is already modeled in another IDEF0 model. Figure 1. Process Model in IDEF0 Notation The basic idea of IDEF0 modeling technique is a structured analysis, which is used to build the model by decomposition Sponsored by the National Natural Science Foundation of China (Grant No. 70772057)
  • 2. 978-1-4244-2108-4/08/$25.00 © 2008 IEEE from top to bottom strictly. According to the level of decomposition, the activity can represent the whole process, a sub process or an atomic activity. The main function is explained on the top and definitive details are gained through analysis in each level. All models are similarly inside[4] , as is shown in Fig. 2. Figure 2. Decomposition Structure of IDEF0 B. Characteristics of Construction Projects Construction project is a temporary endeavor, and the uncertainty is prevalent during its lifecycle. Thus, the project execution organization usually divides the projects into some project phases to facilitate more effective management and to build appropriate relationship with the continuous operation of project execution. Each project phase is characterized by the completion of one or more deliverables which are any verifiable items that must be produced to complete the project, such as project feasibility study, detailed design, etc. Deliverables and phases are common and logical parts that assure correct definitions of products. C. Applicability of IDEF0 in Modeling of Construction Projects As a very special product, the construction process becomes much complicated. Furthermore, the number of unforeseeable factors increases to a large degree due to the open system. In order to build an integrated system, the information and process of construction projects need fully understanding and the scope and information during the lifecycle should be comprehended[5] . Thus, the whole process of the construction projects can be clearly defined if IDEF0 is used to model construction projects. Through the application of IDEF0, people can deeply understand the lifecycle of construction projects from initiation, design and construction to operation and realize the integrated management of construction projects. IV. DEVELOPMENT OF THE LIFECYCLE FUNCTION MODEL FOR CONSTRUCTION PROJECTS BY IDEF0 A. Definition of phases in the Con-struction Project Lifecycle The lifecycle of projects refers to the whole process from project conception to project completion. There are four phases in lifecycle of construction projects[6][7] : initiation, design, construction and operation. Each phase can be divided to subprocedures, which are shown in the Fig. 3. 1) Project Initiation Phrase In this phase of initiation, through the analysis of investment opportunity, feasibility study and project evaluation, varied plans should be carefully compared and the necessity, possibility, time and implement of project investment should be scientifically determined. Although not a huge workload, the phase is crucial to the overall control of project investment. 2) Project Design Phrase Design includes conceptual design, preliminary design, detailed design, and preparation of contract, etc. This phase is the concretion of strategic decisions, which determines whether the project can be completed successfully and achieve the original goals with high efficiency. Figure 3. Lifecycle of Construction Projects
  • 3. 978-1-4244-2108-4/08/$25.00 © 2008 IEEE 3) Project Construction Phrase The main task of construction is to put the blueprint into reality and achieve the goals of investors. Therefore, the project goal should be high-efficiently accomplished within the limit of the given time, quality and cost. This phase spends the largest amount of manpower, material and money and requires the heaviest workload. As a result, it is the most difficult for the project management. 4) Project Operation Phrase The phase of operation should comprise but not be limited to test on completion, commissioning, maintenance, post evaluation and dismantlement. Even after the commissioning of the project and the owner’s taking over, project management still can not be ignored in the step of the project maintenance As different parts of a whole system, the above phases of the project lifecycle are interrelated as an indivisible integration. B. Establishing the Lifecycle Function Model for the Construction Project As is shown in Fig. 4, the lifecycle model of construction project can be divided into four function modules: initiation module, design module, construction module and operation module. The outputs of each function module are the inputs or controls of the next function module. The inputs of the lifecycle are existing projects including the project entity and the past data related to projects. The controls are owner's requirements and pertinent laws and regulations during the operation of all modules. Correlative facilities and human resources are the mechanisms of the model. Product, which is the goal of construction project, is the final outputs. If the design or construction does not meet the anticipated requirements, the project should be redesigned or reconstructed until these standards are satisfied. Only in this way can the next module be inputted. C. Analysis of the Construction Modules in the Lifecycle Function Model The specific analysis of the construction module is shown in Fig. 5. The construction module can be divided into five submodules: selection of constructors, preparation of construction methods, civil construction, equipment installation and test on completion and commissioning. The outputs of each submodule are controls or inputs of the next submodule. The original inputs are current facilities. Controls include owner's requirements and pertinent laws and regulations given in A0 diagram, as well as contract documents and final design scheme produced in the design module. Correlative facilities and human resources are defined as mechanisms. The outputs of this model are the completed projects and relevant information. Civil construction, equipment installation and test on completion and commissioning are three sources of the information of completed project. Unqualified projects in the process of civil construction and equipment installation should be reworked until the projects and information meet the requirement of controls. The construction module is taken as an example in this paper, and the other modules will not be analyzed due to the similar decomposing procedure based on the analysis of all phases of the construction project lifecycle. It is necessary for these modules to be progressively decomposed in order to build up a feasible and practical lifecycle function model for construction projects. 标题:节点: 编号: 1A0 The Lifecycle Function Model for Construction Projects 1 Initiation 2 Design 3 Construction 4 Operation Existing Projects Information about Decision Laws and regulations Final Detailed Design Owner’s Requirements Completed Qualified Project Unqualited Design Unqualified Project Information of Completed Project Production Human Resources Correlative Facilities Conceptual Design Diagram Title Code Figure 4. The lifecycle Function Model for Construction Project
  • 4. 978-1-4244-2108-4/08/$25.00 © 2008 IEEE Figure 5. Function Model of the Construction Module V. CONCLUSION A. Contributions to the development of Integrated Management Information System for Construction Projects Developing the lifecycle function model for construction projects by IDEF0 is a way to explicitly understand the functions, inputs, outputs and relationships of the modules in the project lifecycle. Therefore, the integrated management information system developed based the model will contribute to the fulfillment of the integrated management of the whole process, omnibearing and whole staff, and the improvement of the overall management level for construction projects especially large-scale ones, as well as the overall economic and social benefits. B. Further Research Though this paper puts up with the method to develop the lifecycle function model for construction project, the model built by IDEF0 above needs to be further embodied and improved to construct the models of information classification and information integration according to characteristics of the different construction projects. Therefore, in the future, the function descriptions of all phases for construction projects should be more specifically clearly identified. On the other hand, due to the defects naturally existing in the IDEF0 model, the effective development of integrated system for complex or mega construction projects should require more than one modeling technique, and thus how to combine the function model developed with other modeling methods and other models is one possible research direction. REFERENCES [1] M. R. M. Halfawy, T. M. Froese, “Component-Based Framework for Implementing Integrated Architectural-Engineering-Construction Project Systems”. Journal of Computing in Civil Engineering. Vol. 21, Issue: 6, pp. 441-452, Nov/Dec 2007 [2] W. A. Liu, J. J. Zhang, “Methods and tools of process modeling in product development”, Modern Manufacturing Engineering,Issue: 3, pp. 55-59, March 2006. [3] B. Karakostas; Y. Zorgios. “Automatic derivation of BPEL4WS from IDEF0 process models”. Software & Systems Modeling. Vol. 5, Issue: 2, pp. 208-218, June 2006. [4] Y. l.Chen, “Modeling Analysis and Design Methods of IDEF”. Beijing: Tsinghua University Press, 2000. [5] Y. W. Wang, J. Yang J, Q. P. Shen, “The application of electronic commerce and information integration in the construction industry”. International Journal of Project Management. Vol: 25, Issue:2, pp. 158- 163, February 2007. [6] Chartered Institute of Building, Code of Practice of Project Management for Construction and Development, 3rd ed., UK: Blackwell Publishing, 2002. [7] Project Management Institute. A Guide to the Project Management Body of Knowledge. USA: Project Management Institute, 2004. [8] Y. Q. Chen, “Modern Information Technology Based Study of Integration Management of Mega Construction Projects”. PhD Thesis, Tianjin: Tianjin University, 2004.