Este documento es un registro de cambios y modificaciones para una obra que contiene 22 entradas vacías con fecha, código y estado sin detalles de modificaciones u objetivos. El registro está actualizado al 3 de junio de 2012.
Understanding of Communication and Language Difficultiesemilyparker01
From the literature I understood that language “comprehension,” is not a simple single skill – to actually comprehend spoken language involves a multi stage process which starts from the reception of a sound stimulus at the ears and involves the ability to classify the speech sounds and relate them to a mental dictionary, to interpret the words heard using the order in which they are spoken and the tonal inflections, to relate what is heard to the social and psychological context and ultimately choose from multiple possible meanings to the correct one meant by the speaker (Bishop, 1997).
Dhaval Mody is applying for a suitable position. He has over 10 years of experience working as a Chief Manager in Treasury and Investment Back Office at Kotak Life Insurance and previously in their Internal Audit department. Before joining Kotak, he worked as a Deputy Manager in the Statutory Audit department at Deloitte Haskins and Sells. He believes his experience and academic qualifications of being a CA and B.Com would allow him to contribute to organizational growth. His resume is enclosed for review.
Gilberto Gimenez M. is a Venezuelan citizen with identification number V-20.186.871 studying political economy in the SAIA section. The document provides basic identifying information for Gilberto Gimenez M. including his name, identification number, area of study, and academic section.
The document appears to contain personal identifying information, including a name - Niva Xelena Gonzalez Molina - and a date, possibly a birthdate, of 10-01. No other contextual information is provided, so the purpose and content of the document cannot be determined from the limited information given.
El documento discute las condiciones necesarias para un desarrollo personal pleno, señalando que algunas personas se están alejando de los valores morales y guiándose por antivalores debido al egoísmo y la influencia de los medios de comunicación y conflictos familiares. También indica que en las instituciones educativas algunos estudiantes usan palabras inadecuadas en lugar de un lenguaje apropiado para alguien con normas morales.
Understanding of Communication and Language Difficultiesemilyparker01
From the literature I understood that language “comprehension,” is not a simple single skill – to actually comprehend spoken language involves a multi stage process which starts from the reception of a sound stimulus at the ears and involves the ability to classify the speech sounds and relate them to a mental dictionary, to interpret the words heard using the order in which they are spoken and the tonal inflections, to relate what is heard to the social and psychological context and ultimately choose from multiple possible meanings to the correct one meant by the speaker (Bishop, 1997).
Dhaval Mody is applying for a suitable position. He has over 10 years of experience working as a Chief Manager in Treasury and Investment Back Office at Kotak Life Insurance and previously in their Internal Audit department. Before joining Kotak, he worked as a Deputy Manager in the Statutory Audit department at Deloitte Haskins and Sells. He believes his experience and academic qualifications of being a CA and B.Com would allow him to contribute to organizational growth. His resume is enclosed for review.
Gilberto Gimenez M. is a Venezuelan citizen with identification number V-20.186.871 studying political economy in the SAIA section. The document provides basic identifying information for Gilberto Gimenez M. including his name, identification number, area of study, and academic section.
The document appears to contain personal identifying information, including a name - Niva Xelena Gonzalez Molina - and a date, possibly a birthdate, of 10-01. No other contextual information is provided, so the purpose and content of the document cannot be determined from the limited information given.
El documento discute las condiciones necesarias para un desarrollo personal pleno, señalando que algunas personas se están alejando de los valores morales y guiándose por antivalores debido al egoísmo y la influencia de los medios de comunicación y conflictos familiares. También indica que en las instituciones educativas algunos estudiantes usan palabras inadecuadas en lugar de un lenguaje apropiado para alguien con normas morales.
Kerry McPheeters is a nonprofit professional with over 15 years of experience in customer service, program management, fundraising, and child advocacy. She has worked as a nanny, freelance writer, and store manager. McPheeters has a Bachelor's degree in Psychology and Social Behavior and Criminology, Law and Society from UC Irvine. She is skilled in budget management, relationship building, and exceptional communication. McPheeters volunteers her time to help victims of disasters through organizations like Habitat for Humanity and Food Bank New York City.
In this talk I review the concept of Granger causality and the problematic effects of synergy and redundancy on its estimation.
I will then propose an operative definition of these concepts.
The document provides instructions for measuring rooms to calculate the area needed for wall and floor tiling. It describes breaking walls down into rectangles and measuring the height and width of each rectangle. The measurements are used to calculate the area of each rectangle section and the total area of the room. Specific instructions are given for measuring around doors and other fixtures. The example provided measures a sample room and calculates the total area as 19.81 square meters.
The document discusses the evolution of the finance function from the 1960s to present and future. It describes how the finance function has transformed from a focus on "creative accounting" and scorekeeping to prioritizing compliance, efficiency, decision support, and becoming a business partner. The future of finance is outlined as providing predictive insights into performance, growth, and risk to help drive business decisions as a true strategic partner. Finance is utilizing new technologies and analytical skills to integrate diverse data sources and provide real-time insights beyond just financial data.
El alumnado de 5º de Primaria ha disfrutado muchísimo en la biblioteca del centro cívico "El Esqueleto" con un divertido juego en torno al libro El pequeño Nicolás.
This document is a curriculum vitae for Pramod Pandey that outlines his contact information, career objective, educational background, software skills, work experience, and key attributes. Pramod has over 10 years of experience in visual effects and compositing using software like After Effects, Nuke, and Maya. He has worked as a promo artist for television channels and is currently a VFX artist for Gener8 Digital Media Corp. Pramod holds a diploma in animation and has taught multimedia software.
Este documento resume los requisitos para la presentación de propuestas técnicas y económicas para una licitación pública de selección de consultores individuales. Los participantes deben presentar sus propuestas en dos sobres separados, uno conteniendo la oferta económica y otro la oferta técnica, rotulados adecuadamente y con la documentación requerida en cada uno para acreditar los requisitos de calificación y cumplimiento de los términos de referencia. La documentación solicitada incluye cartas, declaraciones juradas, currí
Este documento detalla la licitación pública para la selección de consultores individuales para un proyecto de ingeniería. Se especifica que la entrega de propuestas debe ser presencial y que se requiere una garantía de seriedad de oferta. Además, se establecen las fechas para el proceso de selección, que incluye la convocatoria, registro de participantes, consultas, presentación y evaluación de propuestas, y otorgamiento de la buena pro. El documento también analiza factores como la inversión requerida, capacidad té
Perfecionamiento del contrato 2016 hlciaedd Apellidos
Este documento detalla los requisitos para la perfección de un contrato con Hills and Lenz Company S.A.C. para un proyecto de ingeniería. Se requiere que la compañía presente constancias de no estar inhabilitada, una garantía de fiel cumplimiento del contrato, contrato de consorcio legalizado, código de cuenta interbancaria, poder legal de representación, datos de contacto, documentos de identidad, certificados de habilidad, detalles de costos y cronogramas de ejecución y adquisición de materiales. El contacto
El documento identifica los principales riesgos en diferentes áreas de conocimiento (alcance, tiempo, costos, calidad, finanzas, seguridad y medio ambiente) que pueden presentarse durante las distintas fases de un proyecto, incluyendo la concepción, definición, ejecución, ventas, saneado legal y cierre del proyecto.
El resumen describe un proyecto de construcción con un presupuesto de $200,000. Incluye información sobre el alcance, duración y costos del proyecto, así como informes de estado sobre el avance financiero y cronológico hasta la fecha.
Este documento solicita información requerida para realizar una tasación de un inmueble, incluyendo los nombres y documentos de identidad del propietario y solicitante, la fecha y ubicación del predio, sus linderos, medidas, áreas de terreno y construcción, descripción y distribución de la edificación, calidad de acabados, antigüedad, estado de conservación, titulación e inscripción registral, zonificación, uso actual, infraestructura de servicios y fecha de constatación.
This document provides an estimate of costs for a retaining wall based on its dimensions. It details the excavation area and perimeter, unit costs for excavation, material removal, formwork, and concrete at different depths. Cost estimates are provided for retaining wall depths from 1 to 8 meters, with the minimum cost-effective depth determined to be 3.4 meters and a total cost of 56,014.32 soles.
This document contains information for valuing equipment using the cost-replacement value method. It provides details on a piece of equipment such as its brand, year, model, condition, and total installed cost of $31,326. It then calculates the equipment's remaining life, residual value, depreciation, operational grade, and concludes with an actual current value of $11,486.20 compared to its replacement value of $10,911.89.
Este documento provee un resumen de la valuación de un automóvil usando el método directo de costo menos depreciación. Proporciona detalles sobre el automóvil como marca, año, modelo, estado y recorrido. Calcula el valor actual del automóvil en aproximadamente 49,000 soles peruanos después de deducir la depreciación lineal sobre 15 años de vida útil desde un costo similar nuevo de 60,525 soles.
El documento estima la cantidad de volquetes necesarios para transportar 400 m3 de asfalto caliente desde una planta a una obra en un día. Se calcula que se necesitarán 5 volquetes con una capacidad promedio de 15 m3 cada uno para completar los 27 viajes requeridos. El ciclo de cada volquete se estima en 82 minutos. Para un trabajo continuo se requerirían 13 volquetes.
This document provides details on the design of a reinforced concrete retaining wall, including:
1) Site soil properties and concrete specifications.
2) Preliminary wall dimensions including height, base width, toe projection, and heel depth.
3) Calculations to verify soil bearing capacity, stability against sliding and overturning, and pressure distribution.
4) Estimation of reinforcing steel based on bending moment calculations. Rebar sizes and spacing are specified.
This document contains two tables. The first table lists unit costs in Soles and dollars for various construction elements (walls, floors, etc.) according to building typology from A to G. It also provides the total unit cost per square meter for each typology. The second table shows the cost ratios for specialties (structures, architecture, installations) for each typology, with typology A having the highest costs and typology G the lowest. On average, structures make up 40% of costs, architecture 45%, and installations 15%.
Kerry McPheeters is a nonprofit professional with over 15 years of experience in customer service, program management, fundraising, and child advocacy. She has worked as a nanny, freelance writer, and store manager. McPheeters has a Bachelor's degree in Psychology and Social Behavior and Criminology, Law and Society from UC Irvine. She is skilled in budget management, relationship building, and exceptional communication. McPheeters volunteers her time to help victims of disasters through organizations like Habitat for Humanity and Food Bank New York City.
In this talk I review the concept of Granger causality and the problematic effects of synergy and redundancy on its estimation.
I will then propose an operative definition of these concepts.
The document provides instructions for measuring rooms to calculate the area needed for wall and floor tiling. It describes breaking walls down into rectangles and measuring the height and width of each rectangle. The measurements are used to calculate the area of each rectangle section and the total area of the room. Specific instructions are given for measuring around doors and other fixtures. The example provided measures a sample room and calculates the total area as 19.81 square meters.
The document discusses the evolution of the finance function from the 1960s to present and future. It describes how the finance function has transformed from a focus on "creative accounting" and scorekeeping to prioritizing compliance, efficiency, decision support, and becoming a business partner. The future of finance is outlined as providing predictive insights into performance, growth, and risk to help drive business decisions as a true strategic partner. Finance is utilizing new technologies and analytical skills to integrate diverse data sources and provide real-time insights beyond just financial data.
El alumnado de 5º de Primaria ha disfrutado muchísimo en la biblioteca del centro cívico "El Esqueleto" con un divertido juego en torno al libro El pequeño Nicolás.
This document is a curriculum vitae for Pramod Pandey that outlines his contact information, career objective, educational background, software skills, work experience, and key attributes. Pramod has over 10 years of experience in visual effects and compositing using software like After Effects, Nuke, and Maya. He has worked as a promo artist for television channels and is currently a VFX artist for Gener8 Digital Media Corp. Pramod holds a diploma in animation and has taught multimedia software.
Este documento resume los requisitos para la presentación de propuestas técnicas y económicas para una licitación pública de selección de consultores individuales. Los participantes deben presentar sus propuestas en dos sobres separados, uno conteniendo la oferta económica y otro la oferta técnica, rotulados adecuadamente y con la documentación requerida en cada uno para acreditar los requisitos de calificación y cumplimiento de los términos de referencia. La documentación solicitada incluye cartas, declaraciones juradas, currí
Este documento detalla la licitación pública para la selección de consultores individuales para un proyecto de ingeniería. Se especifica que la entrega de propuestas debe ser presencial y que se requiere una garantía de seriedad de oferta. Además, se establecen las fechas para el proceso de selección, que incluye la convocatoria, registro de participantes, consultas, presentación y evaluación de propuestas, y otorgamiento de la buena pro. El documento también analiza factores como la inversión requerida, capacidad té
Perfecionamiento del contrato 2016 hlciaedd Apellidos
Este documento detalla los requisitos para la perfección de un contrato con Hills and Lenz Company S.A.C. para un proyecto de ingeniería. Se requiere que la compañía presente constancias de no estar inhabilitada, una garantía de fiel cumplimiento del contrato, contrato de consorcio legalizado, código de cuenta interbancaria, poder legal de representación, datos de contacto, documentos de identidad, certificados de habilidad, detalles de costos y cronogramas de ejecución y adquisición de materiales. El contacto
El documento identifica los principales riesgos en diferentes áreas de conocimiento (alcance, tiempo, costos, calidad, finanzas, seguridad y medio ambiente) que pueden presentarse durante las distintas fases de un proyecto, incluyendo la concepción, definición, ejecución, ventas, saneado legal y cierre del proyecto.
El resumen describe un proyecto de construcción con un presupuesto de $200,000. Incluye información sobre el alcance, duración y costos del proyecto, así como informes de estado sobre el avance financiero y cronológico hasta la fecha.
Este documento solicita información requerida para realizar una tasación de un inmueble, incluyendo los nombres y documentos de identidad del propietario y solicitante, la fecha y ubicación del predio, sus linderos, medidas, áreas de terreno y construcción, descripción y distribución de la edificación, calidad de acabados, antigüedad, estado de conservación, titulación e inscripción registral, zonificación, uso actual, infraestructura de servicios y fecha de constatación.
This document provides an estimate of costs for a retaining wall based on its dimensions. It details the excavation area and perimeter, unit costs for excavation, material removal, formwork, and concrete at different depths. Cost estimates are provided for retaining wall depths from 1 to 8 meters, with the minimum cost-effective depth determined to be 3.4 meters and a total cost of 56,014.32 soles.
This document contains information for valuing equipment using the cost-replacement value method. It provides details on a piece of equipment such as its brand, year, model, condition, and total installed cost of $31,326. It then calculates the equipment's remaining life, residual value, depreciation, operational grade, and concludes with an actual current value of $11,486.20 compared to its replacement value of $10,911.89.
Este documento provee un resumen de la valuación de un automóvil usando el método directo de costo menos depreciación. Proporciona detalles sobre el automóvil como marca, año, modelo, estado y recorrido. Calcula el valor actual del automóvil en aproximadamente 49,000 soles peruanos después de deducir la depreciación lineal sobre 15 años de vida útil desde un costo similar nuevo de 60,525 soles.
El documento estima la cantidad de volquetes necesarios para transportar 400 m3 de asfalto caliente desde una planta a una obra en un día. Se calcula que se necesitarán 5 volquetes con una capacidad promedio de 15 m3 cada uno para completar los 27 viajes requeridos. El ciclo de cada volquete se estima en 82 minutos. Para un trabajo continuo se requerirían 13 volquetes.
This document provides details on the design of a reinforced concrete retaining wall, including:
1) Site soil properties and concrete specifications.
2) Preliminary wall dimensions including height, base width, toe projection, and heel depth.
3) Calculations to verify soil bearing capacity, stability against sliding and overturning, and pressure distribution.
4) Estimation of reinforcing steel based on bending moment calculations. Rebar sizes and spacing are specified.
This document contains two tables. The first table lists unit costs in Soles and dollars for various construction elements (walls, floors, etc.) according to building typology from A to G. It also provides the total unit cost per square meter for each typology. The second table shows the cost ratios for specialties (structures, architecture, installations) for each typology, with typology A having the highest costs and typology G the lowest. On average, structures make up 40% of costs, architecture 45%, and installations 15%.
El documento presenta una tabla con la proyección de pagos de una empresa, incluyendo las fechas de registro y pago, número y código de factura, concepto del pago, monto a pagar dividido en diferentes categorías como gastos de operación, mantenimiento de equipo, equipos, materiales y más. La tabla incluye espacios para la guía de remisión, factura, monto y comentarios.
El documento presenta una guía para generar códigos de primer y segundo nivel para gastos de operación, gastos en proyectos y gastos de post-inversión. Se detallan ejemplos de códigos de tercer nivel para conceptos como estructuras, instalaciones y arquitectura.
Este documento evalúa las oportunidades de inversión de una tormenta de ideas realizada el 05/09/2012. Incluye tablas de flujos de gastos, costos, inversiones e ingresos proyectados por semestre para evaluar la rentabilidad esperada de las oportunidades identificadas y su duración.
Este documento detalla los costos horarios de alquiler de equipos mecánicos. Explica los costos de adquisición del equipo como el valor de la unidad, impuestos de importación, y mantenimiento. También cubre los costos operativos como combustible, lubricantes, neumáticos y mantenimiento. Finalmente, calcula el costo horario total de alquiler agregando los costos de posesión y operación más ajustes.
El Sistema Nacional de Inversión Pública (SNIP) establece que todo Proyecto de Inversión Pública (PIP) debe seguir el Ciclo del Proyecto que comprende las fases de Preinversión, Inversión y Postinversión. El SNIP ha sido descentralizado y ahora los sectores, gobiernos regionales y locales pueden declarar la viabilidad de los proyectos de su competencia, mientras que el Ministerio de Economía y Finanzas evalúa los proyectos con endeudamiento o garantía estatal. El SNIP no es una instit
Este documento identifica los principales riesgos en diferentes áreas de conocimiento (alcance, tiempo, costos, calidad, finanzas, seguridad y medio ambiente) que pueden surgir durante las distintas fases de un proyecto (concepción, definición, ejecución, ventas, saneado legal y cierre). Los riesgos de alcance, tiempo, costos, finanzas y seguridad son más comunes en las primeras fases de concepción y definición del proyecto, mientras que los riesgos en todas las áreas
El documento solicita varios tipos de información y documentación requerida para una obra, incluyendo copias de contratos, presupuestos, programaciones, cronogramas, planes de trabajo, seguridad y salud ocupacional, así como información y documentos relacionados con el personal, equipos, valorizaciones, pagos y avances de la obra.
1. CONTROL / REGISTRO DE CAMBIOS Y MODIFICACIONES
OBRA:
Actualizado al: 03/06/2012
FECHA DE
ID DIA - FECHA CODIGO MODIFICACION / CAMBIO / ADICIONAL OBJETIVO DEL CAMBIO SOLICITANTE ESTADO
APROBACION
01 SAB - 21/04/2012
02 DOM - 22/04/2012
03 LUN - 23/04/2012
04 MAR - 24/04/2012
05 MIE - 25/04/2012
06 JUE - 26/04/2012
07 VIE - 27/04/2012
08 SAB - 28/04/2012
09 DOM - 29/04/2012
10 LUN - 30/04/2012
11 MAR - 01/05/2012
12 MIE - 02/05/2012
13 JUE - 03/05/2012
14 VIE - 04/05/2012
15 SAB - 05/05/2012
16 DOM - 06/05/2012
17 LUN - 07/05/2012
18 MAR - 08/05/2012
19 MIE - 09/05/2012
20 JUE - 10/05/2012
21 VIE - 11/05/2012
22 SAB - 12/05/2012
-