Martin Smith and Andrew Marshall – ABB UK

    Help your CFO make more timely decisions
    and sharpen your company‘s competitive edge


© ABB Group
October 25, 2010 | Slide 1
Agenda

                             Brief overview of ABB
                             ABB UK SAP Transition experience
                                ERP Landscape
                                Implementation process overview
                                Challenges
                                Tangible benefits
                             What does this mean for the CFO?
                             Critical success factors
                             What would we do differently?
                             Single item generating most improvement




© ABB Group
October 25, 2010 | Slide 2
Power and productivity for a better world
ABB’s vision




                             As one of the world’s leading engineering companies, we
                             help our customers to use electrical power efficiently, to
                             increase industrial productivity and to lower environmental
                             impact in a sustainable way.

                                                    www.abb.com


© ABB Group
October 25, 2010 | Slide 3
Introduction
                         Martin Smith
                             FI/CO System Architect, ABB UK
                             4 years with ABB
                                SAP Project Responsible for:
                                    Roles and Authorisations,
                                    SOX,
                                    UAT


                         Andrew Marshall
                             General Manager, Shared Accounting Services, ABB UK
                             14 years with ABB
                                SAP Project Responsible for
                                    Single sets of Master Data
                                    Compliant and reconciled transition of legacy financials
                                    Member of “One Simple ABB” concept team
© ABB Group
October 25, 2010 | Slide 4
Power and automation are all around us
You will find ABB technology…

                             orbiting the earth and working beneath it,



                             crossing oceans and on the sea bed,



                             in the fields that grow our crops and packing
                             the food we eat,


                             on the trains we ride and in the facilities that
                             process our water,


                             in the plants that generate our power and in our
                             homes, offices and factories

© ABB Group
October 25, 2010 | Slide 5
ABB UK and Ireland Overview


                             Part of ABB Group
                                  >$32Bn Revenues
                                 100 countries / 117,000 employees

                             12 main locations across the
                             UK and Ireland
                             >5,000 Customers
                             2,200 employees
                             £650m revenue in 2009
                             Over 5,000 customers
                             Head offices: Daresbury and Dublin
                             Currently 2 shared service centres
                                 Moving to 1 centre from Jan 2011

                             SAP in UK
                             BaaN in IE (current transition to SAP)

© ABB Group
October 25, 2010 | Slide 6
Some ABB Customers




© ABB Group
October 25, 2010 | Slide 7
ABB UK SAP Transition Experience


© ABB Group
October 25, 2010 | Slide 8
UK ERP Landscape – 2006

                                2006                     Supported   Age            Issues
                               LP PA       DM   PS    PP  Revs % of System
                  Oracle                                   32%     10 Yrs     Totally unsupported
                  Vax                Mfg                   10%     26 Yrs     Bespoke (1 expert)
                  JD Edwards                                7%     10 Yrs     Old AS400
                  Agresso                                   8%      7 Yrs
                  Sanderson    Mfg                          5%      4 Yrs     Unstable
                  Baan                                     32%      8 Yrs     Old Version (4c4)
                  Vixen                                     5%     16 Yrs     Limited support


                                                     One Simple ABB Project

                                2008                        Revs %
                               LP PA       DM   PS    PP
                  SAP                                        100%




© ABB Group
October 25, 2010 | Slide 9
GB ERP and F&A – Pre SAP
                              Finance          Operations                  HR    Payroll

                                ABACUS
                                 Credica
                                             AMF
                                                   Open Uptime

                                                   Comp SCOT
                                                    Agresso               G     Ceridian
                                                                        IN
                                           Vixen                      NT PWA    Payrite
                                                                    OU
                                                             A CC
                                        Sanderson                       Excel    Ernie
                                                        ET
                                                      HE
                                Open Accs           DSVax              Oracle   Ceridian
                                               EA
                                           SPR    Oracle                        Ceridian
                                         L
                                      CE Edwards                        Excel   Ceridian
                                    EX JD
© ABB Group
                                            Baan                        PWA     Ceridian
October 25, 2010 | Slide 10
GB ERP and F&A – To be
                              Finance       Operations   HR   Payroll

                                 ABACUS
                                  Credica
                                 BASWARE


                                             Comp SCOT




                                            MySAP             Ceridian



© ABB Group
October 25, 2010 | Slide 11
Implementation Process Overview

                         NOT Finance or IS lead project
                              Designed as business-wide project
                                 Each business was stakeholder – full engagement
                              UK Management team (board) = STECO
                         Defined and dedicated team for UK
                              Plus business support teams
                                 1:1 relationships with SAP consultants
                                    Module by module
                         Ring-fenced project – entirely divorced from day to day operations
                         Series of “gates” and checkpoints at critical phases
                         Phased (separate business “types”) implementation over 9 months

© ABB Group
October 25, 2010 | Slide 12
Implementation Process Overview

                         This approach enabled
                              Business buy-in
                              Senior management involvement (STECO) gave project priority /
                              gravitas it needed to succeed
                              SAP project as a “single function” (separate accounting/separate
                              management) enabled critical FOCUS
                              Modular approach gave full, in depth understanding of each
                              element at a module level
                         Downsides to this approach
                              Team pulled in different directions by own businesses
                                 Inevitably added time to project
                              Modular focus reduced overview – increased “Silo” mentality
                                 Made dependencies less visible
© ABB Group
October 25, 2010 | Slide 13
Challenges

                              Breaking the spreadsheet culture
                                Building confidence in the SAP numbers
                                   Despite the CFO having confidence, we probably spent
                                   the first 6 months after go live “proving” to businesses that
                                   the information in SAP was correct
                              Reducing the number of journals
                                We found that our Business Controllers were having to
                                complete/correct the actions (or lack of them !) of the
                                business
                                   The wider business had to learn that our SAP isn’t just a
                                   finance system
                                Accounting during the month, not just at month end, in
                                particular dealing with Results Analysis & Settlement errors

© ABB Group
October 25, 2010 | Slide 14
Tangible Benefits

                         Single ERP system (from 7 disparate)
                         Significant improvement in availability, completeness and accuracy of first run
                         numbers
                              Final reporting maintained at 5 days (group requirement) but…
                                 Quality vastly improved
                                 Availability of numbers much sooner
                                 Belief in numbers significantly greater
                                 Analysis/reconciliation time more available
                                 Now believe 3 day reporting is a real possibility when required
                         Reduced costs
                              Shared Accounting Services 50% size of pre-SAP
                              50% reduction in Overdues
                              Better visibility of debt, improved debtor reporting etc

© ABB Group
October 25, 2010 | Slide 15
Tangible Benefits

              Purchase order compliance
                        Vastly improved and standardised supply chain process
                              Helped increase PO coverage from about 50% (records difficult to obtain!!!)
                                 To 100% compliant under SAP (fully measurable!)
                        Vast improvement in Matching rates
                              From about <20% (records difficult to obtain !!!)
                                 To 65% and growing
                        Faster payment – now above industry average at 86% - 90% paid to terms
              Reduced SOX controls from 800 to 300
                        Standardised
                        More easily defined, operated and tested
                              lower cost


© ABB Group
October 25, 2010 | Slide 16
What does this mean for the CFO

                                    PRE SAP                   POST SAP
                              Multiple communications   One communication
                              from various sources      source directly from SAP


                              Significant effort to     One version of the truth
                              achieve degree of
                              confidence in numbers

                                                        Flash result achievable
                              Delayed finalisation of
                                                        sooner direct from SAP
                              numbers

                                                        More time for CFO to
                              CFO forced to perform
                                                        review and analyse –
                              extra activity
                                                        instead of creating


© ABB Group
October 25, 2010 | Slide 17
Critical Success Factors




                              Business led approach

                              Dedicated team

                              We did not aim to “Save the World”

                              Being flexible to change approaches as SAP mist lifted




© ABB Group
October 25, 2010 | Slide 18
What would we do differently?

                 Despite vast improvements (eg)
                              Quicker, more visible, greater accuracy, consistency, reduced cost,
                              more credible etc …


                              …the knowledge that we have gleaned whilst using SAP has
                              prompted us to question why we did not “do more” (eg):
                                 (Ironically) Better reporting
                                    Order to Cash / Procure to Pay cycles well catered for
                                 Further standardisation through more restricted practices
                                 Less scope creep allowed during project




© ABB Group
October 25, 2010 | Slide 19
Single item generating most improvement



                         Steering Committee being represented by UK Board
                              Committed
                              Informed
                              Strong
                              Supportive




© ABB Group
October 25, 2010 | Slide 20
SAP Project in Summary


                              Providing
                              Right
                              Information
                              Delivering
                              Excellence
© ABB Group
October 25, 2010 | Slide 21
© ABB Group
October 25, 2010 | Slide 22
Effective reporting in SAP: Help your CFO make more timely decisions and sharpen your company’s competitive edge

Más contenido relacionado

La actualidad más candente

Overview Sap Outsourcing Services En 2012
Overview Sap Outsourcing Services En  2012Overview Sap Outsourcing Services En  2012
Overview Sap Outsourcing Services En 2012
Roman_Peresypkin
 
direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview
direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview  direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview
direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview
finance15
 
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Vedanta Barooah
 

La actualidad más candente (7)

Overview Sap Outsourcing Services En 2012
Overview Sap Outsourcing Services En  2012Overview Sap Outsourcing Services En  2012
Overview Sap Outsourcing Services En 2012
 
Cloud Foundry bootcamp at ContributingCode
Cloud Foundry bootcamp at ContributingCodeCloud Foundry bootcamp at ContributingCode
Cloud Foundry bootcamp at ContributingCode
 
Lessons in Enterprise Architecture and IT Service Management by Charles Betz,...
Lessons in Enterprise Architecture and IT Service Management by Charles Betz,...Lessons in Enterprise Architecture and IT Service Management by Charles Betz,...
Lessons in Enterprise Architecture and IT Service Management by Charles Betz,...
 
Operationalizing HPM - The Value of Integrated Data Management
Operationalizing HPM - The Value of Integrated Data ManagementOperationalizing HPM - The Value of Integrated Data Management
Operationalizing HPM - The Value of Integrated Data Management
 
Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply Chain
 
direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview
direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview  direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview
direc tv group The DIRECTV Group, Inc. at Merrill Lynch Media Fall Preview
 
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
 

Destacado

Akant SAP ABAP Technical Architect
Akant SAP  ABAP Technical ArchitectAkant SAP  ABAP Technical Architect
Akant SAP ABAP Technical Architect
Akant Tewari
 
54145899 sap-sd-int-tips
54145899 sap-sd-int-tips54145899 sap-sd-int-tips
54145899 sap-sd-int-tips
Nitesh Mahajan
 

Destacado (13)

8706 lng-brochure
8706 lng-brochure8706 lng-brochure
8706 lng-brochure
 
The Superstar CFO: Optimizing an Increasingly Complex Role
The Superstar CFO: Optimizing an Increasingly Complex RoleThe Superstar CFO: Optimizing an Increasingly Complex Role
The Superstar CFO: Optimizing an Increasingly Complex Role
 
Rosangela II
Rosangela IIRosangela II
Rosangela II
 
Abb
AbbAbb
Abb
 
ABB case study - 2008/9 - MSc in Business Administration (Belgium)
ABB case study - 2008/9 - MSc in Business Administration (Belgium)ABB case study - 2008/9 - MSc in Business Administration (Belgium)
ABB case study - 2008/9 - MSc in Business Administration (Belgium)
 
SAP ABAP Resume
SAP ABAP ResumeSAP ABAP Resume
SAP ABAP Resume
 
Final2 abb group_presentation2013_en
Final2 abb group_presentation2013_enFinal2 abb group_presentation2013_en
Final2 abb group_presentation2013_en
 
Akant SAP ABAP Technical Architect
Akant SAP  ABAP Technical ArchitectAkant SAP  ABAP Technical Architect
Akant SAP ABAP Technical Architect
 
54145899 sap-sd-int-tips
54145899 sap-sd-int-tips54145899 sap-sd-int-tips
54145899 sap-sd-int-tips
 
Abap reports
Abap reportsAbap reports
Abap reports
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 
Case study abb mission and vision
Case study abb mission and visionCase study abb mission and vision
Case study abb mission and vision
 
Abb
AbbAbb
Abb
 

Similar a Effective reporting in SAP: Help your CFO make more timely decisions and sharpen your company’s competitive edge

Green growth and network quality in a high-growth market - Martin Backstrom -...
Green growth and network quality in a high-growth market - Martin Backstrom -...Green growth and network quality in a high-growth market - Martin Backstrom -...
Green growth and network quality in a high-growth market - Martin Backstrom -...
Ericsson France
 
Ozone profile general presentation 1
Ozone profile general presentation 1Ozone profile general presentation 1
Ozone profile general presentation 1
Natalliamaroz
 
Areva t&d india ltd.pdf (ankush1)
Areva t&d india ltd.pdf (ankush1)Areva t&d india ltd.pdf (ankush1)
Areva t&d india ltd.pdf (ankush1)
Abhimanu Mahajan
 

Similar a Effective reporting in SAP: Help your CFO make more timely decisions and sharpen your company’s competitive edge (20)

Cisco Case Study Reverse Logistics Transformation (Interlog)
Cisco Case Study   Reverse Logistics Transformation (Interlog)Cisco Case Study   Reverse Logistics Transformation (Interlog)
Cisco Case Study Reverse Logistics Transformation (Interlog)
 
S3 Group: Custom Mixed SIgnal SoCs
S3 Group: Custom Mixed SIgnal SoCsS3 Group: Custom Mixed SIgnal SoCs
S3 Group: Custom Mixed SIgnal SoCs
 
Practical innovation
Practical innovationPractical innovation
Practical innovation
 
Green growth and network quality in a high-growth market - Martin Backstrom -...
Green growth and network quality in a high-growth market - Martin Backstrom -...Green growth and network quality in a high-growth market - Martin Backstrom -...
Green growth and network quality in a high-growth market - Martin Backstrom -...
 
Atti della Conferenza GENERAZIONE EOLICA “PULITA”: aspetti meccatronici/azion...
Atti della Conferenza GENERAZIONE EOLICA “PULITA”: aspetti meccatronici/azion...Atti della Conferenza GENERAZIONE EOLICA “PULITA”: aspetti meccatronici/azion...
Atti della Conferenza GENERAZIONE EOLICA “PULITA”: aspetti meccatronici/azion...
 
AWS Partner Presentation - Riverbed
AWS Partner Presentation - RiverbedAWS Partner Presentation - Riverbed
AWS Partner Presentation - Riverbed
 
Using Lean to Create Global Competiveness!
Using Lean to Create Global Competiveness!Using Lean to Create Global Competiveness!
Using Lean to Create Global Competiveness!
 
Shared Services Talent Management - Slash your recruitment bill by retaining ...
Shared Services Talent Management - Slash your recruitment bill by retaining ...Shared Services Talent Management - Slash your recruitment bill by retaining ...
Shared Services Talent Management - Slash your recruitment bill by retaining ...
 
Avnet Analyst Day 2010 Presentation 2 Path to Premier
Avnet Analyst Day 2010 Presentation 2 Path to PremierAvnet Analyst Day 2010 Presentation 2 Path to Premier
Avnet Analyst Day 2010 Presentation 2 Path to Premier
 
ABB CONTACT INDIA Issue 1/12
ABB CONTACT INDIA Issue 1/12ABB CONTACT INDIA Issue 1/12
ABB CONTACT INDIA Issue 1/12
 
Trainingportal #hms2013 aibel - ansetter 2000 personer på kort tid - hvorda...
Trainingportal #hms2013   aibel - ansetter 2000 personer på kort tid - hvorda...Trainingportal #hms2013   aibel - ansetter 2000 personer på kort tid - hvorda...
Trainingportal #hms2013 aibel - ansetter 2000 personer på kort tid - hvorda...
 
SAP BI-A
SAP BI-ASAP BI-A
SAP BI-A
 
RhiZone Energy Solutions
RhiZone Energy SolutionsRhiZone Energy Solutions
RhiZone Energy Solutions
 
BlogWell 20June2011 Mark Yolton @ SAP
BlogWell 20June2011 Mark Yolton @ SAPBlogWell 20June2011 Mark Yolton @ SAP
BlogWell 20June2011 Mark Yolton @ SAP
 
BlogWell San Francisco Social Media Case Study: SAP, presented by Mark Yolton
BlogWell San Francisco Social Media Case Study: SAP, presented by Mark YoltonBlogWell San Francisco Social Media Case Study: SAP, presented by Mark Yolton
BlogWell San Francisco Social Media Case Study: SAP, presented by Mark Yolton
 
”Why EDB Went Global”, Tom Scharning, Executive Vice President EDB Consulting...
”Why EDB Went Global”, Tom Scharning, Executive Vice President EDB Consulting...”Why EDB Went Global”, Tom Scharning, Executive Vice President EDB Consulting...
”Why EDB Went Global”, Tom Scharning, Executive Vice President EDB Consulting...
 
BlogWell San Francisco Case Study: SAP, presented by Mark Yolton
BlogWell San Francisco Case Study: SAP, presented by Mark YoltonBlogWell San Francisco Case Study: SAP, presented by Mark Yolton
BlogWell San Francisco Case Study: SAP, presented by Mark Yolton
 
Dynamics Day '11 - NAV case study Sealord
Dynamics Day '11 - NAV case study SealordDynamics Day '11 - NAV case study Sealord
Dynamics Day '11 - NAV case study Sealord
 
Ozone profile general presentation 1
Ozone profile general presentation 1Ozone profile general presentation 1
Ozone profile general presentation 1
 
Areva t&d india ltd.pdf (ankush1)
Areva t&d india ltd.pdf (ankush1)Areva t&d india ltd.pdf (ankush1)
Areva t&d india ltd.pdf (ankush1)
 

Más de sharedserviceslink.com

Más de sharedserviceslink.com (20)

Does simultaneous outsourcing of all your purchase-to-pay processes and achie...
Does simultaneous outsourcing of all your purchase-to-pay processes and achie...Does simultaneous outsourcing of all your purchase-to-pay processes and achie...
Does simultaneous outsourcing of all your purchase-to-pay processes and achie...
 
Business cases are not a dark art: the science behind the numbers
Business cases are not a dark art: the science behind the numbersBusiness cases are not a dark art: the science behind the numbers
Business cases are not a dark art: the science behind the numbers
 
Are P-cards the answer to making payments easy? What about losing control? An...
Are P-cards the answer to making payments easy? What about losing control? An...Are P-cards the answer to making payments easy? What about losing control? An...
Are P-cards the answer to making payments easy? What about losing control? An...
 
Don’t like risk? Stop gambling in your accounts payable and start to take sys...
Don’t like risk? Stop gambling in your accounts payable and start to take sys...Don’t like risk? Stop gambling in your accounts payable and start to take sys...
Don’t like risk? Stop gambling in your accounts payable and start to take sys...
 
Exceptions are inevitable. But does your struggle against them have to be?
Exceptions are inevitable. But does your struggle against them have to be?Exceptions are inevitable. But does your struggle against them have to be?
Exceptions are inevitable. But does your struggle against them have to be?
 
Still have procurement outside shared services? Ever ask yourself why?
Still have procurement outside shared services? Ever ask yourself why?Still have procurement outside shared services? Ever ask yourself why?
Still have procurement outside shared services? Ever ask yourself why?
 
Touching your invoices? You don’t need to. 14 'how to’s' to touchless processing
Touching your invoices? You don’t need to. 14 'how to’s' to touchless processingTouching your invoices? You don’t need to. 14 'how to’s' to touchless processing
Touching your invoices? You don’t need to. 14 'how to’s' to touchless processing
 
The power that comes from linking departments
The power that comes from linking departmentsThe power that comes from linking departments
The power that comes from linking departments
 
T&E – total control across your organization
T&E – total control across your organizationT&E – total control across your organization
T&E – total control across your organization
 
Process improvement without technology investments?
Process improvement without technology investments?Process improvement without technology investments?
Process improvement without technology investments?
 
Supply chain finance models Part 1: bank-agnostic models, bank-funded and man...
Supply chain finance models Part 1: bank-agnostic models, bank-funded and man...Supply chain finance models Part 1: bank-agnostic models, bank-funded and man...
Supply chain finance models Part 1: bank-agnostic models, bank-funded and man...
 
Governing your realm to ensure your customers are consistently delighted with...
Governing your realm to ensure your customers are consistently delighted with...Governing your realm to ensure your customers are consistently delighted with...
Governing your realm to ensure your customers are consistently delighted with...
 
Why move your SSC to a high-cost location?
Why move your SSC to a high-cost location?Why move your SSC to a high-cost location?
Why move your SSC to a high-cost location?
 
Nokia’s procurement shared services story and its ‘3C formula’ for success
Nokia’s procurement shared services story and its ‘3C formula’ for successNokia’s procurement shared services story and its ‘3C formula’ for success
Nokia’s procurement shared services story and its ‘3C formula’ for success
 
Petra williams final
Petra williams finalPetra williams final
Petra williams final
 
How to improve your supplier relationships while lowering invoice handling costs
How to improve your supplier relationships while lowering invoice handling costsHow to improve your supplier relationships while lowering invoice handling costs
How to improve your supplier relationships while lowering invoice handling costs
 
Smoothly passing the baton from captive to outsourced service delivery in jus...
Smoothly passing the baton from captive to outsourced service delivery in jus...Smoothly passing the baton from captive to outsourced service delivery in jus...
Smoothly passing the baton from captive to outsourced service delivery in jus...
 
How can you make process improvements easier to realise?
How can you make process improvements easier to realise?How can you make process improvements easier to realise?
How can you make process improvements easier to realise?
 
The 9 big issues of shared services and outsourcing: research insights from ACCA
The 9 big issues of shared services and outsourcing: research insights from ACCAThe 9 big issues of shared services and outsourcing: research insights from ACCA
The 9 big issues of shared services and outsourcing: research insights from ACCA
 
The seven culture traits to take you to a customer-focused shared services op...
The seven culture traits to take you to a customer-focused shared services op...The seven culture traits to take you to a customer-focused shared services op...
The seven culture traits to take you to a customer-focused shared services op...
 

Último

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

Effective reporting in SAP: Help your CFO make more timely decisions and sharpen your company’s competitive edge

  • 1. Martin Smith and Andrew Marshall – ABB UK Help your CFO make more timely decisions and sharpen your company‘s competitive edge © ABB Group October 25, 2010 | Slide 1
  • 2. Agenda Brief overview of ABB ABB UK SAP Transition experience ERP Landscape Implementation process overview Challenges Tangible benefits What does this mean for the CFO? Critical success factors What would we do differently? Single item generating most improvement © ABB Group October 25, 2010 | Slide 2
  • 3. Power and productivity for a better world ABB’s vision As one of the world’s leading engineering companies, we help our customers to use electrical power efficiently, to increase industrial productivity and to lower environmental impact in a sustainable way. www.abb.com © ABB Group October 25, 2010 | Slide 3
  • 4. Introduction Martin Smith FI/CO System Architect, ABB UK 4 years with ABB SAP Project Responsible for: Roles and Authorisations, SOX, UAT Andrew Marshall General Manager, Shared Accounting Services, ABB UK 14 years with ABB SAP Project Responsible for Single sets of Master Data Compliant and reconciled transition of legacy financials Member of “One Simple ABB” concept team © ABB Group October 25, 2010 | Slide 4
  • 5. Power and automation are all around us You will find ABB technology… orbiting the earth and working beneath it, crossing oceans and on the sea bed, in the fields that grow our crops and packing the food we eat, on the trains we ride and in the facilities that process our water, in the plants that generate our power and in our homes, offices and factories © ABB Group October 25, 2010 | Slide 5
  • 6. ABB UK and Ireland Overview Part of ABB Group >$32Bn Revenues 100 countries / 117,000 employees 12 main locations across the UK and Ireland >5,000 Customers 2,200 employees £650m revenue in 2009 Over 5,000 customers Head offices: Daresbury and Dublin Currently 2 shared service centres Moving to 1 centre from Jan 2011 SAP in UK BaaN in IE (current transition to SAP) © ABB Group October 25, 2010 | Slide 6
  • 7. Some ABB Customers © ABB Group October 25, 2010 | Slide 7
  • 8. ABB UK SAP Transition Experience © ABB Group October 25, 2010 | Slide 8
  • 9. UK ERP Landscape – 2006 2006 Supported Age Issues LP PA DM PS PP Revs % of System Oracle 32% 10 Yrs Totally unsupported Vax Mfg 10% 26 Yrs Bespoke (1 expert) JD Edwards 7% 10 Yrs Old AS400 Agresso 8% 7 Yrs Sanderson Mfg 5% 4 Yrs Unstable Baan 32% 8 Yrs Old Version (4c4) Vixen 5% 16 Yrs Limited support One Simple ABB Project 2008 Revs % LP PA DM PS PP SAP 100% © ABB Group October 25, 2010 | Slide 9
  • 10. GB ERP and F&A – Pre SAP Finance Operations HR Payroll ABACUS Credica AMF Open Uptime Comp SCOT Agresso G Ceridian IN Vixen NT PWA Payrite OU A CC Sanderson Excel Ernie ET HE Open Accs DSVax Oracle Ceridian EA SPR Oracle Ceridian L CE Edwards Excel Ceridian EX JD © ABB Group Baan PWA Ceridian October 25, 2010 | Slide 10
  • 11. GB ERP and F&A – To be Finance Operations HR Payroll ABACUS Credica BASWARE Comp SCOT MySAP Ceridian © ABB Group October 25, 2010 | Slide 11
  • 12. Implementation Process Overview NOT Finance or IS lead project Designed as business-wide project Each business was stakeholder – full engagement UK Management team (board) = STECO Defined and dedicated team for UK Plus business support teams 1:1 relationships with SAP consultants Module by module Ring-fenced project – entirely divorced from day to day operations Series of “gates” and checkpoints at critical phases Phased (separate business “types”) implementation over 9 months © ABB Group October 25, 2010 | Slide 12
  • 13. Implementation Process Overview This approach enabled Business buy-in Senior management involvement (STECO) gave project priority / gravitas it needed to succeed SAP project as a “single function” (separate accounting/separate management) enabled critical FOCUS Modular approach gave full, in depth understanding of each element at a module level Downsides to this approach Team pulled in different directions by own businesses Inevitably added time to project Modular focus reduced overview – increased “Silo” mentality Made dependencies less visible © ABB Group October 25, 2010 | Slide 13
  • 14. Challenges Breaking the spreadsheet culture Building confidence in the SAP numbers Despite the CFO having confidence, we probably spent the first 6 months after go live “proving” to businesses that the information in SAP was correct Reducing the number of journals We found that our Business Controllers were having to complete/correct the actions (or lack of them !) of the business The wider business had to learn that our SAP isn’t just a finance system Accounting during the month, not just at month end, in particular dealing with Results Analysis & Settlement errors © ABB Group October 25, 2010 | Slide 14
  • 15. Tangible Benefits Single ERP system (from 7 disparate) Significant improvement in availability, completeness and accuracy of first run numbers Final reporting maintained at 5 days (group requirement) but… Quality vastly improved Availability of numbers much sooner Belief in numbers significantly greater Analysis/reconciliation time more available Now believe 3 day reporting is a real possibility when required Reduced costs Shared Accounting Services 50% size of pre-SAP 50% reduction in Overdues Better visibility of debt, improved debtor reporting etc © ABB Group October 25, 2010 | Slide 15
  • 16. Tangible Benefits Purchase order compliance Vastly improved and standardised supply chain process Helped increase PO coverage from about 50% (records difficult to obtain!!!) To 100% compliant under SAP (fully measurable!) Vast improvement in Matching rates From about <20% (records difficult to obtain !!!) To 65% and growing Faster payment – now above industry average at 86% - 90% paid to terms Reduced SOX controls from 800 to 300 Standardised More easily defined, operated and tested lower cost © ABB Group October 25, 2010 | Slide 16
  • 17. What does this mean for the CFO PRE SAP POST SAP Multiple communications One communication from various sources source directly from SAP Significant effort to One version of the truth achieve degree of confidence in numbers Flash result achievable Delayed finalisation of sooner direct from SAP numbers More time for CFO to CFO forced to perform review and analyse – extra activity instead of creating © ABB Group October 25, 2010 | Slide 17
  • 18. Critical Success Factors Business led approach Dedicated team We did not aim to “Save the World” Being flexible to change approaches as SAP mist lifted © ABB Group October 25, 2010 | Slide 18
  • 19. What would we do differently? Despite vast improvements (eg) Quicker, more visible, greater accuracy, consistency, reduced cost, more credible etc … …the knowledge that we have gleaned whilst using SAP has prompted us to question why we did not “do more” (eg): (Ironically) Better reporting Order to Cash / Procure to Pay cycles well catered for Further standardisation through more restricted practices Less scope creep allowed during project © ABB Group October 25, 2010 | Slide 19
  • 20. Single item generating most improvement Steering Committee being represented by UK Board Committed Informed Strong Supportive © ABB Group October 25, 2010 | Slide 20
  • 21. SAP Project in Summary Providing Right Information Delivering Excellence © ABB Group October 25, 2010 | Slide 21
  • 22. © ABB Group October 25, 2010 | Slide 22