SlideShare una empresa de Scribd logo
1 de 48
Descargar para leer sin conexión
Ishikawa-Diagram
Structure
Kaoru Ishikawa
basic concept
aim
theoretical conversion
practical example
exercise
Kaoru Ishikawa
(1915 - 1989)
• born in Tokio 1915
• graduated University of Tokyo in 1939 with an
Engineering degree in applied chemistry
• worked as a naval technical officer until 1941
• worked for Nissan Liquid Fuel Company
• associate professor at the University of Tokyo in 1947
• famous person in Qualitymanagement
• not only product quality
• but also e.g. quality of Management and assistant
• developed several quality-tools
• One of these tools is the Ishikawa-Diagram
(also called Fishbone- or cause and effect diagram)
basic concept
The Idea:
think about possible causes and reasons leading to
an effect or a problem
find solution for preventing those problems
basic concept
• one problem/effect
• 7 causes lead to the problem/effect
• the causes are divided into main- and sidecauses
The 7 causes are:
1. Methods
2. Machinery
3. Management
4. Materials
5. Manpower
6. Environment
7. Measurement
basic concept
individual problem/effect needs individual factors
basic concept
individual problem/effect needs individual factors
not all 7 factors are needed in the diagram
basic concept
individual problem/effect needs individual factors
not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine
Branch of administration: Management, Environment
basic concept
individual problem/effect needs individual factors
not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine
Branch of administration: Management, Environment
e.g. Methods, Machinery, Management, Materials, Manpower
basic concept
individual problem/effect needs individual factors
not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine
Branch of administration: Management, Environment
e.g. Methods, Machinery, Management, Materials, Manpower
5 M‘s
basic concept
individual problem/effect needs individual factors
not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine
Branch of administration: Management, Environment
e.g. Methods, Machinery, Management, Materials, Manpower
5 M‘s
4P (Place, Procedures, People, Policies )
4S (Surroundings, Suppliers, Systems, Skills)
basic concept
aim
• find the causes, main- and sidecauses
• clarity
• interdependence of the causes
• improve them for having the wanted effect
or eliminate them for solving the problem
theoretical conversion
1. sketch the diagram and inscript the needed causes
theoretical conversion
1. sketch the diagram and inscript the needed causes
2. work the main- and sidecauses out
theoretical conversion
1. sketch the diagram and inscript the needed causes
2. work the main- and sidecauses out
3. check the completeness
theoretical conversion
1. sketch the diagram and inscript the needed causes
2. work the main- and sidecauses out
3. check the completeness
4. weight the the main- & sidecauses in terms of meaning & influence
theoretical conversion
1. sketch the diagram and inscript the needed causes
2. work the main- and sidecauses out
3. check the completeness
4. weight the the main- & sidecauses in terms of meaning & influence
5. check the selected causes for rightness
theoretical conversion
1. sketch the diagram and inscript the needed causes
2. work the main- and sidecauses out
3. check the completeness
4. weight the the main- & sidecauses in terms of meaning & influence
5. check the selected causes for rightness
6. The team discusses about the solution
theoretical conversion
6. The team discusses about the solution
• causes that can be improved or eliminated easily will be finished
first of all (no need to be weighted)
• The weighted causes are in a list of priority and will be finished in
turn
theoretical conversion
It‘s important
theoretical conversion
It‘s important
that the team has skilled workers involved in discussion
theoretical conversion
It‘s important
that the team has skilled workers involved in discussion
e.g. supplier, clients etc
practical example
rise in productivity
practical example
1. sketch the diagram and inscript the needed causes
practical example
1. sketch the diagram and inscript the needed causes
practical example
1. sketch the diagram and inscript the needed causes
rise in productivity
practical example
1. sketch the diagram and inscript the needed causes
rise in productivity
Enviroment
practical example
1. sketch the diagram and inscript the needed causes
rise in productivity
ManpowerEnviroment
practical example
1. sketch the diagram and inscript the needed causes
rise in productivity
ManpowerEnviroment
Machine
practical example
1. sketch the diagram and inscript the needed causes
rise in productivity
ManpowerEnviroment
Machine Materials
practical example
1. sketch the diagram and inscript the needed causes
rise in productivity
ManpowerEnviroment
Machine Materials Methods
practical example
2. work the main- and sidecauses out
rise in productivity
ManpowerEnviroment
Machine Materials Methods
practical example
2. work the main- and sidecauses out
rise in productivity
ManpowerEnviroment
Machine Materials Methods
Noise
Temperature
practical example
2. work the main- and sidecauses out
rise in productivity
ManpowerEnviroment
Machine Materials Methods
Noise
Temperature
Education
Motivation
w
age
practical example
2. work the main- and sidecauses out
rise in productivity
ManpowerEnviroment
Machine Materials Methods
Noise
Temperature
Education
Motivation
w
age
Software
Hardware
practical example
2. work the main- and sidecauses out
rise in productivity
ManpowerEnviroment
Machine Materials Methods
Noise
Temperature
Education
Motivation
w
age
Software
Hardware
Procurement
practical example
2. work the main- and sidecauses out
rise in productivity
ManpowerEnviroment
Machine Materials Methods
Noise
Temperature
Education
Motivation
w
age
Software
Hardware
Procurement
Standardisation
Lean Management
CIP
practical example
3. check the completeness
rise in productivity
ManpowerEnviroment
Machine Materials Methods
Noise
Temperature
Education
Motivation
w
age
Software
Hardware
Procurement
Standardisation
Lean Management
CIP
practical example
4. weight the the main- & sidecauses in terms of meaning & influence
• Lean Management
• Standardisation
• Motivation
• Education
•…
practical example
5. check the selected causes for rightness
• Lean Management
• Standardisation
• Motivation
• Education
•…
practical example
6. The team discusses about the solution
causes that can be improved or eliminated easily:
• Hardware
• Software
• Temperature
• Noise
practical example
6. The team discusses about the solution
weighted causes
• Lean Management
• Standardisation
• Motivation
• Education
exercise
excessive drop of paper
Henner Graubitz
October 23rd 2006
exercise
1. sketch the diagram and inscript the needed causes
2. work the main- and sidecauses out
3. check the completeness
4. weight the the main- & sidecauses in terms of meaning & influence
5. check the selected causes for rightness
6. The team discusses about the solution
exercise
solution
excessive drop of
paper
Manpower Machine
Materials Methods
create faulty
documents
faulty feeder of
papers
too heavy
paper
misprints aren‘t
used as paper for
notices
Advantage:
• different opinions by teamwork
• easy to apply
• little effort to practise
• better understanding for causes and
effects
Advantage:
• different opinions by teamwork
• easy to apply
• little effort to practise
• better understanding for causes and
effects
Disadvantage:
• No clarity in very complex problems
• Interactions and chronological
dependence can’t be displayed

Más contenido relacionado

La actualidad más candente

Deming’s PDCA and Constant Learning
Deming’s PDCA and Constant LearningDeming’s PDCA and Constant Learning
Deming’s PDCA and Constant LearningJeanie Arnoco
 
Useful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingUseful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingOperational Excellence Consulting
 
Quality Improvement Methodologies and Tools
Quality Improvement Methodologies and ToolsQuality Improvement Methodologies and Tools
Quality Improvement Methodologies and ToolsDr. Aqeel Ahmed Khan
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aRai University
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycleshobhu
 
Structured Problem Solving
Structured Problem SolvingStructured Problem Solving
Structured Problem Solvingvenkatasirish
 
Integrated Project Delivery - Global Survey Results
Integrated Project Delivery - Global Survey ResultsIntegrated Project Delivery - Global Survey Results
Integrated Project Delivery - Global Survey ResultsCraig Skipsey
 
concept of value engineering-construction industry.
concept of value engineering-construction industry.concept of value engineering-construction industry.
concept of value engineering-construction industry.SJMIT,now NMAMIT NITTE
 
Close the Loop - Simplifying A3 Thinking for Team Retrospectives
Close the Loop - Simplifying A3 Thinking for Team RetrospectivesClose the Loop - Simplifying A3 Thinking for Team Retrospectives
Close the Loop - Simplifying A3 Thinking for Team RetrospectivesCara Turner
 
Value Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptxValue Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptxvirshit
 
Practicing Structured Problem Solving Methodology
Practicing Structured Problem Solving MethodologyPracticing Structured Problem Solving Methodology
Practicing Structured Problem Solving MethodologySarthak Banerjee
 
Week2 value management introduction
Week2 value management introductionWeek2 value management introduction
Week2 value management introductionlogan gracieuse
 
Test Process Improvement
Test Process ImprovementTest Process Improvement
Test Process ImprovementMomentum NI
 
IIE 2008 Minneapolis Conference
IIE 2008 Minneapolis ConferenceIIE 2008 Minneapolis Conference
IIE 2008 Minneapolis ConferenceDidier Rabino, Lbc
 
Basic Qulaity Tools/Techniques Workshop for process improvement
Basic Qulaity Tools/Techniques Workshop for process improvementBasic Qulaity Tools/Techniques Workshop for process improvement
Basic Qulaity Tools/Techniques Workshop for process improvementMouad Hourani
 
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmTheory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmScott Abel
 
White paper: "Human performance improvement"
White paper: "Human performance improvement"White paper: "Human performance improvement"
White paper: "Human performance improvement"APARNA SANAKA
 

La actualidad más candente (20)

4 Of The 7 Problem Solving Tools
4 Of The 7 Problem Solving Tools4 Of The 7 Problem Solving Tools
4 Of The 7 Problem Solving Tools
 
Deming’s PDCA and Constant Learning
Deming’s PDCA and Constant LearningDeming’s PDCA and Constant Learning
Deming’s PDCA and Constant Learning
 
Useful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingUseful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence Consulting
 
Kaizen-Whitepaper
Kaizen-WhitepaperKaizen-Whitepaper
Kaizen-Whitepaper
 
Quality Improvement Methodologies and Tools
Quality Improvement Methodologies and ToolsQuality Improvement Methodologies and Tools
Quality Improvement Methodologies and Tools
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management a
 
CMMI and Agile
CMMI and AgileCMMI and Agile
CMMI and Agile
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycle
 
Structured Problem Solving
Structured Problem SolvingStructured Problem Solving
Structured Problem Solving
 
Integrated Project Delivery - Global Survey Results
Integrated Project Delivery - Global Survey ResultsIntegrated Project Delivery - Global Survey Results
Integrated Project Delivery - Global Survey Results
 
concept of value engineering-construction industry.
concept of value engineering-construction industry.concept of value engineering-construction industry.
concept of value engineering-construction industry.
 
Close the Loop - Simplifying A3 Thinking for Team Retrospectives
Close the Loop - Simplifying A3 Thinking for Team RetrospectivesClose the Loop - Simplifying A3 Thinking for Team Retrospectives
Close the Loop - Simplifying A3 Thinking for Team Retrospectives
 
Value Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptxValue Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptx
 
Practicing Structured Problem Solving Methodology
Practicing Structured Problem Solving MethodologyPracticing Structured Problem Solving Methodology
Practicing Structured Problem Solving Methodology
 
Week2 value management introduction
Week2 value management introductionWeek2 value management introduction
Week2 value management introduction
 
Test Process Improvement
Test Process ImprovementTest Process Improvement
Test Process Improvement
 
IIE 2008 Minneapolis Conference
IIE 2008 Minneapolis ConferenceIIE 2008 Minneapolis Conference
IIE 2008 Minneapolis Conference
 
Basic Qulaity Tools/Techniques Workshop for process improvement
Basic Qulaity Tools/Techniques Workshop for process improvementBasic Qulaity Tools/Techniques Workshop for process improvement
Basic Qulaity Tools/Techniques Workshop for process improvement
 
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmTheory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
 
White paper: "Human performance improvement"
White paper: "Human performance improvement"White paper: "Human performance improvement"
White paper: "Human performance improvement"
 

Destacado

OLD SEVEN TOOLS OF QUALTIY MANAGEMENT
OLD SEVEN TOOLS OF QUALTIY MANAGEMENTOLD SEVEN TOOLS OF QUALTIY MANAGEMENT
OLD SEVEN TOOLS OF QUALTIY MANAGEMENTANNA UNIVERSITY
 
Deber diagrama de ishikawa
Deber diagrama de ishikawaDeber diagrama de ishikawa
Deber diagrama de ishikawaEthetson Pineda
 
Los grandes de la calidad y su legado
Los grandes de la calidad y su legadoLos grandes de la calidad y su legado
Los grandes de la calidad y su legadoJorge Pacheco
 
Incorporating Mindmapping into EFL classrooms
Incorporating Mindmapping into EFL classroomsIncorporating Mindmapping into EFL classrooms
Incorporating Mindmapping into EFL classroomsdoggerwu
 
Mindmap Identity
Mindmap Identity Mindmap Identity
Mindmap Identity Red Rock
 
2014 Golden Globe Awards mindmap by ConceptDraw MindMap
2014 Golden Globe Awards mindmap by ConceptDraw MindMap2014 Golden Globe Awards mindmap by ConceptDraw MindMap
2014 Golden Globe Awards mindmap by ConceptDraw MindMapAnastasia Krylova
 
Launch your online course plan and mindmap
Launch your online course plan and mindmapLaunch your online course plan and mindmap
Launch your online course plan and mindmapCaroline Balinska
 
Men's Health Goals presentation by ConceptDraw MindMap
Men's Health Goals presentation by ConceptDraw MindMapMen's Health Goals presentation by ConceptDraw MindMap
Men's Health Goals presentation by ConceptDraw MindMapAnastasia Krylova
 
Sales Standards Presentation by ConceptDraw MINDMAP
Sales Standards Presentation by ConceptDraw MINDMAPSales Standards Presentation by ConceptDraw MINDMAP
Sales Standards Presentation by ConceptDraw MINDMAPAnastasia Krylova
 
Tania's class - guest lecture
Tania's class - guest lectureTania's class - guest lecture
Tania's class - guest lectureleeannrenninger
 
Melting Pot’s Sleep Solutions Mindmap
Melting Pot’s Sleep Solutions MindmapMelting Pot’s Sleep Solutions Mindmap
Melting Pot’s Sleep Solutions MindmapVanesa Bú
 
Linda Oestreich's Mindmap Your Way to Project Success
Linda Oestreich's Mindmap Your Way to Project SuccessLinda Oestreich's Mindmap Your Way to Project Success
Linda Oestreich's Mindmap Your Way to Project SuccessSTC San Diego
 
Tractor Fish Bone
Tractor  Fish BoneTractor  Fish Bone
Tractor Fish Bonebharrigan
 

Destacado (20)

OLD SEVEN TOOLS OF QUALTIY MANAGEMENT
OLD SEVEN TOOLS OF QUALTIY MANAGEMENTOLD SEVEN TOOLS OF QUALTIY MANAGEMENT
OLD SEVEN TOOLS OF QUALTIY MANAGEMENT
 
Deber diagrama de ishikawa
Deber diagrama de ishikawaDeber diagrama de ishikawa
Deber diagrama de ishikawa
 
Diagrama de ishikawa
Diagrama de ishikawa Diagrama de ishikawa
Diagrama de ishikawa
 
Los grandes de la calidad y su legado
Los grandes de la calidad y su legadoLos grandes de la calidad y su legado
Los grandes de la calidad y su legado
 
Diagrama de ishikawa y árbol de objetivos
Diagrama de ishikawa y árbol de objetivosDiagrama de ishikawa y árbol de objetivos
Diagrama de ishikawa y árbol de objetivos
 
Kaoru Ishikawa
Kaoru IshikawaKaoru Ishikawa
Kaoru Ishikawa
 
Estructura
EstructuraEstructura
Estructura
 
Ishikawa expo
Ishikawa expoIshikawa expo
Ishikawa expo
 
Tqm
TqmTqm
Tqm
 
Incorporating Mindmapping into EFL classrooms
Incorporating Mindmapping into EFL classroomsIncorporating Mindmapping into EFL classrooms
Incorporating Mindmapping into EFL classrooms
 
Mindmap Identity
Mindmap Identity Mindmap Identity
Mindmap Identity
 
Mind mapping
Mind mappingMind mapping
Mind mapping
 
2014 Golden Globe Awards mindmap by ConceptDraw MindMap
2014 Golden Globe Awards mindmap by ConceptDraw MindMap2014 Golden Globe Awards mindmap by ConceptDraw MindMap
2014 Golden Globe Awards mindmap by ConceptDraw MindMap
 
Launch your online course plan and mindmap
Launch your online course plan and mindmapLaunch your online course plan and mindmap
Launch your online course plan and mindmap
 
Men's Health Goals presentation by ConceptDraw MindMap
Men's Health Goals presentation by ConceptDraw MindMapMen's Health Goals presentation by ConceptDraw MindMap
Men's Health Goals presentation by ConceptDraw MindMap
 
Sales Standards Presentation by ConceptDraw MINDMAP
Sales Standards Presentation by ConceptDraw MINDMAPSales Standards Presentation by ConceptDraw MINDMAP
Sales Standards Presentation by ConceptDraw MINDMAP
 
Tania's class - guest lecture
Tania's class - guest lectureTania's class - guest lecture
Tania's class - guest lecture
 
Melting Pot’s Sleep Solutions Mindmap
Melting Pot’s Sleep Solutions MindmapMelting Pot’s Sleep Solutions Mindmap
Melting Pot’s Sleep Solutions Mindmap
 
Linda Oestreich's Mindmap Your Way to Project Success
Linda Oestreich's Mindmap Your Way to Project SuccessLinda Oestreich's Mindmap Your Way to Project Success
Linda Oestreich's Mindmap Your Way to Project Success
 
Tractor Fish Bone
Tractor  Fish BoneTractor  Fish Bone
Tractor Fish Bone
 

Similar a Ishikawa diagram

Examination papers of_project_management_and_project_managment_in_it
Examination papers of_project_management_and_project_managment_in_itExamination papers of_project_management_and_project_managment_in_it
Examination papers of_project_management_and_project_managment_in_itNMIMS ASSIGNMENTS HELP
 
Examination papers of project management and project managment in it
Examination papers of project management and project managment in itExamination papers of project management and project managment in it
Examination papers of project management and project managment in itNMIMS ASSIGNMENTS HELP
 
Process improvement using six sigma (1)
Process improvement using six sigma (1)Process improvement using six sigma (1)
Process improvement using six sigma (1)Meezan Bank
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxRoopaDNDandally
 
Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...
Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...
Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...Dhinakaran416989
 
Lightweighting , Vehicle,
Lightweighting , Vehicle,Lightweighting , Vehicle,
Lightweighting , Vehicle,tmtrnr
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for LearningCIToolkit
 
OR chapter 1.pdf
OR chapter 1.pdfOR chapter 1.pdf
OR chapter 1.pdfAlexHayme
 
Lecture 4 Root Cause Analysis in Company
Lecture 4 Root Cause Analysis in CompanyLecture 4 Root Cause Analysis in Company
Lecture 4 Root Cause Analysis in CompanyRyan Olaybal
 

Similar a Ishikawa diagram (20)

Tech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.pptTech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.ppt
 
OMG: Preventive Maintenance 2015
OMG: Preventive Maintenance 2015OMG: Preventive Maintenance 2015
OMG: Preventive Maintenance 2015
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Training Strategie Action Learning
Training Strategie  Action Learning Training Strategie  Action Learning
Training Strategie Action Learning
 
1.9.TQM gurus.pdf
1.9.TQM gurus.pdf1.9.TQM gurus.pdf
1.9.TQM gurus.pdf
 
TQM.pdf
TQM.pdfTQM.pdf
TQM.pdf
 
Slides 2015 for contact 2
Slides 2015 for contact 2Slides 2015 for contact 2
Slides 2015 for contact 2
 
Examination papers of_project_management_and_project_managment_in_it
Examination papers of_project_management_and_project_managment_in_itExamination papers of_project_management_and_project_managment_in_it
Examination papers of_project_management_and_project_managment_in_it
 
Examination papers of project management and project managment in it
Examination papers of project management and project managment in itExamination papers of project management and project managment in it
Examination papers of project management and project managment in it
 
Process improvement using six sigma (1)
Process improvement using six sigma (1)Process improvement using six sigma (1)
Process improvement using six sigma (1)
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
 
Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...
Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...
Problem Solving Tools.pptx and basix 7Qc Tools and QCC -12 Steps Problem solv...
 
Slides 2015 for contact 4
Slides 2015 for contact 4Slides 2015 for contact 4
Slides 2015 for contact 4
 
PS 130 Rev D Problem Solving
PS 130 Rev D Problem SolvingPS 130 Rev D Problem Solving
PS 130 Rev D Problem Solving
 
Lightweighting , Vehicle,
Lightweighting , Vehicle,Lightweighting , Vehicle,
Lightweighting , Vehicle,
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
OR chapter 1.pdf
OR chapter 1.pdfOR chapter 1.pdf
OR chapter 1.pdf
 
PDCA cycle
PDCA cyclePDCA cycle
PDCA cycle
 
Lecture 4 Root Cause Analysis in Company
Lecture 4 Root Cause Analysis in CompanyLecture 4 Root Cause Analysis in Company
Lecture 4 Root Cause Analysis in Company
 
02 processraison
02 processraison02 processraison
02 processraison
 

Último

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 

Último (20)

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 

Ishikawa diagram

  • 2. Structure Kaoru Ishikawa basic concept aim theoretical conversion practical example exercise
  • 3. Kaoru Ishikawa (1915 - 1989) • born in Tokio 1915 • graduated University of Tokyo in 1939 with an Engineering degree in applied chemistry • worked as a naval technical officer until 1941 • worked for Nissan Liquid Fuel Company • associate professor at the University of Tokyo in 1947 • famous person in Qualitymanagement • not only product quality • but also e.g. quality of Management and assistant • developed several quality-tools • One of these tools is the Ishikawa-Diagram (also called Fishbone- or cause and effect diagram)
  • 4. basic concept The Idea: think about possible causes and reasons leading to an effect or a problem find solution for preventing those problems
  • 5. basic concept • one problem/effect • 7 causes lead to the problem/effect • the causes are divided into main- and sidecauses The 7 causes are: 1. Methods 2. Machinery 3. Management 4. Materials 5. Manpower 6. Environment 7. Measurement
  • 6. basic concept individual problem/effect needs individual factors
  • 7. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram
  • 8. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment
  • 9. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment e.g. Methods, Machinery, Management, Materials, Manpower
  • 10. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment e.g. Methods, Machinery, Management, Materials, Manpower 5 M‘s
  • 11. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment e.g. Methods, Machinery, Management, Materials, Manpower 5 M‘s 4P (Place, Procedures, People, Policies ) 4S (Surroundings, Suppliers, Systems, Skills)
  • 13. aim • find the causes, main- and sidecauses • clarity • interdependence of the causes • improve them for having the wanted effect or eliminate them for solving the problem
  • 14. theoretical conversion 1. sketch the diagram and inscript the needed causes
  • 15. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out
  • 16. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness
  • 17. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence
  • 18. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence 5. check the selected causes for rightness
  • 19. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence 5. check the selected causes for rightness 6. The team discusses about the solution
  • 20. theoretical conversion 6. The team discusses about the solution • causes that can be improved or eliminated easily will be finished first of all (no need to be weighted) • The weighted causes are in a list of priority and will be finished in turn
  • 22. theoretical conversion It‘s important that the team has skilled workers involved in discussion
  • 23. theoretical conversion It‘s important that the team has skilled workers involved in discussion e.g. supplier, clients etc
  • 25. practical example 1. sketch the diagram and inscript the needed causes
  • 26. practical example 1. sketch the diagram and inscript the needed causes
  • 27. practical example 1. sketch the diagram and inscript the needed causes rise in productivity
  • 28. practical example 1. sketch the diagram and inscript the needed causes rise in productivity Enviroment
  • 29. practical example 1. sketch the diagram and inscript the needed causes rise in productivity ManpowerEnviroment
  • 30. practical example 1. sketch the diagram and inscript the needed causes rise in productivity ManpowerEnviroment Machine
  • 31. practical example 1. sketch the diagram and inscript the needed causes rise in productivity ManpowerEnviroment Machine Materials
  • 32. practical example 1. sketch the diagram and inscript the needed causes rise in productivity ManpowerEnviroment Machine Materials Methods
  • 33. practical example 2. work the main- and sidecauses out rise in productivity ManpowerEnviroment Machine Materials Methods
  • 34. practical example 2. work the main- and sidecauses out rise in productivity ManpowerEnviroment Machine Materials Methods Noise Temperature
  • 35. practical example 2. work the main- and sidecauses out rise in productivity ManpowerEnviroment Machine Materials Methods Noise Temperature Education Motivation w age
  • 36. practical example 2. work the main- and sidecauses out rise in productivity ManpowerEnviroment Machine Materials Methods Noise Temperature Education Motivation w age Software Hardware
  • 37. practical example 2. work the main- and sidecauses out rise in productivity ManpowerEnviroment Machine Materials Methods Noise Temperature Education Motivation w age Software Hardware Procurement
  • 38. practical example 2. work the main- and sidecauses out rise in productivity ManpowerEnviroment Machine Materials Methods Noise Temperature Education Motivation w age Software Hardware Procurement Standardisation Lean Management CIP
  • 39. practical example 3. check the completeness rise in productivity ManpowerEnviroment Machine Materials Methods Noise Temperature Education Motivation w age Software Hardware Procurement Standardisation Lean Management CIP
  • 40. practical example 4. weight the the main- & sidecauses in terms of meaning & influence • Lean Management • Standardisation • Motivation • Education •…
  • 41. practical example 5. check the selected causes for rightness • Lean Management • Standardisation • Motivation • Education •…
  • 42. practical example 6. The team discusses about the solution causes that can be improved or eliminated easily: • Hardware • Software • Temperature • Noise
  • 43. practical example 6. The team discusses about the solution weighted causes • Lean Management • Standardisation • Motivation • Education
  • 44. exercise excessive drop of paper Henner Graubitz October 23rd 2006
  • 45. exercise 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence 5. check the selected causes for rightness 6. The team discusses about the solution
  • 46. exercise solution excessive drop of paper Manpower Machine Materials Methods create faulty documents faulty feeder of papers too heavy paper misprints aren‘t used as paper for notices
  • 47. Advantage: • different opinions by teamwork • easy to apply • little effort to practise • better understanding for causes and effects
  • 48. Advantage: • different opinions by teamwork • easy to apply • little effort to practise • better understanding for causes and effects Disadvantage: • No clarity in very complex problems • Interactions and chronological dependence can’t be displayed