Faster, Better  and   Cheaper? Martin Burns, Lean CoE Sept 2011
About Me ,[object Object],[object Object],[object Object],[object Object],[object Object]
Interesting Times: Responding to Imposed Constraints More output Less time Less people Less cost Constant Improvement Resourcing Constraint Disruptive Change Cost Reduction Pressure Growth Challenge
What is Lean Thinking? Long Term Philosophy and Decision Making Value Maximisation One Piece Flow Pulled Through the System Obsessive Improvement At All Scales Involvement of Everybody
Value: Output The Customer Pays For Solution Request Solution Definition, Development & Delivery End user  receives Solution Value  Delivered Customer Logo Replaced Customer Logo Replaced
Value Is Created as Work  Actively  Moves Through The Value Stream Value Stream / End to end process Incident Raised  by end user Incident Management End user receives resolution Incident Received Analysed Resolved Customer Confirmation Value  Delivered Customer Logo Replaced Customer Logo Replaced Logo Replaced Start Finish
Value Is Created as Work Moves Through The Value Stream Value Stream / End to end process New Functionality Need Solution Delivery Solution Released to Production Review Review UAT QA Test Deploy Analysis Design Build Customer Logo Replaced Customer Logo Replaced Logo Replaced
Value Is Created as Work Moves Through The Value Stream Value Stream / End to end process New Functionality Need Solution Delivery Solution Released to Production Review (v) 1 day (e) 2 weeks (c) 6 weeks Test (v) 3 weeks (e) 3 weeks (c) 32 weeks Deploy (v) 1 week (e) 2 weeks (c) 37 weeks Analysis (v) 1 week (e) 4 weeks (c) 4 weeks Design (v) 2 weeks (e) 6 weeks (c) 12 weeks Build (v) 8 week (e) 14 weeks (c) 28 weeks Review (v) 1 day (e) 2 weeks (c) 14 weeks QA (v) 3 days (e) 1 week (c) 29 weeks UAT (v) 3 weeks (e) 3 weeks (c) 35 weeks (v) Value-adding Time (e) Elapsed Time (c) Cumulative Elapsed Time Customer Logo Replaced Customer Logo Replaced Logo Replaced
Value Is Created as Work Moves Through The Value Stream Value Stream / End to end process New Functionality Need Solution Delivery Solution Released to Production Review (v) 1 day (e) 2 weeks (c) 6 weeks Test (v) 3 weeks (e) 3 weeks (c) 32 weeks Deploy (v) 1 week (e) 2 weeks (c) 37 weeks Analysis (v) 1 week (e) 4 weeks (c) 4 weeks Design (v) 2 weeks (e) 6 weeks (c) 12 weeks Build (v) 8 week (e) 14 weeks (c) 28 weeks Review (v) 1 day (e) 2 weeks (c) 14 weeks QA (v) 3 days (e) 1 week (c) 29 weeks UAT (v) 3 weeks (e) 3 weeks (c) 35 weeks Total Value Adding Time:  18 Weeks Efficiency:  48% Total Elapsed Time:  37 Weeks Slow Expensive, Unresponsive Logo Replaced Customer Logo Replaced Customer Logo Replaced
5 Principles for Value Maximisation Customer Value Value Stream Flowing Processes Pull- Principle Perfection Create Value Without Waste Right  Method  Produces Right Results Stop producing what your customer is not asking (or paying) for Review & simplify your processes One In,  One Out Produce on demand, not on schedule Not to have  a problem  is  a problem
Work to Perfection: Change Done Right, At All Scales ,[object Object],[object Object],[object Object],[object Object],Effective  only if changing  Method , not just  Slogans
Standardised Template that error-proofs the thinking process Deming/ Shewhart Cycle:
Improvement is Even Simpler...  The trouble with everyone of us is that we don't  think  enough Thomas J. Watson, Sr
Does It Work? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Relative National Productivity 1937 Sources: Ohno: Toyota Production System: Beyond Large-scale Production The Competitive Status of the US Auto Industry, National Academy Press 1982
Customer Reference Ticket Turn Around Time reduced by 40% Operational Efficiency Improved Quality End user Customer satisfaction increased from 3.22 to 3.45  Productivity increased by 17%,  Bad fixes reduced from 2.2 to 1.4% Average ticket turn around time improve by 20% Improve Communication between IBM and end user Standardized process within AM team Productivity increased by 15%,  Total lead time reduced by 50% Increased flexibility of Maintenance release milestones Reduce the effort and rework in creating a solution for a Defect YTD cost-per-fix is down by 15%. Up to 70% reduction in the end-to-end production support lead-time For enhancements, confirmation of requirements and business need enabled better decision making Single point of entry and ticketing resulted in improved ticket solution and resolution time Standardization enables greater use of offshore resources (supports 20% IT cost reduction) Average turn around time reduced by 20% Volume of tickets reduced by 12% Ticket backlog reduced by 19% SLA adherence improved Productivity increased by 16%  Reduction of Process Lead time to resolve incidents by 15 % and Problem Management by 20% End of Month Ticket Backlog reduction to Zero. Reduction in incoming tickets Changes in Remedy to get ticket alerts via email Incident Resolution productivity improvement of 10%-16% Customer Service Productivity Impact European  Telecoms Equipment Manufacturer Global Mobile  Telecoms  Service Provider UK Telecoms  Service Provider Large Oil &  Gas Company Global  Oil Company Leading  Automotive Company
How to Get Started ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Más contenido relacionado

La actualidad más candente

Exposing Your Hidden Costs of Performance
Exposing Your Hidden Costs of PerformanceExposing Your Hidden Costs of Performance
Exposing Your Hidden Costs of PerformanceJuran Global
 
The value chain
The value chainThe value chain
The value chainCATC-ACM
 
Cost of-poor-quality
Cost of-poor-qualityCost of-poor-quality
Cost of-poor-qualitydenmas831
 
OR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaOR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaImprovement Skills Consulting Ltd.
 
Implement a PMO, Receive Customer Love
Implement a PMO, Receive Customer LoveImplement a PMO, Receive Customer Love
Implement a PMO, Receive Customer LoveKeyedIn Solutions Inc.
 
Costof quality
Costof qualityCostof quality
Costof qualityOmnex Inc.
 
Why would you want to improve your test process using TPI or TMMi?
Why would you want to improve your test process using TPI or TMMi?Why would you want to improve your test process using TPI or TMMi?
Why would you want to improve your test process using TPI or TMMi?Rik Marselis
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1Pankaj Nalwa
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentationjonschofield
 
Total Quality Management Principles
Total Quality Management PrinciplesTotal Quality Management Principles
Total Quality Management PrinciplesAmmar Mubarak
 
Test Process Improvement
Test Process ImprovementTest Process Improvement
Test Process ImprovementMomentum NI
 
Agile Metrics: It's Not All That Complicated
Agile Metrics: It's Not All That ComplicatedAgile Metrics: It's Not All That Complicated
Agile Metrics: It's Not All That ComplicatedVersionOne
 
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and servicePgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and serviceAquamarine Emerald
 
Governance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabsGovernance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabsVIJAYA BHASKARA VARMA YARAKARAJU
 
Process Analysis 091025030547 Phpapp02
Process Analysis 091025030547 Phpapp02Process Analysis 091025030547 Phpapp02
Process Analysis 091025030547 Phpapp02jasonhian
 
Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemSteven Muñoz
 
Measuring the Real Cost of Quality: Methods, Models & Tips
Measuring the Real Cost of Quality: Methods, Models & TipsMeasuring the Real Cost of Quality: Methods, Models & Tips
Measuring the Real Cost of Quality: Methods, Models & TipsSafetyChain Software
 
Zero Defect Initiative - Quality Index Generator
Zero Defect Initiative - Quality Index GeneratorZero Defect Initiative - Quality Index Generator
Zero Defect Initiative - Quality Index GeneratorQuEST Forum
 

La actualidad más candente (20)

Exposing Your Hidden Costs of Performance
Exposing Your Hidden Costs of PerformanceExposing Your Hidden Costs of Performance
Exposing Your Hidden Costs of Performance
 
The value chain
The value chainThe value chain
The value chain
 
Cost of-poor-quality
Cost of-poor-qualityCost of-poor-quality
Cost of-poor-quality
 
OR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaOR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 Sigma
 
Implement a PMO, Receive Customer Love
Implement a PMO, Receive Customer LoveImplement a PMO, Receive Customer Love
Implement a PMO, Receive Customer Love
 
Costof quality
Costof qualityCostof quality
Costof quality
 
Why would you want to improve your test process using TPI or TMMi?
Why would you want to improve your test process using TPI or TMMi?Why would you want to improve your test process using TPI or TMMi?
Why would you want to improve your test process using TPI or TMMi?
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentation
 
Total Quality Management Principles
Total Quality Management PrinciplesTotal Quality Management Principles
Total Quality Management Principles
 
Agile metrics
Agile metricsAgile metrics
Agile metrics
 
Test Process Improvement
Test Process ImprovementTest Process Improvement
Test Process Improvement
 
Agile Metrics: It's Not All That Complicated
Agile Metrics: It's Not All That ComplicatedAgile Metrics: It's Not All That Complicated
Agile Metrics: It's Not All That Complicated
 
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and servicePgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
 
Governance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabsGovernance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabs
 
Process Analysis 091025030547 Phpapp02
Process Analysis 091025030547 Phpapp02Process Analysis 091025030547 Phpapp02
Process Analysis 091025030547 Phpapp02
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis System
 
Measuring the Real Cost of Quality: Methods, Models & Tips
Measuring the Real Cost of Quality: Methods, Models & TipsMeasuring the Real Cost of Quality: Methods, Models & Tips
Measuring the Real Cost of Quality: Methods, Models & Tips
 
Zero Defect Initiative - Quality Index Generator
Zero Defect Initiative - Quality Index GeneratorZero Defect Initiative - Quality Index Generator
Zero Defect Initiative - Quality Index Generator
 

Destacado

Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...
Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...
Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...Marc Garriga
 
Recorrido por "La Taguara"
Recorrido por "La Taguara"Recorrido por "La Taguara"
Recorrido por "La Taguara"romeromontiel
 
More Than Checks - Organisationales Feedback
More Than Checks  - Organisationales FeedbackMore Than Checks  - Organisationales Feedback
More Than Checks - Organisationales FeedbackAlexander Schön
 
Caracoles y sociedades en Europa desde la antiguedad
Caracoles y sociedades en Europa desde la antiguedadCaracoles y sociedades en Europa desde la antiguedad
Caracoles y sociedades en Europa desde la antiguedadJakinola
 
Red Social Empresarial con IBM Connections - Casos de referencia
Red Social Empresarial con IBM Connections - Casos de referenciaRed Social Empresarial con IBM Connections - Casos de referencia
Red Social Empresarial con IBM Connections - Casos de referenciaIntellego Chile
 
Diferencia entre plato y piramide.
Diferencia entre plato y piramide.Diferencia entre plato y piramide.
Diferencia entre plato y piramide.jaquelinecastillo
 
Projecte l'univers 2010 pt primer cicle2010fin
Projecte l'univers 2010 pt primer cicle2010finProjecte l'univers 2010 pt primer cicle2010fin
Projecte l'univers 2010 pt primer cicle2010finJuan Ángel Moya
 
Ftth in china
Ftth in chinaFtth in china
Ftth in chinaherooftit
 
Ejercicio parejas
Ejercicio parejasEjercicio parejas
Ejercicio parejasTuvie
 
Narasi terakhir cintaku cankmaz
Narasi terakhir cintaku cankmazNarasi terakhir cintaku cankmaz
Narasi terakhir cintaku cankmazAgyl Cankmaz
 

Destacado (20)

Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...
Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...
Abriendo Datos: Compartiendo conocimiento, transformando los gobiernos para s...
 
Módulo instruccional ScienceDirect
Módulo instruccional ScienceDirectMódulo instruccional ScienceDirect
Módulo instruccional ScienceDirect
 
Ecopro am-918
Ecopro am-918Ecopro am-918
Ecopro am-918
 
Recorrido por "La Taguara"
Recorrido por "La Taguara"Recorrido por "La Taguara"
Recorrido por "La Taguara"
 
More Than Checks - Organisationales Feedback
More Than Checks  - Organisationales FeedbackMore Than Checks  - Organisationales Feedback
More Than Checks - Organisationales Feedback
 
Caracoles y sociedades en Europa desde la antiguedad
Caracoles y sociedades en Europa desde la antiguedadCaracoles y sociedades en Europa desde la antiguedad
Caracoles y sociedades en Europa desde la antiguedad
 
Comunicación con el 112
Comunicación con el 112Comunicación con el 112
Comunicación con el 112
 
Red Social Empresarial con IBM Connections - Casos de referencia
Red Social Empresarial con IBM Connections - Casos de referenciaRed Social Empresarial con IBM Connections - Casos de referencia
Red Social Empresarial con IBM Connections - Casos de referencia
 
Diferencia entre plato y piramide.
Diferencia entre plato y piramide.Diferencia entre plato y piramide.
Diferencia entre plato y piramide.
 
Projecte l'univers 2010 pt primer cicle2010fin
Projecte l'univers 2010 pt primer cicle2010finProjecte l'univers 2010 pt primer cicle2010fin
Projecte l'univers 2010 pt primer cicle2010fin
 
Ftth in china
Ftth in chinaFtth in china
Ftth in china
 
Senador J. Orpis Ley Resp. Penal Juvenil.
Senador J. Orpis Ley Resp. Penal Juvenil.Senador J. Orpis Ley Resp. Penal Juvenil.
Senador J. Orpis Ley Resp. Penal Juvenil.
 
Humitas
HumitasHumitas
Humitas
 
Edició de textos
Edició de textosEdició de textos
Edició de textos
 
Ejercicio parejas
Ejercicio parejasEjercicio parejas
Ejercicio parejas
 
Narasi terakhir cintaku cankmaz
Narasi terakhir cintaku cankmazNarasi terakhir cintaku cankmaz
Narasi terakhir cintaku cankmaz
 
Fondurile guvernamentale in 2016
Fondurile guvernamentale in 2016Fondurile guvernamentale in 2016
Fondurile guvernamentale in 2016
 
Delibera Circhi
Delibera CirchiDelibera Circhi
Delibera Circhi
 
Romanticismo
RomanticismoRomanticismo
Romanticismo
 
Plan de clase
Plan de clasePlan de clase
Plan de clase
 

Similar a Lean introduction

Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10mccall1966
 
BPMN -The Very First Step in Business Continuity
BPMN -The Very First Step in Business ContinuityBPMN -The Very First Step in Business Continuity
BPMN -The Very First Step in Business ContinuityPECB
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11laukoamy
 
Redesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for FlowRedesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for FlowLean Enterprise Academy
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Jamie Voster
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation4 Steps to Drive Process Innovation
4 Steps to Drive Process InnovationJuran Global
 
How to design RPA performance metrics
How to design RPA performance metricsHow to design RPA performance metrics
How to design RPA performance metricsARJUN S MEDA
 
Know the Best Cost Reduction & Performance Management Strategies
Know the Best Cost Reduction & Performance Management StrategiesKnow the Best Cost Reduction & Performance Management Strategies
Know the Best Cost Reduction & Performance Management StrategiesNext Level Purchasing
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsTKMG, Inc.
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)Mudassar Salman
 
Cost Cutting Conundrum Final
Cost Cutting Conundrum FinalCost Cutting Conundrum Final
Cost Cutting Conundrum FinalCoupa Software
 
Have you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonHave you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonInstitut Lean France
 

Similar a Lean introduction (20)

PMI-ACP Release Planning & Estimation
PMI-ACP Release Planning & EstimationPMI-ACP Release Planning & Estimation
PMI-ACP Release Planning & Estimation
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10
 
BPMN -The Very First Step in Business Continuity
BPMN -The Very First Step in Business ContinuityBPMN -The Very First Step in Business Continuity
BPMN -The Very First Step in Business Continuity
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
 
Redesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for FlowRedesigning IT and Service Organisations for Flow
Redesigning IT and Service Organisations for Flow
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation
 
How to design RPA performance metrics
How to design RPA performance metricsHow to design RPA performance metrics
How to design RPA performance metrics
 
Know the Best Cost Reduction & Performance Management Strategies
Know the Best Cost Reduction & Performance Management StrategiesKnow the Best Cost Reduction & Performance Management Strategies
Know the Best Cost Reduction & Performance Management Strategies
 
C12 quality
C12 qualityC12 quality
C12 quality
 
C12 quality
C12 qualityC12 quality
C12 quality
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work Enviroments
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Cost Cutting Conundrum Final
Cost Cutting Conundrum FinalCost Cutting Conundrum Final
Cost Cutting Conundrum Final
 
Have you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonHave you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel Breston
 
Lean Mgmt
Lean MgmtLean Mgmt
Lean Mgmt
 
The VDS Approach
The VDS ApproachThe VDS Approach
The VDS Approach
 

Más de Martin Burns

Lightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI PlanningLightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI PlanningMartin Burns
 
Transformation by Invitation
Transformation by InvitationTransformation by Invitation
Transformation by InvitationMartin Burns
 
10 Years of Big Room Planning
10 Years of Big Room Planning10 Years of Big Room Planning
10 Years of Big Room PlanningMartin Burns
 
Travelers' Tales from the Trail to Agility
Travelers' Tales from the Trail to AgilityTravelers' Tales from the Trail to Agility
Travelers' Tales from the Trail to AgilityMartin Burns
 
SAFe City, Agile in the City Bristol
SAFe City, Agile in the City BristolSAFe City, Agile in the City Bristol
SAFe City, Agile in the City BristolMartin Burns
 
10 Years of Big Room Planning
10 Years of Big Room Planning10 Years of Big Room Planning
10 Years of Big Room PlanningMartin Burns
 
The Lean Agile Big Questions
The Lean Agile Big QuestionsThe Lean Agile Big Questions
The Lean Agile Big QuestionsMartin Burns
 
This is the Sound of All of Us
This is the Sound of All of UsThis is the Sound of All of Us
This is the Sound of All of UsMartin Burns
 
Developers Developers Developers
Developers Developers DevelopersDevelopers Developers Developers
Developers Developers DevelopersMartin Burns
 
Unlocking Excellence with Agile Metrics
Unlocking Excellence with Agile MetricsUnlocking Excellence with Agile Metrics
Unlocking Excellence with Agile MetricsMartin Burns
 
Plumbing for Profit
Plumbing for ProfitPlumbing for Profit
Plumbing for ProfitMartin Burns
 
Plumbing for Profit
Plumbing for ProfitPlumbing for Profit
Plumbing for ProfitMartin Burns
 
SAFe City Workshop: Portfolio & Program Prioritisation In Practice
SAFe City Workshop: Portfolio & Program Prioritisation In PracticeSAFe City Workshop: Portfolio & Program Prioritisation In Practice
SAFe City Workshop: Portfolio & Program Prioritisation In PracticeMartin Burns
 
SAFely Dancing With Conway's law
SAFely Dancing With Conway's lawSAFely Dancing With Conway's law
SAFely Dancing With Conway's lawMartin Burns
 
Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)
Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)
Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)Martin Burns
 
Shearing Layers: An architectural response to uncertainty & change
Shearing Layers: An architectural response to uncertainty & changeShearing Layers: An architectural response to uncertainty & change
Shearing Layers: An architectural response to uncertainty & changeMartin Burns
 
Independence and Centralisation: Power Structures in Delivery Organisations
Independence and Centralisation: Power Structures in Delivery OrganisationsIndependence and Centralisation: Power Structures in Delivery Organisations
Independence and Centralisation: Power Structures in Delivery OrganisationsMartin Burns
 
Product Flow Is Not Enough
Product Flow Is Not EnoughProduct Flow Is Not Enough
Product Flow Is Not EnoughMartin Burns
 
Lightning Talk: This Is The Sound of All Of Us
Lightning Talk: This Is The Sound of All Of UsLightning Talk: This Is The Sound of All Of Us
Lightning Talk: This Is The Sound of All Of UsMartin Burns
 

Más de Martin Burns (20)

Lightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI PlanningLightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI Planning
 
Transformation by Invitation
Transformation by InvitationTransformation by Invitation
Transformation by Invitation
 
10 Years of Big Room Planning
10 Years of Big Room Planning10 Years of Big Room Planning
10 Years of Big Room Planning
 
Travelers' Tales from the Trail to Agility
Travelers' Tales from the Trail to AgilityTravelers' Tales from the Trail to Agility
Travelers' Tales from the Trail to Agility
 
SAFe City, Agile in the City Bristol
SAFe City, Agile in the City BristolSAFe City, Agile in the City Bristol
SAFe City, Agile in the City Bristol
 
10 Years of Big Room Planning
10 Years of Big Room Planning10 Years of Big Room Planning
10 Years of Big Room Planning
 
The Lean Agile Big Questions
The Lean Agile Big QuestionsThe Lean Agile Big Questions
The Lean Agile Big Questions
 
This is the Sound of All of Us
This is the Sound of All of UsThis is the Sound of All of Us
This is the Sound of All of Us
 
Developers Developers Developers
Developers Developers DevelopersDevelopers Developers Developers
Developers Developers Developers
 
Unlocking Excellence with Agile Metrics
Unlocking Excellence with Agile MetricsUnlocking Excellence with Agile Metrics
Unlocking Excellence with Agile Metrics
 
Push It Down
Push It DownPush It Down
Push It Down
 
Plumbing for Profit
Plumbing for ProfitPlumbing for Profit
Plumbing for Profit
 
Plumbing for Profit
Plumbing for ProfitPlumbing for Profit
Plumbing for Profit
 
SAFe City Workshop: Portfolio & Program Prioritisation In Practice
SAFe City Workshop: Portfolio & Program Prioritisation In PracticeSAFe City Workshop: Portfolio & Program Prioritisation In Practice
SAFe City Workshop: Portfolio & Program Prioritisation In Practice
 
SAFely Dancing With Conway's law
SAFely Dancing With Conway's lawSAFely Dancing With Conway's law
SAFely Dancing With Conway's law
 
Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)
Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)
Adaptive Delivery at Scale With the Scaled Agile Framework (SAFe)
 
Shearing Layers: An architectural response to uncertainty & change
Shearing Layers: An architectural response to uncertainty & changeShearing Layers: An architectural response to uncertainty & change
Shearing Layers: An architectural response to uncertainty & change
 
Independence and Centralisation: Power Structures in Delivery Organisations
Independence and Centralisation: Power Structures in Delivery OrganisationsIndependence and Centralisation: Power Structures in Delivery Organisations
Independence and Centralisation: Power Structures in Delivery Organisations
 
Product Flow Is Not Enough
Product Flow Is Not EnoughProduct Flow Is Not Enough
Product Flow Is Not Enough
 
Lightning Talk: This Is The Sound of All Of Us
Lightning Talk: This Is The Sound of All Of UsLightning Talk: This Is The Sound of All Of Us
Lightning Talk: This Is The Sound of All Of Us
 

Último

Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionAlejandro Cremades
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptxrdishurana
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)linciy03
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdfzukhrafshabbir
 
Revolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon ComponentsRevolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon ComponentsConnova AG
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024Adnet Communications
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckHajeJanKamps
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfsuperbizness1227
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfHenry Tapper
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsFEXLE
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxWorkforce Group
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Associationseri bangash
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corp.
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseirhcs
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Alejandro Cremades
 
Engagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed GuideEngagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed GuideCharleston Alexander
 
Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datassDilipParmar63
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfCIOLOOKIndia
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowMiriam Robeson
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.FelixPerez547899
 

Último (20)

Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Revolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon ComponentsRevolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon Components
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdf
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
Engagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed GuideEngagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed Guide
 
Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datass
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdf
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 

Lean introduction

  • 1. Faster, Better and Cheaper? Martin Burns, Lean CoE Sept 2011
  • 2.
  • 3. Interesting Times: Responding to Imposed Constraints More output Less time Less people Less cost Constant Improvement Resourcing Constraint Disruptive Change Cost Reduction Pressure Growth Challenge
  • 4. What is Lean Thinking? Long Term Philosophy and Decision Making Value Maximisation One Piece Flow Pulled Through the System Obsessive Improvement At All Scales Involvement of Everybody
  • 5. Value: Output The Customer Pays For Solution Request Solution Definition, Development & Delivery End user receives Solution Value Delivered Customer Logo Replaced Customer Logo Replaced
  • 6. Value Is Created as Work Actively Moves Through The Value Stream Value Stream / End to end process Incident Raised by end user Incident Management End user receives resolution Incident Received Analysed Resolved Customer Confirmation Value Delivered Customer Logo Replaced Customer Logo Replaced Logo Replaced Start Finish
  • 7. Value Is Created as Work Moves Through The Value Stream Value Stream / End to end process New Functionality Need Solution Delivery Solution Released to Production Review Review UAT QA Test Deploy Analysis Design Build Customer Logo Replaced Customer Logo Replaced Logo Replaced
  • 8. Value Is Created as Work Moves Through The Value Stream Value Stream / End to end process New Functionality Need Solution Delivery Solution Released to Production Review (v) 1 day (e) 2 weeks (c) 6 weeks Test (v) 3 weeks (e) 3 weeks (c) 32 weeks Deploy (v) 1 week (e) 2 weeks (c) 37 weeks Analysis (v) 1 week (e) 4 weeks (c) 4 weeks Design (v) 2 weeks (e) 6 weeks (c) 12 weeks Build (v) 8 week (e) 14 weeks (c) 28 weeks Review (v) 1 day (e) 2 weeks (c) 14 weeks QA (v) 3 days (e) 1 week (c) 29 weeks UAT (v) 3 weeks (e) 3 weeks (c) 35 weeks (v) Value-adding Time (e) Elapsed Time (c) Cumulative Elapsed Time Customer Logo Replaced Customer Logo Replaced Logo Replaced
  • 9. Value Is Created as Work Moves Through The Value Stream Value Stream / End to end process New Functionality Need Solution Delivery Solution Released to Production Review (v) 1 day (e) 2 weeks (c) 6 weeks Test (v) 3 weeks (e) 3 weeks (c) 32 weeks Deploy (v) 1 week (e) 2 weeks (c) 37 weeks Analysis (v) 1 week (e) 4 weeks (c) 4 weeks Design (v) 2 weeks (e) 6 weeks (c) 12 weeks Build (v) 8 week (e) 14 weeks (c) 28 weeks Review (v) 1 day (e) 2 weeks (c) 14 weeks QA (v) 3 days (e) 1 week (c) 29 weeks UAT (v) 3 weeks (e) 3 weeks (c) 35 weeks Total Value Adding Time: 18 Weeks Efficiency: 48% Total Elapsed Time: 37 Weeks Slow Expensive, Unresponsive Logo Replaced Customer Logo Replaced Customer Logo Replaced
  • 10. 5 Principles for Value Maximisation Customer Value Value Stream Flowing Processes Pull- Principle Perfection Create Value Without Waste Right Method Produces Right Results Stop producing what your customer is not asking (or paying) for Review & simplify your processes One In, One Out Produce on demand, not on schedule Not to have a problem is a problem
  • 11.
  • 12. Standardised Template that error-proofs the thinking process Deming/ Shewhart Cycle:
  • 13. Improvement is Even Simpler... The trouble with everyone of us is that we don't think enough Thomas J. Watson, Sr
  • 14.
  • 15. Customer Reference Ticket Turn Around Time reduced by 40% Operational Efficiency Improved Quality End user Customer satisfaction increased from 3.22 to 3.45 Productivity increased by 17%, Bad fixes reduced from 2.2 to 1.4% Average ticket turn around time improve by 20% Improve Communication between IBM and end user Standardized process within AM team Productivity increased by 15%, Total lead time reduced by 50% Increased flexibility of Maintenance release milestones Reduce the effort and rework in creating a solution for a Defect YTD cost-per-fix is down by 15%. Up to 70% reduction in the end-to-end production support lead-time For enhancements, confirmation of requirements and business need enabled better decision making Single point of entry and ticketing resulted in improved ticket solution and resolution time Standardization enables greater use of offshore resources (supports 20% IT cost reduction) Average turn around time reduced by 20% Volume of tickets reduced by 12% Ticket backlog reduced by 19% SLA adherence improved Productivity increased by 16% Reduction of Process Lead time to resolve incidents by 15 % and Problem Management by 20% End of Month Ticket Backlog reduction to Zero. Reduction in incoming tickets Changes in Remedy to get ticket alerts via email Incident Resolution productivity improvement of 10%-16% Customer Service Productivity Impact European Telecoms Equipment Manufacturer Global Mobile Telecoms Service Provider UK Telecoms Service Provider Large Oil & Gas Company Global Oil Company Leading Automotive Company
  • 16.

Notas del editor

  1. Why should you listen to me? Until last week I was a delivery manager of a team of ~50, contractually obliged to find better ways of doing things I came into Lean as a way of motivating my team, having heard really good things about Toyota, and found the people management part was part of a much bigger way of thinking, which had a lot of resonance with what we were doing I'm going to tell you how to do it via a set of proven, interlocking approaches and tools, known as Lean. Anyone been in a Lean presentation before? OK, I promise you only 1 slide on the car industry, and only 1 with any kind of history..
  2. Affordability Challenge: Enabling customer to cut cost without cutting capability Disruptive Change: Client : “Unprecedented” - requirement and opportunity for pervasive improvement Joint working – requires upheaval Report X & Report Y means BaU isn't an option Sector Leader: Need to be really smart at what we do” Growth Challenge: Aggressive targets in the Fall Plan Resourcing Constraint: Can't find the people fast enough to fulfill needs Adding more ppl won't enable cost constraints
  3. Value is delivered when a paying customer gets what they pay for. So, it only actually happens **HERE** >click< - until that point, it doesn't actually mean anything. It also means that THE most important people are those who are creating the thing that the customer pays for.
  4. Value is created as the piece of work is actively transformed through a process – from customer's initial idea of “I'd like a think” to its delivery back. We may not be all the pieces along the way – at xxx client, we didn't do full functional test or architecture, but we did design, build and Unit test.
  5. The same for a piece of new development – work moves through a standard set of steps as its transformed from idea to working code in production
  6. Now let's think about how long those steps take. That's in terms of both hands-on time spent writing designs, producing code, actively testing And The elapsed time it takes to do it The thing generally that takes the time isn't the hands on time, but the waiting, interruptions and “other stuff” time Let's add all that up
  7. I've already calculated the overall elapsed time **>click<** But how much actual work was involved that took 37 weeks to complete? **>click<** **>click<** This is a relatively efficient process too – think how much longer it would be if you had a quarterly or six monthly release cycle. In many processes, you might be only 10% efficient. How long does a house take to build? (ask for suggestions) 3d. FertigHaus In xxx client, we found in one process, delivery was extending from 1d hands-on work to over a week for small pieces of work because of stakeholder signoffs and responses to queries. And in all that time, the customer is waiting, and has more opportunities to change their mind. **>click<**
  8. There are some specific Lean tools to expose Waste, making it easier to see and therefore start removing. However, a target of single piece flow will bring many of them to the surface as barriers to achieving. These 5 principles will help you get there Value: What is it that the customer is paying for? What else are you doing? Why? Sometimes you have to as an enabler, but best to keep that far away from delivery people. Make sure that everything in the process is transforming from customer request/though to deliverable Any kind of batching is a waste – you've spent money on transforming to this point, so why are you holding it up artificially? Better to have it move on and closer to delivering value Pull: no point in adding to my pile as a tester as I won't get to it Perfection: You won't get there in one go, so one step at a time.
  9. Problems/Opportunities come in all sizes **>click<** Traditional Improvement Programmes are one-off, lots of bang for the buck initiatives. They're the easiest to measure Lean does those, sure. But it also looks for all the very small opportunities, that individuals and small teams can change within their own control One of the biggest wastes you can have is untapped people creativity – and who else understands the work to be improved best? **>click<** And Lean organisations don't just improve once
  10. Spend 80% of time understanding the problem Analyse & plan carefully Spend 20% of time doing Implement solutions aggressively Toyota do all improvement at every level on single pieces of A3. Even the global financials are done on A3, with the CFO challenging his reports to produce them on A4
  11. Decision-making is rapid, based on devolving assessment to empowered managers coaching a knowledgeable team-member: The manager can’t solve the problem alone, because the manager isn’t close enough to the problem to know the facts. But the employee can’t solve the problem alone either, because he or she is often too close to the issue to see its context and may refrain from asking tough questions about his or her own work. Only by showing mutual respect is it possible to solve problems and move organisational performance to an ever-higher level.
  12. I promised you 1 history slide and this is it. And I've combined it with the 1 car industry slide. In 1937, it was generally assessed that the average German worker was 3 times as productive as a Japanese, and that the average American was 3 times more productive again. In 1947, even after the huge dip caused by wartime destruction, the head of Toyota set his employees a challenge: to catch up with the Americans In the next couple of decades, Ford were in the middle of a boom, and assumed that this would carry them forward (forever) – they'd always be able to sell whatever they made In the mean time, there were Toyota, working hard in Interesting times to get better every day – better quality, better prices. Less time, less effort, fewer defects. Obsessively. Do you think it worked?