Engineering the Future:
AI-Augmented DevOps Through the Nine
Pillars of Excellence
La Ingeniería del Futuro: DevOps
Potenciado con IA a través de los Nueve
Pilares de la Excelencia
Marc Hornbeek
Marc Hornbeek “DevOps_the_Gray”
P. Eng., B.Sc./EE, MBA
IEEE Outstanding Engineer
CEO, Engineering DevOps Consulting
• Digital Transformation Consultant
• Author
• Instructor
Topics:
Continuous Testing, DevOps, DevSecOps, Site Reliability
Engineering, Intelligent Continuous Security, Engineering
leadership
DEVOPS NINE PILLARS OF PRACTICES
• Foundation built on orchestration,
automation and governance.
• Supports well-engineered value streams,
releases and continuous delivery
pipelines.
1. Leadership
2. Collaborative Culture
3. Design for DevOps
4. Continuous Integration
5. Continuous Testing
6. Elastics Infrastructure
7. Continuous Monitoring
8. Continuous Security
9. Continuous Delivery
1. Liderazgo
2. Cultura Colaborativa
3. Diseño para DevOps
4. Integración Continua
5. Pruebas Continuas
6. Infraestructura Elástica
7. Monitoreo Continuo,
8. Seguridad Continua
9. Entrega Continua.
• Una base construida sobre orquestación,
automatización y gobernanza.
• Sustenta flujos de valor, versiones y
canalizaciones de entrega continua bien
diseñadas.
DEVOPS LEADERSHIP PILLAR
“Without strong leadership, DevOps becomes a
disconnected set of tools and tasks—not a
sustainable, evolving culture.”
Visionary Thinking, Systems Thinking, Servant Leadership, Cultural
Stewardship, Data-Driven Decision Making, Collaboration Champion,
Adaptability and Continuous Learning, Technical Fluency, Resilience
and Grit, and Security and Compliance Awareness.
"Sin un liderazgo sólido, DevOps se convierte en un
conjunto desconectado de herramientas y tareas,
no en una cultura sostenible y en evolución.“
Pensamiento Visionario, Pensamiento Sistémico, Liderazgo Servicial,
Custodia Cultural, Toma de Decisiones Basada en Datos, Promotor
de la Colaboración, Adaptabilidad y Aprendizaje Continuo, Fluidez
Técnica, Resiliencia y Determinación, y Conciencia de Seguridad y
Cumplimiento.
AI IMPACTS ON DEVOPS LEADERSHIP
“AI empowers leaders with real-time
insights, fostering proactive and strategic
decision-making.”
Case Study
TechNova Corp.
Scenario: Implemented AI
analytics to monitor team
performance and project health.
Outcome: Improved project
delivery timelines by 25% and
enhanced team morale through
data-driven leadership.
"La IA empodera a los líderes con
información en tiempo real, fomentando una
toma de decisiones proactiva y estratégica."
Caso de estudio
TechNova Corp.
Escenario: Se implementó análisis
con IA para monitorear el
rendimiento del equipo y la salud del
proyecto.
Resultado: Mejoró los tiempos de
entrega de proyectos en un 25 % y
mejoró el estado de ánimo del
equipo mediante un liderazgo
basado en datos.
Tableau, Power BI, IBM Watson
Analytics.
COLLABORATIVE CULTURE PILLAR
“A culture that values open communication,
continuous learning, collaboration,
accountability, and a willingness to embrace
change works best with DevOps.”
“Una cultura que valora la comunicación
abierta, el aprendizaje continuo, la
colaboración, la responsabilidad y la
disposición a aceptar el cambio funciona
mejor con DevOps.”
AI IMPACTS ON COLLABORATIVE CULTURE
Case Study
DevSync Ltd.
Scenario: Adopted AI-driven
communication tools to
enhance remote team
collaboration.
Outcome: Increased cross-
functional project success rates
by 30% and reduced
communication delays.
“AI bridges communication gaps,
cultivating a cohesive and collaborative
team environment.”
"La inteligencia artificial cierra brechas de
comunicación, cultivando un entorno de
equipo cohesionado y colaborativo."
Caso de estudio
DevSync Ltd.
Escenario: Adoptó
herramientas de comunicación
impulsadas por IA para mejorar
la colaboración de equipos
remotos.
Resultado: Aumentó en un
30 % la tasa de éxito de
proyectos multifuncionales y
redujo los retrasos en la
comunicación.
Slack con integraciones de IA,
Microsoft Teams, CultureAmp.
DESIGN FOR DEVOPS PILLAR
"Design for DevOps" is crucial for organizations
transforming to higher performance DevOps because
it ensures that systems are built to support rapid,
reliable, and repeatable deployments, leading to faster
time-to-market and improved quality.”
“Diseñar para DevOps” es fundamental para las
organizaciones que están transformándose hacia un
DevOps de alto rendimiento, porque asegura que los
sistemas estén construidos para soportar
implementaciones rápidas, confiables y repetibles, lo
que se traduce en un menor tiempo de salida al
mercado y una mejor calidad.
AI IMPACTS ON DESIGN FOR DEVOPS
Case Study
SoftStruct Inc.
Scenario: Utilized AI tools for
architectural design and
compliance validation.
Outcome: Reduced design errors
by 40% and accelerated
deployment readiness.
“Integrating AI in design ensures scalable,
compliant, and efficient system
architecture.”
“Integrar la inteligencia artificial en el
diseño garantiza una arquitectura de
sistemas escalable, conforme y eficiente.”
Caso de estudio
SoftStruct Inc.
Escenario: Utilizó herramientas
de inteligencia artificial para el
diseño arquitectónico y la
validación de cumplimiento.
Resultado: Redujo los errores
de diseño en un 40 % y aceleró
la preparación para el
despliegue.
AWS Well-Architected Tool,
Azure Advisor, IBM Cloud Pak.
“Continuous Integration is vital because it helps catch
bugs early in the development cycle, reduces
integration problems, and allows for faster iterations. It
improves code quality, reduces the risk of late-stage
issues, and accelerates the development process by
ensuring that the codebase is always in a deployable
state.”
CONTINUOUS INTEGRATION (CI) PILLAR
“La Integración Continua es vital porque ayuda a
detectar errores temprano en el ciclo de desarrollo,
reduce los problemas de integración y permite
iteraciones más rápidas. Mejora la calidad del código,
reduce el riesgo de problemas en etapas finales y
acelera el proceso de desarrollo al garantizar que la
base de código esté siempre en un estado
desplegable.”
AI IMPACTS ON CONTINUOUS INTEGRATION
Case Study
CodeMerge Solutions
Scenario: Implemented AI-
driven code review tools in CI
pipeline.
Outcome: Decreased
integration time by 35% and
improved code quality metrics.
“AI streamlines integration, ensuring
rapid and reliable code merges.”
“La IA agiliza la integración, asegurando
fusiones de código rápidas y confiables.”
Caso de estudio
CodeMerge Solutions
Escenario: Implementaron
herramientas de revisión de
código impulsadas por IA en la
canalización de Integración
Continua (CI).
Resultado: Redujeron el tiempo
de integración en un 35% y
mejoraron los indicadores de
calidad del código.
GitHub Copilot, Jenkins with ML
plugins, SonarQube.
DEVOPS CONTINUOUS TESTING PILLAR
“Continuous Testing helps organizations achieve faster
release cycles while maintaining high-quality
standards. By embedding testing into the development
lifecycle, it allows for the early detection and resolution
of defects, which reduces the cost and time associated
with fixing issues later in the process.”
“Las Pruebas Continuas (Continuous Testing) ayudan
a las organizaciones a lograr ciclos de lanzamiento
más rápidos sin sacrificar los estándares de calidad.
Al integrar las pruebas dentro del ciclo de vida del
desarrollo, permiten la detección y resolución
temprana de defectos, lo cual reduce el costo y el
tiempo asociados con la corrección de problemas en
etapas posteriores.”
AI IMPACTS ON CONTINUOUS TESTING
Case Study
QualityFirst Tech.
Scenario: Deployed AI tools for
automated test generation and
execution.
Outcome: Achieved a 50%
reduction in testing time and
improved defect detection
rates.
"AI enhances testing efficiency, catching
defects early and reducing manual
effort."
"La IA mejora la eficiencia de las pruebas,
detectando defectos tempranamente y
reduciendo el esfuerzo manual."
Caso de estudio
QualityFirst Tech
Escenario: Se implementaron
herramientas de IA para la generación
y ejecución automatizada de
pruebas.
Resultado: Se logró una reducción
del 50% en el tiempo de prueba y se
mejoró la tasa de detección de
defectos.
Test.ai, Applitools, Selenium
con integraciones de IA.
ELASTIC INFRASTRUCTURE PILLAR
“The Elastic Infrastructure pillar enables organizations to
respond swiftly to changing demands, ensuring consistent
performance and availability of applications across all
environments. It allows for rapid provisioning and de-
provisioning of development and test environments, speeding
up the development and delivery processes. It helps simulate
production-like environments for accurate testing. “
“El pilar de infraestructura elástica permite a las
organizaciones responder rápidamente a las demandas
cambiantes, garantizando un rendimiento y una
disponibilidad consistentes para las aplicaciones en
todos los entornos. Permite la provisión y desprovisión
rápida de entornos de desarrollo y prueba, acelerando los
procesos de desarrollo y entrega. Ayuda a simular
entornos similares a producción para realizar pruebas
precisas.”
AI IMPACTS ON ELASTIC INFRASTRUCTURE
Case Study
CloudFlex Enterprises.
Scenario: Leveraged AI for
dynamic scaling and resource
management.
Outcome: Reduced infrastructure
costs by 20% and improved
application uptime.
“AI ensures infrastructure adapts
dynamically, optimizing performance
and cost."
“La IA garantiza que la infraestructura se adapte
dinámicamente, optimizando el rendimiento y el
costo.”
Caso de estudio
CloudFlex Enterprises
Escenario: Aprovechó la IA para
escalado dinámico y gestión de
recursos.
Resultado: Redujo los costos de
infraestructura en un 20 % y mejoró
el tiempo de funcionamiento
ininterrumpido de las aplicaciones.
AWS Auto Scaling con ML
Gestión de recursos
impulsada por IA de Google
Cloud
Azure Monitor
CONTINUOUS MONITORING PILLAR
“Continuous Monitoring ensures that organizations
have a complete view of their system's health and
performance during the entire software
development lifecycle.”
“La Monitorización Continua garantiza que las
organizaciones tengan una visión completa del
estado y rendimiento de sus sistemas durante todo
el ciclo de vida del desarrollo de software.”
AI IMPACTS ON CONTINUOUS MONITORING
Case Study
MonitorPro Inc.
Scenario: Integrated AI tools
for continuous system
monitoring.
Outcome: Detected and
resolved issues 40% faster,
enhancing user satisfaction.
"AI-driven monitoring proactively
identifies issues, ensuring system
reliability."
“La supervisión impulsada por IA identifica
problemas de forma proactiva, garantizando
la fiabilidad del sistema.”
Caso de estudio
MonitorPro Inc.
Escenario: Integración de
herramientas de IA para la
supervisión continua del
sistema.
Resultado: Los problemas se
detectaron y resolvieron un 40 %
más rápido, mejorando la
satisfacción del usuario.
Datadog con funciones de IA,
Splunk, New Relic.
CONTINUOUS SECURITY PILLAR
“Continuous Security ensures that security
vulnerabilities are detected and addressed early in the
development lifecycle, reducing the likelihood of
deploying insecure applications or infrastructure. It
provides a proactive security approach, minimizing the
risk of breaches and ensuring compliance with security
standards.”
“La Seguridad Continua garantiza que las
vulnerabilidades de seguridad se detecten y aborden
tempranamente en el ciclo de vida del desarrollo, lo
que reduce la probabilidad de implementar
aplicaciones o infraestructuras inseguras. Proporciona
un enfoque de seguridad proactivo, minimizando el
riesgo de violaciones de seguridad y asegurando el
cumplimiento de los estándares de seguridad.”
AI IMPACTS ON CONTINUOUS SECURITY
Case Study
SecureNet Solutions.
Scenario: Employed AI for
proactive threat detection and
mitigation.
Outcome: Reduced security
breaches by 60% and improved
compliance posture.
"AI fortifies security by anticipating threats
and automating defenses."
"La IA refuerza la seguridad anticipando
amenazas y automatizando las defensas."
Caso de estudio
SecureNet Solutions
Escenario: Implementó
inteligencia artificial para la
detección proactiva de amenazas y
su mitigación automática.
Resultado: Redujo los incidentes
de seguridad en un 60 % y
fortaleció significativamente el
cumplimiento normativo.
CONTINUOUS DELIVERY PILLAR
“Continuous Delivery and Deployment allows for
frequent, reliable releases, reduces the risk of deploying
changes, and accelerates the feedback loop between
developers and users. This leads to faster innovation,
higher-quality software, and a more responsive
approach to market and customer demands.”
“La Entrega y Despliegue Continuos permiten
lanzamientos frecuentes y confiables, reducen el
riesgo al implementar cambios y aceleran el ciclo de
retroalimentación entre los desarrolladores y los
usuarios. Esto conduce a una innovación más rápida,
software de mayor calidad y una respuesta más ágil a
las demandas del mercado y de los clientes.”
AI IMPACTS ON CONTINUOUS DELIVERY
Case Study
DeliverFast Corp.
Scenario: Integrated AI into
their CD pipeline for optimized
deployments.
Outcome: Shortened release
cycles by 45% and enhanced
deployment success rates.
" AI accelerates delivery pipelines,
ensuring timely and reliable releases.“
"La IA acelera las canalizaciones de
entrega, garantizando lanzamientos
oportunos y confiables."
Estudio de caso
DeliverFast Corp.
Escenario: Integró IA en su
canalización de entrega continua
(CD) para optimizar los
despliegues.
Resultado: Acortó los ciclos de
lanzamiento en un 45 % y mejoró
las tasas de éxito de los
despliegues.
Spinnaker con módulos de IA,
Harness, Azure DevOps.
SUMMARY: AI IMPACTS ON THE NINE PILLARS
Leadership: real-time insights, fostering proactive
and strategic decision-making.
Collaborative Culture: bridges communication
gaps, cultivating a cohesive and collaborative team
environment. Design for DevOps: Intelligent
architecture, scalability forecasting, automated
compliance
Continuous Integration: streamlines integration,
ensuring rapid and reliable code merges.
Continuous Testing: enhances testing efficiency,
catching defects early and reducing manual effort.
Elastic Infrastructure: infrastructure adapts
dynamically, optimizing performance and cost.
Continuous Monitoring: proactively identifies
issues, ensuring system reliability.
Continuous Security: fortifies security by
anticipating threats and automating defenses.
Continuous Delivery: accelerates delivery
pipelines, ensuring timely and reliable releases.
Liderazgo: La información en tiempo real fomenta la toma de
decisiones proactiva y estratégica.
Cultura Colaborativa: Cierra las brechas de comunicación,
fomentando un entorno de equipo cohesionado y
colaborativo.
Diseño para DevOps: Arquitectura inteligente, predicción de
escalabilidad y cumplimiento automatizado.
Integración Continua: Optimiza la integración, asegurando
fusiones de código rápidas y confiables.
Pruebas Continuas: Mejora la eficiencia de las pruebas,
detectando defectos tempranamente y reduciendo el esfuerzo
manual.
Infraestructura Elástica: Garantiza que la infraestructura se
adapte dinámicamente, optimizando el rendimiento y el
costo.
Monitoreo Continuo: Identifica problemas de manera
proactiva, asegurando la confiabilidad del sistema.
Seguridad Continua: La IA refuerza la seguridad anticipando
amenazas y automatizando defensas.
Entrega Continua: La IA acelera los pipelines de entrega,
asegurando lanzamientos oportunos y confiables.
• AI-Driven Autonomation
will dominate CI/CD
pipelines
• GenAI will enable AI-
powered collaboration
across Dev, Sec, and
Ops
• Predictive and
prescriptive
Observability Will
become the norm
• Continuous
Compliance and Policy-
as-Code will be fully
automated
• La automatización
autónoma impulsada por
IA dominará los flujos
CI/CD
• La IA generativa habilitará
la colaboración entre
Dev, Sec y Ops
• La observabilidad
predictiva y prescriptiva
se convertirá en la norma
• El cumplimiento
continuo y las políticas
como código estarán
completamente
automatizados
PREDICTION FOR AI IMPACTS ON DEVOPS
www.engineeringdevops.com
mhornbeek@engineeringdevops.com
2025 New Release
Marc Hornbeek - Books
Discounted pricing during the DevOps Days book signing event.
Precios con descuento durante el evento de firma de libros en DevOpsDays.
Intelligent-Institute.com Discount Code: devopsdays50%
Intelligent-Institute.com Código de Descuento: devopsdays50%
Marc Hornbeek
mhornbeek@engineeringdevops.com
+1 805 908 5789
www.linkedin.com/in/marc
hornbeek/
www.engineeringdevops.com
www.intelligent-Institute.com
Gracias
Preguntas?

Hornbeek - Nine Pillars Augmented with AI.pdf

  • 1.
    Engineering the Future: AI-AugmentedDevOps Through the Nine Pillars of Excellence La Ingeniería del Futuro: DevOps Potenciado con IA a través de los Nueve Pilares de la Excelencia Marc Hornbeek
  • 2.
    Marc Hornbeek “DevOps_the_Gray” P.Eng., B.Sc./EE, MBA IEEE Outstanding Engineer CEO, Engineering DevOps Consulting • Digital Transformation Consultant • Author • Instructor Topics: Continuous Testing, DevOps, DevSecOps, Site Reliability Engineering, Intelligent Continuous Security, Engineering leadership
  • 3.
    DEVOPS NINE PILLARSOF PRACTICES • Foundation built on orchestration, automation and governance. • Supports well-engineered value streams, releases and continuous delivery pipelines. 1. Leadership 2. Collaborative Culture 3. Design for DevOps 4. Continuous Integration 5. Continuous Testing 6. Elastics Infrastructure 7. Continuous Monitoring 8. Continuous Security 9. Continuous Delivery 1. Liderazgo 2. Cultura Colaborativa 3. Diseño para DevOps 4. Integración Continua 5. Pruebas Continuas 6. Infraestructura Elástica 7. Monitoreo Continuo, 8. Seguridad Continua 9. Entrega Continua. • Una base construida sobre orquestación, automatización y gobernanza. • Sustenta flujos de valor, versiones y canalizaciones de entrega continua bien diseñadas.
  • 4.
    DEVOPS LEADERSHIP PILLAR “Withoutstrong leadership, DevOps becomes a disconnected set of tools and tasks—not a sustainable, evolving culture.” Visionary Thinking, Systems Thinking, Servant Leadership, Cultural Stewardship, Data-Driven Decision Making, Collaboration Champion, Adaptability and Continuous Learning, Technical Fluency, Resilience and Grit, and Security and Compliance Awareness. "Sin un liderazgo sólido, DevOps se convierte en un conjunto desconectado de herramientas y tareas, no en una cultura sostenible y en evolución.“ Pensamiento Visionario, Pensamiento Sistémico, Liderazgo Servicial, Custodia Cultural, Toma de Decisiones Basada en Datos, Promotor de la Colaboración, Adaptabilidad y Aprendizaje Continuo, Fluidez Técnica, Resiliencia y Determinación, y Conciencia de Seguridad y Cumplimiento.
  • 5.
    AI IMPACTS ONDEVOPS LEADERSHIP “AI empowers leaders with real-time insights, fostering proactive and strategic decision-making.” Case Study TechNova Corp. Scenario: Implemented AI analytics to monitor team performance and project health. Outcome: Improved project delivery timelines by 25% and enhanced team morale through data-driven leadership. "La IA empodera a los líderes con información en tiempo real, fomentando una toma de decisiones proactiva y estratégica." Caso de estudio TechNova Corp. Escenario: Se implementó análisis con IA para monitorear el rendimiento del equipo y la salud del proyecto. Resultado: Mejoró los tiempos de entrega de proyectos en un 25 % y mejoró el estado de ánimo del equipo mediante un liderazgo basado en datos. Tableau, Power BI, IBM Watson Analytics.
  • 6.
    COLLABORATIVE CULTURE PILLAR “Aculture that values open communication, continuous learning, collaboration, accountability, and a willingness to embrace change works best with DevOps.” “Una cultura que valora la comunicación abierta, el aprendizaje continuo, la colaboración, la responsabilidad y la disposición a aceptar el cambio funciona mejor con DevOps.”
  • 7.
    AI IMPACTS ONCOLLABORATIVE CULTURE Case Study DevSync Ltd. Scenario: Adopted AI-driven communication tools to enhance remote team collaboration. Outcome: Increased cross- functional project success rates by 30% and reduced communication delays. “AI bridges communication gaps, cultivating a cohesive and collaborative team environment.” "La inteligencia artificial cierra brechas de comunicación, cultivando un entorno de equipo cohesionado y colaborativo." Caso de estudio DevSync Ltd. Escenario: Adoptó herramientas de comunicación impulsadas por IA para mejorar la colaboración de equipos remotos. Resultado: Aumentó en un 30 % la tasa de éxito de proyectos multifuncionales y redujo los retrasos en la comunicación. Slack con integraciones de IA, Microsoft Teams, CultureAmp.
  • 8.
    DESIGN FOR DEVOPSPILLAR "Design for DevOps" is crucial for organizations transforming to higher performance DevOps because it ensures that systems are built to support rapid, reliable, and repeatable deployments, leading to faster time-to-market and improved quality.” “Diseñar para DevOps” es fundamental para las organizaciones que están transformándose hacia un DevOps de alto rendimiento, porque asegura que los sistemas estén construidos para soportar implementaciones rápidas, confiables y repetibles, lo que se traduce en un menor tiempo de salida al mercado y una mejor calidad.
  • 9.
    AI IMPACTS ONDESIGN FOR DEVOPS Case Study SoftStruct Inc. Scenario: Utilized AI tools for architectural design and compliance validation. Outcome: Reduced design errors by 40% and accelerated deployment readiness. “Integrating AI in design ensures scalable, compliant, and efficient system architecture.” “Integrar la inteligencia artificial en el diseño garantiza una arquitectura de sistemas escalable, conforme y eficiente.” Caso de estudio SoftStruct Inc. Escenario: Utilizó herramientas de inteligencia artificial para el diseño arquitectónico y la validación de cumplimiento. Resultado: Redujo los errores de diseño en un 40 % y aceleró la preparación para el despliegue. AWS Well-Architected Tool, Azure Advisor, IBM Cloud Pak.
  • 10.
    “Continuous Integration isvital because it helps catch bugs early in the development cycle, reduces integration problems, and allows for faster iterations. It improves code quality, reduces the risk of late-stage issues, and accelerates the development process by ensuring that the codebase is always in a deployable state.” CONTINUOUS INTEGRATION (CI) PILLAR “La Integración Continua es vital porque ayuda a detectar errores temprano en el ciclo de desarrollo, reduce los problemas de integración y permite iteraciones más rápidas. Mejora la calidad del código, reduce el riesgo de problemas en etapas finales y acelera el proceso de desarrollo al garantizar que la base de código esté siempre en un estado desplegable.”
  • 11.
    AI IMPACTS ONCONTINUOUS INTEGRATION Case Study CodeMerge Solutions Scenario: Implemented AI- driven code review tools in CI pipeline. Outcome: Decreased integration time by 35% and improved code quality metrics. “AI streamlines integration, ensuring rapid and reliable code merges.” “La IA agiliza la integración, asegurando fusiones de código rápidas y confiables.” Caso de estudio CodeMerge Solutions Escenario: Implementaron herramientas de revisión de código impulsadas por IA en la canalización de Integración Continua (CI). Resultado: Redujeron el tiempo de integración en un 35% y mejoraron los indicadores de calidad del código. GitHub Copilot, Jenkins with ML plugins, SonarQube.
  • 12.
    DEVOPS CONTINUOUS TESTINGPILLAR “Continuous Testing helps organizations achieve faster release cycles while maintaining high-quality standards. By embedding testing into the development lifecycle, it allows for the early detection and resolution of defects, which reduces the cost and time associated with fixing issues later in the process.” “Las Pruebas Continuas (Continuous Testing) ayudan a las organizaciones a lograr ciclos de lanzamiento más rápidos sin sacrificar los estándares de calidad. Al integrar las pruebas dentro del ciclo de vida del desarrollo, permiten la detección y resolución temprana de defectos, lo cual reduce el costo y el tiempo asociados con la corrección de problemas en etapas posteriores.”
  • 13.
    AI IMPACTS ONCONTINUOUS TESTING Case Study QualityFirst Tech. Scenario: Deployed AI tools for automated test generation and execution. Outcome: Achieved a 50% reduction in testing time and improved defect detection rates. "AI enhances testing efficiency, catching defects early and reducing manual effort." "La IA mejora la eficiencia de las pruebas, detectando defectos tempranamente y reduciendo el esfuerzo manual." Caso de estudio QualityFirst Tech Escenario: Se implementaron herramientas de IA para la generación y ejecución automatizada de pruebas. Resultado: Se logró una reducción del 50% en el tiempo de prueba y se mejoró la tasa de detección de defectos. Test.ai, Applitools, Selenium con integraciones de IA.
  • 14.
    ELASTIC INFRASTRUCTURE PILLAR “TheElastic Infrastructure pillar enables organizations to respond swiftly to changing demands, ensuring consistent performance and availability of applications across all environments. It allows for rapid provisioning and de- provisioning of development and test environments, speeding up the development and delivery processes. It helps simulate production-like environments for accurate testing. “ “El pilar de infraestructura elástica permite a las organizaciones responder rápidamente a las demandas cambiantes, garantizando un rendimiento y una disponibilidad consistentes para las aplicaciones en todos los entornos. Permite la provisión y desprovisión rápida de entornos de desarrollo y prueba, acelerando los procesos de desarrollo y entrega. Ayuda a simular entornos similares a producción para realizar pruebas precisas.”
  • 15.
    AI IMPACTS ONELASTIC INFRASTRUCTURE Case Study CloudFlex Enterprises. Scenario: Leveraged AI for dynamic scaling and resource management. Outcome: Reduced infrastructure costs by 20% and improved application uptime. “AI ensures infrastructure adapts dynamically, optimizing performance and cost." “La IA garantiza que la infraestructura se adapte dinámicamente, optimizando el rendimiento y el costo.” Caso de estudio CloudFlex Enterprises Escenario: Aprovechó la IA para escalado dinámico y gestión de recursos. Resultado: Redujo los costos de infraestructura en un 20 % y mejoró el tiempo de funcionamiento ininterrumpido de las aplicaciones. AWS Auto Scaling con ML Gestión de recursos impulsada por IA de Google Cloud Azure Monitor
  • 16.
    CONTINUOUS MONITORING PILLAR “ContinuousMonitoring ensures that organizations have a complete view of their system's health and performance during the entire software development lifecycle.” “La Monitorización Continua garantiza que las organizaciones tengan una visión completa del estado y rendimiento de sus sistemas durante todo el ciclo de vida del desarrollo de software.”
  • 17.
    AI IMPACTS ONCONTINUOUS MONITORING Case Study MonitorPro Inc. Scenario: Integrated AI tools for continuous system monitoring. Outcome: Detected and resolved issues 40% faster, enhancing user satisfaction. "AI-driven monitoring proactively identifies issues, ensuring system reliability." “La supervisión impulsada por IA identifica problemas de forma proactiva, garantizando la fiabilidad del sistema.” Caso de estudio MonitorPro Inc. Escenario: Integración de herramientas de IA para la supervisión continua del sistema. Resultado: Los problemas se detectaron y resolvieron un 40 % más rápido, mejorando la satisfacción del usuario. Datadog con funciones de IA, Splunk, New Relic.
  • 18.
    CONTINUOUS SECURITY PILLAR “ContinuousSecurity ensures that security vulnerabilities are detected and addressed early in the development lifecycle, reducing the likelihood of deploying insecure applications or infrastructure. It provides a proactive security approach, minimizing the risk of breaches and ensuring compliance with security standards.” “La Seguridad Continua garantiza que las vulnerabilidades de seguridad se detecten y aborden tempranamente en el ciclo de vida del desarrollo, lo que reduce la probabilidad de implementar aplicaciones o infraestructuras inseguras. Proporciona un enfoque de seguridad proactivo, minimizando el riesgo de violaciones de seguridad y asegurando el cumplimiento de los estándares de seguridad.”
  • 19.
    AI IMPACTS ONCONTINUOUS SECURITY Case Study SecureNet Solutions. Scenario: Employed AI for proactive threat detection and mitigation. Outcome: Reduced security breaches by 60% and improved compliance posture. "AI fortifies security by anticipating threats and automating defenses." "La IA refuerza la seguridad anticipando amenazas y automatizando las defensas." Caso de estudio SecureNet Solutions Escenario: Implementó inteligencia artificial para la detección proactiva de amenazas y su mitigación automática. Resultado: Redujo los incidentes de seguridad en un 60 % y fortaleció significativamente el cumplimiento normativo.
  • 20.
    CONTINUOUS DELIVERY PILLAR “ContinuousDelivery and Deployment allows for frequent, reliable releases, reduces the risk of deploying changes, and accelerates the feedback loop between developers and users. This leads to faster innovation, higher-quality software, and a more responsive approach to market and customer demands.” “La Entrega y Despliegue Continuos permiten lanzamientos frecuentes y confiables, reducen el riesgo al implementar cambios y aceleran el ciclo de retroalimentación entre los desarrolladores y los usuarios. Esto conduce a una innovación más rápida, software de mayor calidad y una respuesta más ágil a las demandas del mercado y de los clientes.”
  • 21.
    AI IMPACTS ONCONTINUOUS DELIVERY Case Study DeliverFast Corp. Scenario: Integrated AI into their CD pipeline for optimized deployments. Outcome: Shortened release cycles by 45% and enhanced deployment success rates. " AI accelerates delivery pipelines, ensuring timely and reliable releases.“ "La IA acelera las canalizaciones de entrega, garantizando lanzamientos oportunos y confiables." Estudio de caso DeliverFast Corp. Escenario: Integró IA en su canalización de entrega continua (CD) para optimizar los despliegues. Resultado: Acortó los ciclos de lanzamiento en un 45 % y mejoró las tasas de éxito de los despliegues. Spinnaker con módulos de IA, Harness, Azure DevOps.
  • 22.
    SUMMARY: AI IMPACTSON THE NINE PILLARS Leadership: real-time insights, fostering proactive and strategic decision-making. Collaborative Culture: bridges communication gaps, cultivating a cohesive and collaborative team environment. Design for DevOps: Intelligent architecture, scalability forecasting, automated compliance Continuous Integration: streamlines integration, ensuring rapid and reliable code merges. Continuous Testing: enhances testing efficiency, catching defects early and reducing manual effort. Elastic Infrastructure: infrastructure adapts dynamically, optimizing performance and cost. Continuous Monitoring: proactively identifies issues, ensuring system reliability. Continuous Security: fortifies security by anticipating threats and automating defenses. Continuous Delivery: accelerates delivery pipelines, ensuring timely and reliable releases. Liderazgo: La información en tiempo real fomenta la toma de decisiones proactiva y estratégica. Cultura Colaborativa: Cierra las brechas de comunicación, fomentando un entorno de equipo cohesionado y colaborativo. Diseño para DevOps: Arquitectura inteligente, predicción de escalabilidad y cumplimiento automatizado. Integración Continua: Optimiza la integración, asegurando fusiones de código rápidas y confiables. Pruebas Continuas: Mejora la eficiencia de las pruebas, detectando defectos tempranamente y reduciendo el esfuerzo manual. Infraestructura Elástica: Garantiza que la infraestructura se adapte dinámicamente, optimizando el rendimiento y el costo. Monitoreo Continuo: Identifica problemas de manera proactiva, asegurando la confiabilidad del sistema. Seguridad Continua: La IA refuerza la seguridad anticipando amenazas y automatizando defensas. Entrega Continua: La IA acelera los pipelines de entrega, asegurando lanzamientos oportunos y confiables.
  • 23.
    • AI-Driven Autonomation willdominate CI/CD pipelines • GenAI will enable AI- powered collaboration across Dev, Sec, and Ops • Predictive and prescriptive Observability Will become the norm • Continuous Compliance and Policy- as-Code will be fully automated • La automatización autónoma impulsada por IA dominará los flujos CI/CD • La IA generativa habilitará la colaboración entre Dev, Sec y Ops • La observabilidad predictiva y prescriptiva se convertirá en la norma • El cumplimiento continuo y las políticas como código estarán completamente automatizados PREDICTION FOR AI IMPACTS ON DEVOPS
  • 24.
    www.engineeringdevops.com mhornbeek@engineeringdevops.com 2025 New Release MarcHornbeek - Books Discounted pricing during the DevOps Days book signing event. Precios con descuento durante el evento de firma de libros en DevOpsDays. Intelligent-Institute.com Discount Code: devopsdays50% Intelligent-Institute.com Código de Descuento: devopsdays50%
  • 25.
    Marc Hornbeek mhornbeek@engineeringdevops.com +1 805908 5789 www.linkedin.com/in/marc hornbeek/ www.engineeringdevops.com www.intelligent-Institute.com
  • 26.