Berlin 06. März 2015
Integriertes Wasserressourcen- Management
(IWRM) in Zentralasien: Modellregion Mongolei
(MoMo) - Phase III
Wassertechnologien
Dr. Buren Scharaw
Fraunhofer IOSB-AST
Am Vogelherd 50, 98693 Ilmenau, Germany
Telefon: +49 (0) 3677 / 461-121,
mailto: buren.scharaw@iosb-ast.fraunhofer.de
Berlin 06. März 2015
Model Region: River Basin Kharaa, City of Darkhan
Kharaa River Basin 
Kharaa Catchment area ~15.015 km2
Kharaa flow at Darkhan: MQ ca. 10,5 m3/s
Catchment Orkhon (~132.835 km2), 
Catchment Selenge (~280.000 km2), 
Baikalsee, Russland
Population of Darkhan ca. 90.000 
Darkhan
Berlin 06. März 2015
The IWRM-MoMo Project : Past, Present & Future
Kharaa River basin,
Urban and rural water management analysis,
city of Darkhan and Orkhon Sum
Identification of
Testing of measures
• Evaluation of proposed measures from MoMo 1
pilot measures
• Methods for multi-disciplinary planning of effective
and efficient measures toolbox model
Implementation of measures
• application and optimisation of measures,
• evaluation of the IWRM approach.
• existing problems
• impacts on population & environment
• effective programs of measure.
1
2006
2009
2017
2010
2014
2
3
PastPresentFuture
Berlin 06. März 2015Page 4
IWRM systems approach…
Ground Water
Agriculture
Nat. Land-use
Wastewater
Drinking Water
Atmosphere / Climate
Stagnant Waters
Implementation
Running Waters
CapacityDevelopment
System Analysis and ScenariosInstitutiontionalConditions
Berlin 06. März 2015
Air Temperature Change Mongolia
-2
-1
0
1
2
3
4
5
Temperature[°C]
A2 CNCM3
A2 ECHAM5
A2 IPSL
B1 CNCM3
B1 ECHAM5
B1 IPSL
WFD
Berlin 06. März 2015
Air Temperature Change Mongolia
1971-2000
2071-2100 (B1-CNCM3) 2071-2100 (A2-ECHAM5)
Berlin 06. März 2015
Water Availability Change Mongolia
Water availability [mm]
Berlin 06. März 2015
Water Availability Change Mongolia
2071‐2100
Berlin 06. März 2015
Overview and Objectives
Implementation of pilot measures based on results of MoMo phase 1
area
urban area
(city of Darkhan)
suburban area
(ger settlements)
rural area
(rural settlements)
Problem
identification
Phase I
• Data collection, online measures,
• Problem identification,
• Analyses,
• Proposals of optimal solutions
Methods
Approaches
Phase II
• Ground water simulation by
MODFLOW
• central water supply with optimal
management by HydroDyn,
• central wastewater treatment (reuse of
water and nutrients)
• water kiosks & wells for water
supply
• decentralized collection of faeces
and transport to central wastewater
treatment plant
• participative development of
measures
• drinking water supply
• Decentralized / semi centralized
treatment
• WSB-Technology for
decentralized waste water
treatment
Pilot measures
Phase II
• location of leakages of the water
supply system in Darkhan,
• central wwtp (SBR), pilot plant scale
central anaerobic treatment of faeces
of ger camps (biogas plant)
• collect and bring system for water
supply and faeces („small business“)
• possibly additional pilot measures
• location analysis
ecotechnical wastewater
treatment (PPA)
• Small sewage works / small wwtp
(WSB® Technology at
Kindergarten in Orkhon Sum
Berlin 06. März 2015
Drinking water extraction in Darkhan city:
Ground water monitoring
18 wells of USAG (depth: 60-70m)
8 km south of Darkhan
bank filtrate
~ 9.700 m³/day
8 wells of Thermal Power Plant
(depth: 70-80m)
~ 8.300 m³/day
13 wells of other industries
(brick manufacture, tannery)
USAG wells
TPP wells
Darkhan (~ 80 000)
Berlin 06. März 2015
Drinking water extraction:
Monitoring Ground water situation
10 pressure transducers measure
ground water level continuously
Berlin 06. März 2015
• 3-D finite-difference model
• Open source, published by the U.S. Geological Survey
• Used version: MODFLOW-2005 http://water.usgs.gov
• The 3-D model domain (e.g. aquifer system) is discretized into a
block of grids called cells
• For each cell the hydraulic properties (e.g. conductivity, storativity)
are defined
• Layers correspond to horizontal hydrogeological units
• In each cell there is a point called “node” at which hydraulic head is
calculated
Ground water flow modelling with MODFLOW
Drinking water extraction:
Ground water modellig
Berlin 06. März 2015
simulated steady-state water table (hydraulic head) for warm season (April-October)
Drinking water extraction:
Ground water simulation results
• represents average flow conditions
• Warm season =>
- river and soil water not frozen
- groundwater recharge (10mm/year)
• GW-flow in alluvial aquifer from South
to North parallel to Kharaa River
draw down in 8 TPP
wells galary is larger
than in 18 USAG
wells galary
TPP wells are further
away from
the Kharaa River
Berlin 06. März 2015
Water balance:
Water flow into the model domain Kharaa River larges contribution
Water flow out of model domain pumping wells larges contribution
Kharaa River:
important water source
for Darkhan
Drinking water extraction:
Ground water simulation results
Berlin 06. März 2015
Drinking water extraction:
Assessment of ground water quality
Berlin 06. März 2015
Drinking water supply in city of Darkhan
• 18 groundwater wells near the river Kharaa
(depth 70m) with ~70.000 m3/d capacity
• 6 tanks
• 225 km network pipes
• ca. 18.000 m3/d demands
• Old and often broken down network
infrastructure (pumps, pipes, valves)
• High water losses in the DWSN
• 3 distribution zones (Old Darkhan, New Darkhan
and Industry)
• Rehabilitation of distribution network
Berlin 06. März 2015
Drinking Water Supply
• Leak Detection - sensor test installation with GSM
communication
• Software Interfaces - data exchange between
sensor SCADA and HydroDyn
• Chemical Backtrace-Contamination source - new
model for mixing in network nodes implemented
(bulk-advective-model)
• Sensor Installation – 10 multiparameter sensors
for darkhan water network [April-May 2011]
Drinking Water Supply
Berlin 06. März 2015
Water production and water losses in distribution network
Drinking Water Supply:
Concept
Berlin 06. März 2015
Water balance in city of Darkhan
Berlin 06. März 2015
300
350
400
450
500
550
9 12 15 18 21 0 3 6 9
[m³/h]
Time
Daily Demand Profiles Darkhan
Sunday Monday
Tuesday Wednesday
Thursday Friday
Saturday
Indicator for high leak flow
Largest Demand 525m³/h
High nightly
demand 340m³/h
Drinking Water Supply:
Leakage
Berlin 06. März 2015
Drinking Water Supply:
Installation of sensors
Pin-Pointing of Leakages by
Field Measurements
• Workshop with USAG
employees in Summer 2012
in the Mangit area (Capacity
Development)
• Training of usage of SebaKMT
noise loggers, correlators and
ground microphones
Berlin 06. März 2015
small pressure drop
Flow change
Drinking Water Supply:
results from leakage detection
Comparing the results between
• online measurement-data from sensors and
• simulation by HydroDyn
Proposal for rehabilitation of the pipe lines
(2013 3 km and 18 km in 2013
by local company USAG Darkhan
Reducing the leakages by 5%-7%
Berlin 06. März 2015
Zentrale Abwasserbehandlung (ZKA)
• ZKA-Darkhan wurde 1964 gebaut (51 Jahre)
• Ablaufwerte sind schlecht
• Erfassung der online Messwerte seit 2006 zur
Überwachung der Prozessabläufe
• Entwicklung des Simulationstools der ZKA
• Erd- und Bauarbeiten, Bauüberwachung,
Installation und Erprobung einer SBR-
Demonstrationsanlage auf der ZKA Darkhan/p2m
• Inbetriebnahme am 10. Sep.2011 durch
Staatsekretärin Frau Erdenezezeg / Bau und
Infrastruktur Ministerium
Berlin 06. März 2015
Aufgabe in MoMo3
Zentrale Abwasserbehandlung Darkhan
• Fortführung und Erweiterung des Online-Monitoring der
Prozesse auf der zentralen Kläranlage Darkhan
• Untersuchung der Abwässer aus Industrien ->
Vorklärung von Industriewässern
• Erstellung eines Konzeptes zur Instandsetzung der
Abwasserkanalisation mit 3 Pumpstationen (223km)
• Fachliche Begleitung der lokalen Behörden bei
Vorbereitung der Ausschreibungsunterlagen für den Bau
bzw. Rekonstruktion der Zentralkläranlage in den
Städten Darkhan
• Beteiligung bei der Ausschreibung mit der Fa. p2m
• Initiativen für die Übertragung der im IWRM-MoMo
Projekt getesteten Technologien
Berlin 06. März 2015
Waste water treatment:
the tested SBR Pilot Plant
Task: Construction and operation of
an SBR Pilot Plant
• Pilot plant site selected at the WWTP
Darkhan
• Planning of the Pilot Plant completed
• Drawings submitted to USAG
• Machinery Parts ordered and packed for
transportation to Darkhan
• PLC programming in progress
• Start-up planed in may 2011
• All action in scheduled time and costs as
submitted with proposal
Berlin 06. März 2015
Preliminary Design of Large-scale WWTP
by SBR-Technology
Berlin 06. März 2015
Small Waste Water Treatment Plant
Decentralized Waste Water Management
Pre-treatment - Biological stage - Final clarification
Biological stage with Biofilm Carrier
Working plan
04.2011 – 06.2011 - construction work
06.2011 - start-up
07.2011 – 01.2013 - operating time
Modification
• Location adaptation
• plant size form 20 to 50 PE
Treatment Plant
• for a kindergarten
• in Orkhon soum
• Capacity 50 PE
Berlin 06. März 2015
Anpassung der Technologie
Vorklärung Biologie –
Wirbel- Schwebebettreaktor Nachklärung
Zulauf
Ablauf
Berlin 06. März 2015
Anpassung der Technik
Nachklärung Biologie
Vorklärung und
Schlammspeicher
Berlin 06. März 2015
Dezentrale Abwasserbehandlung
für ländliche Gebiete
- Koordination der Umsetzungsmaßnahmen
- Erd- und Bauarbeiten der
Demonstrationsanlage am Kindergarten in
Orkhon Sum für 50 EWG
- Bauüberwachung,
- Ferngesteuerte Prozessüberwachung,
- Erfolgreiche Umsetzung und Anpassung der
WSB-Technologie
- Erfolgreiche Demonstration und Vermarktung
Berlin 06. März 2015
Implementation in Mongolia
1. Төв аймаг,
2. Булган аймаг,
3. Өвөрхангай аймаг,
4. Эрдэнэт,
5. Улаанбаатар
Berlin 06. März 2015
Waste Water Treatment Plant with
Integrated Wood Production
Objective A Identify an affordable waste water treatment approach that is compatible with
the harsh climatic conditions of the Darkhan region.
Objective B Utilise waste water components for local environmental and economic benefit.
M A M J J A S O N D J F M A M J J A S O N D J F M A
No. Task
1 Preliminary design
2 Design development
3 Detailed design
4 Tender documents
5 Construction documents
6 Preparation for additional trials
7 Construction phase 1 (Treatment beds)
8 Plant establishment
9 Bill of Quantities
10 University contract
11 Site selection
12 Tender meetings
13 Construction phase 2 (Irrigation supply)
14 Supporting trials
15 Reporting
16 Maintenance documentation
17 Sampling and monitoring
2011 2012 2013
Distribution system Willow and Poplar trees
Sampling point
Overflow to sewer
Collection pipework
Influent delivery
Location: MUST University
Berlin 06. März 2015
Waste water treatment Ger area: iPiT
intermediate
storage
biogas
plant
• iPiT installation in bag 7
in Darkhan
• Installation of biogas plant
on the CWWTP Darkhan
Berlin 06. März 2015
Capacity Development (2006-2013)
Mongolian Scientists and Stakeholders
in Germany
• Project partners and key persons from
Ministries, Kharaa River Basin Council, Water
Administration and provincial Gouvernement
Darkhan-Uul Aimag, local companies, like
USAG and Universities (MUST, NUM)
University and Schools
• Lectures (MUST Darkhan and NUM)
• Mongolian diploma student - cost analyses of a
new WWTP, at FhAST-Ilmenau
• Supervision of Ph.D. master/bachelor theses to
Mongolian students
• Master Program: Environmental Engineering &
Management (EEM)
• Water Fun Programm at schools (UBZ)
• Technical training course for decentralized
waste water systems (Fraunhofer and UFZ)
Berlin 06. März 2015
Aufgabe in MoMo3
Dezentrale Abwasserbehandlung
• Fernübertragung der Daten und Fernüberwachung der
Prozesse aus Deutschland
• Erstellung eines Betreiber-Modells
• Fachliche Begleitung der lokalen Entscheidungsträger
bei der Ausschreibung und Umsetzung sowie
Übertragung der getesteten WSB-Technologie in
weiteren Regionen
• Mitwirkung bei der Vorbereitung von
Ausschreibungsunterlagen von 6 Anlagen in Tuv,
Bulgan, Uvurkhangai Provinzen in 2015
• Weitere 20 Anlagen werden ausgeschrieben
• Gute Chancen für die Gewinnung der Ausschreibungen
Fraunhofer/Fa. Bergmann
Berlin 06. März 2015
Thank you very much – Баярлалаа

Más contenido relacionado

La actualidad más candente

Solar Sipper Presentation
Solar Sipper PresentationSolar Sipper Presentation
Solar Sipper PresentationSignarama Dtc
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission hydrologywebsite1
 
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering SystemsUsing Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering SystemsProcess Ecology Inc
 
Why do we need new and improved on-line monitoring and data analyses in waste...
Why do we need new and improved on-line monitoring and data analyses in waste...Why do we need new and improved on-line monitoring and data analyses in waste...
Why do we need new and improved on-line monitoring and data analyses in waste...CLIC Innovation Ltd
 
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsHeat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsProcess Ecology Inc
 
Environmental Presentation G 11
Environmental Presentation G 11Environmental Presentation G 11
Environmental Presentation G 11Andrew Salah
 

La actualidad más candente (7)

Soot blowing and advantages
Soot blowing and advantagesSoot blowing and advantages
Soot blowing and advantages
 
Solar Sipper Presentation
Solar Sipper PresentationSolar Sipper Presentation
Solar Sipper Presentation
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering SystemsUsing Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
 
Why do we need new and improved on-line monitoring and data analyses in waste...
Why do we need new and improved on-line monitoring and data analyses in waste...Why do we need new and improved on-line monitoring and data analyses in waste...
Why do we need new and improved on-line monitoring and data analyses in waste...
 
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsHeat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
 
Environmental Presentation G 11
Environmental Presentation G 11Environmental Presentation G 11
Environmental Presentation G 11
 

Destacado

CIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.Сайнсөр
CIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.СайнсөрCIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.Сайнсөр
CIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.Сайнсөрtuvshin111
 
Allgemeinbildung in der Mongolei Impulse für mögliche Beiträge von uns
Allgemeinbildung in der Mongolei Impulse für mögliche Beiträge von unsAllgemeinbildung in der Mongolei Impulse für mögliche Beiträge von uns
Allgemeinbildung in der Mongolei Impulse für mögliche Beiträge von unstuvshin111
 
Projekt: “Mongolische Bürger”
Projekt:   “Mongolische Bürger”Projekt:   “Mongolische Bürger”
Projekt: “Mongolische Bürger”tuvshin111
 
Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...
Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...
Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...tuvshin111
 
Rat der mongolischen und mongolisch-deutschen Vereine in Deutschland
Rat der mongolischen und mongolisch-deutschen Vereine in DeutschlandRat der mongolischen und mongolisch-deutschen Vereine in Deutschland
Rat der mongolischen und mongolisch-deutschen Vereine in Deutschland tuvshin111
 
Bob 50 Brochure
Bob 50 BrochureBob 50 Brochure
Bob 50 BrochureOffiSoft
 
Guia macros y_formularios
Guia macros y_formulariosGuia macros y_formularios
Guia macros y_formulariosJOHN BONILLA
 
Being Social beim Werbeplanung.at Summit 2012
Being Social beim Werbeplanung.at Summit 2012Being Social beim Werbeplanung.at Summit 2012
Being Social beim Werbeplanung.at Summit 2012Anne Breitner
 
Genetic algorithm
Genetic algorithmGenetic algorithm
Genetic algorithmMudit Verma
 
109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...
109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...
109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...Fernando Barrero Arzac
 
Presentaciones con poder - Comunicación / Emprender en la escuela
Presentaciones con poder - Comunicación / Emprender en la escuelaPresentaciones con poder - Comunicación / Emprender en la escuela
Presentaciones con poder - Comunicación / Emprender en la escuelaSocialCooking
 
Actividad de aprendizaje 08
Actividad de aprendizaje   08Actividad de aprendizaje   08
Actividad de aprendizaje 08Fidel DO
 
Revista de Documentos Podologicos
Revista de Documentos PodologicosRevista de Documentos Podologicos
Revista de Documentos PodologicosJorge
 
il Portico 305
il Portico 305il Portico 305
il Portico 305novellara
 

Destacado (20)

CIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.Сайнсөр
CIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.СайнсөрCIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.Сайнсөр
CIM / Олон Улсын Шилжилт Хөдөлгөөн Хөгжлийн Төв - С.Сайнсөр
 
Allgemeinbildung in der Mongolei Impulse für mögliche Beiträge von uns
Allgemeinbildung in der Mongolei Impulse für mögliche Beiträge von unsAllgemeinbildung in der Mongolei Impulse für mögliche Beiträge von uns
Allgemeinbildung in der Mongolei Impulse für mögliche Beiträge von uns
 
Projekt: “Mongolische Bürger”
Projekt:   “Mongolische Bürger”Projekt:   “Mongolische Bürger”
Projekt: “Mongolische Bürger”
 
Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...
Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...
Aktive Mitwirkung in dem Projekt Integriertes Wasserressourcenmanagement in Z...
 
Rat der mongolischen und mongolisch-deutschen Vereine in Deutschland
Rat der mongolischen und mongolisch-deutschen Vereine in DeutschlandRat der mongolischen und mongolisch-deutschen Vereine in Deutschland
Rat der mongolischen und mongolisch-deutschen Vereine in Deutschland
 
Bob 50 Brochure
Bob 50 BrochureBob 50 Brochure
Bob 50 Brochure
 
Guia macros y_formularios
Guia macros y_formulariosGuia macros y_formularios
Guia macros y_formularios
 
Being Social beim Werbeplanung.at Summit 2012
Being Social beim Werbeplanung.at Summit 2012Being Social beim Werbeplanung.at Summit 2012
Being Social beim Werbeplanung.at Summit 2012
 
EU Codeweek Austria Show & Tell der österreichischen Initiativen 2014
EU Codeweek Austria Show & Tell der österreichischen Initiativen 2014 EU Codeweek Austria Show & Tell der österreichischen Initiativen 2014
EU Codeweek Austria Show & Tell der österreichischen Initiativen 2014
 
LA LEY. Especial probatica 15
LA LEY. Especial probatica 15LA LEY. Especial probatica 15
LA LEY. Especial probatica 15
 
Genetic algorithm
Genetic algorithmGenetic algorithm
Genetic algorithm
 
Quy định về quản lý mỹ phẩm (v)
Quy định về quản lý mỹ phẩm (v)Quy định về quản lý mỹ phẩm (v)
Quy định về quản lý mỹ phẩm (v)
 
109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...
109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...
109 Brigada Mixta Ejército Popular Republicano / Elaborada por José Vázquez P...
 
Presentaciones con poder - Comunicación / Emprender en la escuela
Presentaciones con poder - Comunicación / Emprender en la escuelaPresentaciones con poder - Comunicación / Emprender en la escuela
Presentaciones con poder - Comunicación / Emprender en la escuela
 
Actividad de aprendizaje 08
Actividad de aprendizaje   08Actividad de aprendizaje   08
Actividad de aprendizaje 08
 
chromatography
chromatography chromatography
chromatography
 
My publications: HHL news 2013
My publications: HHL news 2013My publications: HHL news 2013
My publications: HHL news 2013
 
Servicio
ServicioServicio
Servicio
 
Revista de Documentos Podologicos
Revista de Documentos PodologicosRevista de Documentos Podologicos
Revista de Documentos Podologicos
 
il Portico 305
il Portico 305il Portico 305
il Portico 305
 

Similar a Integriertes Wasserressourcenmanagement in Zentralasien , Modelregion Mongolei Prof. Dr. Buren Sharaw

Rainwater harvesting efforts in Bangalore_BWSSB_2013
Rainwater harvesting efforts in Bangalore_BWSSB_2013Rainwater harvesting efforts in Bangalore_BWSSB_2013
Rainwater harvesting efforts in Bangalore_BWSSB_2013India Water Portal
 
DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...
DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...
DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...Deltares
 
Teamnet Engineering - Company Profile
Teamnet Engineering - Company ProfileTeamnet Engineering - Company Profile
Teamnet Engineering - Company ProfileTeamnet International
 
WaterInnovationMeyAriel
WaterInnovationMeyArielWaterInnovationMeyAriel
WaterInnovationMeyArielZeev Somer
 
DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...
DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...
DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...Deltares
 
Preparation for Depressurization: How to Survive a Major Water Main Break
Preparation for Depressurization:How to Survive a Major Water Main BreakPreparation for Depressurization:How to Survive a Major Water Main Break
Preparation for Depressurization: How to Survive a Major Water Main BreakDan Barr
 
The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...Ecological Sequestration Trust
 
Seoul Water Pipe Network Enviroment Improvement
Seoul Water Pipe Network Enviroment ImprovementSeoul Water Pipe Network Enviroment Improvement
Seoul Water Pipe Network Enviroment Improvementsimrc
 
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxHYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxINDRANIL BANERJEE
 
DSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - WangDSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - WangDeltares
 
Continuing the development of WASH use-case studies to simulate in resilience...
Continuing the development of WASH use-case studies to simulate in resilience...Continuing the development of WASH use-case studies to simulate in resilience...
Continuing the development of WASH use-case studies to simulate in resilience...Ecological Sequestration Trust
 
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...Deltares
 
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...Environmental Protection Agency, Ireland
 
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van KelleyGMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van KelleyTexas Alliance of Groundwater Districts
 

Similar a Integriertes Wasserressourcenmanagement in Zentralasien , Modelregion Mongolei Prof. Dr. Buren Sharaw (20)

Rainwater harvesting efforts in Bangalore_BWSSB_2013
Rainwater harvesting efforts in Bangalore_BWSSB_2013Rainwater harvesting efforts in Bangalore_BWSSB_2013
Rainwater harvesting efforts in Bangalore_BWSSB_2013
 
DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...
DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...
DSD-INT 2019 wflow and the River Suir operational flood forecasting system, R...
 
Teamnet Engineering - Company Profile
Teamnet Engineering - Company ProfileTeamnet Engineering - Company Profile
Teamnet Engineering - Company Profile
 
WaterInnovationMeyAriel
WaterInnovationMeyArielWaterInnovationMeyAriel
WaterInnovationMeyAriel
 
DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...
DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...
DSD-INT 2014 - OpenMI Symposium - A selection of water-related applications o...
 
Preparation for Depressurization: How to Survive a Major Water Main Break
Preparation for Depressurization:How to Survive a Major Water Main BreakPreparation for Depressurization:How to Survive a Major Water Main Break
Preparation for Depressurization: How to Survive a Major Water Main Break
 
The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...
 
Seoul Water Pipe Network Enviroment Improvement
Seoul Water Pipe Network Enviroment ImprovementSeoul Water Pipe Network Enviroment Improvement
Seoul Water Pipe Network Enviroment Improvement
 
IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016 IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016
 
Water Woes of Mumbai City by Mr.P.K.Charankar
Water Woes of Mumbai City by Mr.P.K.CharankarWater Woes of Mumbai City by Mr.P.K.Charankar
Water Woes of Mumbai City by Mr.P.K.Charankar
 
GAMA Technical Group Webinar June 2015
GAMA Technical Group Webinar June 2015GAMA Technical Group Webinar June 2015
GAMA Technical Group Webinar June 2015
 
International Water Summit 2016
International Water Summit 2016International Water Summit 2016
International Water Summit 2016
 
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxHYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
 
Himachal may, 2014
Himachal  may, 2014Himachal  may, 2014
Himachal may, 2014
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
DSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - WangDSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - Wang
 
Continuing the development of WASH use-case studies to simulate in resilience...
Continuing the development of WASH use-case studies to simulate in resilience...Continuing the development of WASH use-case studies to simulate in resilience...
Continuing the development of WASH use-case studies to simulate in resilience...
 
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
 
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
 
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van KelleyGMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
 

Más de tuvshin111

Монгол хэл төсөл - Oyuntulkhuur Ulzii
Монгол хэл төсөл - Oyuntulkhuur UlziiМонгол хэл төсөл - Oyuntulkhuur Ulzii
Монгол хэл төсөл - Oyuntulkhuur Ulziituvshin111
 
МЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц - Boldgerel
МЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц -  BoldgerelМЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц -  Boldgerel
МЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц - Boldgereltuvshin111
 
Upgrading university education and R & D in ITC Mongolia -Dr-Ing. S. Olonbayar
Upgrading university education and R & D in ITC Mongolia -Dr-Ing. S. OlonbayarUpgrading university education and R & D in ITC Mongolia -Dr-Ing. S. Olonbayar
Upgrading university education and R & D in ITC Mongolia -Dr-Ing. S. Olonbayartuvshin111
 
Lehr-­‐und Erlebnisgewächshaus für die Umweltbildung
Lehr-­‐und Erlebnisgewächshaus für die UmweltbildungLehr-­‐und Erlebnisgewächshaus für die Umweltbildung
Lehr-­‐und Erlebnisgewächshaus für die Umweltbildungtuvshin111
 
ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD
ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD
ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD tuvshin111
 
Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...
Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...
Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...tuvshin111
 
Хөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛ
Хөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛХөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛ
Хөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛtuvshin111
 
TRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politik
TRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politikTRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politik
TRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politiktuvshin111
 
Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei
Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei
Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei tuvshin111
 
Шинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 он
Шинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 онШинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 он
Шинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 онtuvshin111
 

Más de tuvshin111 (10)

Монгол хэл төсөл - Oyuntulkhuur Ulzii
Монгол хэл төсөл - Oyuntulkhuur UlziiМонгол хэл төсөл - Oyuntulkhuur Ulzii
Монгол хэл төсөл - Oyuntulkhuur Ulzii
 
МЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц - Boldgerel
МЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц -  BoldgerelМЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц -  Boldgerel
МЭРГЭЖЛИЙН БОЛОВСРОЛ СУРГАЛТ бүтээн байгуулалтын гарц - Boldgerel
 
Upgrading university education and R & D in ITC Mongolia -Dr-Ing. S. Olonbayar
Upgrading university education and R & D in ITC Mongolia -Dr-Ing. S. OlonbayarUpgrading university education and R & D in ITC Mongolia -Dr-Ing. S. Olonbayar
Upgrading university education and R & D in ITC Mongolia -Dr-Ing. S. Olonbayar
 
Lehr-­‐und Erlebnisgewächshaus für die Umweltbildung
Lehr-­‐und Erlebnisgewächshaus für die UmweltbildungLehr-­‐und Erlebnisgewächshaus für die Umweltbildung
Lehr-­‐und Erlebnisgewächshaus für die Umweltbildung
 
ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD
ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD
ENTWICKLUNGSZUSAMMEN-ARBEIT ZWISCHEN DER MONGOLEI UND DER BRD
 
Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...
Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...
Mongolei - Rechtliche Rahmenbedingungen, Einfuhrbestimmungen, Zölle, Normen u...
 
Хөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛ
Хөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛХөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛ
Хөдөлмөр эрхлэлтийн ЧИГ ХАНДЛАГА, БОДЛОГЫН ШИНЭЧЛЭЛ
 
TRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politik
TRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politikTRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politik
TRENDS der BESCHÄFTIGUNG UND REFORM der BESCHÄFTIGUNGs politik
 
Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei
Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei
Investitionsgesetz und Möglichkeiten für Investionen in der Mongolei
 
Шинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 он
Шинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 онШинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 он
Шинэ жилийн мэндчилгээ / сурталчилгаа Берлин 2015 он
 

Último

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 

Último (20)

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 

Integriertes Wasserressourcenmanagement in Zentralasien , Modelregion Mongolei Prof. Dr. Buren Sharaw

  • 1. Berlin 06. März 2015 Integriertes Wasserressourcen- Management (IWRM) in Zentralasien: Modellregion Mongolei (MoMo) - Phase III Wassertechnologien Dr. Buren Scharaw Fraunhofer IOSB-AST Am Vogelherd 50, 98693 Ilmenau, Germany Telefon: +49 (0) 3677 / 461-121, mailto: buren.scharaw@iosb-ast.fraunhofer.de
  • 2. Berlin 06. März 2015 Model Region: River Basin Kharaa, City of Darkhan Kharaa River Basin  Kharaa Catchment area ~15.015 km2 Kharaa flow at Darkhan: MQ ca. 10,5 m3/s Catchment Orkhon (~132.835 km2),  Catchment Selenge (~280.000 km2),  Baikalsee, Russland Population of Darkhan ca. 90.000  Darkhan
  • 3. Berlin 06. März 2015 The IWRM-MoMo Project : Past, Present & Future Kharaa River basin, Urban and rural water management analysis, city of Darkhan and Orkhon Sum Identification of Testing of measures • Evaluation of proposed measures from MoMo 1 pilot measures • Methods for multi-disciplinary planning of effective and efficient measures toolbox model Implementation of measures • application and optimisation of measures, • evaluation of the IWRM approach. • existing problems • impacts on population & environment • effective programs of measure. 1 2006 2009 2017 2010 2014 2 3 PastPresentFuture
  • 4. Berlin 06. März 2015Page 4 IWRM systems approach… Ground Water Agriculture Nat. Land-use Wastewater Drinking Water Atmosphere / Climate Stagnant Waters Implementation Running Waters CapacityDevelopment System Analysis and ScenariosInstitutiontionalConditions
  • 5. Berlin 06. März 2015 Air Temperature Change Mongolia -2 -1 0 1 2 3 4 5 Temperature[°C] A2 CNCM3 A2 ECHAM5 A2 IPSL B1 CNCM3 B1 ECHAM5 B1 IPSL WFD
  • 6. Berlin 06. März 2015 Air Temperature Change Mongolia 1971-2000 2071-2100 (B1-CNCM3) 2071-2100 (A2-ECHAM5)
  • 7. Berlin 06. März 2015 Water Availability Change Mongolia Water availability [mm]
  • 8. Berlin 06. März 2015 Water Availability Change Mongolia 2071‐2100
  • 9. Berlin 06. März 2015 Overview and Objectives Implementation of pilot measures based on results of MoMo phase 1 area urban area (city of Darkhan) suburban area (ger settlements) rural area (rural settlements) Problem identification Phase I • Data collection, online measures, • Problem identification, • Analyses, • Proposals of optimal solutions Methods Approaches Phase II • Ground water simulation by MODFLOW • central water supply with optimal management by HydroDyn, • central wastewater treatment (reuse of water and nutrients) • water kiosks & wells for water supply • decentralized collection of faeces and transport to central wastewater treatment plant • participative development of measures • drinking water supply • Decentralized / semi centralized treatment • WSB-Technology for decentralized waste water treatment Pilot measures Phase II • location of leakages of the water supply system in Darkhan, • central wwtp (SBR), pilot plant scale central anaerobic treatment of faeces of ger camps (biogas plant) • collect and bring system for water supply and faeces („small business“) • possibly additional pilot measures • location analysis ecotechnical wastewater treatment (PPA) • Small sewage works / small wwtp (WSB® Technology at Kindergarten in Orkhon Sum
  • 10. Berlin 06. März 2015 Drinking water extraction in Darkhan city: Ground water monitoring 18 wells of USAG (depth: 60-70m) 8 km south of Darkhan bank filtrate ~ 9.700 m³/day 8 wells of Thermal Power Plant (depth: 70-80m) ~ 8.300 m³/day 13 wells of other industries (brick manufacture, tannery) USAG wells TPP wells Darkhan (~ 80 000)
  • 11. Berlin 06. März 2015 Drinking water extraction: Monitoring Ground water situation 10 pressure transducers measure ground water level continuously
  • 12. Berlin 06. März 2015 • 3-D finite-difference model • Open source, published by the U.S. Geological Survey • Used version: MODFLOW-2005 http://water.usgs.gov • The 3-D model domain (e.g. aquifer system) is discretized into a block of grids called cells • For each cell the hydraulic properties (e.g. conductivity, storativity) are defined • Layers correspond to horizontal hydrogeological units • In each cell there is a point called “node” at which hydraulic head is calculated Ground water flow modelling with MODFLOW Drinking water extraction: Ground water modellig
  • 13. Berlin 06. März 2015 simulated steady-state water table (hydraulic head) for warm season (April-October) Drinking water extraction: Ground water simulation results • represents average flow conditions • Warm season => - river and soil water not frozen - groundwater recharge (10mm/year) • GW-flow in alluvial aquifer from South to North parallel to Kharaa River draw down in 8 TPP wells galary is larger than in 18 USAG wells galary TPP wells are further away from the Kharaa River
  • 14. Berlin 06. März 2015 Water balance: Water flow into the model domain Kharaa River larges contribution Water flow out of model domain pumping wells larges contribution Kharaa River: important water source for Darkhan Drinking water extraction: Ground water simulation results
  • 15. Berlin 06. März 2015 Drinking water extraction: Assessment of ground water quality
  • 16. Berlin 06. März 2015 Drinking water supply in city of Darkhan • 18 groundwater wells near the river Kharaa (depth 70m) with ~70.000 m3/d capacity • 6 tanks • 225 km network pipes • ca. 18.000 m3/d demands • Old and often broken down network infrastructure (pumps, pipes, valves) • High water losses in the DWSN • 3 distribution zones (Old Darkhan, New Darkhan and Industry) • Rehabilitation of distribution network
  • 17. Berlin 06. März 2015 Drinking Water Supply • Leak Detection - sensor test installation with GSM communication • Software Interfaces - data exchange between sensor SCADA and HydroDyn • Chemical Backtrace-Contamination source - new model for mixing in network nodes implemented (bulk-advective-model) • Sensor Installation – 10 multiparameter sensors for darkhan water network [April-May 2011] Drinking Water Supply
  • 18. Berlin 06. März 2015 Water production and water losses in distribution network Drinking Water Supply: Concept
  • 19. Berlin 06. März 2015 Water balance in city of Darkhan
  • 20. Berlin 06. März 2015 300 350 400 450 500 550 9 12 15 18 21 0 3 6 9 [m³/h] Time Daily Demand Profiles Darkhan Sunday Monday Tuesday Wednesday Thursday Friday Saturday Indicator for high leak flow Largest Demand 525m³/h High nightly demand 340m³/h Drinking Water Supply: Leakage
  • 21. Berlin 06. März 2015 Drinking Water Supply: Installation of sensors Pin-Pointing of Leakages by Field Measurements • Workshop with USAG employees in Summer 2012 in the Mangit area (Capacity Development) • Training of usage of SebaKMT noise loggers, correlators and ground microphones
  • 22. Berlin 06. März 2015 small pressure drop Flow change Drinking Water Supply: results from leakage detection Comparing the results between • online measurement-data from sensors and • simulation by HydroDyn Proposal for rehabilitation of the pipe lines (2013 3 km and 18 km in 2013 by local company USAG Darkhan Reducing the leakages by 5%-7%
  • 23. Berlin 06. März 2015 Zentrale Abwasserbehandlung (ZKA) • ZKA-Darkhan wurde 1964 gebaut (51 Jahre) • Ablaufwerte sind schlecht • Erfassung der online Messwerte seit 2006 zur Überwachung der Prozessabläufe • Entwicklung des Simulationstools der ZKA • Erd- und Bauarbeiten, Bauüberwachung, Installation und Erprobung einer SBR- Demonstrationsanlage auf der ZKA Darkhan/p2m • Inbetriebnahme am 10. Sep.2011 durch Staatsekretärin Frau Erdenezezeg / Bau und Infrastruktur Ministerium
  • 24. Berlin 06. März 2015 Aufgabe in MoMo3 Zentrale Abwasserbehandlung Darkhan • Fortführung und Erweiterung des Online-Monitoring der Prozesse auf der zentralen Kläranlage Darkhan • Untersuchung der Abwässer aus Industrien -> Vorklärung von Industriewässern • Erstellung eines Konzeptes zur Instandsetzung der Abwasserkanalisation mit 3 Pumpstationen (223km) • Fachliche Begleitung der lokalen Behörden bei Vorbereitung der Ausschreibungsunterlagen für den Bau bzw. Rekonstruktion der Zentralkläranlage in den Städten Darkhan • Beteiligung bei der Ausschreibung mit der Fa. p2m • Initiativen für die Übertragung der im IWRM-MoMo Projekt getesteten Technologien
  • 25. Berlin 06. März 2015 Waste water treatment: the tested SBR Pilot Plant Task: Construction and operation of an SBR Pilot Plant • Pilot plant site selected at the WWTP Darkhan • Planning of the Pilot Plant completed • Drawings submitted to USAG • Machinery Parts ordered and packed for transportation to Darkhan • PLC programming in progress • Start-up planed in may 2011 • All action in scheduled time and costs as submitted with proposal
  • 26. Berlin 06. März 2015 Preliminary Design of Large-scale WWTP by SBR-Technology
  • 27. Berlin 06. März 2015 Small Waste Water Treatment Plant Decentralized Waste Water Management Pre-treatment - Biological stage - Final clarification Biological stage with Biofilm Carrier Working plan 04.2011 – 06.2011 - construction work 06.2011 - start-up 07.2011 – 01.2013 - operating time Modification • Location adaptation • plant size form 20 to 50 PE Treatment Plant • for a kindergarten • in Orkhon soum • Capacity 50 PE
  • 28. Berlin 06. März 2015 Anpassung der Technologie Vorklärung Biologie – Wirbel- Schwebebettreaktor Nachklärung Zulauf Ablauf
  • 29. Berlin 06. März 2015 Anpassung der Technik Nachklärung Biologie Vorklärung und Schlammspeicher
  • 30. Berlin 06. März 2015 Dezentrale Abwasserbehandlung für ländliche Gebiete - Koordination der Umsetzungsmaßnahmen - Erd- und Bauarbeiten der Demonstrationsanlage am Kindergarten in Orkhon Sum für 50 EWG - Bauüberwachung, - Ferngesteuerte Prozessüberwachung, - Erfolgreiche Umsetzung und Anpassung der WSB-Technologie - Erfolgreiche Demonstration und Vermarktung
  • 31. Berlin 06. März 2015 Implementation in Mongolia 1. Төв аймаг, 2. Булган аймаг, 3. Өвөрхангай аймаг, 4. Эрдэнэт, 5. Улаанбаатар
  • 32. Berlin 06. März 2015 Waste Water Treatment Plant with Integrated Wood Production Objective A Identify an affordable waste water treatment approach that is compatible with the harsh climatic conditions of the Darkhan region. Objective B Utilise waste water components for local environmental and economic benefit. M A M J J A S O N D J F M A M J J A S O N D J F M A No. Task 1 Preliminary design 2 Design development 3 Detailed design 4 Tender documents 5 Construction documents 6 Preparation for additional trials 7 Construction phase 1 (Treatment beds) 8 Plant establishment 9 Bill of Quantities 10 University contract 11 Site selection 12 Tender meetings 13 Construction phase 2 (Irrigation supply) 14 Supporting trials 15 Reporting 16 Maintenance documentation 17 Sampling and monitoring 2011 2012 2013 Distribution system Willow and Poplar trees Sampling point Overflow to sewer Collection pipework Influent delivery Location: MUST University
  • 33. Berlin 06. März 2015 Waste water treatment Ger area: iPiT intermediate storage biogas plant • iPiT installation in bag 7 in Darkhan • Installation of biogas plant on the CWWTP Darkhan
  • 34. Berlin 06. März 2015 Capacity Development (2006-2013) Mongolian Scientists and Stakeholders in Germany • Project partners and key persons from Ministries, Kharaa River Basin Council, Water Administration and provincial Gouvernement Darkhan-Uul Aimag, local companies, like USAG and Universities (MUST, NUM) University and Schools • Lectures (MUST Darkhan and NUM) • Mongolian diploma student - cost analyses of a new WWTP, at FhAST-Ilmenau • Supervision of Ph.D. master/bachelor theses to Mongolian students • Master Program: Environmental Engineering & Management (EEM) • Water Fun Programm at schools (UBZ) • Technical training course for decentralized waste water systems (Fraunhofer and UFZ)
  • 35. Berlin 06. März 2015 Aufgabe in MoMo3 Dezentrale Abwasserbehandlung • Fernübertragung der Daten und Fernüberwachung der Prozesse aus Deutschland • Erstellung eines Betreiber-Modells • Fachliche Begleitung der lokalen Entscheidungsträger bei der Ausschreibung und Umsetzung sowie Übertragung der getesteten WSB-Technologie in weiteren Regionen • Mitwirkung bei der Vorbereitung von Ausschreibungsunterlagen von 6 Anlagen in Tuv, Bulgan, Uvurkhangai Provinzen in 2015 • Weitere 20 Anlagen werden ausgeschrieben • Gute Chancen für die Gewinnung der Ausschreibungen Fraunhofer/Fa. Bergmann
  • 36. Berlin 06. März 2015 Thank you very much – Баярлалаа