ESC. 1/15
ESC. 1/15
0.10
0.032
0.30
CINTA DE
ADVERTENCIA
VARIABLE
(Min 0.45)
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
VARIABLE
0.15
0.90
0.15
CABLE
DETECTOR
REPOSICIÓN SIMILAR
A LO EXISTENTE
0.35
(Mínimo)
CINTA DE
ADVERTENCIA
CABLE
DETECTOR
VARIABLE
(Min 0.45)
0.15
MATERIAL BASE
COMPACTADO
(AFIRMADO)
0.90
(Tapada
mínima)
VARIABLE
0.15
0.032
0.25
0.05
CARPETA ASFÁLTICA
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
0.10
0.35
(Mínimo)
0.30 a 0.40
0.30 a 0.40
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
ESC. 1/15
0.30
CINTA DE
ADVERTENCIA
VARIABLE
(Min 0.45)
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
MATERIAL BASE
COMPACTADO
(AFIRMADO)
VARIABLE
0.15
0.10
0.032
0.90
0.15
CABLE
DETECTOR
0.35
(Mínimo)
0.30 a 0.40
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
Variable
CONCRETO
TERRENO NATURAL
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION CL./JR./PJ.
CARPETA ASFÁLTICA
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION CL./JR./PJ.
CONCRETO
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION CL./JR./PJ.
ESC. 1/15
0.15
0.10
0.032
0.30
CINTA DE
ADVERTENCIA
0.15
VARIABLE
(Min 0.45)
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
REPOSICIÓN SIMILAR
A LO EXISTENTE
VARIABLE
0.15
0.10
0.032
0.90
0.15
CABLE
DETECTOR
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
0.35
(Mínimo)
0.30 a 0.40
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
JARDIN
Variable
JARDÍN
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION CL./JR./PJ.
ESC. 1/15
CINTA DE
ADVERTENCIA
CABLE
DETECTOR
VARIABLE
(Min 0.45)
0.15
0.032
0.25
MATERIAL BASE
COMPACTADO
(AFIRMADO)
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
CAMA DE ARENA
0.90
(Tapada
mínima)
VARIABLE
0.15
CAMA DE ARENA
TUBERIA PE Ø 32mm
0.10
0.35
(Mínimo)
0.30 a 0.40
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
0.04
0.025
ADOQUINES CONCRETO
ADOQUINES
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION CL./JR./PJ.
ESC. 1/15
ESC. 1/15
0.10
0.032
0.30
CINTA DE
ADVERTENCIA
VARIABLE
(Min 0.75)
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
VARIABLE
0.15
1.20
0.15
CABLE
DETECTOR
REPOSICIÓN SIMILAR
A LO EXISTENTE
0.35
(Mínimo)
CINTA DE
ADVERTENCIA
CABLE
DETECTOR
VARIABLE
(Min 0.75)
0.15
MATERIAL BASE
COMPACTADO
(AFIRMADO)
1.20
(Tapada
mínima)
VARIABLE
0.15
0.032
0.25
0.05
CARPETA ASFÁLTICA
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
0.10
0.35
(Mínimo)
0.30 a 0.40
0.30 a 0.40
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
ESC. 1/15
0.30
CINTA DE
ADVERTENCIA
VARIABLE
(Min 0.75)
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
MATERIAL BASE
COMPACTADO
(AFIRMADO)
VARIABLE
0.15
0.10
0.032
1.20
0.15
CABLE
DETECTOR
0.35
(Mínimo)
0.30 a 0.40
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
Variable
ESC. 1/15
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
ESC. 1/15
0.15
0.10
0.032
0.30
CINTA DE
ADVERTENCIA
0.15
VARIABLE
(Min 0.75)
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
TUBERIA PE Ø 32mm
CAMA DE ARENA
REPOSICIÓN SIMILAR
A LO EXISTENTE
VARIABLE
0.15
0.10
0.032
1.20
0.15
CABLE
DETECTOR
Tapada
mínima
REPOSICIÓN SIMILAR
A LO EXISTENTE
0.35
(Mínimo)
0.30 a 0.40
NOTA:
1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta
compactación se procederá a colocar material afirmado (Previamente aprobado por el
SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación.
CONCRETO
JARDIN
Variable
CINTA DE
ADVERTENCIA
CABLE
DETECTOR
VARIABLE
(Min 0.75)
0.15
0.032
0.25
MATERIAL BASE
COMPACTADO
(AFIRMADO)
REPOSICIÓN SIMILAR
A LO EXISTENTE
ARENA
CAMA DE ARENA
1.20
(Tapada
mínima)
VARIABLE
0.15
CAMA DE ARENA
TUBERIA PE Ø 32mm
0.10
0.35
(Mínimo)
0.30 a 0.40
0.04
0.025
ADOQUINES CONCRETO
TERRENO NATURAL
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION AVENIDAS
CARPETA ASFÁLTICA
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION AVENIDAS
CONCRETO
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION AVENIDAS
ADOQUINES
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION AVENIDAS
JARDÍN
TODAS LAS MEDIDAS ESTAN EN METROS
DETALLE SECCION AVENIDAS
ESCALA:
PROYECTOS :
UNIDADES:
Indicada
TITULO :
ESPECIALIDAD:
CÓDIGO DE PLANO:
PLANO:
1/2
A2
FORMATO:
ELABORO:
REVISO:
APROBO:
FECHA:
REV:
AREA DE CONCESIÓN : MASIFICACIÓN DEL USO DE GAS
NATURAL A NIVEL NACIONAL
CONCESIÓN NORTE
00
H.H.L.
J.CH.G
J.CH.G
natural gas company
DETALLES DE ZANJA - TUBERÍA PE Ø 32mm
Proyecto de Redes de Polietileno de Gas Natural -
Lambayeque - Chiclayo - Distrito José Leonaro Ortíz
JLO - SECTOR - 06
PM-21-037
ESCALA:
PROYECTOS :
UNIDADES:
TITULO :
ESPECIALIDAD:
CÓDIGO DE PLANO:
PLANO:
m
FORMATO:
ELABORO:
REVISO:
APROBO:
20/05/2021
FECHA:
REV:
AREA DE CONCESIÓN :
natural gas company
DETALLES

Más contenido relacionado

Último

Induccion Personal Mision S&A (nueva).pdf
Induccion Personal Mision S&A (nueva).pdfInduccion Personal Mision S&A (nueva).pdf
Induccion Personal Mision S&A (nueva).pdf
stefatoro1392
 
7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...
7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...
7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...
jose880240
 

Último (9)

Dominio de internet, materia de diseño web
Dominio de internet, materia de diseño webDominio de internet, materia de diseño web
Dominio de internet, materia de diseño web
 
TECNOLOGIA ARQUITECTONICA - CASO IQUITOS - PERU
TECNOLOGIA ARQUITECTONICA - CASO IQUITOS - PERUTECNOLOGIA ARQUITECTONICA - CASO IQUITOS - PERU
TECNOLOGIA ARQUITECTONICA - CASO IQUITOS - PERU
 
Blue_Aesthetic_Mood_Board_Brand_Inspiration_Poster.pdf
Blue_Aesthetic_Mood_Board_Brand_Inspiration_Poster.pdfBlue_Aesthetic_Mood_Board_Brand_Inspiration_Poster.pdf
Blue_Aesthetic_Mood_Board_Brand_Inspiration_Poster.pdf
 
Induccion Personal Mision S&A (nueva).pdf
Induccion Personal Mision S&A (nueva).pdfInduccion Personal Mision S&A (nueva).pdf
Induccion Personal Mision S&A (nueva).pdf
 
BOTONES para diseño grafico de paginas web
BOTONES para diseño grafico  de paginas webBOTONES para diseño grafico  de paginas web
BOTONES para diseño grafico de paginas web
 
Planos seriados, conceptos, caracterización y aplicaciones
Planos seriados, conceptos, caracterización y aplicacionesPlanos seriados, conceptos, caracterización y aplicaciones
Planos seriados, conceptos, caracterización y aplicaciones
 
13.05)PRIMER GRUPO CARNES 2024 - RELACION DE FOTOS CORRECTAS.pdf
13.05)PRIMER GRUPO CARNES 2024 - RELACION DE FOTOS CORRECTAS.pdf13.05)PRIMER GRUPO CARNES 2024 - RELACION DE FOTOS CORRECTAS.pdf
13.05)PRIMER GRUPO CARNES 2024 - RELACION DE FOTOS CORRECTAS.pdf
 
7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...
7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...
7.2 -La guerra civil. Evolución de los bandos y consecuencias-Marta y Elena (...
 
word-ejercicios-tabulaciones-taller..doc
word-ejercicios-tabulaciones-taller..docword-ejercicios-tabulaciones-taller..doc
word-ejercicios-tabulaciones-taller..doc
 

Destacado

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Destacado (20)

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 

Detalles de zanja a2

  • 1. ESC. 1/15 ESC. 1/15 0.10 0.032 0.30 CINTA DE ADVERTENCIA VARIABLE (Min 0.45) Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA VARIABLE 0.15 0.90 0.15 CABLE DETECTOR REPOSICIÓN SIMILAR A LO EXISTENTE 0.35 (Mínimo) CINTA DE ADVERTENCIA CABLE DETECTOR VARIABLE (Min 0.45) 0.15 MATERIAL BASE COMPACTADO (AFIRMADO) 0.90 (Tapada mínima) VARIABLE 0.15 0.032 0.25 0.05 CARPETA ASFÁLTICA REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA 0.10 0.35 (Mínimo) 0.30 a 0.40 0.30 a 0.40 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. ESC. 1/15 0.30 CINTA DE ADVERTENCIA VARIABLE (Min 0.45) Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA MATERIAL BASE COMPACTADO (AFIRMADO) VARIABLE 0.15 0.10 0.032 0.90 0.15 CABLE DETECTOR 0.35 (Mínimo) 0.30 a 0.40 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. Variable CONCRETO TERRENO NATURAL TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION CL./JR./PJ. CARPETA ASFÁLTICA TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION CL./JR./PJ. CONCRETO TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION CL./JR./PJ. ESC. 1/15 0.15 0.10 0.032 0.30 CINTA DE ADVERTENCIA 0.15 VARIABLE (Min 0.45) Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA REPOSICIÓN SIMILAR A LO EXISTENTE VARIABLE 0.15 0.10 0.032 0.90 0.15 CABLE DETECTOR Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE 0.35 (Mínimo) 0.30 a 0.40 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. JARDIN Variable JARDÍN TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION CL./JR./PJ. ESC. 1/15 CINTA DE ADVERTENCIA CABLE DETECTOR VARIABLE (Min 0.45) 0.15 0.032 0.25 MATERIAL BASE COMPACTADO (AFIRMADO) REPOSICIÓN SIMILAR A LO EXISTENTE ARENA CAMA DE ARENA 0.90 (Tapada mínima) VARIABLE 0.15 CAMA DE ARENA TUBERIA PE Ø 32mm 0.10 0.35 (Mínimo) 0.30 a 0.40 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. 0.04 0.025 ADOQUINES CONCRETO ADOQUINES TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION CL./JR./PJ. ESC. 1/15 ESC. 1/15 0.10 0.032 0.30 CINTA DE ADVERTENCIA VARIABLE (Min 0.75) Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA VARIABLE 0.15 1.20 0.15 CABLE DETECTOR REPOSICIÓN SIMILAR A LO EXISTENTE 0.35 (Mínimo) CINTA DE ADVERTENCIA CABLE DETECTOR VARIABLE (Min 0.75) 0.15 MATERIAL BASE COMPACTADO (AFIRMADO) 1.20 (Tapada mínima) VARIABLE 0.15 0.032 0.25 0.05 CARPETA ASFÁLTICA REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA 0.10 0.35 (Mínimo) 0.30 a 0.40 0.30 a 0.40 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. ESC. 1/15 0.30 CINTA DE ADVERTENCIA VARIABLE (Min 0.75) Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA MATERIAL BASE COMPACTADO (AFIRMADO) VARIABLE 0.15 0.10 0.032 1.20 0.15 CABLE DETECTOR 0.35 (Mínimo) 0.30 a 0.40 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. Variable ESC. 1/15 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. ESC. 1/15 0.15 0.10 0.032 0.30 CINTA DE ADVERTENCIA 0.15 VARIABLE (Min 0.75) Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE ARENA TUBERIA PE Ø 32mm CAMA DE ARENA REPOSICIÓN SIMILAR A LO EXISTENTE VARIABLE 0.15 0.10 0.032 1.20 0.15 CABLE DETECTOR Tapada mínima REPOSICIÓN SIMILAR A LO EXISTENTE 0.35 (Mínimo) 0.30 a 0.40 NOTA: 1. En caso de encontrarse material ROCOSO ó SEMI-ROCOSO que no permita una correcta compactación se procederá a colocar material afirmado (Previamente aprobado por el SUPERVISOR), con el fin de lograr el porcentaje deseado de compactación. CONCRETO JARDIN Variable CINTA DE ADVERTENCIA CABLE DETECTOR VARIABLE (Min 0.75) 0.15 0.032 0.25 MATERIAL BASE COMPACTADO (AFIRMADO) REPOSICIÓN SIMILAR A LO EXISTENTE ARENA CAMA DE ARENA 1.20 (Tapada mínima) VARIABLE 0.15 CAMA DE ARENA TUBERIA PE Ø 32mm 0.10 0.35 (Mínimo) 0.30 a 0.40 0.04 0.025 ADOQUINES CONCRETO TERRENO NATURAL TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION AVENIDAS CARPETA ASFÁLTICA TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION AVENIDAS CONCRETO TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION AVENIDAS ADOQUINES TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION AVENIDAS JARDÍN TODAS LAS MEDIDAS ESTAN EN METROS DETALLE SECCION AVENIDAS ESCALA: PROYECTOS : UNIDADES: Indicada TITULO : ESPECIALIDAD: CÓDIGO DE PLANO: PLANO: 1/2 A2 FORMATO: ELABORO: REVISO: APROBO: FECHA: REV: AREA DE CONCESIÓN : MASIFICACIÓN DEL USO DE GAS NATURAL A NIVEL NACIONAL CONCESIÓN NORTE 00 H.H.L. J.CH.G J.CH.G natural gas company DETALLES DE ZANJA - TUBERÍA PE Ø 32mm Proyecto de Redes de Polietileno de Gas Natural - Lambayeque - Chiclayo - Distrito José Leonaro Ortíz JLO - SECTOR - 06 PM-21-037 ESCALA: PROYECTOS : UNIDADES: TITULO : ESPECIALIDAD: CÓDIGO DE PLANO: PLANO: m FORMATO: ELABORO: REVISO: APROBO: 20/05/2021 FECHA: REV: AREA DE CONCESIÓN : natural gas company DETALLES