       A control chart is an important tool in statistical process control. Control charts

provide a way to see whether a process is in control by being able to see if the process is

within the set upper and lower limits. Control charts were created by Walter A. Shewart

in the 1920’s and then picked up and used widely by W. Edward Demings.

       The demerit control chart was created by H.F. Dodge while working at Bell

Laboratories as a means to chart products with more than one kind of possible defect.

Some defects had very serious consequences on the performance of the product and some

were not very serious. Dodge classified the various types of defects into four different

categories. Conerly, et al described these different categories as follows:

       Class quot;Aquot; Defects-Very Serious.
       -Will render unit totally unfit for service.
       -Will surely cause operating failure of the unit in service which cannot be readily
       corrected on the job.
       -Liable to cause personal injury or property damage.

       Class quot;Bquot; Defects-Serious.
       -Will probably, but not surely cause Class quot;Aquot; operating failure of the unit in
       service.
       -Will surely cause trouble of a nature less serious than Class quot;Aquot;
       -Will surely cause increased maintenance or decreased life.

       Class quot;Cquot; Defects-Moderately Serious.
       -Will possibly cause operating failure of the unit in service. Likely to cause
       trouble of a nature less serious than operating failure.
       -Likely to cause increased maintenance or decreased life.
       -Major defects of appearance, finish, or workmanship.

       Class quot;Dquot; Defects-Not Serious.
       -Will not cause operating failure of the unit in service.
       -Minor defects of appearance, finish, or workmanship.
The different types of defects first need to be classified as either A, B, C, or D.

Once each defect is classified, a weight is given to each class depending on its severity.

The most common weights used today are 100 for As, 50 for Bs, 10 for Cs, and 1 for Ds.

Demerits are a defect of a product multiplied by its weight.



Steps to Constructing a Demerit Control Chart

1. Calculate the number of demerits per sample. This is done by counting the number of
A, B, C, and D defects and multiplying that number by the weight of each class. If there
were 3 Class A defects then 3 would be multiplied by the Class A weight of 100 for a
total of 300 demerits. Add up the total demerits for each class to get the number of
demerits per inspection sample represented by d. This process is shown in the following
formula:
         d = 100XA + 50XB + 10XC + XD, where XA is the number of Class A defects

2. Find the average number of demerits per unit, represented by u, by taking the number
of demerits per sample, d, and dividing by the number of units in the sample, N.

       u=d/N

3. Find the average number of each class of defect per unit. For Class A, take the total
number of Class A defects in the sample and divide by the number of units in the sample,
N. Repeat for each class.

          A=   XA / N


4. Calculate the standard deviation through the following formula.

       σ = SqRt ((1002      A   + 502   B   + 102   C   +   D)/N)
       -where A is the average number of Class A defects per unit
       -N is the number of units in the sample
5. Calculate the control limits through the following formulas.

       Center Line =        = 100      A   + 50   B   + 10   C   +   D


       Upper Control Limit =               + 3σ

       Lower Control Limit =               - 3σ

6. Now that the center line and control limits have been calculated, a control chart can be
constructed. Information from future inspections can be charted using these limits to
monitor the performance of the process and to insure that the process is in control.


Example
       The easiest way to learn to construct a demerit control chart is by following an

example using real numbers. For this example, the following information will be used.


                  Sample size = 1500                  Class of Defects
                                             A           B         C      D
                  Number of Defects               2         5        12       13

First, calculate the total number of demerits in the sample using the formula from step 1.
        d = 100(2) + 50(5) + 10(12) + 13 = 583

Next, find the average number of demerits per unit.
        u = 583/1500 = .39

Next, find the average number of each class of defect per unit.
          A = 2/1500 = .0013
          B = 5/1500 = .0033
          C = 12/1500 = .008
          D = 13/1500 = .009

Next, calculate the standard deviation.
       σ = SqRt ((1002(.0013) + 502(.0033) + 102(.008) + .009)/N) = .12

Next, calculate the control limits.
       Center Line = 100(.0013) + 50(.0033) + 10(.008) + .009 =.384
       UCL = .384 + 3(.12) = .744
       LCL = .384 – 3(.12) = .024
Additional Information

       A large quantity of information can be found discussing control charts and the

uses of control charts. However, compared to regular control charts, not much has been

published describing the demerit control chart and the reasons for it. The best resources

found are the articles cited in the bibliography of this paper. A demerit chart is a type of

control chart, however, so a lot can be learned about them by reading what is available

about control charts and seeing how a demerit chart can relate.
Bibliography

Conerly, Michael D.; Jones, L Allison,; Woodall, William H. “Exact properties of
       demerit control charts.” Journal of Quality Technology. Milwaukee: Apr
       1999.Vol.31, Iss. 2; pg. 207, 10 pgs.

Crossley, Mark L. “Weighted Pareto Control Charts Work”
       http://www.qualitydigest.com/mar05/departments/what_works.shtml.

Dawson, Cree S.; McCallum, Jr ,Charles J.; Murphy, R. Bradford; Wolman, Eric.
     “Operations Research at Bell Laboratories through the 1970s: Part III.”
     Operations Research, Vol. 48, No. 4. (Jul. - Aug., 2000), pp. 517-526.

Dodge, H. F. (1928). quot;A Method of Rating a Manufactured Productquot;. Bell System
      Technical Journal 7, pp. 350-368.

Más contenido relacionado

La actualidad más candente

Manual part programming
Manual part programmingManual part programming
Manual part programmingjntuhcej
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPmanimaran m
 
Shop floor control and management in CIM
Shop floor control and management in CIMShop floor control and management in CIM
Shop floor control and management in CIMchinmay gosavi
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)sundar sivam
 
Computer generated time standards
Computer  generated time standardsComputer  generated time standards
Computer generated time standardsVenu Yadav
 
Reliability engineering chapter-3 failure data collection and analysis
Reliability engineering chapter-3 failure data collection and analysisReliability engineering chapter-3 failure data collection and analysis
Reliability engineering chapter-3 failure data collection and analysisCharlton Inao
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study pptBeereddy Swapna
 
Thermodynamic assignment 2
Thermodynamic assignment 2Thermodynamic assignment 2
Thermodynamic assignment 2Lahiru Dilshan
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems Nityanand Yadav
 
Reverse engineering & its application
Reverse engineering & its applicationReverse engineering & its application
Reverse engineering & its applicationmapqrs
 

La actualidad más candente (20)

Cnc notes (1)
Cnc notes (1)Cnc notes (1)
Cnc notes (1)
 
Manual part programming
Manual part programmingManual part programming
Manual part programming
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPP
 
Shop floor control and management in CIM
Shop floor control and management in CIMShop floor control and management in CIM
Shop floor control and management in CIM
 
PROCESS CAPABILITY
PROCESS CAPABILITYPROCESS CAPABILITY
PROCESS CAPABILITY
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Taguchi method
Taguchi methodTaguchi method
Taguchi method
 
Taguchi.ppt
Taguchi.pptTaguchi.ppt
Taguchi.ppt
 
Computer generated time standards
Computer  generated time standardsComputer  generated time standards
Computer generated time standards
 
Terotechnology
TerotechnologyTerotechnology
Terotechnology
 
Gear and Screw measurement
Gear and Screw measurementGear and Screw measurement
Gear and Screw measurement
 
Reliability engineering chapter-3 failure data collection and analysis
Reliability engineering chapter-3 failure data collection and analysisReliability engineering chapter-3 failure data collection and analysis
Reliability engineering chapter-3 failure data collection and analysis
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
 
Thermodynamic assignment 2
Thermodynamic assignment 2Thermodynamic assignment 2
Thermodynamic assignment 2
 
NC, CNC & DNC Machine
NC, CNC & DNC Machine NC, CNC & DNC Machine
NC, CNC & DNC Machine
 
CONTROL CHARTS
CONTROL CHARTSCONTROL CHARTS
CONTROL CHARTS
 
Reliability Engineering
Reliability EngineeringReliability Engineering
Reliability Engineering
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
Reverse engineering & its application
Reverse engineering & its applicationReverse engineering & its application
Reverse engineering & its application
 
Dfma
DfmaDfma
Dfma
 

Destacado

Vietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly jonesVietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly joneskmbrlyslp
 
Ciclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
Ciclo de Charlas Doppler Relay: Presente y futuro del Email TransaccionalCiclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
Ciclo de Charlas Doppler Relay: Presente y futuro del Email TransaccionalFromDoppler
 
Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13Munj Bhatt
 
Hr audit questionnaire copy
Hr audit questionnaire   copyHr audit questionnaire   copy
Hr audit questionnaire copyConfidential
 
5. will be going to tong hop
5. will be going to tong hop  5. will be going to tong hop
5. will be going to tong hop Trang Đinh Văn
 
5. will be going to bai tap
5. will be going to bai tap  5. will be going to bai tap
5. will be going to bai tap Trang Đinh Văn
 
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventasDoppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventasFromDoppler
 
Backend as a service Scorocode for mobile, web and desktop apps
Backend as a service Scorocode for mobile, web and desktop appsBackend as a service Scorocode for mobile, web and desktop apps
Backend as a service Scorocode for mobile, web and desktop appsMichael Epikhin
 
Facebook feed tricks
Facebook feed tricksFacebook feed tricks
Facebook feed tricksLisa Sicard
 
DHCP & AAA in ONOS application
DHCP & AAA in ONOS applicationDHCP & AAA in ONOS application
DHCP & AAA in ONOS applicationKyunghee Univ
 
Acceptance Sampling
Acceptance SamplingAcceptance Sampling
Acceptance SamplingVaibhav Koli
 
Publicidad en internet slideshare
Publicidad en internet slidesharePublicidad en internet slideshare
Publicidad en internet slidesharepaolodiego2005
 
Fish quality deterioration
Fish quality deteriorationFish quality deterioration
Fish quality deteriorationMoksha Chib
 

Destacado (20)

Vietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly jonesVietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly jones
 
Ciclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
Ciclo de Charlas Doppler Relay: Presente y futuro del Email TransaccionalCiclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
Ciclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
 
Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13
 
5-S Technique
5-S Technique5-S Technique
5-S Technique
 
Hr audit questionnaire copy
Hr audit questionnaire   copyHr audit questionnaire   copy
Hr audit questionnaire copy
 
5. will be going to tong hop
5. will be going to tong hop  5. will be going to tong hop
5. will be going to tong hop
 
5. will be going to bai tap
5. will be going to bai tap  5. will be going to bai tap
5. will be going to bai tap
 
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventasDoppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
 
Syslog
SyslogSyslog
Syslog
 
4.linking sounds
4.linking sounds4.linking sounds
4.linking sounds
 
Backend as a service Scorocode for mobile, web and desktop apps
Backend as a service Scorocode for mobile, web and desktop appsBackend as a service Scorocode for mobile, web and desktop apps
Backend as a service Scorocode for mobile, web and desktop apps
 
Facebook feed tricks
Facebook feed tricksFacebook feed tricks
Facebook feed tricks
 
hr audit
hr audithr audit
hr audit
 
DHCP & AAA in ONOS application
DHCP & AAA in ONOS applicationDHCP & AAA in ONOS application
DHCP & AAA in ONOS application
 
Acceptance Sampling
Acceptance SamplingAcceptance Sampling
Acceptance Sampling
 
Publicidad en internet slideshare
Publicidad en internet slidesharePublicidad en internet slideshare
Publicidad en internet slideshare
 
Fish quality deterioration
Fish quality deteriorationFish quality deterioration
Fish quality deterioration
 
Repaso unidad 10
Repaso unidad 10Repaso unidad 10
Repaso unidad 10
 
Unitat 9. Els orígens de l'Edat Moderna.
Unitat 9. Els orígens de l'Edat Moderna.Unitat 9. Els orígens de l'Edat Moderna.
Unitat 9. Els orígens de l'Edat Moderna.
 
La función de relación
La función de relaciónLa función de relación
La función de relación
 

Similar a Demerit Control Charts

Control charts[1]
Control charts[1]Control charts[1]
Control charts[1]66784532
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlNAVEENBANSHIWAL
 
control charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiescontrol charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiesINSTITUTE OF ENGINEERING /BKC
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxhinal10
 
7qctools173-100325112603-phpapp01.ppt
7qctools173-100325112603-phpapp01.ppt7qctools173-100325112603-phpapp01.ppt
7qctools173-100325112603-phpapp01.pptOswaldo Gonzales
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.dvietians
 
7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the quality7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the qualityMANISHDUBEY14500
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Hariharan Ponnusamy
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality controlIjan Rahman Ode
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Managementajithsrc
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six SigmaKanriConsulting
 
The 7 basic quality tools through minitab 18
The 7 basic quality tools through minitab 18The 7 basic quality tools through minitab 18
The 7 basic quality tools through minitab 18RAMAR BOSE
 

Similar a Demerit Control Charts (20)

Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
Control charts[1]
Control charts[1]Control charts[1]
Control charts[1]
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
control charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiescontrol charts to enhance your problem solving abilities
control charts to enhance your problem solving abilities
 
C Charts2
C Charts2C Charts2
C Charts2
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptx
 
7qctools173-100325112603-phpapp01.ppt
7qctools173-100325112603-phpapp01.ppt7qctools173-100325112603-phpapp01.ppt
7qctools173-100325112603-phpapp01.ppt
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the quality7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the quality
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]
 
Chapter9[1]
Chapter9[1]Chapter9[1]
Chapter9[1]
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality control
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Management
 
5854579.ppt
5854579.ppt5854579.ppt
5854579.ppt
 
5. spc control charts
5. spc   control charts5. spc   control charts
5. spc control charts
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
The 7 basic quality tools through minitab 18
The 7 basic quality tools through minitab 18The 7 basic quality tools through minitab 18
The 7 basic quality tools through minitab 18
 

Más de ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 

Último

Rich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdfRich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdfJerry Chew
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...EduSkills OECD
 
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MysoreMuleSoftMeetup
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxLimon Prince
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....Ritu480198
 
Pharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdfPharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdfBALASUNDARESAN M
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project researchCaitlinCummins3
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxneillewis46
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismDabee Kamal
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnershipsexpandedwebsite
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17Celine George
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Celine George
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMDEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMELOISARIVERA8
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital ManagementMBA Assignment Experts
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesAmanpreetKaur157993
 

Último (20)

Rich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdfRich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdf
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
Pharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdfPharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdf
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMDEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 

Demerit Control Charts

  • 1. Mark Smallwood Quality Management March 15, 2006 Demerit Control Charts A control chart is an important tool in statistical process control. Control charts provide a way to see whether a process is in control by being able to see if the process is within the set upper and lower limits. Control charts were created by Walter A. Shewart in the 1920’s and then picked up and used widely by W. Edward Demings. The demerit control chart was created by H.F. Dodge while working at Bell Laboratories as a means to chart products with more than one kind of possible defect. Some defects had very serious consequences on the performance of the product and some were not very serious. Dodge classified the various types of defects into four different categories. Conerly, et al described these different categories as follows: Class quot;Aquot; Defects-Very Serious. -Will render unit totally unfit for service. -Will surely cause operating failure of the unit in service which cannot be readily corrected on the job. -Liable to cause personal injury or property damage. Class quot;Bquot; Defects-Serious. -Will probably, but not surely cause Class quot;Aquot; operating failure of the unit in service. -Will surely cause trouble of a nature less serious than Class quot;Aquot; -Will surely cause increased maintenance or decreased life. Class quot;Cquot; Defects-Moderately Serious. -Will possibly cause operating failure of the unit in service. Likely to cause trouble of a nature less serious than operating failure. -Likely to cause increased maintenance or decreased life. -Major defects of appearance, finish, or workmanship. Class quot;Dquot; Defects-Not Serious. -Will not cause operating failure of the unit in service. -Minor defects of appearance, finish, or workmanship.
  • 2. The different types of defects first need to be classified as either A, B, C, or D. Once each defect is classified, a weight is given to each class depending on its severity. The most common weights used today are 100 for As, 50 for Bs, 10 for Cs, and 1 for Ds. Demerits are a defect of a product multiplied by its weight. Steps to Constructing a Demerit Control Chart 1. Calculate the number of demerits per sample. This is done by counting the number of A, B, C, and D defects and multiplying that number by the weight of each class. If there were 3 Class A defects then 3 would be multiplied by the Class A weight of 100 for a total of 300 demerits. Add up the total demerits for each class to get the number of demerits per inspection sample represented by d. This process is shown in the following formula: d = 100XA + 50XB + 10XC + XD, where XA is the number of Class A defects 2. Find the average number of demerits per unit, represented by u, by taking the number of demerits per sample, d, and dividing by the number of units in the sample, N. u=d/N 3. Find the average number of each class of defect per unit. For Class A, take the total number of Class A defects in the sample and divide by the number of units in the sample, N. Repeat for each class. A= XA / N 4. Calculate the standard deviation through the following formula. σ = SqRt ((1002 A + 502 B + 102 C + D)/N) -where A is the average number of Class A defects per unit -N is the number of units in the sample
  • 3. 5. Calculate the control limits through the following formulas. Center Line = = 100 A + 50 B + 10 C + D Upper Control Limit = + 3σ Lower Control Limit = - 3σ 6. Now that the center line and control limits have been calculated, a control chart can be constructed. Information from future inspections can be charted using these limits to monitor the performance of the process and to insure that the process is in control. Example The easiest way to learn to construct a demerit control chart is by following an example using real numbers. For this example, the following information will be used. Sample size = 1500 Class of Defects A B C D Number of Defects 2 5 12 13 First, calculate the total number of demerits in the sample using the formula from step 1. d = 100(2) + 50(5) + 10(12) + 13 = 583 Next, find the average number of demerits per unit. u = 583/1500 = .39 Next, find the average number of each class of defect per unit. A = 2/1500 = .0013 B = 5/1500 = .0033 C = 12/1500 = .008 D = 13/1500 = .009 Next, calculate the standard deviation. σ = SqRt ((1002(.0013) + 502(.0033) + 102(.008) + .009)/N) = .12 Next, calculate the control limits. Center Line = 100(.0013) + 50(.0033) + 10(.008) + .009 =.384 UCL = .384 + 3(.12) = .744 LCL = .384 – 3(.12) = .024
  • 4. Additional Information A large quantity of information can be found discussing control charts and the uses of control charts. However, compared to regular control charts, not much has been published describing the demerit control chart and the reasons for it. The best resources found are the articles cited in the bibliography of this paper. A demerit chart is a type of control chart, however, so a lot can be learned about them by reading what is available about control charts and seeing how a demerit chart can relate.
  • 5. Bibliography Conerly, Michael D.; Jones, L Allison,; Woodall, William H. “Exact properties of demerit control charts.” Journal of Quality Technology. Milwaukee: Apr 1999.Vol.31, Iss. 2; pg. 207, 10 pgs. Crossley, Mark L. “Weighted Pareto Control Charts Work” http://www.qualitydigest.com/mar05/departments/what_works.shtml. Dawson, Cree S.; McCallum, Jr ,Charles J.; Murphy, R. Bradford; Wolman, Eric. “Operations Research at Bell Laboratories through the 1970s: Part III.” Operations Research, Vol. 48, No. 4. (Jul. - Aug., 2000), pp. 517-526. Dodge, H. F. (1928). quot;A Method of Rating a Manufactured Productquot;. Bell System Technical Journal 7, pp. 350-368.