Segmental
Bridge
Construction
Techniques
Presented by: Bob Sward
2012 PTI Convention
Nashville, TN
May 7, 2012
Segmental Bridge
Construction
Techniques
 Cast In Place
 Travelers
 Incremental Launching
 Precast Segmental
 Casting Yard
 Cantilever Construction
 Span by Span
 Full Span
 Span Length 300 to 800 ft
 Typical Segment Length 16 ft
 Non Linear Construction
 Minimal Crane Capacity
 Composite Crew - Efficiency
 Typical Cycle Time – 5 days
Cast in Place Segmental - Cantilever
Cast in Place Segmental - Cantilever
4th Street Bridge – Pueblo, CO Ilan Bridge, Taiwan
(Max. segment weight 120t, FT steel weight 55t)
Cast in Place Segmental - Cantilever
Cast-in-Place – Incremental Launching
 Span Lengths 200’ – 350’
 Casting/launching from end of
bridge working from the ground
 Relatively standard forming
 7 day cycle per launch
Cast-in-Place – Incremental Launching
Precast Segmental
 Segment Casting
Precast Segmental
 Casting Yard
DUBAI METRO PROJECT
 One of the largest pre-casting
yards in the world
 9 tower cranes, 11 gantry
cranes, 64 casting forms, 2,500
segment storage
 Camp for 3,500+ staff & crew
Precast Segmental – Cantilever
Erection with Launching Gantry
 Span up to 350 ft±
 Speed of Erection (up to 6 pairs of
segments)
 Delivery from behind or below
 Overhead Construction
 Self Launching – min. crane support
 Parallel Structures Simultaneously
 Temp loads directly into Piers
 Limited horizontal curvature
Precast Segmental – Cantilever
Erection with Launching Gantry
 Span up to 350 ft±
 Speed of Erection (up to 6 pairs of
segments)
 Delivery from behind or below
 Overhead Construction
 Self Launching – min. crane support
 Parallel Structures Simultaneously
 Temp loads directly into Piers
 Limited horizontal curvature
Precast Segmental – Cantilever
Erection with Lifting Frames
 Longer Span Lengths
 Larger Segments
 Deck Construction can
be non-linear (multiple
work fronts)
 Simple Erection Works
 Rapid Construction
Precast Segmental – Cantilever
Erection with Lifting Frames
 Longer Span Lengths
 Larger Segments
 Deck Construction can
be non-linear (multiple
work fronts)
 Simple Erection Works
 Rapid Construction
Precast Segmental – Cantilever
Erection with Lifting Frames
 Longer Span Lengths
 Larger Segments
 Deck Construction can
be non-linear (multiple
work fronts)
 Simple Erection Works
 Rapid Construction
Precast Segmental – Cantilever
Erection with Cranes
 Longer Span Lengths
 Smaller Segments
 Deck Construction can
be non-linear (multiple
work fronts)
 Readily Available
Equipment
 Rapid Construction
 Small Erection Crew
Precast Segmental – Cantilever
Erection with Cranes
 Longer Span Lengths
 Smaller Segments
 Deck Construction can
be non-linear (multiple
work fronts)
 Readily Available
Equipment
 Rapid Construction
 Small Erection Crew
 Spans typically < 170 ft
 Speed of Erection
(1 span per day possible)
 Small Crew
 Delivery from behind or
below
 Temp load directly into
Piers
Precast Segmental – Span-by-Span
Erection with Launching Gantry (Overhead or Underslung)
 Spans typically < 170 ft
 Speed of Erection
(1 span per day possible)
 Small Crew
 Delivery from behind or
below
 Temp load directly into
Piers
Precast Segmental – Span-by-Span
Erection with Launching Gantry (Overhead or Underslung)
 Locally available equipment
 Multiple work fronts
 Typically smaller project
Precast Segmental – Span-by-Span
On Falsework
Precast Segmental – Full Span
Erection with Launching Gantry
 Typically short spans
 Very high rate of erection
 Factory casting environment -
Very high quality
 Min follow up work
 Large temporary loads
Precast Segmental – Full Span
Erection with Launching Gantry
 Typically short spans
 Very high rate of erection
 Factory casting environment -
Very high quality
 Min follow up work
 Large temporary loads
Precast Segmental – Full Span
Erection with Launching Gantry
 Typically short spans
 Very high rate of erection
 Factory casting environment -
Very high quality
 Min follow up work
 Large temporary loads
 Limited storage (possible)
Precast Segmental – Full Span
Erection with Launching Gantry or Heavy Lift
 Marlins Stadium
 Seven Mile Bridge
 Jamestown Rhode Island
Segmental
Construction
 Speed of erection
 Crew efficiency
 High quality
 Many options
 Top down erection possible
minimal disruption to traffic
and surface operations
 Efficient use of forms
All Possible Through
the innovation of
Post-Tensioning

Más contenido relacionado

La actualidad más candente

Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete BridgeShubham Das
 
Anchored excavations
Anchored excavationsAnchored excavations
Anchored excavationsDeniz Kurt
 
Bridge & Road Construction .pptx
Bridge & Road Construction .pptxBridge & Road Construction .pptx
Bridge & Road Construction .pptxMosaddekHaqueReyad
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignFawad Najam
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajat Nainwal
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls Manvinder Kingra
 
Construction methods of Bridges and its types
Construction methods of Bridges and its typesConstruction methods of Bridges and its types
Construction methods of Bridges and its typesprathiekraj1
 
presentation on slip formwork
presentation on slip formworkpresentation on slip formwork
presentation on slip formworknemilgandhi
 
A Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesA Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesSubham Kundu
 
Combine piled raft foundation (cprf)_Er.Karan Chauhan
Combine piled raft foundation (cprf)_Er.Karan ChauhanCombine piled raft foundation (cprf)_Er.Karan Chauhan
Combine piled raft foundation (cprf)_Er.Karan ChauhanEr.Karan Chauhan
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Make Mannan
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile FoundationSubham Kundu
 

La actualidad más candente (20)

Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete Bridge
 
Anchored excavations
Anchored excavationsAnchored excavations
Anchored excavations
 
open web girder
open web girderopen web girder
open web girder
 
Bridge & Road Construction .pptx
Bridge & Road Construction .pptxBridge & Road Construction .pptx
Bridge & Road Construction .pptx
 
Bridge construction methods aug 2007
Bridge construction methods aug 2007Bridge construction methods aug 2007
Bridge construction methods aug 2007
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column Design
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
STRESS RIBBON BRIDGE
STRESS RIBBON BRIDGESTRESS RIBBON BRIDGE
STRESS RIBBON BRIDGE
 
Construction methods of Bridges and its types
Construction methods of Bridges and its typesConstruction methods of Bridges and its types
Construction methods of Bridges and its types
 
presentation on slip formwork
presentation on slip formworkpresentation on slip formwork
presentation on slip formwork
 
A Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesA Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ Piles
 
Prestressing ppt
Prestressing pptPrestressing ppt
Prestressing ppt
 
Basics of sap2000
Basics of sap2000 Basics of sap2000
Basics of sap2000
 
Combine piled raft foundation (cprf)_Er.Karan Chauhan
Combine piled raft foundation (cprf)_Er.Karan ChauhanCombine piled raft foundation (cprf)_Er.Karan Chauhan
Combine piled raft foundation (cprf)_Er.Karan Chauhan
 
Dampers
DampersDampers
Dampers
 
Prestressed concrete continuous beam
Prestressed concrete continuous beamPrestressed concrete continuous beam
Prestressed concrete continuous beam
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Design of pile foundation
Design of pile foundationDesign of pile foundation
Design of pile foundation
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 

Similar a Segmental bridge constructin techniques

Metode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMetode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMFaridGeonova
 
Master präsentation pal sys-offshore
Master präsentation pal sys-offshoreMaster präsentation pal sys-offshore
Master präsentation pal sys-offshoreBenji George
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibilityguest651e92c
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study NoordzeeSander_van_oirschot
 
Metro ppt-180628112005
Metro ppt-180628112005Metro ppt-180628112005
Metro ppt-180628112005PRATAP MISHRA
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Akhilesh Shukla
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...Nick Bentley
 
Bridge Girder Launcher Machine
Bridge Girder Launcher MachineBridge Girder Launcher Machine
Bridge Girder Launcher MachineJayanta Sen
 
Marine Production Technology
Marine Production TechnologyMarine Production Technology
Marine Production Technologykmsu
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxSanjeevGupta660170
 
Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...
Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...
Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...Don Talend
 
Speed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial DataSpeed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial Datadrk357111
 
An Introduction to Prefabricated structures
An Introduction to Prefabricated structuresAn Introduction to Prefabricated structures
An Introduction to Prefabricated structuresSofia Rajesh
 
Tushar Prabhakar
Tushar PrabhakarTushar Prabhakar
Tushar Prabhakartprabhakar
 
Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Rafi Tchopourian
 
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdfpulakrajpadhai
 
Align Production Systems: Innovation in Movement
Align Production Systems: Innovation in MovementAlign Production Systems: Innovation in Movement
Align Production Systems: Innovation in Movementgary_mollohan
 
Titan Rover CDR Presentation
Titan Rover CDR PresentationTitan Rover CDR Presentation
Titan Rover CDR PresentationKristopherKerames
 

Similar a Segmental bridge constructin techniques (20)

Metode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMetode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.ppt
 
Master präsentation pal sys-offshore
Master präsentation pal sys-offshoreMaster präsentation pal sys-offshore
Master präsentation pal sys-offshore
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study Noordzee
 
Company Profile_ANUPAM
Company Profile_ANUPAMCompany Profile_ANUPAM
Company Profile_ANUPAM
 
I1303025763
I1303025763I1303025763
I1303025763
 
Metro ppt-180628112005
Metro ppt-180628112005Metro ppt-180628112005
Metro ppt-180628112005
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
 
Bridge Girder Launcher Machine
Bridge Girder Launcher MachineBridge Girder Launcher Machine
Bridge Girder Launcher Machine
 
Marine Production Technology
Marine Production TechnologyMarine Production Technology
Marine Production Technology
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptx
 
Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...
Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...
Joy Mining Machinery Maximizes Underground Feeder-Breaker Production with Int...
 
Speed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial DataSpeed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial Data
 
An Introduction to Prefabricated structures
An Introduction to Prefabricated structuresAn Introduction to Prefabricated structures
An Introduction to Prefabricated structures
 
Tushar Prabhakar
Tushar PrabhakarTushar Prabhakar
Tushar Prabhakar
 
Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support
 
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
 
Align Production Systems: Innovation in Movement
Align Production Systems: Innovation in MovementAlign Production Systems: Innovation in Movement
Align Production Systems: Innovation in Movement
 
Titan Rover CDR Presentation
Titan Rover CDR PresentationTitan Rover CDR Presentation
Titan Rover CDR Presentation
 

Más de jose bonifacio de souza leite cuadros

Más de jose bonifacio de souza leite cuadros (20)

Puente eternidad de chupaca junin peru 1
Puente eternidad de chupaca junin peru 1Puente eternidad de chupaca junin peru 1
Puente eternidad de chupaca junin peru 1
 
Empalme de los fierros en un edificio como japon 2019
Empalme de los fierros en un edificio como japon 2019Empalme de los fierros en un edificio como japon 2019
Empalme de los fierros en un edificio como japon 2019
 
Parto mecanismo de rusia 10 aaa
Parto mecanismo de rusia 10 aaaParto mecanismo de rusia 10 aaa
Parto mecanismo de rusia 10 aaa
 
Presentaciones fetales en el parto de argentina 3 aaa
Presentaciones fetales en el parto de argentina 3 aaaPresentaciones fetales en el parto de argentina 3 aaa
Presentaciones fetales en el parto de argentina 3 aaa
 
Zapatas de casas para terremotos medianos 2019
Zapatas  de casas para  terremotos medianos  2019Zapatas  de casas para  terremotos medianos  2019
Zapatas de casas para terremotos medianos 2019
 
Presentaciones fetales en el parto de argentina
Presentaciones fetales en el parto de argentinaPresentaciones fetales en el parto de argentina
Presentaciones fetales en el parto de argentina
 
Parto presentaciones fetales 9 aaa
Parto  presentaciones fetales 9 aaaParto  presentaciones fetales 9 aaa
Parto presentaciones fetales 9 aaa
 
Parto normal vaginal presentaciones 8 aaa
Parto normal vaginal presentaciones 8 aaaParto normal vaginal presentaciones 8 aaa
Parto normal vaginal presentaciones 8 aaa
 
Parto normal cefalico presentaciones 7 aaa
Parto normal cefalico presentaciones 7 aaaParto normal cefalico presentaciones 7 aaa
Parto normal cefalico presentaciones 7 aaa
 
Ranking de las mujeres mas hermosas del mundo 2
Ranking de las mujeres mas hermosas del mundo 2Ranking de las mujeres mas hermosas del mundo 2
Ranking de las mujeres mas hermosas del mundo 2
 
Puente domingo savio huancayo fotos
Puente domingo savio huancayo  fotosPuente domingo savio huancayo  fotos
Puente domingo savio huancayo fotos
 
Puente domingo savio gaviones huancayo
Puente domingo savio gaviones  huancayoPuente domingo savio gaviones  huancayo
Puente domingo savio gaviones huancayo
 
Parto normal eutocico oiia 6 aaa
Parto normal eutocico oiia 6 aaaParto normal eutocico oiia 6 aaa
Parto normal eutocico oiia 6 aaa
 
Altura de presentacion fetal y parto 1 aaa
Altura de presentacion fetal y parto 1 aaaAltura de presentacion fetal y parto 1 aaa
Altura de presentacion fetal y parto 1 aaa
 
Atencion del recien nacido 1 aaa
Atencion del recien nacido 1 aaaAtencion del recien nacido 1 aaa
Atencion del recien nacido 1 aaa
 
Mecanismo de parto obstetricia williams 23 4 aaa
Mecanismo de parto obstetricia williams 23 4 aaaMecanismo de parto obstetricia williams 23 4 aaa
Mecanismo de parto obstetricia williams 23 4 aaa
 
Mecanismo de parto cefalico normal en oiia 3 aaa
Mecanismo de parto cefalico normal en oiia  3 aaaMecanismo de parto cefalico normal en oiia  3 aaa
Mecanismo de parto cefalico normal en oiia 3 aaa
 
Veredas de cemento y plazas publicas de cemento 2
Veredas de cemento y plazas publicas de cemento 2Veredas de cemento y plazas publicas de cemento 2
Veredas de cemento y plazas publicas de cemento 2
 
Columnas distancia entre ellas segun tipo del terreno o piso
Columnas distancia entre ellas segun tipo del terreno o pisoColumnas distancia entre ellas segun tipo del terreno o piso
Columnas distancia entre ellas segun tipo del terreno o piso
 
Veredas de cemento y plazas publicas de cemento
Veredas de cemento y plazas publicas de cementoVeredas de cemento y plazas publicas de cemento
Veredas de cemento y plazas publicas de cemento
 

Último

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Último (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

Segmental bridge constructin techniques

  • 1. Segmental Bridge Construction Techniques Presented by: Bob Sward 2012 PTI Convention Nashville, TN May 7, 2012
  • 2. Segmental Bridge Construction Techniques  Cast In Place  Travelers  Incremental Launching  Precast Segmental  Casting Yard  Cantilever Construction  Span by Span  Full Span
  • 3.  Span Length 300 to 800 ft  Typical Segment Length 16 ft  Non Linear Construction  Minimal Crane Capacity  Composite Crew - Efficiency  Typical Cycle Time – 5 days Cast in Place Segmental - Cantilever
  • 4. Cast in Place Segmental - Cantilever
  • 5. 4th Street Bridge – Pueblo, CO Ilan Bridge, Taiwan (Max. segment weight 120t, FT steel weight 55t) Cast in Place Segmental - Cantilever
  • 6. Cast-in-Place – Incremental Launching  Span Lengths 200’ – 350’  Casting/launching from end of bridge working from the ground  Relatively standard forming  7 day cycle per launch
  • 9. Precast Segmental  Casting Yard DUBAI METRO PROJECT  One of the largest pre-casting yards in the world  9 tower cranes, 11 gantry cranes, 64 casting forms, 2,500 segment storage  Camp for 3,500+ staff & crew
  • 10. Precast Segmental – Cantilever Erection with Launching Gantry  Span up to 350 ft±  Speed of Erection (up to 6 pairs of segments)  Delivery from behind or below  Overhead Construction  Self Launching – min. crane support  Parallel Structures Simultaneously  Temp loads directly into Piers  Limited horizontal curvature
  • 11. Precast Segmental – Cantilever Erection with Launching Gantry  Span up to 350 ft±  Speed of Erection (up to 6 pairs of segments)  Delivery from behind or below  Overhead Construction  Self Launching – min. crane support  Parallel Structures Simultaneously  Temp loads directly into Piers  Limited horizontal curvature
  • 12. Precast Segmental – Cantilever Erection with Lifting Frames  Longer Span Lengths  Larger Segments  Deck Construction can be non-linear (multiple work fronts)  Simple Erection Works  Rapid Construction
  • 13. Precast Segmental – Cantilever Erection with Lifting Frames  Longer Span Lengths  Larger Segments  Deck Construction can be non-linear (multiple work fronts)  Simple Erection Works  Rapid Construction
  • 14. Precast Segmental – Cantilever Erection with Lifting Frames  Longer Span Lengths  Larger Segments  Deck Construction can be non-linear (multiple work fronts)  Simple Erection Works  Rapid Construction
  • 15. Precast Segmental – Cantilever Erection with Cranes  Longer Span Lengths  Smaller Segments  Deck Construction can be non-linear (multiple work fronts)  Readily Available Equipment  Rapid Construction  Small Erection Crew
  • 16. Precast Segmental – Cantilever Erection with Cranes  Longer Span Lengths  Smaller Segments  Deck Construction can be non-linear (multiple work fronts)  Readily Available Equipment  Rapid Construction  Small Erection Crew
  • 17.  Spans typically < 170 ft  Speed of Erection (1 span per day possible)  Small Crew  Delivery from behind or below  Temp load directly into Piers Precast Segmental – Span-by-Span Erection with Launching Gantry (Overhead or Underslung)
  • 18.  Spans typically < 170 ft  Speed of Erection (1 span per day possible)  Small Crew  Delivery from behind or below  Temp load directly into Piers Precast Segmental – Span-by-Span Erection with Launching Gantry (Overhead or Underslung)
  • 19.  Locally available equipment  Multiple work fronts  Typically smaller project Precast Segmental – Span-by-Span On Falsework
  • 20. Precast Segmental – Full Span Erection with Launching Gantry  Typically short spans  Very high rate of erection  Factory casting environment - Very high quality  Min follow up work  Large temporary loads
  • 21. Precast Segmental – Full Span Erection with Launching Gantry  Typically short spans  Very high rate of erection  Factory casting environment - Very high quality  Min follow up work  Large temporary loads
  • 22. Precast Segmental – Full Span Erection with Launching Gantry  Typically short spans  Very high rate of erection  Factory casting environment - Very high quality  Min follow up work  Large temporary loads  Limited storage (possible)
  • 23. Precast Segmental – Full Span Erection with Launching Gantry or Heavy Lift  Marlins Stadium  Seven Mile Bridge  Jamestown Rhode Island
  • 24. Segmental Construction  Speed of erection  Crew efficiency  High quality  Many options  Top down erection possible minimal disruption to traffic and surface operations  Efficient use of forms All Possible Through the innovation of Post-Tensioning