SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
You must be ready the day before service or you
treated
will not be
Professional Pest Solutions, LLC
Date of Service: May 27,2017
The checklist details the stepsof preparation that occupants should take toensure
a successful remediation.This checklist mustbe covered thoroughly with the
occupants. Prior to start of the treatment allitems must be reviewed by the
technician to verify compliance. Corrective measuresshall be taken if steps are not
fully completed.
• Remove all trash, loose paper and smallitems fromthe floor. This includes
under beds, behind dressers and closetfloors. Loose items can damage our
equipment.
• Vacuum all carpets right up to the wallbase (using anangle vacuum hose
to get close to the edges). Wash tile or wood floors before treatment. This is
a must.
• Remove all cardboard boxes used for storage and throw away. Replace
with plastic tubswith lidsclosed or large plastic bags tied tightly. All bags
must not have holesin them.
• All clothes in dressersand closets must be bagged and tied tightly. No holes in
bags. All drawersshould be emptiedfrom clothes and papers. Place all bags in
the middle of the living room or in the bathtub. Drawers will be pulled outand
stacked so treatment canpenetrate behind openings.
• No clothes are allowed to be stored in suitcases; they must be removed and
placed in plasticbags. Suitcases stay in the roomsand remain openfor
treatment.
• All books, magazines and papers mustbe bagged and after treatment, must
be shaken out over the tub before being replaced.
• Leave all electronics in the rooms; they will not be affected by the
treatment.
• Remove oil paintings and place them in onelocation for special treatment.
You must be ready the day before service or you will not be
treated
• All clothes must be washed after treatment.
• Remove all pets from theunit.
• Remove all items fromtops of dressers and end tables of each room being
heated. Placein a plastic bagwithout holes.
• Remove linens from the beds.Remove any plasticcoverings fromthe
mattresses and boxsprings that came from the manufacture.
• All window treatmentmade of cloth should beremoved for cleaning
whether by washing machine or dry cleaning. Place inplastic bags until
cleaning permits.
• Remove window blinds and place them in the closet.
• After treatment hasbeen performed mattress and box springcovers must
be put on. Theseare made of nylon and havezippers on them. Not the
fitted covers that just pull over thecorners.
• If math-esses are made of vinyl, then only the box springs need to be
covered.
• Place all tied bags in the middle of the living room. You may place bags in
the bathtub.
• PPS will refuse treatment to any unit not
properly prepared prior to treatment.Your
unit will be pre inspected the day before and
it must be ready then.
You must be ready to leave at 7am. PPSwill notwait for you to get ready.
This treatment takes all day long and any delay in the starttime thelonger it
will be before you may returnto your unit.
You may not bein the unit during treatment. Cords,wires, machinesand
chemicals will be throughout and there would be a possibility of you getting
hurt.
We will give you the approximate timewe will be done once we arrive on the
day of the service.
La lista de verificationdetalla los pasos de preparation que los ocupantes
You must be ready the day before service or you will not be
treated
deben tomar para asegurar una recuperation exitosa.Esta lista de verification
debe ser cubierta completamente conlos ocupantes. Antes del initio del
tratamiento todos los elementos debenser reexaminados por eltecnico para
verificar el cumplimiento. Se tomaran medidas correctivas si las medidas no
son totalmente terminados.
• Saque el piso todos basura, papelsuelto y objetos pequenos. Esto incluye
debajo de las camas, detras de armarios y suelosde armarios. Elementos
sueltos pueden danar nuestro equipo.
• Vaclo todas las alfombras hasta la base del muro (utilizandouna manguera
de vacio de angulo para acercarse a los bordes). Lavar pisos de baldosas o
madera antes del tratamiento. Esto es una necesidad.
• Retire todas cajas de carton utilizadas para el almacenamiento y tire a la
basura. Reemplace con envases de plastico con tapas cerradas o grandes bolsas
de plastico atanfirmemente. Todaslas bolsas no deben tener agujeros en ellos.
• Toda la ropa en aparadores y armarios debe ser embolsada y atada
firmemente. Sin agujeros en bolsas. Todos los cajones deben vaciarse de ropa y
papeles. Coloque todaslas bolsas enel centro dela sala de estar. Cajones saco
y apilados para que penetre en tratamiento detras de las aberturas.
• No ropa pueden almacenarse encasos de traje;deben ser quitados y
colocadas en bolsas de plasticas.Traje casos puedenalojarse enlas
habitaciones y permanecen abiertos para tratamiento.
• Deje toda la electronica enlas habitaciones; ellos noser afectados por el
tratamiento.
• Eliminar pinturas al oleo y colocarlosen unlugar para un tratamiento
especial.
• Debe lavar toda la ropa.
• Retire todas las mascotasde la unidad.
• Retire todos los articulos de tapas de aparadores y mesas de cada habitation
tratando. Colocar en una bolsa de plasticosin agujeros.
• Quitar la ropa de las camas. Retire cualquier revestimiento plastico de los colchonesy
sommiers provenientes de lafabrication.
• Todos los tratamientos de ventana hechode tela deben eliminarse para la limpieza de la
lavadora o limpieza en seco. Coloqueen bolsas de plastico hasta limpieza de permisos.
• Despues de que el tratamiento ha sido habia realizado colchon y somier cubiertasse deben
You must be ready the day before service or you will not be
treated
poner en. Estos estan hechos de vinilo o nylon y tienen cremalleras en ellos. No las cubiertas
equipadas quesolo tiron sobre las esquinas.
• Si elcolchon se hace de vinilo,entonces solola base de resortes deben cubrirse.
• PPS negara tratamiento a cualquier unidadno preparada antes del tratamiento.
Usted debe estar preparado para Debe estar dispuestos a dejar en 7. PPS no leesperara para
prepararse. Este tratamientolleva todo el dia y cualquier retraso en la hora de salida mas sera
antes de que usted puede regresar a su unidad.
Usted no puedeen la unidad durante el tratamiento. Cuerdas,cables, maquinas y productos
quimicos sera a lolargo y habrla una posibilidad de que lastimado.
Usted puede llamarnos al15 para ver si somos antes de lo previsto y puede regresar temprano.
El numero esta en la parte superior de la hoja.
PoA'crcd tJf
Microsoft*
Translator
Usted debe estar listo para salir a las 7de la manana. PPSno vana esperar a que para
prepararse. Este tratamiento selleva durante todo el dia y cualquier retraso en el tiempo de
inicio maslargo sera antes de que usted pueda volver a su unidad.
No puede ser en la unidad durante el tratamiento. Los cables, alambres,maquinas y productos
quimicos se desarrollara a lo largo y habria una posibilidad de que selastime.
Usted nos puede llamar a las 3 pm para ver si estamos antes delo programado y que puede
volver pronto. El numero esta enla parte superior de la hoja.
Debe estar listo para irse a las 7:00. El PPS nole esperara a prepararse. Este tratamiento toma
todo el dia y cualquier tardanza en el tiempo del principio el mas largo quesera antes de que
pueda volver a su unidad.
No puede estar en la unidad durante el tratamiento. Las cuerdas, los alambres,las maquinas y
los productos quimicosseran en todas partes yhabria una posibilidad de usted hacer dano.
Nos puede llamar a las15:00 para ver si somos antes de lo previsto y que puede volver
temprano. El numero esta en lo alto dela hoja.
You must be ready the day before service or you will not be
treated
Preparation for this treatment is key to the successof eliminating bedbugs. The following is a
list of procedures for your clothes.
1. Put all clothes, linens, drapery or cloth in plastic bags and tightly seal to be washed or dry
cleaned. Thisshould also include shoes,coats and hats.
2. Room should be empty, except furniture.
3. Bring only one load of clothes to the washing area or to the cleaners at a time.
4. Wash each load with hotsoapy water.
5. Destroy each bag that you bringto the washingarea after you have putclothes in washer. Do
not re-use these bags after cleaning.
6. Put clothes indryer immediately after washing. Drying timeshould be at least 20 minutes
beyond finished cycle, as this final process should eliminate any surviving bedbugs. Heat
should be at or above140 degrees.
7. Put newlywashed clothes innew bags ineither living roomor the dining room.
Treatment Prep List

Más contenido relacionado

Similar a Treatment Prep List

TECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdf
TECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdfTECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdf
TECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdfYovanyDiaz4
 
Estadarización Bodega Uniformes.docx
Estadarización Bodega Uniformes.docxEstadarización Bodega Uniformes.docx
Estadarización Bodega Uniformes.docxJuanGallardo193381
 
Técnicas & Procedimientos Asépticos en Quirófano
Técnicas & Procedimientos Asépticos en QuirófanoTécnicas & Procedimientos Asépticos en Quirófano
Técnicas & Procedimientos Asépticos en QuirófanoEdgar Villanueva
 
EcoKit-Mycodelic-UPDATE-03-MAY-2022.pdf
EcoKit-Mycodelic-UPDATE-03-MAY-2022.pdfEcoKit-Mycodelic-UPDATE-03-MAY-2022.pdf
EcoKit-Mycodelic-UPDATE-03-MAY-2022.pdfJonathanLpez82
 
Maniobras de esterilización
Maniobras de esterilizaciónManiobras de esterilización
Maniobras de esterilizaciónLilianagonmu
 
Guía 1 esterilización y asepsia
Guía 1 esterilización y asepsiaGuía 1 esterilización y asepsia
Guía 1 esterilización y asepsiaAdriana Libertad
 
PREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIAL
PREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIALPREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIAL
PREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIALNeteges Tot Net
 
MANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptx
MANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptxMANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptx
MANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptxEvelinsilviaHuamante
 
Buenas Prácticas de Manufactura para Industrias de Alimentos
Buenas Prácticas de Manufactura para Industrias de AlimentosBuenas Prácticas de Manufactura para Industrias de Alimentos
Buenas Prácticas de Manufactura para Industrias de AlimentosAntonio Camacho Arteta
 

Similar a Treatment Prep List (20)

encimeras
encimerasencimeras
encimeras
 
cocina
cocinacocina
cocina
 
4.5.2 arreglo de habitaciones
4.5.2 arreglo de habitaciones4.5.2 arreglo de habitaciones
4.5.2 arreglo de habitaciones
 
Lavadora Aeg L61470WDBI
Lavadora Aeg L61470WDBILavadora Aeg L61470WDBI
Lavadora Aeg L61470WDBI
 
Secadora ZANUSSI ZDH8333PZ
Secadora ZANUSSI ZDH8333PZSecadora ZANUSSI ZDH8333PZ
Secadora ZANUSSI ZDH8333PZ
 
Secadora Zanussi ZDH8333W
Secadora Zanussi ZDH8333WSecadora Zanussi ZDH8333W
Secadora Zanussi ZDH8333W
 
PNT 11: Nutrición parenteral
PNT 11: Nutrición parenteralPNT 11: Nutrición parenteral
PNT 11: Nutrición parenteral
 
Lavadora Zanussi ZWT71401WA
Lavadora Zanussi ZWT71401WALavadora Zanussi ZWT71401WA
Lavadora Zanussi ZWT71401WA
 
jghjgImg013
jghjgImg013jghjgImg013
jghjgImg013
 
TECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdf
TECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdfTECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdf
TECNICAS DE ASEPSIA QUIRURGUCAS, ENFERMERÍA.pdf
 
Estadarización Bodega Uniformes.docx
Estadarización Bodega Uniformes.docxEstadarización Bodega Uniformes.docx
Estadarización Bodega Uniformes.docx
 
Técnicas & Procedimientos Asépticos en Quirófano
Técnicas & Procedimientos Asépticos en QuirófanoTécnicas & Procedimientos Asépticos en Quirófano
Técnicas & Procedimientos Asépticos en Quirófano
 
EcoKit-Mycodelic-UPDATE-03-MAY-2022.pdf
EcoKit-Mycodelic-UPDATE-03-MAY-2022.pdfEcoKit-Mycodelic-UPDATE-03-MAY-2022.pdf
EcoKit-Mycodelic-UPDATE-03-MAY-2022.pdf
 
Maniobras de esterilización
Maniobras de esterilizaciónManiobras de esterilización
Maniobras de esterilización
 
18075640.ppt
18075640.ppt18075640.ppt
18075640.ppt
 
Guía 1 esterilización y asepsia
Guía 1 esterilización y asepsiaGuía 1 esterilización y asepsia
Guía 1 esterilización y asepsia
 
PREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIAL
PREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIALPREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIAL
PREGUNTAS FRECUENTES DICIEMBRE 2018 – ENERO 2019 LIMPIEZA INDUSTRIAL
 
4.5.2
4.5.24.5.2
4.5.2
 
MANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptx
MANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptxMANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptx
MANEJO DE ENVOLTURAS Y RECIPIENTES ESTERILES (1).pptx
 
Buenas Prácticas de Manufactura para Industrias de Alimentos
Buenas Prácticas de Manufactura para Industrias de AlimentosBuenas Prácticas de Manufactura para Industrias de Alimentos
Buenas Prácticas de Manufactura para Industrias de Alimentos
 

Más de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

Informe Estudio de Opinión en Zapopan Jalisco - ABRIL
Informe Estudio de Opinión en Zapopan Jalisco - ABRILInforme Estudio de Opinión en Zapopan Jalisco - ABRIL
Informe Estudio de Opinión en Zapopan Jalisco - ABRILmerca6
 
2024-05-02-Carta-145-aniversario-PSOE.pdf
2024-05-02-Carta-145-aniversario-PSOE.pdf2024-05-02-Carta-145-aniversario-PSOE.pdf
2024-05-02-Carta-145-aniversario-PSOE.pdf20minutos
 
Boletín semanal informativo 17. Abril 2024
Boletín semanal informativo 17. Abril 2024Boletín semanal informativo 17. Abril 2024
Boletín semanal informativo 17. Abril 2024Nueva Canarias-BC
 
PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...
PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...
PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...Baker Publishing Company
 
Declaracion jurada de la ex vicepresidenta Cristina Fernández de Kirchner
Declaracion jurada de la ex vicepresidenta Cristina Fernández de KirchnerDeclaracion jurada de la ex vicepresidenta Cristina Fernández de Kirchner
Declaracion jurada de la ex vicepresidenta Cristina Fernández de KirchnerEduardo Nelson German
 
Boletín semanal informativo 18 Mayo 2024.pdf
Boletín semanal informativo 18 Mayo 2024.pdfBoletín semanal informativo 18 Mayo 2024.pdf
Boletín semanal informativo 18 Mayo 2024.pdfNueva Canarias-BC
 
Índigo Energía e Industria No. 15 - digitalización en industria farmacéutica
Índigo Energía e Industria No. 15 - digitalización en industria farmacéuticaÍndigo Energía e Industria No. 15 - digitalización en industria farmacéutica
Índigo Energía e Industria No. 15 - digitalización en industria farmacéuticaIndigo Energía e Industria
 
PRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdf
PRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdfPRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdf
PRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdfredaccionxalapa
 
LO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptx
LO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptxLO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptx
LO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptxroque fernandez navarro
 
tandeos xalapa zona_alta_MAYO_2024_VF.pdf
tandeos xalapa zona_alta_MAYO_2024_VF.pdftandeos xalapa zona_alta_MAYO_2024_VF.pdf
tandeos xalapa zona_alta_MAYO_2024_VF.pdfredaccionxalapa
 
RELACIÓN DE PLAYAS GALARDONADAS 2024.pdf
RELACIÓN DE PLAYAS GALARDONADAS 2024.pdfRELACIÓN DE PLAYAS GALARDONADAS 2024.pdf
RELACIÓN DE PLAYAS GALARDONADAS 2024.pdf20minutos
 
PRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdf
PRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdfPRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdf
PRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdfEusebioJaramillo
 
Novedades Banderas Azules en España para el año 2024
Novedades Banderas Azules en España para el año 2024Novedades Banderas Azules en España para el año 2024
Novedades Banderas Azules en España para el año 202420minutos
 
Carta de Sabrina Shorff enviada al juez Kevin Castel
Carta de Sabrina Shorff enviada al juez Kevin CastelCarta de Sabrina Shorff enviada al juez Kevin Castel
Carta de Sabrina Shorff enviada al juez Kevin CastelAndySalgado7
 
Proponen la eliminación del Consejo de la Magistratura
Proponen la eliminación del Consejo de la MagistraturaProponen la eliminación del Consejo de la Magistratura
Proponen la eliminación del Consejo de la MagistraturaEduardo Nelson German
 
calendario de tandeos macrosectores xalapa mayo 2024.pdf
calendario de tandeos macrosectores xalapa mayo 2024.pdfcalendario de tandeos macrosectores xalapa mayo 2024.pdf
calendario de tandeos macrosectores xalapa mayo 2024.pdfredaccionxalapa
 

Último (17)

Informe Estudio de Opinión en Zapopan Jalisco - ABRIL
Informe Estudio de Opinión en Zapopan Jalisco - ABRILInforme Estudio de Opinión en Zapopan Jalisco - ABRIL
Informe Estudio de Opinión en Zapopan Jalisco - ABRIL
 
2024-05-02-Carta-145-aniversario-PSOE.pdf
2024-05-02-Carta-145-aniversario-PSOE.pdf2024-05-02-Carta-145-aniversario-PSOE.pdf
2024-05-02-Carta-145-aniversario-PSOE.pdf
 
LA CRÓNICA COMARCA DE ANTEQUERA _ Nº 1079
LA CRÓNICA COMARCA DE ANTEQUERA _ Nº 1079LA CRÓNICA COMARCA DE ANTEQUERA _ Nº 1079
LA CRÓNICA COMARCA DE ANTEQUERA _ Nº 1079
 
Boletín semanal informativo 17. Abril 2024
Boletín semanal informativo 17. Abril 2024Boletín semanal informativo 17. Abril 2024
Boletín semanal informativo 17. Abril 2024
 
PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...
PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...
PROPUESTAS Y RECOMENDACIONES PARA UN NUEVO TRATO ENTRE EL ESTADO, LOS PUEBLOS...
 
Declaracion jurada de la ex vicepresidenta Cristina Fernández de Kirchner
Declaracion jurada de la ex vicepresidenta Cristina Fernández de KirchnerDeclaracion jurada de la ex vicepresidenta Cristina Fernández de Kirchner
Declaracion jurada de la ex vicepresidenta Cristina Fernández de Kirchner
 
Boletín semanal informativo 18 Mayo 2024.pdf
Boletín semanal informativo 18 Mayo 2024.pdfBoletín semanal informativo 18 Mayo 2024.pdf
Boletín semanal informativo 18 Mayo 2024.pdf
 
Índigo Energía e Industria No. 15 - digitalización en industria farmacéutica
Índigo Energía e Industria No. 15 - digitalización en industria farmacéuticaÍndigo Energía e Industria No. 15 - digitalización en industria farmacéutica
Índigo Energía e Industria No. 15 - digitalización en industria farmacéutica
 
PRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdf
PRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdfPRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdf
PRECIOS_M_XIMOS_VIGENTES_DEL_5_AL_11_DE_MAYO_DE_2024.pdf
 
LO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptx
LO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptxLO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptx
LO QUE NUNCA DEBARIA HABER PASADO PACTO CiU PSC (Roque).pptx
 
tandeos xalapa zona_alta_MAYO_2024_VF.pdf
tandeos xalapa zona_alta_MAYO_2024_VF.pdftandeos xalapa zona_alta_MAYO_2024_VF.pdf
tandeos xalapa zona_alta_MAYO_2024_VF.pdf
 
RELACIÓN DE PLAYAS GALARDONADAS 2024.pdf
RELACIÓN DE PLAYAS GALARDONADAS 2024.pdfRELACIÓN DE PLAYAS GALARDONADAS 2024.pdf
RELACIÓN DE PLAYAS GALARDONADAS 2024.pdf
 
PRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdf
PRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdfPRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdf
PRESENTACION PLAN ESTRATEGICOS DE SEGURIDAD VIAL - PESV.pdf
 
Novedades Banderas Azules en España para el año 2024
Novedades Banderas Azules en España para el año 2024Novedades Banderas Azules en España para el año 2024
Novedades Banderas Azules en España para el año 2024
 
Carta de Sabrina Shorff enviada al juez Kevin Castel
Carta de Sabrina Shorff enviada al juez Kevin CastelCarta de Sabrina Shorff enviada al juez Kevin Castel
Carta de Sabrina Shorff enviada al juez Kevin Castel
 
Proponen la eliminación del Consejo de la Magistratura
Proponen la eliminación del Consejo de la MagistraturaProponen la eliminación del Consejo de la Magistratura
Proponen la eliminación del Consejo de la Magistratura
 
calendario de tandeos macrosectores xalapa mayo 2024.pdf
calendario de tandeos macrosectores xalapa mayo 2024.pdfcalendario de tandeos macrosectores xalapa mayo 2024.pdf
calendario de tandeos macrosectores xalapa mayo 2024.pdf
 

Treatment Prep List

  • 1. You must be ready the day before service or you treated will not be Professional Pest Solutions, LLC Date of Service: May 27,2017 The checklist details the stepsof preparation that occupants should take toensure a successful remediation.This checklist mustbe covered thoroughly with the occupants. Prior to start of the treatment allitems must be reviewed by the technician to verify compliance. Corrective measuresshall be taken if steps are not fully completed. • Remove all trash, loose paper and smallitems fromthe floor. This includes under beds, behind dressers and closetfloors. Loose items can damage our equipment. • Vacuum all carpets right up to the wallbase (using anangle vacuum hose to get close to the edges). Wash tile or wood floors before treatment. This is a must. • Remove all cardboard boxes used for storage and throw away. Replace with plastic tubswith lidsclosed or large plastic bags tied tightly. All bags must not have holesin them. • All clothes in dressersand closets must be bagged and tied tightly. No holes in bags. All drawersshould be emptiedfrom clothes and papers. Place all bags in the middle of the living room or in the bathtub. Drawers will be pulled outand stacked so treatment canpenetrate behind openings. • No clothes are allowed to be stored in suitcases; they must be removed and placed in plasticbags. Suitcases stay in the roomsand remain openfor treatment. • All books, magazines and papers mustbe bagged and after treatment, must be shaken out over the tub before being replaced. • Leave all electronics in the rooms; they will not be affected by the treatment. • Remove oil paintings and place them in onelocation for special treatment.
  • 2. You must be ready the day before service or you will not be treated • All clothes must be washed after treatment. • Remove all pets from theunit. • Remove all items fromtops of dressers and end tables of each room being heated. Placein a plastic bagwithout holes. • Remove linens from the beds.Remove any plasticcoverings fromthe mattresses and boxsprings that came from the manufacture. • All window treatmentmade of cloth should beremoved for cleaning whether by washing machine or dry cleaning. Place inplastic bags until cleaning permits. • Remove window blinds and place them in the closet. • After treatment hasbeen performed mattress and box springcovers must be put on. Theseare made of nylon and havezippers on them. Not the fitted covers that just pull over thecorners. • If math-esses are made of vinyl, then only the box springs need to be covered. • Place all tied bags in the middle of the living room. You may place bags in the bathtub. • PPS will refuse treatment to any unit not properly prepared prior to treatment.Your unit will be pre inspected the day before and it must be ready then. You must be ready to leave at 7am. PPSwill notwait for you to get ready. This treatment takes all day long and any delay in the starttime thelonger it will be before you may returnto your unit. You may not bein the unit during treatment. Cords,wires, machinesand chemicals will be throughout and there would be a possibility of you getting hurt. We will give you the approximate timewe will be done once we arrive on the day of the service. La lista de verificationdetalla los pasos de preparation que los ocupantes
  • 3. You must be ready the day before service or you will not be treated deben tomar para asegurar una recuperation exitosa.Esta lista de verification debe ser cubierta completamente conlos ocupantes. Antes del initio del tratamiento todos los elementos debenser reexaminados por eltecnico para verificar el cumplimiento. Se tomaran medidas correctivas si las medidas no son totalmente terminados. • Saque el piso todos basura, papelsuelto y objetos pequenos. Esto incluye debajo de las camas, detras de armarios y suelosde armarios. Elementos sueltos pueden danar nuestro equipo. • Vaclo todas las alfombras hasta la base del muro (utilizandouna manguera de vacio de angulo para acercarse a los bordes). Lavar pisos de baldosas o madera antes del tratamiento. Esto es una necesidad. • Retire todas cajas de carton utilizadas para el almacenamiento y tire a la basura. Reemplace con envases de plastico con tapas cerradas o grandes bolsas de plastico atanfirmemente. Todaslas bolsas no deben tener agujeros en ellos. • Toda la ropa en aparadores y armarios debe ser embolsada y atada firmemente. Sin agujeros en bolsas. Todos los cajones deben vaciarse de ropa y papeles. Coloque todaslas bolsas enel centro dela sala de estar. Cajones saco y apilados para que penetre en tratamiento detras de las aberturas. • No ropa pueden almacenarse encasos de traje;deben ser quitados y colocadas en bolsas de plasticas.Traje casos puedenalojarse enlas habitaciones y permanecen abiertos para tratamiento. • Deje toda la electronica enlas habitaciones; ellos noser afectados por el tratamiento. • Eliminar pinturas al oleo y colocarlosen unlugar para un tratamiento especial. • Debe lavar toda la ropa. • Retire todas las mascotasde la unidad. • Retire todos los articulos de tapas de aparadores y mesas de cada habitation tratando. Colocar en una bolsa de plasticosin agujeros. • Quitar la ropa de las camas. Retire cualquier revestimiento plastico de los colchonesy sommiers provenientes de lafabrication. • Todos los tratamientos de ventana hechode tela deben eliminarse para la limpieza de la lavadora o limpieza en seco. Coloqueen bolsas de plastico hasta limpieza de permisos. • Despues de que el tratamiento ha sido habia realizado colchon y somier cubiertasse deben
  • 4. You must be ready the day before service or you will not be treated poner en. Estos estan hechos de vinilo o nylon y tienen cremalleras en ellos. No las cubiertas equipadas quesolo tiron sobre las esquinas. • Si elcolchon se hace de vinilo,entonces solola base de resortes deben cubrirse. • PPS negara tratamiento a cualquier unidadno preparada antes del tratamiento. Usted debe estar preparado para Debe estar dispuestos a dejar en 7. PPS no leesperara para prepararse. Este tratamientolleva todo el dia y cualquier retraso en la hora de salida mas sera antes de que usted puede regresar a su unidad. Usted no puedeen la unidad durante el tratamiento. Cuerdas,cables, maquinas y productos quimicos sera a lolargo y habrla una posibilidad de que lastimado. Usted puede llamarnos al15 para ver si somos antes de lo previsto y puede regresar temprano. El numero esta en la parte superior de la hoja. PoA'crcd tJf Microsoft* Translator Usted debe estar listo para salir a las 7de la manana. PPSno vana esperar a que para prepararse. Este tratamiento selleva durante todo el dia y cualquier retraso en el tiempo de inicio maslargo sera antes de que usted pueda volver a su unidad. No puede ser en la unidad durante el tratamiento. Los cables, alambres,maquinas y productos quimicos se desarrollara a lo largo y habria una posibilidad de que selastime. Usted nos puede llamar a las 3 pm para ver si estamos antes delo programado y que puede volver pronto. El numero esta enla parte superior de la hoja. Debe estar listo para irse a las 7:00. El PPS nole esperara a prepararse. Este tratamiento toma todo el dia y cualquier tardanza en el tiempo del principio el mas largo quesera antes de que pueda volver a su unidad. No puede estar en la unidad durante el tratamiento. Las cuerdas, los alambres,las maquinas y los productos quimicosseran en todas partes yhabria una posibilidad de usted hacer dano. Nos puede llamar a las15:00 para ver si somos antes de lo previsto y que puede volver temprano. El numero esta en lo alto dela hoja.
  • 5. You must be ready the day before service or you will not be treated Preparation for this treatment is key to the successof eliminating bedbugs. The following is a list of procedures for your clothes. 1. Put all clothes, linens, drapery or cloth in plastic bags and tightly seal to be washed or dry cleaned. Thisshould also include shoes,coats and hats. 2. Room should be empty, except furniture. 3. Bring only one load of clothes to the washing area or to the cleaners at a time. 4. Wash each load with hotsoapy water. 5. Destroy each bag that you bringto the washingarea after you have putclothes in washer. Do not re-use these bags after cleaning. 6. Put clothes indryer immediately after washing. Drying timeshould be at least 20 minutes beyond finished cycle, as this final process should eliminate any surviving bedbugs. Heat should be at or above140 degrees. 7. Put newlywashed clothes innew bags ineither living roomor the dining room.