ASTORIA II
PRESENTATION
                PRESENTACIÓN

                   SANTOS CMI is a One-Stop Shop that offers full
                Engineering, Procurement and Construction services
                for Power Generation and Oil & Gas projects through-
                out Latin America and the Caribbean.


                   The company has significant experience working
COPORATIVO




                in 18 countries within the region, utilizing local and
                global human talent for top-tier customers who seek
                for a serious and reliable contractor that understands
                specific market conditions and requirements, while
                performing as per international codes and practices,
                under turn-key contracts.


                   SANTOS CMI es un contratista Todo-en-Uno que
    CORPORATE




                ofrece servicios completos de Ingeniería, Procura y
                Construcción para proyectos de Generación Eléctrica y
                Petróleo & Gas en América Latina y el Caribe.


                   La compañía tiene experiencia significativa tra-
                bajando en 18 países en la región, utilizando talento
                humano local y global para clientes de primer nivel que
                buscan un contratista serio y confiable que entienda los
                requerimientos y condiciones específicas del mercado y
                que trabaje de acuerdo a códigos y prácticas internacio-
                nales, bajo contratos llave-en-mano.
MISSION - VISION
MISIÓN - VISIÓN



   MISSION                                              MISION

   We are an Engineering, Procurement and                Somos una compañía EPC (Ingeniería,
Construction (EPC) company developing proj-          gestión de compras y construcción) que ejecu-
ects in Latin America and the Caribbean for the      ta proyectos en Latinoamérica y el Caribe para
power generation, oil and gas, and industrial        los sectores energético, petróleo y gas, e in-




                                                                                                             COPORATIVO
sectors; recognized for the quality of our prod-     dustrial; reconocida por la calidad de nuestros
ucts and services, and for our commitment.           productos y servicios, y por el cumplimiento de
                                                     nuestros compromisos.
    We work with international standards of
quality, safety and environmental care to maxi-          Trabajamos con estándares internacio-
mize the benefits for our shareholders, clients      nales tanto de calidad, seguridad y protec-
and the community. We base our operations on         ción del medioambiente, para maximizar los
a strict code of ethics, on the professional and     beneficios de nuestros accionistas, clientes y
personal development of our personnel, and           la comunidad. Fundamentamos nuestras op-
on the continuous quest for efficiency and in-       eraciones en un estricto código de ética, en el
novation in every aspect of our business.            desarrollo profesional y personal de nuestros
                                                     colaboradores, y en la continua búsqueda de
                                                     la eficiencia e innovación todos los ámbitos de




                                                                                                         CORPORATE
                                                     nuestro negocio.v




                                                     VISION
                                                       Be recognized in Latin America and the Carib-
                                                    bean as the leading EPC contractor in thermo-
                                                     electric power generation and with a solid po-
                                                     sition in the oil, gas and specialized industrial
                                                      sectors.

                                                           VISIÓN
                                                          Ser reconocida en Latinoamérica y el Ca-
                                                      ribe como la Compañía Contratista EPC líder en
                                                     generación termoeléctrica y con un sólido posi-
                                                    cionamiento en los sectores de petróleo, gas e
                                                   industrial especializado.
FOUR PILLAR APPROACH
                CUATRO PILARES ESTRATEGICOS

                       GEOGRAPHICAL DIVERSIFICATION

                           With presence and experience in 18 countries throughout Latin America and the
                       Caribbean, SANTOS CMI is ready to provide effective support to customers in the
                       entire region, with local face and knowledge.
COPORATIVO




                                             SECTOR DIVERSIFICATION

                                                 The company works within the entire spectrum of energy
                                             projects: power generation, oil and gas. Also, mining and
                                             industrial projects. In this way, allocates its best resources to
                                             each specialty, according to the natural cycles of each sector
                                             in the different markets.
    CORPORATE




                       NICHE APPROACH

                           With regional talent, SANTOS CMI offers full range of EPC services for up to
                       mid-size projects developed in accordance with international codes and standards.
                       Customers can then have world class solutions, from a local contractor that speaks
                       the language and knows the territory.




                                         EPC FOCUS

                                            Having its origin in construction Works, the company focuses
                                         no won EPC projects, where it can help its clients take control
                                         over scope and Schedule, without compromising to interfaces.
                                         A turn-key response requires experience, capability and man-
                                         agement tools. SANTOS CMI ´s got them.
DIVERSIFICACION GEOGRAFICA

    Con presencia y experiencia en 18 países de América
Latina y el Caribe, SANTOS CMI está preparada para dar
soporte efectivo a clientes en toda la región, con una cara
y conocimiento local.




                                                                         CORPORATIVO
DIVERSIFICACIÓN POR SECTORES

    La empresa trabaja en todo el espectro de proyectos de energía:
generación eléctrica, petróleo y gas. Además tiene proyectos mine-
ros e industriales. De esta forma asigna sus mejores recursos a
cada especialidad, según los ciclos naturales de cada sector en los
distintos mercados.




                                                                      CORPORATE
ENFOQUE ESPECIALIZADO

    Con talento regional, SANTOS CMI ofrece un rango complete
de servicios IPC para proyectos de hasta mediano porte, de-
sarrollados de acuerdo a códigos y estándares internacionales.
Los clientes pueden entonces contar con soluciones de clase
mundial, de un contratista local que habla su idioma y conoce
el territorio.




SOLUCIONES LLAVE EN MANO

    Siendo su origen las obras de construcción, la compañía se en-
foca ahora en proyectos IPC, donde puede ayudar a sus clientes
a tomar control sobre el alcance y el cronograma, sin ceder a las
interfaces. Una respuesta llave-en-mano requiere de experiencia,
capacidad y herramientas de gestión. SANTOS CMI las tiene.
WORLDWIDE CERTIFICATIONS
                   CERTIFICACIONES RECONOCIDAS A NIVEL MUND

                   For decades, SANTOS CMI has delivered outstanding            Por décadas, SANTOS CMI ha provisto servicios ex-
                services, based on proven methodology and a Quality         cepcionales, con base en metodología comprobada y un
                Management System that truly supports its operations.       Sistema de Gestión de Calidad que realmente brinda so-
                                                                            porte a sus operaciones.
                    The organization emphasizes the importance of plan-
                ning and controlling each task under its scope of work.         La organización enfatiza en la importancia de planifi-
                Procedures and management tools continuously receive        car y controlar cada tarea bajo su alcance de trabajo. Los
CORPORATIVO




                feedback from the projects staff to incorporate the voice   procedimientos y herramientas de gestión reciben con-
                of experience and permanently improve.                      tinuamente retro-alimentación del personal de proyectos,
                                                                            para incorporar la voz de la experiencia y mejorar per-
                    The Quality System is certified under ISO 9001 stan-    manentemente.
                dard, 2000 edition, for Design, Procurement and Con-
                struction activities.                                          El Sistema de Calidad está certificado bajo norma
                                                                            ISO 9001, edición 2000, para actividades de Ingeniería,
                   ENVIRONMENT,                                             Suministros y Construcción.
                   HEALTH, & SAFETY
                                                                               SEGURIDAD,
                   Protecting its employees and those involved in the          MEDIO AMBIENTE Y SALUD
                operation is the highest priority. Its Safety Management
                System is certified under the OHSAS 18001 standard,            Proteger a sus empleados y a aquellos involucra-
    CORPORATE




                1999 edition.                                               dos en la operación es la más alta prioridad. Su Sistema
                                                                            de Gestión de Seguridad está certificado bajo la norma
                  The Safety Policy is not only endorsed by the upper       OHSAS 18001, edición 2008.
                management, but shared and exercised by all company
                members every day, every where.                                 La Política de Seguridad no sólo es respaldada por
                                                                            la alta dirección, sino compartida y practicada por
                   CERTIFICATES & STAMPS                                    todos los miembros de la compañía cada día,
                                                                            en todas partes.
                    SANTOS CMI holds Certificates of Authorization,
                issued by the American Society of Mechanical Engineers         CERTIFICADOS
                (ASME) for boiler and pressure vessel manufacturing and        Y ESTAMPES
                assembly, as well as from the National Board of Boiler
                and Pressure Vessels Inspectors (NBBI) for boiler and          SANTOS CMI tiene Certificados
                vessel repair.                                              de Autorización, emitidos por la
                                                                            Sociedad Americana de Ingenie-
                                                                            ros Mecánicos (ASME) y por el
                                                                            Consejo Nacional de Inspecto-
                                                                            res de Calderas y Recipientes a
                                                                            Presión (NBBI).

                                                                                La empresa asociada Indu-
                                                                            stria Acero de los Andes tiene es-
                                                                            tampes ASME “S” y “R”, bien como
                                                                            certificados API y UL.
DIAL




                                                                                       CORPORATIVO/Certificados
   USA / EUA


                                              BAHAMAS
                                                         DOMINICAN REPUBLIC /
   MEXICO
                                                         REPUBLICA DOMINICANA
                                                                   VIRGIN ISLANDS /
           GUATEMALA
                                                                   ISLAS VIRGENES
                   HONDURAS                             COLOMBIA
       NICARAGUA
                                                                       VENEZUELA
                       PANAMA

                                ECUADOR


                           PERU
                                                                     BRAZIL / BRASIL


                                      BOLIVIA




                                                                       URUGUAY
                                          CHILE

                                                             ARGENTINA
VALUE PROPOSITIONS
               PROPUESTAS DE VALOR




                                              FAST-TRACK PROJECTS

                                          Successful experience executing projects under accelerated
                                          or compressed timetables, to compensate delays and comply
                                          with requests ever more frequent in infrastructure works.
COPORATIVO




                         REMOTE LOCATIONS

                         Well trained men and women manage logistics to very remote locations,
                      such as the Amazon rainforest, Caribbean and Pacific islands, jungles and
                      highlands.
   CORPORATE




                                                                DESIGN-BUILD APPROACH

                                                                 Having its origin in the construction field, SANTOS
                                                             CMI´s engineering solutions represent a true value
                                                             for its customers, because they aim towards con-
                                                             structability.




                                          TEAMWORK

                                          The company greatly understands how to create effective teamwork
                                      out of highly productive individuals coming from different back grounds,
                                      nationalities and cultures.




                                                                PROJECT MANAGEMENT

                                                                The basis for SANTOS CMI’s success is its culture
                                                            of planning ahead and reacting fast, with integration
                                                            in mind, to help build a consistent and predictable
                                                            business.
PROYECTOS FAST-TRACK

     Exitosa experiencia ejecutando proyectos bajo cronogramas
    acelerados o comprimidos, para recuperar demoras y atender
     exigencias cada vez más usuales en obras de infraestructura.




                                                                            COPORATIVO
                                              SITIOS REMOTOS

   Hombres y mujeres bien entrenados manejan la logística
    a sitios muy remotos como la selva Amazónica, islas del
         caribe y del Pacífico, bosques y sierras a gran altura.




                                                                        CORPORATE
                                            DESIGN-BUILD APPROACH

             Teniendo su orígen en el campo de la construcción, las
       soluciones de ingeniería de SANTOS CMI representan un ver-
      dadero valor para sus clientes, ya que apuntan a la constructi-
                                                             bilidad.




                                             TEAMWORK

 La compañía entiende muy bien cómo crear equipos
  de trabajo efectivos, integrados por individuos alta-
mente productivos con diferentes experiencias, nacio-
                                 nalidades y culturas.




                                             GERENCIA DE PROYECTOS

    La base del éxito de SANTOS CMI es su cultura de planificación y
     de rápida reacción, con integración en mente, para construir un
                                   negocio consistente y predecible.
GROUP OF COMPANIES / COMPAÑÍAS DEL GRUPO


                                        GENESYS
COMPAÑIAS DEL GRUPO




                                         A specialist contractor for Process Automation and
                                     Commissioning & Start-up services. They design and im-
                                     plement high-end solutions and have hands-on experience
                                     in countries such as Pakistan, Mexico, Argentina and the
                                     Dominican Republic, among others.

                                         Un contratista especializado en automatización de
                                     Procesos y servicios de Comisionado y Puesta en Marcha.
                                     Diseñan e implementa soluciones de alto nivel y tienen ex-
                                     periencia de primera mano en Pakistán, México, Argentina
                                     y la República Dominicana, entre otros.




                                                                                                        VAUTID AMERICAS

                                                                                                        Based on German proprietary technology, this company pro-
                                                                                                    vides specialized services to heavy industries, by successfully re-
                                                                                                    covering wore-out components and ensuring a longer life-cycle.
                                                                                                    Vautid supports its customers throughout Latin America with
         CORPORATE/COMPANIES CROUP




                                                                                                    Long Term Service Agreements for wear protection.

                                                                                                        Basado en tecnología propietaria alemana, esta compañía
                                                                                                    provee servicios especiali zados a industrias pesadas, recupe-
                                                                                                    rando exitosamente componentes desgastados y asegurando
                                                                                                    una mayor vida útil. Vautid da soporte a clientes en América
                                                                                                    Latina con Acuerdos de Servicio de Largo Plazo para protección
                                                                                                    contra desgaste.


                                        INDUSTRIA ACERO
                                        DE LOS ANDES (IAA)


                                         A qualified metal fabrication shop that has successfully
                                     delivered process equipment, tanks and pressure vessels
                                     for projects in countries such as Iraq, Nigeria, Brazil and
                                     Colombia. IAA holds ASME “S”, “U” and “U2”, NBBI “R” and
                                     “NB”, API and UL certifications.

                                         Un taller metalmecánico calificado que exitosamente
                                     produce equipos de proceso, tanques y recipientes a pre-
                                     sión para proyectos en países como Iraq, Nigeria, Brazil
                                     y Colombia. IAA tiene certificados ASME “S”, “U” y “U2”,
                                     NBBI “R” y “NB”, API y UL.
EPC




ONE STOP SHOP                                       ONE STOP SHOP

•	   Engineering services in oil and gas pro-       •	   Engineering services in oil and gas processing
     cessing facilities, power generation, and           facilities, power generation, and industrial fa-
     industrial facilities.                              cilities.

•	   Tailor-made solutions to meet specific re-     •	   Tailor-made solutions to meet specific re-
     quirements.                                         quirements.

•	   Its Design-Build approach provides true        •	   Its Design-Build approach provides true sup-
     support to field construction teams                 port to field construction teams
          Procurement                                         Procurement
          Engineering                                         Engineering
          Construction                                        Construction

•	   Houston Office offers Full Procurement         •	   Houston Office offers Full Procurement Ser-
     Services for projects in the region.                vices for projects in the region.

•	   Timely site delivery to remote locations       •	   Timely site delivery to remote locations in-
     including Chilean and Bolivian highlands,           cluding Chilean and Bolivian highlands,
     jungles of Ecuador, Brazil and Bolivia and          jungles of Ecuador, Brazil and Bolivia and the
     the Caribbean islands.                              Caribbean islands.

•	   Real-time status control system tracks ev-     •	   Real-time status control system tracks every
     ery step of the process.                            step of the process.

•	   Direct execution of civil works and electro-   •	   Direct execution of civil works and electrome-
     mechanical installations.                           chanical installations.

•	   Close monitoring of projects and optimal       •	   Close monitoring of projects and optimal re-
     resource utilization.                               source utilization.
ENGINEERING                                         INGENIERÍA

ENGINEERING                                         INGENIERÍA
SANTOS CMI offers complete basic and de-            SANTOS CMI ofrece servidos completos de diseño
tailed design services complying with interna-      básico y de detalle, de acuerdo a estándares inter-
tional standards and best practices.                nacionales y las mejores prácticas.

EXPERIENCE & CAPABILITY                             CAPACIDAD Y EXPERIENCIA
The human talent at SANTOS CMI is has large         El talento humano de SANTOS CMI es multidisci-
background in industrial projects in Latin          plinario y tiene larga trayectoria en proyectos in-
America, with first-hand knowledge on design,       dustriales en América Latina, con conocimiento de
analysis and studies forthe power generation        primera mano en diseños, análisis y estudios
and oil & gas sectors, executedfor private and      para el sector de generación eléctrica, petróleo y
state companies.                                    gas, ejecutados para empresas privadas y estatales.

SYSTEMS                                             SISTEMAS
Drawings and specifications are issued and          Planos y especificaciones son emitidos y monitorea-
monitored with a web-based online system            dos con un sistema en línea y basado en web que
that ensures the appropriate and timely data        asegura el apropiado y oportuno flujo de datos,
flow, interdisciplinary revisions and reliability   revisiones interdisciplinarias y confiablidad de la
of the information, while allowing customers        información, permitiendo a clientes y personal en
and site personnel to interact -in real time-       obra interactuar en tiempo real con los datos.
with the data.
                                                    TECNOLOGÍA
TECHNOLOGY                                          Nacido en la era digital, el equipo de ingeniería en-
Born in the digital era, the engineering team       tiende y diseña en 3D. Maquetas virtuales evitan
understands and designs in 3D. Virtual renders      interferencias, optimizan listados de cantidades
avoid interferences, optimize bills of quantities   y ayudan a construir mejores plantas. Y con escá-
and help build better plants. And with laser        neres láser se relevan plantas industriales enteras
scanners, entire industrial plants are surveyed     en 3D hasta en el último detalle.
in 3D to the last detail.
GESTION DE COMPRAS                                  PROCUREMENT

La reputación de SANTOS CMI continúa nutrié-        The reputation of SANTOS CMI continues to be
ndose de los excelentes resultados de su ser-       enhanced by the outstanding results of its pro-
vicio de gestión de compras, que suministra         curement services that supply high-quality ma-
materiales y equipos de alta calidad para las       terials and equipment for the balance of plant.
plantas.
                                                    With a procurement office in Houston, TX, USA,
Con una oficina de compras en Houston, TX,          and regional offices in South America, the com-
EE.UU., y oficinas regionales en México y Suda-     pany capitalizes on the new market forces, such
mérica, la compañía capitaliza sobre las nuevas     as global trade, instantaneous communications
fuerzas de mercado, como el comercio global,        and local knowledge, which sustain its differen-
comunicaciones instantáneas y conocimiento          tiation.
local, que sustentan su diferenciación.
                                                    Full logistics capabilities have allowed for the
Las capacidades completas de logística han          timely supply of materials and equipment to
permitido la oportuna entrega de materiales y       remote locations, such as several islands In the
equipos en lugares remotos, como varias islas       Caribbean and the Pacific, the Chilean and Boliv-
del Caribe y del Pacífico, las sierras chilena y    ian highlands and the jungles of Ecuador, Bolivia
boliviana y las selvas de Ecuador, Bolivia y Bra-   and Brazil.
sil.
                                                    SANTOS CMI relies on a detailed and real-time
SANTOS CMI ha desarrollado un sistema de            status control system to properly coordinate and
control de estado detallado y en tiempo real        track every step of the process, from Material
para coordinar y rastrear apropiadamente            Request, through bids evaluation and Purchase
cada etapa del proceso, desde la Requisición        Order, to shipment, customs clearance and site
de Materiales, la evaluación de ofertas y Or-       delivery.
den de Compra, hasta el embarque, desadua-
nización y entrega en sitio.                        A reliable network of vendors, adequate pre-
                                                    qualification and inspection procedures and
Una red confiable de proveedores, proced-           profound local knowledge, support every firm
imientos adecuados de precalificación e in-         commitment to customers in Latin America.
spección y profundo conocimiento local, dan
soporte a cada compromiso con clientes en
América Latina y el caribe.
CONSTRUCCION


   SANTOS CMI posee competencias paro la              SANTOS CMI has the necessary competences
ejecución de proyectos llave en mano, ofreci-      to execute turn-key projects, providing swift re-
endo tiempos de reacción ágiles, mejorando         action times, improving delivery and allowing
los plazos de ejecución y permitiendo a los cli-   for customers to start operations earlier.
entes entrar en operación en un menor tiem-
po.                                                    Its ability to perform multidisciplinary tasks
                                                   has leveraged its successful participation m the
   Su habilidad para ejecutar tareas multidis-     construction and expansion of important indus-
ciplinarias, le ha facultado su exitosa partici-   trial projects.
pación en la construcción y expansión de im-
portantes proyectos industriales.                     With global resources the company has
                                                   erected power boilers, heat recovery steam gen-
   Con recursos globales ha instalado calde-       erators; gas, steam. hydro and wind turbines, fu-
ras y recuperadores de calor, turbinas a gas,      maces and reactors, storage tanks and pressure
vapor, hidráulicas y eólicas. hornos y reacto-     vessels, engine and turbine-driven compressors,
res, tanques de almacenamiento v recipientes       desulphurizers, medium-speed engines, spheres,
a presión, compresores movidos por motor y         substations, equipment for refineries, cement,
turbina, desulfurizadores, motores de media        paper, glass, food & beverage, industrial gases,
velocidad, esferas, subestaciones, equipos         pharmaceutical, plastics and vehicle plants.
para refinerías, plantas de cemento, papel,
vidrio, alimentos y bebidas, gases industriales,      It directly executes earthworks, pilling, con-
farmacéutica, plásticos, vehículos, etc.           crete works, mechanical erection. piping pre-
                                                   fabrication and erection, specialized welding,
    Ejecuta directamente movimiento de tier-       high. medium and low voltage installations, in-
ras, pilotaje, obras de concreto, montaje          strument installation and calibration.
mecánico, prefabricación y montaje de tuber-
ía, suelda especializada, instalaciones de alta,      SANTOS CMI maintains an excellent safety
media y baja tensión, instalación y calibración    and quality record, working for demanding mul-
de instrumentos.                                   tinational firms in the region and is proud to
                                                   state that it has not delayed the commercial op-
  SANTOS CMI mantiene un excelente récord          eration of any facility in none of the 16 countries
de seguridad y calidad, trabajando para exi-       where it has worked.
gentes firmas multinacionales en la reglón .
SECTORE DE MERCADO
       MARKET SECTORS




                        PROJECT MANAGEMENT                                         PRIMAVERA P6
                                                                                       In an effort to continuously improve its performance, the
                            SANTOS CMI follows a structured view of Project        company has fully migrated to Primavera’s latest version of its
                        Management, conducting -every time- a formal and sys-      world-class tool, after many years of mastering previous ver-
                        tematic development of scope, schedule, risk, quality,     sions. This platforms allow for online collaboration and access,
                        human resources, and cost on a task-by-task basis, to      while providing real time reports on the status and forecasts.
                        allocate responsibility and focus on the project goals.
                        The company applies best practices, as suggested by
                        the PMI: Project Management Institute.
                                                                                   PMPs: PROJECT
                        PMO: PROJECT MANAGEMENT OFFICE                             MANAGEMENT PROFESSIONALS
                           A research and development unit, aiming to coach
                        and support Project Managers, share and implement              Duly certified by the PMI, several Project Managers at
                        best practices, collect lessons learned and monitor cus-   SANTOS CMI have already joined a world community, enhanc-
                        tomer satisfaction. A new level of management.             ing their constant training and bringing more value.
SECTORE DE MERCADO
                                                                                                                            MARKET SECTORS
SECTORES DE MERCADO
/ MARKET SECTORS



     SANTOS CMI is building industrial facilities since 1970.
                                                                    UnWderstanding both design and construction, allows
 Understanding both design and construction, allows inte-
                                                                integration of these processes to provide far-reaching
 gration of these processes to provide far-reaching solu-
                                                                solutions. Experienced crews have successfully erected
 tions. Experienced crews have successfully erected equip-
                                                                equipment for steel smelters and soap plants, power boil-
 ment for steel smelters and soap plants, power boilers
                                                                ers and cracking towers, flue gas desulphurization sys-
 and cracking towers, flue gas desulphurization systems
                                                                tems and high voltage substations, as well as concrete
 and high voltage substations, as well as concrete founda-
                                                                foundations for turbines and large storage tanks.
 tions for turbines and large storage tanks.
                                                                    Civil works
     Civil works
                                                                    Mechanical erection
     Mechanical erection
                                                                    Piping pre-fabrication and installation
     Piping pre-fabrication and installation
                                                                    Electrical installation
     Electrical installation
                                                                    Instrumentation & Control
     Instrumentation & Control
                                                                   CONSTRUCTION
    CONSTRUCTION
OIL & GAS
                                         PETRÓLEO Y GAS
SECTORES DE MERCADO




                        UPSTREAM

                            Los proyectos que producen electricidad contribuyen       SANTOS CMI puede declarar experiencia como pocos
                        al avance de la sociedad. Con más de 50 centrales de       contratistas en la región.
                        generación en las Américas, SANTOS CMI puede declarar
                        experiencia como pocos contratistas en la región. Desde        Desde motores a combustión quemando fuel oil,
                        motores a combustión quemando fuel oil, grandes turbi-     grandes turbinas hidráulicas o un parque eólico hasta ci-
                        nas hidráulicas o un parque eólico hasta ciclos combina-   clos combinados o plantas de co-generación quemando
                        dos o plantas de co-generación quemando gas natural o      gas natural o biomasa, la empresa las ha hecho todas.
                        biomasa, la empresa las ha hecho todas.
       MARKET SECTORS




                            Los proyectos que producen electricidad contribuyen        Los proyectos que producen electricidad contribuyen
                        al avance de la sociedad. Con más de 50 centrales de       al avance de la sociedad. Con más de 50 centrales de
                        generación en las Américas, SANTOS CMI puede declarar      generación en las Américas, SANTOS CMI puede declarar
                        experiencia como pocos contratistas en la región. Desde    experiencia como pocos contratistas en la región. Desde
                        motores a combustión quemando fuel oil, grandes turbi-     motores a combustión quemando fuel oil, grandes turbi-
                        nas hidráulicas o un parque eólico hasta ciclos combina-   nas hidráulicas o un parque eólico hasta ciclos combina-
                        dos o plantas de co-generación quemando gas natural o      dos o plantas de co-generación quemando gas natural o
                        biomasa, la empresa las ha hecho todas.                    biomasa, la empresa las ha hecho todas.
SECTORES DE MERCADO
DOWNSTREAM

    Sea una cervercería, una industria de empaques, una         Sea una cervercería, una industria de empaques, una
cementera o una acería, SANTOS CMI es la elección cor-      cementera o una acería, SANTOS CMI es la elección cor-
recta. Muchas décadas de experiencia le permiten reali-     recta. Muchas décadas de experiencia le permiten reali-
zar construcciones y montajes especializados, coordinar     zar construcciones y montajes especializados, coordinar
logística intrincada y administrar colosales proyectos de   logística intrincada y administrar colosales proyectos de
expansión con total compromiso con la seguridad, calidad    expansión con total compromiso con la seguridad, calidad
y plazo.                                                    y plazo.




                                                                                                                         MARKET SECTORS
                                                                                                                        MARKET SECTORS



    Sea una cervercería, una industria de empaques, una         Sea una cervercería, una industria de empaques, una
cementera o una acería, SANTOS CMI es la elección cor-      cementera o una acería, SANTOS CMI es la elección cor-
recta. Muchas décadas de experiencia le permiten reali-     recta. Muchas décadas de experiencia le permiten reali-
zar construcciones y montajes especializados, coordinar     zar construcciones y montajes especializados, coordinar
logística intrincada y administrar colosales proyectos de   logística intrincada y administrar colosales proyectos de
expansión con total compromiso con la seguridad, calidad    expansión con total compromiso con la seguridad, calidad
y plazo.                                                    y plazo.
POWER GENERATION
                                         GENERACIÓN DE ENERGÍA
SECTORES DE MERCADO




                            Los proyectos que producen electricidad contribuyen        Projects that produce electricity contribute to the
                        al avance de la sociedad. Con más de 50 centrales de       advancement of society. With over 50 power generation
                        generación en las Américas, SANTOS CMI puede declarar      plants around the Americas, SANTOS CMI can claim expe-
                        experiencia como pocos contratistas en la región. Desde    rience as few other contractors in the region. From land
                        motores a combustión quemando fuel oil, grandes turbi-     base HFO-fueled engines, large hydro turbines or a wind
                        nas hidráulicas o un parque eólico hasta ciclos combina-   farm to combined cycle or co-generation facilities burning
                        dos o plantas de co-generación quemando gas natural o      natural gas or biomass, the company has done it all.
                        biomasa, la empresa las ha hecho todas.
       MARKET SECTORS




                            Los proyectos que producen electricidad contribuyen        Projects that produce electricity contribute to the
                        al avance de la sociedad. Con más de 50 centrales de       advancement of society. With over 50 power generation
                        generación en las Américas, SANTOS CMI puede declarar      plants around the Americas, SANTOS CMI can claim expe-
                        experiencia como pocos contratistas en la región. Desde    rience as few other contractors in the region. From land
                        motores a combustión quemando fuel oil, grandes turbi-     base HFO-fueled engines, large hydro turbines or a wind
                        nas hidráulicas o un parque eólico hasta ciclos combina-   farm to combined cycle or co-generation facilities burning
                        dos o plantas de co-generación quemando gas natural o      natural gas or biomass, the company has done it all.
                        biomasa, la empresa las ha hecho todas.
SECTORES DE MERCADO
    Sea una cervercería, una industria de empaques, una
cementera o una acería, SANTOS CMI es la elección cor-
recta. Muchas décadas de experiencia le permiten reali-
zar construcciones y montajes especializados, coordinar
logística intrincada y administrar colosales proyectos de
expansión con total compromiso con la seguridad, calidad
y plazo.


    Sea una cervercería, una industria de empaques, una
cementera o una acería, SANTOS CMI es la elección cor-
recta. Muchas décadas de experiencia le permiten reali-
zar construcciones y montajes especializados, coordinar
logística intrincada y administrar colosales proyectos de
expansión con total compromiso con la seguridad, calidad
y plazo.




                                                                                                    MARKET SECTORS
                                                                Sea una cervercería, una indu-
                                                            stria de empaques, una cementera
                                                            o una acería, SANTOS CMI es la
                                                            elección correcta. Muchas décadas
                                                            de experiencia le permiten realizar
                                                            construcciones y montajes especial-
                                                            izados, coordinar logística intrinca-
                                                            da y administrar colosales proyectos
                                                            de expansión con total compromiso
                                                            con la seguridad, calidad y plazo.

                                                                Sea una cervercería, una indu-
                                                            stria de empaques, una cementera
                                                            o una acería, SANTOS CMI es la
                                                            elección correcta. Muchas décadas
                                                            de experiencia le permiten realizar
                                                            construcciones y montajes especial-
                                                            izados, coordinar logística intrinca-
                                                            da y administrar colosales proyectos
                                                            de expansión con total compromiso
                                                            con la seguridad, calidad y plazo.
MINERIA, CIVIL E INDUSTRIAL
                                                                                       MINING. CIVIL & INDUSTRIAL
SECTORES DE MERCADO




                        Mining

                            SANTOS CMI follows a structured view of Project Man-        SANTOS CMI follows a structured view of Project Man-
                        agement, conducting -every time- a formal and system-       agement, conducting -every time- a formal and system-
                        atic development of scope, schedule, risk, quality, human   atic development of scope, schedule, risk, quality, human
                        resources, and cost on a task-by-task basis, to allocate    resources, and cost on a task-by-task basis, to allocate
                        responsibility and focus on the project goals. The com-     responsibility and focus on the project goals. The com-
                        pany applies best practices, as suggested by the PMI:       pany applies best practices, as suggested by the PMI:
                        Project Management Institute.                               Project Management Institute.
       MARKET SECTORS




                            SANTOS CMI follows a structured view of Project Man-        SANTOS CMI follows a structured view of Project Man-
                        agement, conducting -every time- a formal and system-       agement, conducting -every time- a formal and system-
                        atic development of scope, schedule, risk, quality, human   atic development of scope, schedule, risk, quality, human
                        resources, and cost on a task-by-task basis, to allocate    resources, and cost on a task-by-task basis, to allocate
                        responsibility and focus on the project goals. The com-     responsibility and focus on the project goals. The com-
                        pany applies best practices, as suggested by the PMI:       pany applies best practices, as suggested by the PMI:
                        Project Management Institute.                               Project Management Institute.
SECTORES DE MERCADO
   CIVIL

    Sea una cervercería, una industria de empaques, una
cementera o una acería, SANTOS CMI es la elección cor-
recta. Muchas décadas de experiencia le permiten reali-
zar construcciones y montajes especializados, coordinar
logística intrincada y administrar colosales proyectos de
expansión con total compromiso con la seguridad, calidad
y plazo.

    SANTOS CMI follows a structured view of Project Man-
agement, conducting -every time- a formal and system-
atic development of scope, schedule, risk, quality, human
resources, and cost on a task-by-task basis, to allocate
responsibility and focus on the project goals. The com-
pany applies best practices, as suggested by the PMI:
Project Management Institute.




                                                               MARKET SECTORS
   INDUSTRIAL

    Whether it is a brewery, a packaging industry, a ce-
ment plant or a steel production facility, SANTOS CMI is the
right choice to rely on. Decades of experience enable it to
perform specialized construction and erection, coordinate
intricate logistics and manage large expansion projects
with a full commitment to safety, quality and schedule. v

    SANTOS CMI follows a structured view of Project Man-
agement, conducting -every time- a formal and system-
atic development of scope, schedule, risk, quality, human
resources, and cost on a task-by-task basis, to allocate
responsibility and focus on the project goals. The com-
pany applies best practices, as suggested by the PMI:
Project Management Institute.
COMPETENCIAS /


                 ................   .......
COMPETENCIAS
    CORPORATE
Catalogo SantosCMI  - @agenciavertice
Catalogo SantosCMI  - @agenciavertice

Catalogo SantosCMI - @agenciavertice

  • 3.
  • 4.
    PRESENTATION PRESENTACIÓN SANTOS CMI is a One-Stop Shop that offers full Engineering, Procurement and Construction services for Power Generation and Oil & Gas projects through- out Latin America and the Caribbean. The company has significant experience working COPORATIVO in 18 countries within the region, utilizing local and global human talent for top-tier customers who seek for a serious and reliable contractor that understands specific market conditions and requirements, while performing as per international codes and practices, under turn-key contracts. SANTOS CMI es un contratista Todo-en-Uno que CORPORATE ofrece servicios completos de Ingeniería, Procura y Construcción para proyectos de Generación Eléctrica y Petróleo & Gas en América Latina y el Caribe. La compañía tiene experiencia significativa tra- bajando en 18 países en la región, utilizando talento humano local y global para clientes de primer nivel que buscan un contratista serio y confiable que entienda los requerimientos y condiciones específicas del mercado y que trabaje de acuerdo a códigos y prácticas internacio- nales, bajo contratos llave-en-mano.
  • 5.
    MISSION - VISION MISIÓN- VISIÓN MISSION MISION We are an Engineering, Procurement and Somos una compañía EPC (Ingeniería, Construction (EPC) company developing proj- gestión de compras y construcción) que ejecu- ects in Latin America and the Caribbean for the ta proyectos en Latinoamérica y el Caribe para power generation, oil and gas, and industrial los sectores energético, petróleo y gas, e in- COPORATIVO sectors; recognized for the quality of our prod- dustrial; reconocida por la calidad de nuestros ucts and services, and for our commitment. productos y servicios, y por el cumplimiento de nuestros compromisos. We work with international standards of quality, safety and environmental care to maxi- Trabajamos con estándares internacio- mize the benefits for our shareholders, clients nales tanto de calidad, seguridad y protec- and the community. We base our operations on ción del medioambiente, para maximizar los a strict code of ethics, on the professional and beneficios de nuestros accionistas, clientes y personal development of our personnel, and la comunidad. Fundamentamos nuestras op- on the continuous quest for efficiency and in- eraciones en un estricto código de ética, en el novation in every aspect of our business. desarrollo profesional y personal de nuestros colaboradores, y en la continua búsqueda de la eficiencia e innovación todos los ámbitos de CORPORATE nuestro negocio.v VISION Be recognized in Latin America and the Carib- bean as the leading EPC contractor in thermo- electric power generation and with a solid po- sition in the oil, gas and specialized industrial sectors. VISIÓN Ser reconocida en Latinoamérica y el Ca- ribe como la Compañía Contratista EPC líder en generación termoeléctrica y con un sólido posi- cionamiento en los sectores de petróleo, gas e industrial especializado.
  • 6.
    FOUR PILLAR APPROACH CUATRO PILARES ESTRATEGICOS GEOGRAPHICAL DIVERSIFICATION With presence and experience in 18 countries throughout Latin America and the Caribbean, SANTOS CMI is ready to provide effective support to customers in the entire region, with local face and knowledge. COPORATIVO SECTOR DIVERSIFICATION The company works within the entire spectrum of energy projects: power generation, oil and gas. Also, mining and industrial projects. In this way, allocates its best resources to each specialty, according to the natural cycles of each sector in the different markets. CORPORATE NICHE APPROACH With regional talent, SANTOS CMI offers full range of EPC services for up to mid-size projects developed in accordance with international codes and standards. Customers can then have world class solutions, from a local contractor that speaks the language and knows the territory. EPC FOCUS Having its origin in construction Works, the company focuses no won EPC projects, where it can help its clients take control over scope and Schedule, without compromising to interfaces. A turn-key response requires experience, capability and man- agement tools. SANTOS CMI ´s got them.
  • 7.
    DIVERSIFICACION GEOGRAFICA Con presencia y experiencia en 18 países de América Latina y el Caribe, SANTOS CMI está preparada para dar soporte efectivo a clientes en toda la región, con una cara y conocimiento local. CORPORATIVO DIVERSIFICACIÓN POR SECTORES La empresa trabaja en todo el espectro de proyectos de energía: generación eléctrica, petróleo y gas. Además tiene proyectos mine- ros e industriales. De esta forma asigna sus mejores recursos a cada especialidad, según los ciclos naturales de cada sector en los distintos mercados. CORPORATE ENFOQUE ESPECIALIZADO Con talento regional, SANTOS CMI ofrece un rango complete de servicios IPC para proyectos de hasta mediano porte, de- sarrollados de acuerdo a códigos y estándares internacionales. Los clientes pueden entonces contar con soluciones de clase mundial, de un contratista local que habla su idioma y conoce el territorio. SOLUCIONES LLAVE EN MANO Siendo su origen las obras de construcción, la compañía se en- foca ahora en proyectos IPC, donde puede ayudar a sus clientes a tomar control sobre el alcance y el cronograma, sin ceder a las interfaces. Una respuesta llave-en-mano requiere de experiencia, capacidad y herramientas de gestión. SANTOS CMI las tiene.
  • 8.
    WORLDWIDE CERTIFICATIONS CERTIFICACIONES RECONOCIDAS A NIVEL MUND For decades, SANTOS CMI has delivered outstanding Por décadas, SANTOS CMI ha provisto servicios ex- services, based on proven methodology and a Quality cepcionales, con base en metodología comprobada y un Management System that truly supports its operations. Sistema de Gestión de Calidad que realmente brinda so- porte a sus operaciones. The organization emphasizes the importance of plan- ning and controlling each task under its scope of work. La organización enfatiza en la importancia de planifi- Procedures and management tools continuously receive car y controlar cada tarea bajo su alcance de trabajo. Los CORPORATIVO feedback from the projects staff to incorporate the voice procedimientos y herramientas de gestión reciben con- of experience and permanently improve. tinuamente retro-alimentación del personal de proyectos, para incorporar la voz de la experiencia y mejorar per- The Quality System is certified under ISO 9001 stan- manentemente. dard, 2000 edition, for Design, Procurement and Con- struction activities. El Sistema de Calidad está certificado bajo norma ISO 9001, edición 2000, para actividades de Ingeniería, ENVIRONMENT, Suministros y Construcción. HEALTH, & SAFETY SEGURIDAD, Protecting its employees and those involved in the MEDIO AMBIENTE Y SALUD operation is the highest priority. Its Safety Management System is certified under the OHSAS 18001 standard, Proteger a sus empleados y a aquellos involucra- CORPORATE 1999 edition. dos en la operación es la más alta prioridad. Su Sistema de Gestión de Seguridad está certificado bajo la norma The Safety Policy is not only endorsed by the upper OHSAS 18001, edición 2008. management, but shared and exercised by all company members every day, every where. La Política de Seguridad no sólo es respaldada por la alta dirección, sino compartida y practicada por CERTIFICATES & STAMPS todos los miembros de la compañía cada día, en todas partes. SANTOS CMI holds Certificates of Authorization, issued by the American Society of Mechanical Engineers CERTIFICADOS (ASME) for boiler and pressure vessel manufacturing and Y ESTAMPES assembly, as well as from the National Board of Boiler and Pressure Vessels Inspectors (NBBI) for boiler and SANTOS CMI tiene Certificados vessel repair. de Autorización, emitidos por la Sociedad Americana de Ingenie- ros Mecánicos (ASME) y por el Consejo Nacional de Inspecto- res de Calderas y Recipientes a Presión (NBBI). La empresa asociada Indu- stria Acero de los Andes tiene es- tampes ASME “S” y “R”, bien como certificados API y UL.
  • 9.
    DIAL CORPORATIVO/Certificados USA / EUA BAHAMAS DOMINICAN REPUBLIC / MEXICO REPUBLICA DOMINICANA VIRGIN ISLANDS / GUATEMALA ISLAS VIRGENES HONDURAS COLOMBIA NICARAGUA VENEZUELA PANAMA ECUADOR PERU BRAZIL / BRASIL BOLIVIA URUGUAY CHILE ARGENTINA
  • 10.
    VALUE PROPOSITIONS PROPUESTAS DE VALOR FAST-TRACK PROJECTS Successful experience executing projects under accelerated or compressed timetables, to compensate delays and comply with requests ever more frequent in infrastructure works. COPORATIVO REMOTE LOCATIONS Well trained men and women manage logistics to very remote locations, such as the Amazon rainforest, Caribbean and Pacific islands, jungles and highlands. CORPORATE DESIGN-BUILD APPROACH Having its origin in the construction field, SANTOS CMI´s engineering solutions represent a true value for its customers, because they aim towards con- structability. TEAMWORK The company greatly understands how to create effective teamwork out of highly productive individuals coming from different back grounds, nationalities and cultures. PROJECT MANAGEMENT The basis for SANTOS CMI’s success is its culture of planning ahead and reacting fast, with integration in mind, to help build a consistent and predictable business.
  • 11.
    PROYECTOS FAST-TRACK Exitosa experiencia ejecutando proyectos bajo cronogramas acelerados o comprimidos, para recuperar demoras y atender exigencias cada vez más usuales en obras de infraestructura. COPORATIVO SITIOS REMOTOS Hombres y mujeres bien entrenados manejan la logística a sitios muy remotos como la selva Amazónica, islas del caribe y del Pacífico, bosques y sierras a gran altura. CORPORATE DESIGN-BUILD APPROACH Teniendo su orígen en el campo de la construcción, las soluciones de ingeniería de SANTOS CMI representan un ver- dadero valor para sus clientes, ya que apuntan a la constructi- bilidad. TEAMWORK La compañía entiende muy bien cómo crear equipos de trabajo efectivos, integrados por individuos alta- mente productivos con diferentes experiencias, nacio- nalidades y culturas. GERENCIA DE PROYECTOS La base del éxito de SANTOS CMI es su cultura de planificación y de rápida reacción, con integración en mente, para construir un negocio consistente y predecible.
  • 12.
    GROUP OF COMPANIES/ COMPAÑÍAS DEL GRUPO GENESYS COMPAÑIAS DEL GRUPO A specialist contractor for Process Automation and Commissioning & Start-up services. They design and im- plement high-end solutions and have hands-on experience in countries such as Pakistan, Mexico, Argentina and the Dominican Republic, among others. Un contratista especializado en automatización de Procesos y servicios de Comisionado y Puesta en Marcha. Diseñan e implementa soluciones de alto nivel y tienen ex- periencia de primera mano en Pakistán, México, Argentina y la República Dominicana, entre otros. VAUTID AMERICAS Based on German proprietary technology, this company pro- vides specialized services to heavy industries, by successfully re- covering wore-out components and ensuring a longer life-cycle. Vautid supports its customers throughout Latin America with CORPORATE/COMPANIES CROUP Long Term Service Agreements for wear protection. Basado en tecnología propietaria alemana, esta compañía provee servicios especiali zados a industrias pesadas, recupe- rando exitosamente componentes desgastados y asegurando una mayor vida útil. Vautid da soporte a clientes en América Latina con Acuerdos de Servicio de Largo Plazo para protección contra desgaste. INDUSTRIA ACERO DE LOS ANDES (IAA) A qualified metal fabrication shop that has successfully delivered process equipment, tanks and pressure vessels for projects in countries such as Iraq, Nigeria, Brazil and Colombia. IAA holds ASME “S”, “U” and “U2”, NBBI “R” and “NB”, API and UL certifications. Un taller metalmecánico calificado que exitosamente produce equipos de proceso, tanques y recipientes a pre- sión para proyectos en países como Iraq, Nigeria, Brazil y Colombia. IAA tiene certificados ASME “S”, “U” y “U2”, NBBI “R” y “NB”, API y UL.
  • 13.
    EPC ONE STOP SHOP ONE STOP SHOP • Engineering services in oil and gas pro- • Engineering services in oil and gas processing cessing facilities, power generation, and facilities, power generation, and industrial fa- industrial facilities. cilities. • Tailor-made solutions to meet specific re- • Tailor-made solutions to meet specific re- quirements. quirements. • Its Design-Build approach provides true • Its Design-Build approach provides true sup- support to field construction teams port to field construction teams Procurement Procurement Engineering Engineering Construction Construction • Houston Office offers Full Procurement • Houston Office offers Full Procurement Ser- Services for projects in the region. vices for projects in the region. • Timely site delivery to remote locations • Timely site delivery to remote locations in- including Chilean and Bolivian highlands, cluding Chilean and Bolivian highlands, jungles of Ecuador, Brazil and Bolivia and jungles of Ecuador, Brazil and Bolivia and the the Caribbean islands. Caribbean islands. • Real-time status control system tracks ev- • Real-time status control system tracks every ery step of the process. step of the process. • Direct execution of civil works and electro- • Direct execution of civil works and electrome- mechanical installations. chanical installations. • Close monitoring of projects and optimal • Close monitoring of projects and optimal re- resource utilization. source utilization.
  • 14.
    ENGINEERING INGENIERÍA ENGINEERING INGENIERÍA SANTOS CMI offers complete basic and de- SANTOS CMI ofrece servidos completos de diseño tailed design services complying with interna- básico y de detalle, de acuerdo a estándares inter- tional standards and best practices. nacionales y las mejores prácticas. EXPERIENCE & CAPABILITY CAPACIDAD Y EXPERIENCIA The human talent at SANTOS CMI is has large El talento humano de SANTOS CMI es multidisci- background in industrial projects in Latin plinario y tiene larga trayectoria en proyectos in- America, with first-hand knowledge on design, dustriales en América Latina, con conocimiento de analysis and studies forthe power generation primera mano en diseños, análisis y estudios and oil & gas sectors, executedfor private and para el sector de generación eléctrica, petróleo y state companies. gas, ejecutados para empresas privadas y estatales. SYSTEMS SISTEMAS Drawings and specifications are issued and Planos y especificaciones son emitidos y monitorea- monitored with a web-based online system dos con un sistema en línea y basado en web que that ensures the appropriate and timely data asegura el apropiado y oportuno flujo de datos, flow, interdisciplinary revisions and reliability revisiones interdisciplinarias y confiablidad de la of the information, while allowing customers información, permitiendo a clientes y personal en and site personnel to interact -in real time- obra interactuar en tiempo real con los datos. with the data. TECNOLOGÍA TECHNOLOGY Nacido en la era digital, el equipo de ingeniería en- Born in the digital era, the engineering team tiende y diseña en 3D. Maquetas virtuales evitan understands and designs in 3D. Virtual renders interferencias, optimizan listados de cantidades avoid interferences, optimize bills of quantities y ayudan a construir mejores plantas. Y con escá- and help build better plants. And with laser neres láser se relevan plantas industriales enteras scanners, entire industrial plants are surveyed en 3D hasta en el último detalle. in 3D to the last detail.
  • 15.
    GESTION DE COMPRAS PROCUREMENT La reputación de SANTOS CMI continúa nutrié- The reputation of SANTOS CMI continues to be ndose de los excelentes resultados de su ser- enhanced by the outstanding results of its pro- vicio de gestión de compras, que suministra curement services that supply high-quality ma- materiales y equipos de alta calidad para las terials and equipment for the balance of plant. plantas. With a procurement office in Houston, TX, USA, Con una oficina de compras en Houston, TX, and regional offices in South America, the com- EE.UU., y oficinas regionales en México y Suda- pany capitalizes on the new market forces, such mérica, la compañía capitaliza sobre las nuevas as global trade, instantaneous communications fuerzas de mercado, como el comercio global, and local knowledge, which sustain its differen- comunicaciones instantáneas y conocimiento tiation. local, que sustentan su diferenciación. Full logistics capabilities have allowed for the Las capacidades completas de logística han timely supply of materials and equipment to permitido la oportuna entrega de materiales y remote locations, such as several islands In the equipos en lugares remotos, como varias islas Caribbean and the Pacific, the Chilean and Boliv- del Caribe y del Pacífico, las sierras chilena y ian highlands and the jungles of Ecuador, Bolivia boliviana y las selvas de Ecuador, Bolivia y Bra- and Brazil. sil. SANTOS CMI relies on a detailed and real-time SANTOS CMI ha desarrollado un sistema de status control system to properly coordinate and control de estado detallado y en tiempo real track every step of the process, from Material para coordinar y rastrear apropiadamente Request, through bids evaluation and Purchase cada etapa del proceso, desde la Requisición Order, to shipment, customs clearance and site de Materiales, la evaluación de ofertas y Or- delivery. den de Compra, hasta el embarque, desadua- nización y entrega en sitio. A reliable network of vendors, adequate pre- qualification and inspection procedures and Una red confiable de proveedores, proced- profound local knowledge, support every firm imientos adecuados de precalificación e in- commitment to customers in Latin America. spección y profundo conocimiento local, dan soporte a cada compromiso con clientes en América Latina y el caribe.
  • 16.
    CONSTRUCCION SANTOS CMI posee competencias paro la SANTOS CMI has the necessary competences ejecución de proyectos llave en mano, ofreci- to execute turn-key projects, providing swift re- endo tiempos de reacción ágiles, mejorando action times, improving delivery and allowing los plazos de ejecución y permitiendo a los cli- for customers to start operations earlier. entes entrar en operación en un menor tiem- po. Its ability to perform multidisciplinary tasks has leveraged its successful participation m the Su habilidad para ejecutar tareas multidis- construction and expansion of important indus- ciplinarias, le ha facultado su exitosa partici- trial projects. pación en la construcción y expansión de im- portantes proyectos industriales. With global resources the company has erected power boilers, heat recovery steam gen- Con recursos globales ha instalado calde- erators; gas, steam. hydro and wind turbines, fu- ras y recuperadores de calor, turbinas a gas, maces and reactors, storage tanks and pressure vapor, hidráulicas y eólicas. hornos y reacto- vessels, engine and turbine-driven compressors, res, tanques de almacenamiento v recipientes desulphurizers, medium-speed engines, spheres, a presión, compresores movidos por motor y substations, equipment for refineries, cement, turbina, desulfurizadores, motores de media paper, glass, food & beverage, industrial gases, velocidad, esferas, subestaciones, equipos pharmaceutical, plastics and vehicle plants. para refinerías, plantas de cemento, papel, vidrio, alimentos y bebidas, gases industriales, It directly executes earthworks, pilling, con- farmacéutica, plásticos, vehículos, etc. crete works, mechanical erection. piping pre- fabrication and erection, specialized welding, Ejecuta directamente movimiento de tier- high. medium and low voltage installations, in- ras, pilotaje, obras de concreto, montaje strument installation and calibration. mecánico, prefabricación y montaje de tuber- ía, suelda especializada, instalaciones de alta, SANTOS CMI maintains an excellent safety media y baja tensión, instalación y calibración and quality record, working for demanding mul- de instrumentos. tinational firms in the region and is proud to state that it has not delayed the commercial op- SANTOS CMI mantiene un excelente récord eration of any facility in none of the 16 countries de seguridad y calidad, trabajando para exi- where it has worked. gentes firmas multinacionales en la reglón .
  • 18.
    SECTORE DE MERCADO MARKET SECTORS PROJECT MANAGEMENT PRIMAVERA P6 In an effort to continuously improve its performance, the SANTOS CMI follows a structured view of Project company has fully migrated to Primavera’s latest version of its Management, conducting -every time- a formal and sys- world-class tool, after many years of mastering previous ver- tematic development of scope, schedule, risk, quality, sions. This platforms allow for online collaboration and access, human resources, and cost on a task-by-task basis, to while providing real time reports on the status and forecasts. allocate responsibility and focus on the project goals. The company applies best practices, as suggested by the PMI: Project Management Institute. PMPs: PROJECT PMO: PROJECT MANAGEMENT OFFICE MANAGEMENT PROFESSIONALS A research and development unit, aiming to coach and support Project Managers, share and implement Duly certified by the PMI, several Project Managers at best practices, collect lessons learned and monitor cus- SANTOS CMI have already joined a world community, enhanc- tomer satisfaction. A new level of management. ing their constant training and bringing more value.
  • 19.
    SECTORE DE MERCADO MARKET SECTORS SECTORES DE MERCADO / MARKET SECTORS SANTOS CMI is building industrial facilities since 1970. UnWderstanding both design and construction, allows Understanding both design and construction, allows inte- integration of these processes to provide far-reaching gration of these processes to provide far-reaching solu- solutions. Experienced crews have successfully erected tions. Experienced crews have successfully erected equip- equipment for steel smelters and soap plants, power boil- ment for steel smelters and soap plants, power boilers ers and cracking towers, flue gas desulphurization sys- and cracking towers, flue gas desulphurization systems tems and high voltage substations, as well as concrete and high voltage substations, as well as concrete founda- foundations for turbines and large storage tanks. tions for turbines and large storage tanks.  Civil works  Civil works  Mechanical erection  Mechanical erection  Piping pre-fabrication and installation  Piping pre-fabrication and installation  Electrical installation  Electrical installation  Instrumentation & Control  Instrumentation & Control CONSTRUCTION CONSTRUCTION
  • 20.
    OIL & GAS PETRÓLEO Y GAS SECTORES DE MERCADO UPSTREAM Los proyectos que producen electricidad contribuyen SANTOS CMI puede declarar experiencia como pocos al avance de la sociedad. Con más de 50 centrales de contratistas en la región. generación en las Américas, SANTOS CMI puede declarar experiencia como pocos contratistas en la región. Desde Desde motores a combustión quemando fuel oil, motores a combustión quemando fuel oil, grandes turbi- grandes turbinas hidráulicas o un parque eólico hasta ci- nas hidráulicas o un parque eólico hasta ciclos combina- clos combinados o plantas de co-generación quemando dos o plantas de co-generación quemando gas natural o gas natural o biomasa, la empresa las ha hecho todas. biomasa, la empresa las ha hecho todas. MARKET SECTORS Los proyectos que producen electricidad contribuyen Los proyectos que producen electricidad contribuyen al avance de la sociedad. Con más de 50 centrales de al avance de la sociedad. Con más de 50 centrales de generación en las Américas, SANTOS CMI puede declarar generación en las Américas, SANTOS CMI puede declarar experiencia como pocos contratistas en la región. Desde experiencia como pocos contratistas en la región. Desde motores a combustión quemando fuel oil, grandes turbi- motores a combustión quemando fuel oil, grandes turbi- nas hidráulicas o un parque eólico hasta ciclos combina- nas hidráulicas o un parque eólico hasta ciclos combina- dos o plantas de co-generación quemando gas natural o dos o plantas de co-generación quemando gas natural o biomasa, la empresa las ha hecho todas. biomasa, la empresa las ha hecho todas.
  • 21.
    SECTORES DE MERCADO DOWNSTREAM Sea una cervercería, una industria de empaques, una Sea una cervercería, una industria de empaques, una cementera o una acería, SANTOS CMI es la elección cor- cementera o una acería, SANTOS CMI es la elección cor- recta. Muchas décadas de experiencia le permiten reali- recta. Muchas décadas de experiencia le permiten reali- zar construcciones y montajes especializados, coordinar zar construcciones y montajes especializados, coordinar logística intrincada y administrar colosales proyectos de logística intrincada y administrar colosales proyectos de expansión con total compromiso con la seguridad, calidad expansión con total compromiso con la seguridad, calidad y plazo. y plazo. MARKET SECTORS MARKET SECTORS Sea una cervercería, una industria de empaques, una Sea una cervercería, una industria de empaques, una cementera o una acería, SANTOS CMI es la elección cor- cementera o una acería, SANTOS CMI es la elección cor- recta. Muchas décadas de experiencia le permiten reali- recta. Muchas décadas de experiencia le permiten reali- zar construcciones y montajes especializados, coordinar zar construcciones y montajes especializados, coordinar logística intrincada y administrar colosales proyectos de logística intrincada y administrar colosales proyectos de expansión con total compromiso con la seguridad, calidad expansión con total compromiso con la seguridad, calidad y plazo. y plazo.
  • 22.
    POWER GENERATION GENERACIÓN DE ENERGÍA SECTORES DE MERCADO Los proyectos que producen electricidad contribuyen Projects that produce electricity contribute to the al avance de la sociedad. Con más de 50 centrales de advancement of society. With over 50 power generation generación en las Américas, SANTOS CMI puede declarar plants around the Americas, SANTOS CMI can claim expe- experiencia como pocos contratistas en la región. Desde rience as few other contractors in the region. From land motores a combustión quemando fuel oil, grandes turbi- base HFO-fueled engines, large hydro turbines or a wind nas hidráulicas o un parque eólico hasta ciclos combina- farm to combined cycle or co-generation facilities burning dos o plantas de co-generación quemando gas natural o natural gas or biomass, the company has done it all. biomasa, la empresa las ha hecho todas. MARKET SECTORS Los proyectos que producen electricidad contribuyen Projects that produce electricity contribute to the al avance de la sociedad. Con más de 50 centrales de advancement of society. With over 50 power generation generación en las Américas, SANTOS CMI puede declarar plants around the Americas, SANTOS CMI can claim expe- experiencia como pocos contratistas en la región. Desde rience as few other contractors in the region. From land motores a combustión quemando fuel oil, grandes turbi- base HFO-fueled engines, large hydro turbines or a wind nas hidráulicas o un parque eólico hasta ciclos combina- farm to combined cycle or co-generation facilities burning dos o plantas de co-generación quemando gas natural o natural gas or biomass, the company has done it all. biomasa, la empresa las ha hecho todas.
  • 23.
    SECTORES DE MERCADO Sea una cervercería, una industria de empaques, una cementera o una acería, SANTOS CMI es la elección cor- recta. Muchas décadas de experiencia le permiten reali- zar construcciones y montajes especializados, coordinar logística intrincada y administrar colosales proyectos de expansión con total compromiso con la seguridad, calidad y plazo. Sea una cervercería, una industria de empaques, una cementera o una acería, SANTOS CMI es la elección cor- recta. Muchas décadas de experiencia le permiten reali- zar construcciones y montajes especializados, coordinar logística intrincada y administrar colosales proyectos de expansión con total compromiso con la seguridad, calidad y plazo. MARKET SECTORS Sea una cervercería, una indu- stria de empaques, una cementera o una acería, SANTOS CMI es la elección correcta. Muchas décadas de experiencia le permiten realizar construcciones y montajes especial- izados, coordinar logística intrinca- da y administrar colosales proyectos de expansión con total compromiso con la seguridad, calidad y plazo. Sea una cervercería, una indu- stria de empaques, una cementera o una acería, SANTOS CMI es la elección correcta. Muchas décadas de experiencia le permiten realizar construcciones y montajes especial- izados, coordinar logística intrinca- da y administrar colosales proyectos de expansión con total compromiso con la seguridad, calidad y plazo.
  • 24.
    MINERIA, CIVIL EINDUSTRIAL MINING. CIVIL & INDUSTRIAL SECTORES DE MERCADO Mining SANTOS CMI follows a structured view of Project Man- SANTOS CMI follows a structured view of Project Man- agement, conducting -every time- a formal and system- agement, conducting -every time- a formal and system- atic development of scope, schedule, risk, quality, human atic development of scope, schedule, risk, quality, human resources, and cost on a task-by-task basis, to allocate resources, and cost on a task-by-task basis, to allocate responsibility and focus on the project goals. The com- responsibility and focus on the project goals. The com- pany applies best practices, as suggested by the PMI: pany applies best practices, as suggested by the PMI: Project Management Institute. Project Management Institute. MARKET SECTORS SANTOS CMI follows a structured view of Project Man- SANTOS CMI follows a structured view of Project Man- agement, conducting -every time- a formal and system- agement, conducting -every time- a formal and system- atic development of scope, schedule, risk, quality, human atic development of scope, schedule, risk, quality, human resources, and cost on a task-by-task basis, to allocate resources, and cost on a task-by-task basis, to allocate responsibility and focus on the project goals. The com- responsibility and focus on the project goals. The com- pany applies best practices, as suggested by the PMI: pany applies best practices, as suggested by the PMI: Project Management Institute. Project Management Institute.
  • 25.
    SECTORES DE MERCADO CIVIL Sea una cervercería, una industria de empaques, una cementera o una acería, SANTOS CMI es la elección cor- recta. Muchas décadas de experiencia le permiten reali- zar construcciones y montajes especializados, coordinar logística intrincada y administrar colosales proyectos de expansión con total compromiso con la seguridad, calidad y plazo. SANTOS CMI follows a structured view of Project Man- agement, conducting -every time- a formal and system- atic development of scope, schedule, risk, quality, human resources, and cost on a task-by-task basis, to allocate responsibility and focus on the project goals. The com- pany applies best practices, as suggested by the PMI: Project Management Institute. MARKET SECTORS INDUSTRIAL Whether it is a brewery, a packaging industry, a ce- ment plant or a steel production facility, SANTOS CMI is the right choice to rely on. Decades of experience enable it to perform specialized construction and erection, coordinate intricate logistics and manage large expansion projects with a full commitment to safety, quality and schedule. v SANTOS CMI follows a structured view of Project Man- agement, conducting -every time- a formal and system- atic development of scope, schedule, risk, quality, human resources, and cost on a task-by-task basis, to allocate responsibility and focus on the project goals. The com- pany applies best practices, as suggested by the PMI: Project Management Institute.
  • 26.
    COMPETENCIAS / ................ ....... COMPETENCIAS CORPORATE