SlideShare una empresa de Scribd logo
1 de 7
1
Sachin Deshpande - Personal Review
Electrical Division
Varroc Engineering Pvt. Ltd.
2
Personal Details
Name :- Sachin S. Deshpande
Total Experience :- 9 Years
Varroc Experience :- 16 Month
Qualification :- B.com , M.com, M.B.A. – Fin, A.D.S.E. Diploma
Hard core Subject :- Analysis ,Costing
Reporting to : Mr. Sharad Satalkar.
3
For Holol Project :-
• We have calculated capex requirement base on Hero sales Plan.
• MHR calculation for Process cost.
• Highlight logical Error ₹ 10.50 Per Part in Hard coating Process Cost.
• We have correct consumable cost ₹ 4.92 instead of ₹ 2.63
For New RFQ :-
• While calculating new sale rate we have considered 60% SSW & 40% casual Manpower
in Process Cost.
• Line Depreciation we are load/ Calculate on 300 day’s instead of 365 day’s.
• We are calculate expenses on Sales rate instead of RMC + Process.
4
Cost Saving Project :-
• We have highlight Excess Manpower issue. Impact is 6 to 7 Lacs per month.
• Also we highlight Scrap/Rework issue. Impact is 11 to 13 Lacs per month
• We have calculated new MHR for BU Electrical.
• We have Calculated new 30 Sale Rate ( RFQ) for BU Electrical.
• We have calculated 30 IRR for BU Electricals.
• MIS / Budget working for every Month.
5
Working Plan for New Years
• Budget Preparation :-
• Minimum Variance in Value
• Manpower Calculation Method as per below.
• SSW – who is working in production Dept. only .
• SSW Leave Gap will be compensate with Casual.
• Trainee/ Apprentices who is working in Prod ’n dept. only.
• Trainee/ Apprentices Leave Gap will be compensate with Casual.
• if Trainee/ Apprentices periods is finished that time being GAP will compensate
with casual. So that above point will help to reduce our Variance. And %
6
• Investment/ Capex :- Minimum capex for thick the ROSE.
• At the time of Capex we will take care especially in CD investment Maximum CD
investment convert into a Amortization. We will encourages to CD/Purchase team for that.
in that case our ROSE with thick.
• In capacity enhancement project, first we will take care of that capacity will fulfil through
other plant if yes than we will do cost benefit Analysis between interest & Packing & Freight.
than we will take a call. Other wise we will invest.
• Cost Saving Project :-
• Year on year our supplier is doing same work hence We will built one product wise Expert
CFT for element the process at supplier end.
• Same CFT will take care of over engineering in material as well as other things.
• In both activity we will reduce material as well as Process cost for FY- 16-17.
7
Journey will continue ……..

Más contenido relacionado

La actualidad más candente

sagar_115747355 (2)
sagar_115747355 (2)sagar_115747355 (2)
sagar_115747355 (2)
Sagar Parhi
 
Job Performance Rating Appendix
Job Performance Rating AppendixJob Performance Rating Appendix
Job Performance Rating Appendix
Wong Chen Ni
 
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Qamar Ahmad
 
Satyajit Sahoo_ Resume
Satyajit Sahoo_ ResumeSatyajit Sahoo_ Resume
Satyajit Sahoo_ Resume
Satyajit Sahoo
 
Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017
Shashidhar MG
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENT
Praveen Pravin
 
Vijay Dalmia
Vijay DalmiaVijay Dalmia
Vijay Dalmia
vk_dalmia
 

La actualidad más candente (20)

cv
cvcv
cv
 
Hariharan 2016
Hariharan 2016Hariharan 2016
Hariharan 2016
 
Resumeam
ResumeamResumeam
Resumeam
 
sagar_115747355 (2)
sagar_115747355 (2)sagar_115747355 (2)
sagar_115747355 (2)
 
Karthik Resume NPD
Karthik Resume  NPDKarthik Resume  NPD
Karthik Resume NPD
 
Vinay_Resume
Vinay_ResumeVinay_Resume
Vinay_Resume
 
Resume
ResumeResume
Resume
 
Resume_Updated
Resume_UpdatedResume_Updated
Resume_Updated
 
Fall 09 Residential Presentation
Fall 09 Residential PresentationFall 09 Residential Presentation
Fall 09 Residential Presentation
 
M.Ali CV
M.Ali  CVM.Ali  CV
M.Ali CV
 
Naresh Resume
Naresh Resume Naresh Resume
Naresh Resume
 
naukri Rusme
naukri Rusmenaukri Rusme
naukri Rusme
 
CV
CVCV
CV
 
Job Performance Rating Appendix
Job Performance Rating AppendixJob Performance Rating Appendix
Job Performance Rating Appendix
 
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
 
Murali_1_resume.doc
Murali_1_resume.docMurali_1_resume.doc
Murali_1_resume.doc
 
Satyajit Sahoo_ Resume
Satyajit Sahoo_ ResumeSatyajit Sahoo_ Resume
Satyajit Sahoo_ Resume
 
Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENT
 
Vijay Dalmia
Vijay DalmiaVijay Dalmia
Vijay Dalmia
 

Destacado

Tarea 2 de recursos tecnologicos
Tarea 2 de recursos tecnologicosTarea 2 de recursos tecnologicos
Tarea 2 de recursos tecnologicos
bebava
 
Unidad iii psicologia del aprendizaje
Unidad iii psicologia del aprendizajeUnidad iii psicologia del aprendizaje
Unidad iii psicologia del aprendizaje
Roberto Choque Vega
 
Tarea 2 de recursos didacticos
Tarea 2 de recursos didacticosTarea 2 de recursos didacticos
Tarea 2 de recursos didacticos
anyi35
 
Recursos Tecnológicos Implementados en la Educación Inicial
Recursos Tecnológicos Implementados en la Educación InicialRecursos Tecnológicos Implementados en la Educación Inicial
Recursos Tecnológicos Implementados en la Educación Inicial
romuloenrique
 

Destacado (20)

Golf dunya kadar yuvarlak
Golf  dunya kadar yuvarlakGolf  dunya kadar yuvarlak
Golf dunya kadar yuvarlak
 
Tarea # 3 Recursos Didacticos y Tegnologicos
Tarea # 3 Recursos Didacticos y TegnologicosTarea # 3 Recursos Didacticos y Tegnologicos
Tarea # 3 Recursos Didacticos y Tegnologicos
 
Tarea iii recursos didacticos
Tarea iii recursos didacticosTarea iii recursos didacticos
Tarea iii recursos didacticos
 
Tarea iii recursos didacticos y tecnologicos MARIANELA POLANCO
Tarea iii recursos didacticos  y tecnologicos MARIANELA POLANCOTarea iii recursos didacticos  y tecnologicos MARIANELA POLANCO
Tarea iii recursos didacticos y tecnologicos MARIANELA POLANCO
 
Recursos didácticos
Recursos didácticosRecursos didácticos
Recursos didácticos
 
Medios audiovisuales y nuevas tecnologías
Medios audiovisuales y nuevas tecnologíasMedios audiovisuales y nuevas tecnologías
Medios audiovisuales y nuevas tecnologías
 
Tarea 2 de recursos tecnologicos
Tarea 2 de recursos tecnologicosTarea 2 de recursos tecnologicos
Tarea 2 de recursos tecnologicos
 
medios didacticos
medios didacticosmedios didacticos
medios didacticos
 
Exposición teorica
Exposición teoricaExposición teorica
Exposición teorica
 
Recursos educativos y medios didácticos para la creación
Recursos educativos y medios didácticos para la creaciónRecursos educativos y medios didácticos para la creación
Recursos educativos y medios didácticos para la creación
 
Unidad iii psicologia del aprendizaje
Unidad iii psicologia del aprendizajeUnidad iii psicologia del aprendizaje
Unidad iii psicologia del aprendizaje
 
Tarea 2 de recursos didacticos y tecnologicos
Tarea 2 de recursos didacticos y tecnologicosTarea 2 de recursos didacticos y tecnologicos
Tarea 2 de recursos didacticos y tecnologicos
 
Medios didacticos
Medios  didacticos Medios  didacticos
Medios didacticos
 
Tarea i recursos didacticos y tecnologicos
Tarea i recursos didacticos y tecnologicosTarea i recursos didacticos y tecnologicos
Tarea i recursos didacticos y tecnologicos
 
Tarea 2 de recursos didacticos
Tarea 2 de recursos didacticosTarea 2 de recursos didacticos
Tarea 2 de recursos didacticos
 
Medios convencionales
Medios convencionalesMedios convencionales
Medios convencionales
 
Tarea 2 recurso didactico y tecnologico en el nivel inicial yankely
Tarea 2 recurso didactico y tecnologico en el nivel inicial yankelyTarea 2 recurso didactico y tecnologico en el nivel inicial yankely
Tarea 2 recurso didactico y tecnologico en el nivel inicial yankely
 
Internet caracter, ventajas
Internet caracter, ventajasInternet caracter, ventajas
Internet caracter, ventajas
 
Medios Didacticos Convencionales[1]
Medios Didacticos Convencionales[1]Medios Didacticos Convencionales[1]
Medios Didacticos Convencionales[1]
 
Recursos Tecnológicos Implementados en la Educación Inicial
Recursos Tecnológicos Implementados en la Educación InicialRecursos Tecnológicos Implementados en la Educación Inicial
Recursos Tecnológicos Implementados en la Educación Inicial
 

Similar a Personal Review

D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
Leanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
Leanleaders.org
 
Stewart Box Company 2nd March
Stewart Box Company 2nd MarchStewart Box Company 2nd March
Stewart Box Company 2nd March
shashank gupta
 
How much will this cost?
How much will this cost?How much will this cost?
How much will this cost?
Evan Leybourn
 

Similar a Personal Review (20)

Sachin_Deshpande
Sachin_DeshpandeSachin_Deshpande
Sachin_Deshpande
 
Ch 1
Ch 1Ch 1
Ch 1
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
Stewart Box Company 2nd March
Stewart Box Company 2nd MarchStewart Box Company 2nd March
Stewart Box Company 2nd March
 
Understanding, Managing, and Reducing Cost of Quality
Understanding, Managing, and Reducing Cost of QualityUnderstanding, Managing, and Reducing Cost of Quality
Understanding, Managing, and Reducing Cost of Quality
 
Using of Target Costing in Different Industry : Auto, IT and Banking
Using of Target Costing in Different Industry : Auto, IT and BankingUsing of Target Costing in Different Industry : Auto, IT and Banking
Using of Target Costing in Different Industry : Auto, IT and Banking
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
Partner Performance Improvement
Partner Performance ImprovementPartner Performance Improvement
Partner Performance Improvement
 
Essentialsof Project Management
Essentialsof Project ManagementEssentialsof Project Management
Essentialsof Project Management
 
1587310189-week6.pptx
1587310189-week6.pptx1587310189-week6.pptx
1587310189-week6.pptx
 
Understanding, Managing, and Reducing Cost of Quality
Understanding, Managing, and Reducing Cost of QualityUnderstanding, Managing, and Reducing Cost of Quality
Understanding, Managing, and Reducing Cost of Quality
 
Lean Kanban India 2019 Conference | Scrumban comes to the rescue: A Case Stud...
Lean Kanban India 2019 Conference | Scrumban comes to the rescue: A Case Stud...Lean Kanban India 2019 Conference | Scrumban comes to the rescue: A Case Stud...
Lean Kanban India 2019 Conference | Scrumban comes to the rescue: A Case Stud...
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
The Nature of Costs
The Nature of CostsThe Nature of Costs
The Nature of Costs
 
How much will this cost?
How much will this cost?How much will this cost?
How much will this cost?
 
2023 Capital Budgeting.pptx
2023 Capital Budgeting.pptx2023 Capital Budgeting.pptx
2023 Capital Budgeting.pptx
 
COST ANALYSIS
COST ANALYSISCOST ANALYSIS
COST ANALYSIS
 
Nature of Costs
Nature of CostsNature of Costs
Nature of Costs
 

Personal Review

  • 1. 1 Sachin Deshpande - Personal Review Electrical Division Varroc Engineering Pvt. Ltd.
  • 2. 2 Personal Details Name :- Sachin S. Deshpande Total Experience :- 9 Years Varroc Experience :- 16 Month Qualification :- B.com , M.com, M.B.A. – Fin, A.D.S.E. Diploma Hard core Subject :- Analysis ,Costing Reporting to : Mr. Sharad Satalkar.
  • 3. 3 For Holol Project :- • We have calculated capex requirement base on Hero sales Plan. • MHR calculation for Process cost. • Highlight logical Error ₹ 10.50 Per Part in Hard coating Process Cost. • We have correct consumable cost ₹ 4.92 instead of ₹ 2.63 For New RFQ :- • While calculating new sale rate we have considered 60% SSW & 40% casual Manpower in Process Cost. • Line Depreciation we are load/ Calculate on 300 day’s instead of 365 day’s. • We are calculate expenses on Sales rate instead of RMC + Process.
  • 4. 4 Cost Saving Project :- • We have highlight Excess Manpower issue. Impact is 6 to 7 Lacs per month. • Also we highlight Scrap/Rework issue. Impact is 11 to 13 Lacs per month • We have calculated new MHR for BU Electrical. • We have Calculated new 30 Sale Rate ( RFQ) for BU Electrical. • We have calculated 30 IRR for BU Electricals. • MIS / Budget working for every Month.
  • 5. 5 Working Plan for New Years • Budget Preparation :- • Minimum Variance in Value • Manpower Calculation Method as per below. • SSW – who is working in production Dept. only . • SSW Leave Gap will be compensate with Casual. • Trainee/ Apprentices who is working in Prod ’n dept. only. • Trainee/ Apprentices Leave Gap will be compensate with Casual. • if Trainee/ Apprentices periods is finished that time being GAP will compensate with casual. So that above point will help to reduce our Variance. And %
  • 6. 6 • Investment/ Capex :- Minimum capex for thick the ROSE. • At the time of Capex we will take care especially in CD investment Maximum CD investment convert into a Amortization. We will encourages to CD/Purchase team for that. in that case our ROSE with thick. • In capacity enhancement project, first we will take care of that capacity will fulfil through other plant if yes than we will do cost benefit Analysis between interest & Packing & Freight. than we will take a call. Other wise we will invest. • Cost Saving Project :- • Year on year our supplier is doing same work hence We will built one product wise Expert CFT for element the process at supplier end. • Same CFT will take care of over engineering in material as well as other things. • In both activity we will reduce material as well as Process cost for FY- 16-17.