UNIVERSIDAD TECNOLÓGICA DE EL SALVADOR
MATERIA:
INVESTIGACION Y DESARROLLO DEL PRODUCTO.
TEMA:
- 10 IDEAS DE PRODUCTOS ELABORADOS CON MATERIA PRIMA RECICLADA
-RECICLAJE DE MATERIA PRIMA.
- IDENTIFICAR OPORTUNIDADES.
-PASOS PARA DISEÑAR UN PLAN DE PRODUCTO.
DOCENTE:
ING. CARLA PUENTE.
ALUMNOS:
NOMBRES CARNET
DIAZ ACEVEDO, JOSE LUIS 22-5637-2008
FLORES LANDAVERDE, ERIC ANTONIO 22-1700-2011
LOPEZ FUENTES, JUAN RAMON 22-3144-2010
ORTIZ MENDOZA, CRUZ ANTONIO 22-6021-2007
VANEGAS HERNANDEZ, JOEL 22-0308-2008
SÁBADO, 19 DE MARZO DE 2016
INDICE. PAG
INTRODUCCION………………………………………………………………………………………………………………3
OBJETIVO………………………………………………………………………………………………………………………..4
MATERIALES RECICLADOS EN EL SALVADOR……………………………………………………………………5
TRATAMIENTODEL RECICLADODE PALETSEN EL SALVADOR……………………………………….…………7
PRODUCTOSELABORADOSCON MATERIA PRIMA RECICLADA………………………………………………….….8.
CONCLUSION……………………………………………………………………………………………………………………………….12
ENVUDODE OPORTUNIDADES…………………………………………………………………………………………………….13
PASOSPARA DISEÑARUN PLAN DE OPRTUNIDADES……………………………………………………………………15
PASO1: IDENTIFICAROPORTUNIDADES………………………………………………………………………………………15
PASO2: EVALUARY DAR PRIORIDAD A LOS PROYECTOS……………………………………………………………..19
PROYECTOSSELECCIONADOS……………………………………………………………………………………………………..20
PASO3: ASIGNARRECURSOSY PLANEARTIEMPOS……………………………………………………………………..21
PASO4: COMPLETARPLANEACION DEL ANTEPROYECTO…………………………………………………………….32
PASO5: REFLEXIONAREN LOS RESULTADOS Y PROCESOS……………………………………………………………25
IDENTIFICACION DELASNECESIDADESDEL CLIENTE……………………………………………………………………26
PASO6: ESPECIFICACIONES DELPRODUCTO…………………………………………………………………………………29
PASO7: GENERACION DEL COMCEPTO………………………………………………………………………………………..31
ESLOGANSDE LASPALETS……………………………………………………………………………………………………………32
CONCLUSION……………………………………………………………………………………………………………………………….43
INTRODUCCION
En el siguiente trabajoel lectorencontraralasempresasque se encargande recolectarlos
productosa reciclary las empresasque reciclanlosmateriales que hancompradoy así fabrican
un nuevoproducto,ademásel lectorencontrara10 ideasde nuevosproductosafabricar con los
que estaría cuidandoel medioambiente ademásde ganardinerodándoleunnuevociclode vidaa
esosproductosque su únicocaminoerael basureroy contaminarel medioambiente.
En el siguiente trabajoel lectorencontraralaidentificaciónde oportunidadesasícomoel embudo
de oportunidades que se realizóendondese encontraralasfuentesde oportunidades,mercadeo
y ventas,lasorganizacionesde investigaciónydiseño,clientesactualesypotenciales,proveedores
inventoresysocioscomercialesademásel lectorencontraralospasospara diseñarunplande
productoenel cual encontraralossiguientespuntosque sonidentificaroportunidades,evaluary
dar prioridada proyectos,asignarrecursosyplaneartiempos,completarplaneacióndel
anteproyectoylareflexiónenlosresultadosyel procesoconel seguimientoel seguimientode
estospasospara un plande producto el lectorsabrácomo como elegirunaoportunidadyel
procesoque conllevaparaelegirestaoportunidad.
OBJETIVO:
Que el lectorencuentre eneste trabajolasempresasque reciclanproductoasícomolas empresas
que se encargan de comercializarloparallevárseloalasempresasque comoya lomencionamosse
encargande reciclarestamateriaprimapara hacer susproductosy ponerlosala venta,ademásen
este trabajoel lectorconocerálo que sonlos10 productoselaborados conmateriaprima
recicladaloque losconvierte enproductosamigablesconel medioambiente.
Que el lectorconozca por este trabajo ex aulacomo identificaroportunidadesycomoestas
oportunidades hande pasardespuésde seridentificadasporel embudode oportunidades,
posteriormente el lectorde este trabajoencontraralospasosparadiseñarunplande producto
donde se identificó oportunidades,se evaluóydioprioridadaproyectos,se asignórecursosyse
planeótiempos,posteriormente se completólaplaneacióndel anteproyectoyse reflexionó enlos
resultadosyel proceso.
II. ALCANCES Y LIMITACIONES
ALCANCES
En esta fase el alcance particular se centra en el logro de las especificaciones del
producto razonadas a partir de las necesidades de los clientes investigadas en el
proceso de entrevista.
LIMITACIONES
 Falta de colaboración por parte de las personas abordadas a la hora
de responder sobre el tema de reciclaje y la entrevista acerca de las
características del mueble propuesto.
 Dificultad para la investigación en la competencia, ya que no se
determinaba un producto similar al propuesto en el proyecto por lo
que se tomó en base a la necesidad básica del cliente ( muebles para
sala de espera), lo cual no genera una comparación precisa con la
idea de proyecto.
III. MARCO TEORICO.
INDUSTRIA DEL RECICLADO/REUSO (Reducir, Reusar y Reciclar).
MARCO TEORICO
Reciclaje.
El reciclado, es una de las alternativas utilizadas en la reducción del
volumen de los residuos sólidos. Se trata de un proceso, también conocido
como reciclaje, que consiste básicamente en volver a utilizar materiales que
fueron desechados y que aún son aptos para elaborar otros productos o
refabricar los mismos. Buenos ejemplos de materiales reciclables son los
metales, el vidrio, el plástico, el papel o las pilas.
A diferencia del reciclado, la reutilización es toda operación en la que el
envase concebido y diseñado para realizar un número mínimo de circuitos,
rotaciones o usos a lo largo de su ciclo de vida, es rellenado o reutilizado
con el mismo fin para el que fue diseñado.
Son muchas las razones para reciclar: se ahorran recursos, se disminuye la
contaminación, se alarga la vida de los materiales aunque sea con
diferentes usos, se logra ahorrar energía, se evita la deforestación, se
reduce el 80% del espacio que ocupan los desperdicios al convertirse en
basura, se puede disminuir el pago de impuestos por concepto de
recolección de basura y al mismo tiempo se genera empleo y riqueza.
La mayor parte de los desechos son reutilizables y reciclables, el problema
estriba en que al mezclarlos se convierten en basura. Así que una de las
soluciones al problema de la basura es no hacerla, separando los desechos
para poder reciclar. Hay que tener en cuenta también que resulta
prácticamente imposible que la basura desaparezca por sí sola; basta con
saber el tiempo que necesitan algunos materiales para deteriorarse en la
naturaleza: un tallo de bambú puede tardar en desaparecer de 1 a 3 años,
pero los plásticos o las botellas de cristal pueden permanecer intactos de
500 a 1.000 años. Es importante que comprendamos que para ayudar a
nuestro planeta es necesario tomar en cuenta la regla de las tres “R”:
Reducir, Reusar, Reciclar.
LAS TRES R EN LA PRÁCTICA.
Hay gente que piensa que a las tres “R” habría que agregarle algunas R
más. Por ejemplo Repensar que implica que los algunos productos deben
ser diseñados nuevamente para hacerlos menos contaminantes, menos
consumidores de recursos, etc. Para otros es importante el Responder y
con esto se refieren a que si ves algo que no te gusta de un producto
porque daña el ambiente podrías escribirle a los productores para hacerles
saber tu preocupación.
Reducir es lo primero que tenemos que tratar de hacer porque es la mejor
forma de prevenir y no curar. Esto quiere decir que hay que EVITAR que se
genere la basura comprando más sabiamente y utilizando los productos de
la manera correcta. ¿Cómo?:
a) Comprando siempre productos con menor cantidad de envase.
b) Evitando comprar cosas que contengan sustancias peligrosas y, si son
súper necesarias, asegurarse de tener lo justo y no más que eso.
c) Procurando no desperdiciar alimentos.
d) No comprando productos descartables que son el enemigo Nº1 del
ambiente.
e) Teniendo cuidado al utilizar productos contaminantes para no
derramar o desperdiciar
Reusar es tratar de darle algún uso a la basura antes de tirarla, por
ejemplo, forrar las cajas, frascos o latas y usarlas para guardar cosas.
Reciclar es una actividad que desarrollan muchas empresas y personas,
consiste en rescatar la basura para volver a utilizarla. Del papel y cartón, se
puede recuperar cerca del 40% a través del reciclaje, si no están revueltos
con basura que los moje o manche.
En la actualidad se reciclan materiales muy diversos; los más comunes son
el papel, el vidrio y los envases. Otros materiales que se reciclan son las
pilas y baterías, pues son altamente contaminantes al contener elementos
como el mercurio (pilas botón), el cinc (pilas tradicionales), el níquel y el
cadmio (en los ordenadores y teléfonos móviles) o el manganeso (baterías
de electrodomésticos). También se encuentra en auge el reciclado de los
consumibles ligados a la informática, como los cartuchos de tinta o tóner de
las impresoras láser, y los propios equipos informáticos.
EL RECICLADO EN EL SALVADOR.
El mercado de reciclaje opera como cualquier otro mercado de bienes y servicios,
donde existen consumidores y ofertantes. A nivel local e internacional funciona a
través de intermediarios (en pequeño o grande) que facilitan los acopios para los
recolectores y consumidores. Este mercado es regido básicamente por las leyes
de la oferta y demanda, las cuales se enuncian de la siguiente manera :
Ley de la Oferta: “Cuanto más se eleven los precios de un producto o bien,
mayores serán las cantidades que los empresarios estarán dispuestos a ofrecer,
en un determinado tiempo”
Ley de la demanda: “Cuanto más se eleven los precios de un producto o bien,
menores serán las cantidades que los consumidores estarán dispuestos y en
condiciones de adquirir , en un determinado tiempo”.
La tendencia actual del mercado, en cuanto a oferta y demanda se manifiesta de la
siguiente manera: Es preferible vender en el exterior y no abastecer la local,
debido a que existen mejores precios en el mercado internacional; y por el otro
lado, que el consumidor local de reciclables debe importar lo que el mercado local
no es capaz de abastecer en cuanto a calidad y cantidad. El 80% del mercado
opera de manera informal, sector que se ve menos favorecido en cuanto al remate
de precios y las condiciones de trabajo en que se encuentran para realizar la
recuperación de materiales. El otro 20% es el sector formal, quienes se encargan
de abastecer el mercado local y de exportar. El mercado de reciclaje presenta una
movilidad muy intensa debido a las tendencias que experimenta, entre las que
sobresalen las siguientes:
 Demanda y precios internacionales de determinados
materiales.
 Precios altos de insumos vírgenes.
 Alianzas empresariales que presionan la reconversión de
las tecnologías productivas.
 Competitividad en el mercado.
 Beneficios fiscales.
En el mercado se identifican también actores que cumplen ciertas funciones dentro del
flujo de cada material, después de la observación de campo, se puede identificar al
menos, los siguientes:
GENERADORES.
Es el grupo en el que se inicia la actividad del mercado de reciclaje, aquí se incluyen
domicilios, industrias, comercios, instituciones y cualquier otro establecimiento en el que
se generen desechos sólidos y éstos contengan material con potencial reciclable o
reusable.
RECOLECTORES/PEPENADORES
Es el grupo de personas o empresas que se dedican a la actividad de recuperación en los
puntos de generación y botaderos a cielo abierto a cambio de conseguir ingresos. Este
grupo usualmente identifica las fuentes de generación más atractivas en cuanto a volumen
de captación, limpieza de los materiales, accesibilidad y otros. Para este grupo los lugares
con mayor potencial de captación de materiales son: los domicilios (casa por casa), en
calle a los rellenos sanitarios y en botaderos. Sus materiales son vendidos a
intermediarios minoristas o mayoristas.
INTERMEDIARIOS MINORISTAS.
Es el grupo de personas que se dedica a la compra y venta, captando directamente del
recolector o pepenador en centros de acopio a pequeña escala. Usualmente la actividad
de recuperación es diaria en pequeños volúmenes que son almacenados hasta alcanzar
cantidades que vuelvan rentable el flete hasta los intermediarios mayoristas,
procesadores, maquiladores, recicladores o compradores de insumos reciclables. Este
grupo, al igual que el de pepenadores y recolectores es difícil de cuantificar por el carácter
informal en el que operan y la espontaneidad o movilidad con que aparecen y
desaparecen del mercado.
INTERMEDIARIOS MAYORISTAS.
Es el grupo de personas o empresas que se dedican a la compra y venta y obtienen el
material reciclado directamente del recolector o pepenador, intermediarios minoristas que
acopian a pequeña escala. Los intermediarios mayoristas, desde el punto de vista jurídico
y de acuerdo a las exigencias de sus clientes, operan formalmente, ya que en su mayoría
se dedican a la exportación de materiales o colocación en el mercado local, especialmente
al sector industrial, y para eso se requiere formar parte del sistema legal del país.
PROCESADORES y MAQUILADORES.
Es el grupo de personas o empresas que se dedican al procesamiento o maquila de
materiales reciclables. Este es el sector que prepara los insumos que serán agregados al
proceso de producción de la industria que incorpora material reciclable procesado a sus
productos. En este grupo también se incluyen algunos intermediarios, sea minorista o
mayorista los que consideran como valor agregado el maquilado. Este grupo, por sus
características se ubica en el sector formal.
CONSUMIDORES.
Son las personas o empresas que utilizan materiales reciclables procesados, preparados
por los maquiladores, y que se convierten en parte de su materia prima, como insumo en
su proceso. Es el grupo en el que termina el ciclo del mercado; donde se sustituye materia
prima virgen por materiales reciclables procesados para la fabricación de sus productos.
En este grupo se incluyen los compradores de materiales para reuso.
BROKERS.
La mayoría de intermediarios venden y compran sus materiales en el mercado
internacional a través de Brokers.
Un Broker es una firma, sociedad o profesional independiente que presta servicios de
compra y venta de valores; al igual que los agentes de bolsa tradicionales, su función es
informar acerca de las operaciones y transacciones financieras que el usuario puede
realizar para aprovechar mejor las oportunidades que surjan en materiales reciclables. En
el mercado nacional, no se identifica ninguna empresa o persona en esta categoría de
actores. En esta figura se hace muy difícil conocer el destinatario final de los materiales
pero es la más eficiente ya que las cantidades colocadas pueden ser ilimitadas.
Los actores que se han mencionado son los que determinan la dinámica del mercado de
reciclaje, sin embargo, se perfilan dos mercados: El Mercado Nacional y el Mercado
Internacional.
Materiales que se reciclan en el salvador.
Papel y cartón.
El Reciclaje de papel es una de las formas de reciclar más beneficiosas para el
medio ambiente, en gran parte por el coste medioambiental que tiene obtenerlo.
El reciclado de papel, tiene por norma general producir de nuevo papel, llamado
papel reciclado. para obtenerlo, se consigue bien por papel molido, que es el que se
obtiene de trozos y recortes de papel provenientes de manufacturas de papel, de
papel pre-consumo o bien de papel post-consumo, que se obtiene principalmente de
revistas, periódicos y todo tipo de documentos que solemos tirar.
Cuando la planta de reciclado selecciona el papel, y lo encuentra adecuado para
reciclar, se le llama desecho de papel.
El proceso de reciclaje del papel
En primer lugar, la pastificación del papel, que consiste en añadir disolventes
químicos para que las fibras del papel se separen.
El segundo paso del reciclado de papel consiste en una criba de todo aquel material
que no es papel.
A continuación se centrifuga todo el material, para que estos se separen por su
densidad, para su posterior paso, que es la flotación, donde se elimina la tinta con
burbujas de aire.
Toda esta pasta de papel, se lava a continuación para eliminar las pequeñas
partículas que pudieran quedar, para finalmente blanquear el papel con peróxido de
hidrógeno o hidrosulfito de sodio.
Vidrio.
El reciclaje de vidrio es el proceso mediante el cual se convierten desechos devidrio en
materiales que servirán para la creación de nuevos productos.
Este reciclaje permite reducir la cantidad de residuos destinados a vertederos, lo que supone
un ahorro tanto de materias primas como de energía respecto a la fabricación de vidrio a partir
de materias primas nuevas.
Proceso de reciclado del vidrio.
Este proceso del reciclaje del vidrio, tiene un ciclo circular tal como vemos en la
imagen. Tras el uso de este material, y si lo depositamos en los contenedores
verdes, el vidrio pasa por una fase de recogida, para su posterior tratamiento en
una planta de reciclaje. Vemos como de esta sencilla forma, hacemos que el
vidrio pueda tener muchas más vidas y por tanto generamos una menor cantidad
de residuos.
Reciclaje de plástico.
El reciclado de plástico es el proceso de recuperación de desechos de plásticos.
Las tres principales finalidades del plástico reciclado son la reutilización directa, el
aprovechamiento como materia prima para la fabricación de nuevos productos y su conversión
como combustible o como nuevos productos químicos.
Antes de su reciclaje, los plásticos se clasifican de acuerdo a su tipo de resina. Aunque se han
utilizado varios métodos a lo largo del tiempo para distinguir las resinas, actualmente se
utilizan los infrarrojos. Después de separarlos se trituran y se eliminan las impurezas, como las
etiquetas de papel. Luego se funde y se divide en esferas pequeñas que posteriormente se
utilizan para la fabricación de otros productos.
Existen tres principales tipos de reciclaje:
Reciclaje mecánico: método que consiste en separar los plásticos por clase, lavarlos y
triturarlos hasta convertirlos en pequeños trozos que se fundirán en moldes para producir
nuevos productos.
Reciclaje químico: método que consiste en la degradación del plástico mediante calor para
resultar nuevamente moléculas simples.
Recuperación energética: método que convierte el plástico en un combustible para la
generación de energía.
El reciclaje del aluminio es uno de los más rentables para la industria, ya que
se aprovecha prácticamente la totalidad de los desechos. El aluminio se recicla
de latas, cables, embalajes, muebles o perfiles de construcción, así como de
todas las virutas que se producen en la industria al fabricar objetos con este
material.
El proceso del reciclaje del aluminio, comienza con la recolección de dicho material,
para su posterior traslado a la planta de reciclaje, donde se separa, limpia y se aplasta
creando grandes bloques. El aluminio se funde, creando de nuevo láminas de este
material, listas para un nuevo uso.
El aluminio, tras el hierro y el acero, es el metal más utilizado en el mundo, y es uno
de los materiales que menos reciclamos. por esto, es muy importante concienciar a la
gente que hay que reciclar el aluminio, que encontramos en envases y en el propio
papel de aluminio en nuestros hogares, y en coches, barcos, edificios y muchos usos
más, a nivel industrial.
El aluminio, aunque es muy cuantioso en nuestro planeta, tiene unos altos costes de
extracción, especialmente energéticos. Reciclando aluminio, se ahorra un 94% de ese
coste energético. Es un material además que no pierde propiedades tras varios
procesos de reciclado. Todo ello hace que prácticamente la totalidad del aluminio
empleado en la industria, sea reciclado, a pesar que a nivel doméstico no se recicle
prácticamente.
Reciclaje de las llantas.
El reciclado de llantas puede ser un buen proyecto de reciclaje ya que hay muchas llantas
de donde trabajar para poner un buen uso al hule.
¿Por qué?
Según la Asociación Nacional de Distribuidores de Llantas (Andellac), cada año en nuestro
país se desechan 25 millones de neumáticos viejos. Ya sea que se quemen en hornos de
cemento o que se depositen en tiraderos a cielo abierto. Esto representa un grave problema
de salud por las emisiones de sustancias tóxicas y una amenaza para el medio ambiente.
¿Cómo hacerlo?
Se trata del acopio y reciclado de llantas y hule de todo tipo, que al pasar por un proceso de
trituración, se pulverizan para que su reutilización en la fabricación de suelas de zapatos,
mouse pad, macetas, mangueras, juegos infantiles, loseta o para la pavimentación de
avenidas y carreteras.
También encontramos oportunidades en las llantas hacer uso de ella como una segunda
opción para el diseño de una línea o familia de producto nuevos.
Reciclaje de pallets.
Cada vez es más común la práctica de reciclar y de reutilizar pallets para la
fabricación de nuevos productos y aplicaciones. La versatilidad de la madera
permite construir una gran variedad de productos.
EL MERCADO NACIONAL Y EL MERCADO INTERNACIONAL.
El Mercado Nacional cumpletodo el ciclo desde la generación hasta la incorporación
de materiales reciclables procesados a los productos, a diferencia del Mercado
Internacional donde solamente interactúan los Intermediarios Mayoristas, Los
Procesadores y Maquiladores y los Consumidores (éstos últimos en el carácter de
compradores de reciclables ya maquilados, es decir materiales con valor agregado).
El diagrama que se presenta a continuación, muestrael ciclo que cumple el mercado
de reciclaje y cómo cada uno de los actores ya especificados interviene en cada
etapa del ciclo.
FLUJO DEL MERCADO DE RECICLAJE
Habiéndose definido el ciclo del mercado de reciclaje, el flujo que siguen los
materiales con potencial reciclable en función de las etapas del manejo
integral de desechos sólidos. En la figura Nº1 se reflejan los actores que
intervienen en cada etapa del recorrido de los materiales, como la actividad
que propician dicho recorrido y finalmente la condición del material resultante
de dicha actividad.
a. PRINCIPALES MATERIAS PRIMAS PARA EL RECICLAJE / REUSO.
MATERIALES RECICLABLES
Los materiales con potencial reciclable son aquellos desechos que han sido
recuperados y que por sus propiedades y características pueden convertirse en
recurso a través del reprocesamiento para luego ser incorporados como materia
prima en la fabricación de productos. El reciclaje implica dar una nueva vida al
material en cuestión, lo que ayuda a reducir el consumode recursos y la degradación
del planeta.
Luego de realizar consultas exploratorias en el mercado de reciclables y su
importancia entre los diferentes actores (pepenadores, intermediarios, maquiladores
y consumidores) y revisar los siguientes estudios más recientes en el tema se han
obtenido información que se proporciona en el cuadro nº 1
El proceso de reciclaje tiene una balanza de ventajas e inconvenientes. Es
fundamental que en la balanza pesen más las ventajas que los inconvenientes, ya
que como se ha dicho, el reciclaje, es una iniciativa positiva. Fundamentalmente,
los beneficios son los que han de posicionarse de forma que la balanza vaya a favor
de los beneficios.
El tratamiento de reciclaje puede llevarse a cabo de manera total o parcial, según
cada caso con algunos materiales, es posible que el proceso de reciclaje tenga una
balanza de ventajas e inconvenientes. Las ventajas del reciclaje son varias y tienen
diversos aspectos, tanto ecológicos como económicos y sociales.
a) A NIVEL ECOLÓGICO:
 Se conserva el ambiente y se reduce la contaminación.
 Se alarga la vida útil de los sistemas sanitarios.
 Se protegen los recursos naturales renovables y no renovables.
 El reciclaje ayuda a prolongar la vida y utilidad de los recursos.
 Prácticamente todo lo que vemos a nuestro alrededor puede ser
reciclado.
 Reciclar papel evita una buena cantidad de talas innecesarias y
también la contaminación de grandes cantidades de agua que
conlleva la fabricación del papel.
b) A NIVEL ECONÓMICO
 Se ahorra materia prima en la manufactura de productos nuevos con
materiales reciclables.
 El proceso del reciclaje ha creado un mercado económico y ha
generado numerosos puestos de trabajo.
c) A NIVEL SOCIAL
 Crecimiento de la conciencia ecológica, promoviendo un
comportamiento responsable en relación con el medio ambiente por
parte de las empresas y ciudadanos.
 Mas acceso a fuentes de agua más acceso a fuentes de alimentos.
 Menos Enfermedades ocasionadas producto de la contaminación.
 Generación de empleo ya que el proceso necesita se realizan en
diversas fases llevadas a cabo por distintos trabajadores.
 Menor impacto ambiental, debido a la reducción de los desechos
producidos por el consumo y Optimización de los recursos
naturales.
Las principales desventajas del reciclaje son las siguientes:
 Falta de información de como se debe almacenar correctamente los
residuos para distribuirlos en los centros de reciclaje, lo cual puede
generar fauna nociva en casa.
 No todos los materiales que se anuncian como reciclables son
recibidos por las empresas recicladoras.
 No hay reglas claras para aceptar el material a reciclar por parte de
las recicladoras.
 La poca cantidad que pagan por kilogramo, desincentiva a muchos
que batallaron para reunir dichos materiales.
 En materia de materiales reciclados, algunos son de menor calidad
que los de primera generación, ejemplo puntual: el unicel reciclado
solo se ocupa para algunos empaques y a petición del cliente por su
menor precio y calidad.
Bibliografia.
http://www.inforeciclaje.com/reciclaje-papel.php
https://es.wikipedia.org/wiki/Reciclado_de_pl%C3%A1stico
http://www.inforeciclaje.com/reciclaje-aluminio.php
http://www.soyentrepreneur.com/100ideas/2008/10/reciclaje-de-llantas/
Tema 2: 10 PRODUCTOS ELABORADOS CON MATERIA PRIMA RECICLADA.
- PRODUCTO 1: JUEGO DE SALA ELABORADO CON LLANTAS.
- DESCRIPCION DE USO: Son tantos los neumáticos
que son desechados en el mundo que darles un uso
funcional, después de su vida útil es una tarea muy
difícil, es por lo cual se ha pensado en crear un
hermoso juego de sala que salga de lo común en una
casa hechos con llantas de carro que ya terminaron
su vida útil.
-
- PRODUCTO 2: VASOS Y TASAS ELABORADOS CON EMBASES DE CERVEZA O BOTELLAS DE
LICOR.
- DESCRIPCION DE USO: Estas bonitas tasas y vasos
elaboradas con botellas de cerveza o licor son una
forma muy útil de reciclar y poderle dar un segundo
ciclo de vida a estos artículo que muchas veces
terminan en basureros contaminando el medio
ambiente. Estos vasos y tasas pueden ser utilizados
como adornos de sala o en bares a la vez pueden
usarse para ingerir alguna bebida ya sea alcohólica o
no.
1
- PRODUCTO 3: ELEGANTE LAMPARA DECORATIVA ELABORADA CONPRODUCTOS PLASTICOS
DESCRIPCION DE USO: Esta elegante lámparaelaboradacon
productosplásticosque yaterminaronsuciclode vidapuede ser
usada para adornarel foco de una casa exactamente enlasalade
una casa o enun restaurante obar.
- PRODUCTO 4: COCINAECONOMICAELABORADA CON MATERIA
PRIMA RECICLADA.
-DESCRIPCION DEUSO: Esta cocina elaboradaconmateriaprima
recicladay que usara gas propanoseráuna rápidaopciónpara las
personasque difícilmente puedencomprarunabuenacocinade
gas propanopor dificultadesimpuestasporsueconomía.
- PRODUCTO 5: PEQUEÑA MASETA DECORATIVA HECHAS CON
FOCOS
- DESCRIPCION DE USO: Conla pequeñamasetadecorativase le
puede darun nuevo ciclode vidaa losfocos que se fundierony
que solose puedenbotar.La pequeñamasetadecorativase
puede utilizarparaadornarla casa u oficinaconfloresnaturales
de una maneramuy llamativa.
2
- PRODUCTO 6: JUEGODE SALA CON TARIMAS DE PALET
DESCRIPCION DE USO: Este bonitojuegode salaelaboradocon
tarimasde palletes económicoysale de locomún para
adornar lasala de una casa u oficina.
- PRODUCTO 7: ROPERO DE PALET
- Descripción de uso:Este roperohechode palletpara guardar
la ropa esuna buenaopciónpara salirdel roperocomúnque
siempre se hautilizadoyesuncambiobonitoy sobre todo
económicoparael bolsillo de lapersonaque lodesee
comprar.
- PRODUCTO 8: LAMPARA DECORATIVA DE PALET.
- DESCRIPCION DE USO: Es una lámparadecorativapara lasala o
cualquiertipode negociolacual será barnizaday con agujeros
decorativos que le aranmuyespecial asimple vistaademásse
usara un focoahorrativode energíaeléctrica.
3
- PRODUCTO 9: BANCO DECORATIVO CON LLANTA.
- DESCRIPCION DE USO: La elaboraciónde bancopara sentarse a ver
televisiónensusratoslibresesunabuenaopcióneleganteytípica
que adornar cualquiersaladonde seaocupadayque ademásserá
muyconfortable paraquienlaocupe.
PRODUCTO 10: PORTA MASETA PARA MESA O PORTA VELA PARA
MESA HECHA CONLATILLA DE ATUN.
- DESCRIPCION DE USO: De nuevolaslatas de atún puedenserel
centrode unaideanovedosaparareciclar.Esta vezusandopinzas
para la ropa que puedesluegopintarobarnizar.
-
4
1.2 EVALUAR Y DAR PRIORIDAD A PROYECTOS.
Para la evaluacion de oportunidades aplicamos la técnica denominada EMBUDO DE
OPORTUNIDADES con filtro de LAS CUATRO PERSPECTIVAS:
LAS CUATRO PERSPECTIVAS
Una de las técnicas de evaluación de oportunidades de negocio es por medio del
embudo de oportunidades en donde se utilizan dos de las cuatro perspectivas, en
donde se definirá la oportunidad optima entre los proyectos planteados, en base al
análisis de cada proyecto presentado en el cuadro del embudo de oportunidades
utilizando la estrategia competitiva y plataforma de productos se considero tres criterios
fundamentales como son el ámbito económico, variedad de productos a realizar, daño
provocado por la durabilidad del material reciclable al medio ambiente.
Las perspectivas a utilizar son:
a) Estrategia competitiva.
Se utilizará esta perspectiva desde el punto de análisis de la oportunidad
que el proyecto puede proporcionar, y se orientará a lograr liderazgo en
costos.
b) Plataforma de productos.
Se utilizará para evaluar el proyecto y ver la versatilidad que posee en
crear diversos productos para lograr una mejor cobertura del mercad
5
EMBUDO DE OPORTUNIDADES.
FUENTE DE
OPORTUNIDADES
MERCADEO VENTAS ORGANIZACIONES DE
INVESTIGACION Y
DISEÑO
CLIENTES ACTUALES
Y POTENCIALES
PROVEEDORES
INVENTORES Y
SOCIOS
COMERCIALES
Juego de sala
elaborado con llantas
usadas
Este producto se
comercializara en
tiendas y
almacenes de
prestigio
Se espera que con
el juego de sala
elaborado con
llantas se obtenga
altas ventas
Este diseñodel juegode
sala elaborado con
llantas tendrá el fin de
reusar las llantas usadas
Este producto será
enfocado a un
segmento de la
población que sea de
clase media baja
Los proveedores:
puestos de llantas
usadas
Socios
comerciales:
almacenes de
venta de muebles
Vasos y tasas
elaborados con
botellas de licor o
cervezas
El producto será
comercializado en
diferentes puestos
de venta.
Con este producto
decorativo se
espera tener un
considerable
número de ventas
Este producto es creado
por diversas
organizaciones con el
fin de reciclar los
envases usados de
cerveza.
Los clientes actuales
y potenciales de este
producto son bares y
personas
coleccionistas
Proveedores:
Puestos de
materia prima
reciclada
Comerciales:
Almacenes de
productos
decorativos.
Elegante lámpara
decorativo elaborada
con materiales
plásticos reciclados
Este producto será
comercializado en
almacenes
Se esperaque este
producto tenga un
número llamativo
de ventas
Este artículo es creado
por diversas
organizaciones con el
objetivo de reciclar las
botellas plásticas que
ya fueron usadas
Los clientes actuales
y potenciales de este
producto son
personas que les
llama la atención los
artículos hechos de
materia prima
reciclada
Proveedores:
Puestos de
materia prima
reciclada
Comerciales:
Almacenes de
productos
decorativos
6
FUENTE DE
OPORTUNIDADES
MERCADEO VENTAS ORGNIZACIONES DE
INVESTIGACION Y
DISEÑO
CLIENTES ACTUALES
Y POTENCIALES
PROVEEDORES
INVENTORES Y
SOCIOS
COMERCIALES
Cocina económica
elaborada con
materia prima
reciclada
Este producto será
comercializadoen
almacenesque
vendan productos
de líneablanca
Con este producto
se esperatenerun
gran númerode
ventas por su
precioeconómico
Este producto es
elaborado por distintas
organizacionescomo
una cocina económica
Los clientesactuales
y potencialesde este
producto son
aquellaspersonas
que buscan una
cocina a bajo precio
Proveedores:
Puestos de
materia prima
reciclada.
Comerciales:
Almacenescon
venta de
productos de
líneablanca
Pequeñamaseta
decorativa hecha con
focos quemados
Este producto será
comercializadoen
distintosalmacenes
Con este producto
se esperatenerun
considerable
númerode ventas
Este producto ya es
elaborado por distintas
organizacionesque
trabajan con materia
prima reciclada
Los clientesactualesy
potencialesde este
producto son aquellas
personas que buscan
adornar su casa u
oficinacon adornos
hechoscon materia
prima reciclada
Proveedores:
Puestosde materia
prima reciclada
Comerciales:
Almacenesde
productos
decorativos
Juegode sala con
tarimas de pallet
Este producto será
comercializadoen
distintosalmacenes
Con este producto
se esperatenerun
gran númerode
ventas.
Este artículo que sale de
lo común eselaborado
por distintas
organizacionesque
trabajan con tarimas de
pallet
Los clientes
potencialesde este
producto son
personas que buscan
salir de lo común a la
hora de comprar
Proveedores:
puestosde venta
de pallet
Comerciales:
Almacenesde
productos para el
hogar
7
FUENTE DE
OPORTUNIDADES
MERCADEO VENTAS ORGNIZACIONES DE
INVESTIGACION Y
DISEÑO
CLIENTES ACTUALES Y
POTENCIALES
PROVEEDORES
INVENTORES Y
SOCIOS
COMERCIALES
Banco decorativo
elaborado con llantas
Este producto se
comercializara en
tiendasy almacenes
de prestigio
Se esperaque con el
banco para la sala
elaborado con
llantas se obtenga
altas ventas
Este diseñodel banco
de sala elaboradocon
llantas tendrá el fin de
reusar las llantas
usadas
Este producto será
enfocado a un
segmento de la
población que sea de
clase media baja
Los proveedores:
puestos de llantas
usadas
Socios comerciales:
almacenesde
venta de muebles
Porta maseta para
mesa o porta vela
para mesa hechacon
latillade atún
Este producto será
comercializadoen
tiendas
Espera que este
producto decorativo
tenga un
considerable
númerode ventas al
ser un adorno
llamativo
Estos productos
elaboradospor
distintasorganizaciones
con el finde reciclar.
Este producto
decorativo será
utilizadoen
restaurantes de
prestigio
Proveedores:
puestosde venta
de materia prima
reciclada
Socios comerciales:
Almacenesde
venta de productos
decorativos
8
PASO 1: IDENTIFICAR OPORTUNIDADES
Tiposde
proyectos
Produ
ctos
Descripcióndel
producto
Imágenes
Derivados
de
plataformas
de Producto
ya
existente.-
1 Juego
de
sala
elabor
ado
con
llantas
Este juegode sala
será elaboradocon
llantasya
utilizadas.
2 Vasos
y tasas
elabor
adas
con
envas
esde
cervez
a o
licor
Estos vasosserán
elaboradoscon
envasesusados
como materia
primareciclada
3 Lámpa
ra de
techo
Lámpara elaborada
de cucharas
desechablesy
botellaplásticaen
desuso(Mas
componentes
eléctricos)
4 Cocina
elabor
ada
con
materi
a
prima
recicla
da
La cocinaestará
hechacon materia
primareciclada
para gas propano
9
5 Peque
ña
maset
a
decor
ativa
hecha
con
fotos
quem
ados
Esta pequeña
masetadecorativa
se colocara en
mesaso jugueteras
6 Juego
de
sala
con
tarima
s de
pallet
Este bonitojuego
de sala elaborado
con tarimasde
palletes
económicoysale
de lo común,para
salau oficina
7 Roper
o de
pallet
Este ropero hecho
de palletpara
guardar ropa es
una buenaopción
para salirde lo
común
8 Lámpa
ra
decor
ativa
de
pallet
Esta lámpara
decorativase usara
enla sala o
cualquiertipode
negocio.
10
9 Banco
decor
ativo
elabór
ela
con
llantas
El banco decorativo
elaboradocon
llantasesuna
buenaopción
elegante ytípica
para adornar
cualquiersala
1
0
Porta
vela
para
mesa
hecha
con
latillas
de
atún y
chuch
os de
ropa
Elaboradacon
latillasde atúnesta
puede serel centro
de una idea
novedosa.
Hasta aqui
11
12
PASO 2: EVALUAR Y DAR PRIORIDAD A LOS PROYECTOS CUADRO DE VALORACION:ALTO(3),MEDIO(2)
Y BAJO (1).
Evaluar y dar prioridad a proyectos
Método de Evaluación: Estrategia Competitiva (La estrategia competitiva de una organización define un método básico de abordar
mercados y productos con respecto a la competencia.) Puntuaciones del 0 al 10
N
º
NOMBRE DEL
PRODUCTO
LIDERAZGO
TECNOLOGI
CO
LIDERAZGO DECOSTOS CONCENTRACIÓN EN EL CLIENTE IMITATIVA TOTAL EN PORCENTAJE.
EX
IS
TE
NO
EXISTE
COSTO DE
MANO DE
OBRA
MANEJA
SISTEMA DE
PRODUCCIÓN
USA METODOS
DE
MANUFACTURA
CLIENTES
NUEVOS
COMPRAS
MASIVAS
SEGMENTACIÓN
DE MERCADO
GRADO DE
INNOVACIÓN
SUMA. Alto Medio Bajo Total
1
COCINA
ECONOMICA DE
GAS PROPANO
- Bajo (1) Medio (2) Medio (2) Alto (3) Alto (3) Medio (2) Medio (2) Alto (3) 18 38% 50% 12% 100%
2
LAMPARA DE
PALLET
- Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100%
3
VASOS Y TASAS
ELABORADOSCON
ENVASES DE
CERVEZA O LICOR
- Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100%
4
LAMPARA DE
TECHO - Bajo (1) Bajo (1) Bajo (1) Bajo (1) Alto (1) Alto (3) Bajo (1) Medio (2) 11 25% 12% 63% 100%
5 ROPERO DE PALLET - Bajo (1) Bajo (1) Bajo (1) Bajo (1) Alto (3) Medio (2) Bajo (1) Bajo (1) 11 38% 12% 50% 100%
6 BANCO CON LLANTA - Bajo (1) Alto (3) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) 10 25% 50% 25% 100%
7
JUEGO DE SALASALA
DE PALLET
- Bajo (1) Medio (2) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) 9 12% 50% 38% 100%
8
MASETA
DECORATIVA
HECHA CON FOCOS
- Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Medio (2) 9 24% 38% 38% 100%
9 JUEGO DE SALA
ELBORADO CON
LLANTAS
Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) 8 24% 38% 38% 100%
1
0
PORTAVELA. Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1= Bajo (1) Bajo (1) 8 24% 38% 38% 100%
13
Proyectos seleccionados.
- Cocina economica de gas propano
- Lampara de pallet
- Vasos y tasa elaboradas xon cervezas y tasas de licor
Evaluar y dar prioridad a proyectos
Método de Evaluación: Estrategia Competitiva (La estrategia competitiva de una organización define un método básico de abordar
mercados y productos con respecto a la competencia.) Puntuaciones del 0 al 10
N
º
NOMBRE DEL
PRODUCTO
LIDERAZGO
TECNOLOGI
CO
LIDERAZGO DECOSTOS CONCENTRACIÓN EN EL CLIENTE IMITATIVA TOTAL EN PORCENTAJE.
EX
IS
TE
NO
EXISTE
COSTO DE
MANO DE
OBRA
MANEJA
SISTEMA DE
PRODUCCIÓN
USA METODOS
DE
MANUFACTURA
CLIENTES
NUEVOS
COMPRAS
MASIVAS
SEGMENTACIÓN
DE MERCADO
GRADO DE
INNOVACIÓN
SUMA. Alto Medio Bajo Total
1
COCINA
ECONOMICA DE
GAS PROPANO
- Bajo (1) Medio (2) Medio (2) Alto (3) Alto (3) Medio (2) Medio (2) Alto (3) 18 38% 50% 12% 100%
2
LAMPARA DE
PALLET
- Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100%
3
VASOS Y TASAS
ELABORADOSCON
ENVASES DE
CERVEZA O LICOR
- Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100%
14
PASO 3: ASIGNAR RECURSOS Y PLANEAR TIEMPOS.
N ACTIVIDADES RESPONSAMBLES RECURSOS
TIEMPO
Febrero 2016 Marzo 20016 Abril 2016 Mayo 2016 Junio 2016
S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4
1
IDENTIFICAR
OPORTUNIDADES. JOSE DIAZ.
2
EVALUARY DAR
PRIORIDADA LOS
PROYECTOS. JUAN LOPEZ
3
ASIGNARRECURSOSY
PLANIFICARTIEMPOS. CRUZ ANTONIO.
4
CONTEMPLAR
PLANEACION DEL
ANTEPROYECTO. JOEL VANEGAS.
5
REFLECCIONAREN LOS
RECURSOS Y EL
PROCESO. ERIC FLORES.
6
7
8
9
10
15
PASO 4: COMPLETAR PLANEACION DEL ANTEPROYECTO.
DECLARACION DE MISION
Cocina economica de gas propano
Descripción
del producto
Cocinaeconómicade gas propanopara personasque deseenahorrardineroalahora de comprar unacocina.
Propuestade
valor
Con lacocina económicase podránrealizardiferentestiposde platosde comidasinimportarel tiempode usode
la cocina.
Objetivosdel
negocio
Con estacocinaayudar la economíade la familiasalvadoreñaque nopuede adquirirunacocinatradicional por
dificultades económicas.
Esta cocina a pesarde serde un costo menora las cocinasque actualmente se encuentranenel mercadosu
tiempode duraciónseráigual o mayora las cocinasque son de mayor precio.
Mercado
primario
Familiatradicional salvadoreña
Mercado
segundario
Negociosque comienzan operacionesconunbajopresupuesto
Suposiciones y
Restricciones
Presupuesto, alcance ytiempo.
Involucrados Proveedorde la,materiaprima
Compradoresyusuarios.
Distribuidoresyrevendedores
16
PASO 4: COMPLETAR PLANEACION DEL ANTEPROYECTO.
DECLARACION DE MISION
Lámpara de pallet
Descripción
del producto
Es una lámparade ahorroelaboradacon tarimasde pallet
Propuestade
valor
Lámpara de palletequipadaconunfoco ahorrativoel cual se conecta a 120 voltiosya unafrecuenciade 60 Hz
Objetivosdel
negocio
-Serlíderesenlafabricaciónyventade lámparasde palletparael hogar, el negocioola oficina.
- Que este productoseautilizadocomobase a lahora de diseñarlasala,oficinaonegocio
Mercado
primario
Familiasopersonasque adornanlasala de su casa u oficinaonegocio
Mercado
segundario
Empresasdiseñadorasde salasde hogaru oficinas
Suposiciones y
Restricciones
Presupuesto, alcance ytiempo.
Involucrados Proveedorde la,materiaprima
Compradoresyusuarios.
Distribuidoresyrevendedores
17
PASO 4: COMPLETAR PLANEACION DEL ANTEPROYECTO.
DECLARACION DE MISION
Juego de sala de pallet
Descripción
del producto
Este bonitojuegode salade palletesunaformamuy útil de darle un toque elegante alasalade nuestracasa,
oficinaunegocio.
Propuestade
valor
Introduciral mercadoun bonitojuegode sala, ergonómicoparalasala de una casa, oficinaunegocio
Objetivosdel
negocio
Elaborar unjuegode sala que tengagran aceptaciónenel mercadopor su costoy que ademásadorne la salade
un hogar,oficinaonegocio.
Mercado
primario
Familiasopersonasque adornanlasala de su casa u oficinaonegocio
Mercado
segundario
Empresasdiseñadorasde salasde hogaru oficinas
Suposiciones y
Restricciones
Presupuesto, alcance ytiempo.
Involucrados Proveedorde lamateriaprima
Compradoresyusuarios.
Distribuidores yrevendedores
18
ELECCION Y JUSTIFICACION DEL PRODUCTO A DESARROLLAR
Las características e insumos del material reciclado como son: Los precios de las
pallets a bajo costo que están dados por el mercado, las condiciones de reciclado
son buenas, la singularidad del producto es atractiva, la creación de diseños
llamativos, el mercado primario y secundario es bastante extenso, la contribución al
cuido del medio ambiente y generación de empleos son contribuciones que dan valor
al desarrollo de productos con pallets reciclables. Por tanto que considerando el
proceso de evaluación anteriormente descrito se selecciona el proyecto de producto
de:
“Diseñar una lámpara a partir de pallets
reciclados, para contribuir al medio ambiente,
de bajo costo, con diseños llamativos, de buena
calidad.”
5. IDENTIFICACIÓN DE NECESIDADES DEL CLIENTE
5.1 DATOS SIN PROCESAR DE LOS CLIENTES.
Para el logro de la identificación de las necesidades del cliente el método utilizado
en la recolección de información es mediante una entrevista dirigida al mercado
primario.
Preguntas de la entrevista
1- Prefiere lámpara de techo o de mesa.
2- Qué tipo de foco le gustaría.
3- Como le gustaría el diseño.
4- Que le cambiaria.
19
Cliente Usos típicos que
puede darle a
este tipo de
lámpara.
Que le gusta de
este diseño.
Que no le
gusta de este
diseño.
Que puede
mejorarse de este
diseño.
1 Para iluminar la sala Que es material
reciclado.
La forma para
instalarla.
Que se dé fácil
instalación.
2 Para iluminar el
cuarto
Es atractivo Se ve muy
pesado
Que sea liviano
3 Para iluminar el
comedor
Que es de focos La forma para instalarla Que sea de fácil instalación
4 Para iluminar el
cuarto
Es atractivo El tamaño Que sea liviano
5 Para iluminar la
sala
Que es de material
reciclado
La forma para instalarla Que sea de fácil instalación
6 Para iluminar la
sala
Que es de focos Se muy grande Que sea liviano
7 Para iluminar el
comedor Que es atractivo
El foco Que sea candela led
8 Para iluminar la
sala
Que es de material
reciclado
La forma para
instalarla
Que sea de fácil
instalación
9 Para iluminar la
sala
Que es de focos Se muy pesado Que sea liviano
20
10 Para iluminar la
sala
Es atractivo Que es de foco Que sea de
candela led
11 Para iluminar el
comedor
Es atractivo Las forma de
instalación
Que sea de fácil
instalación
12 Para iluminar la
sala
Que es de foco Se ve muy
pesado
Que sea liviano
13 Para iluminar la
sala
14 Para iluminar el
cuarto
15
16 Para iluminar la
sala
17
18
19
20 Para iluminar la
sala
21
PASO 5: REFLEXIONAR EN LOS RESULTADOS Y PROCESOS.
1. En el embudo de oportunidades están agrupadas buenas ideas y diverso conjunto de oportunidades del producto que
podemos desarrollar.
2. Se puede verificar que el plan de producto concuerda con la estrategia competitiva que se busca.
3. Se ha asignado suficiente recursos en el desarrollo del producto para seguir la estrategia competitiva que se pretende lograr.
4. El equipo principal esta consiente y acepta los desafíos de la declaración de la misión resultante.
22
5. El equipo trabajo no ha encontrado limitantes de gran magnitud por lo que se permite obtener los mejores resultados.
23
5) IDENTIFICACION EN LAS NECESIDADES DE LOS CLIENTES.
REDACCION DE LA INFORMACION DELOS USUARIOS DE LA LAMPARA DE PALLET.
Encuestarealizadaporel grupo de diseño
PRODUCTO: Lampara de palets
1) Uso tipicode la lamparade palets.
R// Para iluminarunlugar
2) ¿Que le gustariaque tuvieralalampara de palets?.
R// Multiplescoloresparaescoger.
3) ¿Que no le gustade lalampara de palets?.
R// El tamaño que tiene.
4) ¿Que le cambiaria?.
R// El tamaño.
24
5) ¿Que sugerenciasharia?.
R// Que fuerafabricadaendistitasformasytamañosasi como con variedadde colores
6) ¿Qué colorde luzle gustariaque emanarala lampara?
R// Me gustariaque fueracolorfluorecente.
7) ¿ Estaria dispuestoustedacomprarla lamparade palet?
R// Si,siempre ycuandotuvieraundiseñoatractivo,unprecioaccesible yunfocoahorrativo,si esledmejor.
-Que sealámparade techo………………...15 personas
- Que tengafocosahorrativos…………….20 personas
- Que seade focospequeños………………5personas
- Que seade fácil instalación……………….3personas
- Que seatipocandela…………………………5 personas
- Consensorde encendidoyapagado..2 personas
- Diseñoatractivo……………………………....15personas
- Que seade pesoliviano……………..…….6personas
- Que su precioseaaccesible…………….20personas
- Coloresde diseñovariados……..………6personas
25
- Que sea de material duradero…….…12personas.
CARACTERISTICAS.
Buen diseño. Tipode foco
- Lampara de techo * - Que sea tipocandela***
- Que sea de facil instalacion*** - Focospequeños***
- Que sea de tipocandela*** - Focos ahorrativos *
- Diseñoatractivo*
- De pesoliviano*** Segmentode mercado
- Coloresvariadosensudiseño***
Imnovacion. - Que sea barata *
- Con censorde encendidoyapagado***
Calidad.
- Material duradero**
26
IMPORTANCIA DE LASESTRELLAS
Primaria*
Segundaria**
Terciaria ***
N NECESIDAD IMPORTANCIA
1 La lampara es de foco ahorrativo *
2 la lampara es de precio accesible *
3 la lampara es de techo *
4 la lampara tiene diseño atractivo *
5 la lampara es de material durable **
6 la lampara es de focos pequeños ***
7 la lampara tiene iluminaria tipo candela ***
8 la lampara es de peso liviano ***
9 la lampara tiene diversidad de colores ***
10 la lampara es de fácil instalación ***
11 la lampara tiene sensor de encendido y apagado ***
N NECESIDAD IMPORTANCIA
1 la lampara es de precio accesible 1
2 la lampara tiene diseño atractivo 1
3 la lampara es de fácil instalación 1
27
4 la lampara es de techo 2
5 la lampara es de material durable 2
6 la lampara es de focos pequeños 3
7 la lampara tiene iluminaria tipo candela 3
8 la lampara es de peso liviano 3
9 La lampara es de foco ahorrativo 4
10 la lampara tiene diversidad de colores 4
11 la lampara tiene sensor de encendido y
apagado
5
28
6) ESPECIFICACIONES DEL PRODUCTO.
N. Necesidad Importancia
1 La lampara tiene tubo fluorecente led 1
2 La lampara tiene poco peso 1
3 La lampara tiene diseño atractivo 1
4 La lampara es colgante 2
5 La lampara tiene precio accesible 3
N. Unidad Valor IMPORTANCI
A
Unidades P1 P2 P3 Margen
Aceptable
Valor
Ideal
1 1 Longituddel tubo 1 mm 1210 1210 1210 1210 1210
2 1 Diametrodel tubo 1 mm 31 40 36  30 < 40
3 1 Voltage 1 V 220 110 110  110 < 220
4 1 Corriente 1 A 0.17 1.5 2.5  0.17 < 10
5 1 Potencia 1 W 15 40 40  15 < 40
6 1 Temperaturade calor 1 K 3000 4000 6500  3000 < 6500
7 1 Iluminacion 1 Lux 34.6 24.2 24.2  24 < 35
8 2 Masa total 1 Kg 1.5 2.5 2.0  1.5 < 2.5
9 2 Densidaddel material 1 g/cm3 0.3 0.4 0.9  0.3 < 0.9
10 3 Presentacion 1 Subj 1 2 1  1 < 2
11 4 Masa de la lampara 2 Kg 1.5 2.5 2.0  1.5 < 2.5
12 4 Longitud 2 mm 2000 21.50 2300  2000 < 300
13 4 Ancho 2 mm 7.50 7.75 810  700 < 900
14 4 Altura 2 mm 220 283 255  200 < 300
15 5 Costode fabricacion 3 $ 15 2.3 32  1.5 < 40
29
Caja negra.
Caja transparente.
Madera de
pallets
Sistema electrico
Encendido.
Dispositivo de
iluminaria
Diseño del producto
Energia electrica
Interruptor
Iluminacion con
dedecoracion
Tubo fluorecente
Tubo fluorecente
Energiaelectrica
Interruptor
Lampara
30
7)GENERACION DE COMCEPTO
Materia
prima
Herramientas Forma Luminaria Mano de
obra
Sujetadores Color
Pallets Electricas Rectangular Candela led Linea de
produccion
Pernos Caoba
Manuales Cuadra Candela
fluorecente
Operario
unico
Argollas
atornilladas
Negro
Triangular Foco
fluorecente
Arnez Natural
Redonda Foco led
31
Eslogans de la lampara de pallets.
1. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
2. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro.
3. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
4. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
5. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba.
6. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba.
7. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
8. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada con operario unico sujetadas con pernos y la lampara lleva el color caoba.
9. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
32
10. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
11. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
12. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
13. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
14. La lampara de pallets es fabricada con herramientas electricas de forma triangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
15. La lampara de pallets es fabricada con herramientas electricas de forma redonda, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
16. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
17. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro.
18. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
33
19. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
20. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba.
21. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba.
22. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
23. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada con operario unico sujetadas con pernos y la lampara lleva el color caoba.
24. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
25. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
26. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de foco fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
27. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de foco led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
34
28. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
29. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
30. La lampara de pallets es fabricada con herramientas manuales de forma triangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
31. La lampara de pallets es fabricada con herramientas manuales de forma redonda, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
32. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
33. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
34. La lampara de pallets es fabricada con herramientas electricas de forma triangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
35. La lampara de pallets es fabricada con herramientas electricas de forma redonda, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
35
36. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
37. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
38. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
39. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
40. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
41. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en operario unico sujetadas con pernos y la lampara lleva el color caoba.
42. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
43. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba.
44. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba.
36
45. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
46. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro.
47. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
48. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
49. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
50. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro.
51. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
52. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
37
53. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba.
54. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color negro.
55. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
56. La lampara de pallets es fabricada con herramientas manuales de forma triangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
57. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
58. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
59. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco fluorecente, la cual
es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
60. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
61. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
38
62. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada con operario unico sujetadas con arnez y la lampara lleva el color natural.
63. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
64. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
65. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollaz atornilladas y la lampara lleva el color natural.
66. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba.
67. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color negro.
68. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
69. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
39
70. La lampara de pallets es fabricada con herramientas manuales de forma triangular, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
71. La lampara de pallets es fabricada con herramientas manuales de forma redonda, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
72. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
73. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
74. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco fluorecente, la cual
es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
75. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
76. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color negro.
77. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
78. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada con operario unico sujetadas con arnez y la lampara lleva el color caoba.
40
79. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada con operario unico sujetadas con arnez y la lampara lleva el color negro.
80. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada con operario unico sujetadas con arnez y la lampara lleva el color natural.
81. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
82. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
83. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba.
84. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro.
85. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color natural.
86. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro.
87. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro.
41
88. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color natural.
89. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba.
90. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro.
91. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
92. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro.
93. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
94. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
95. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
96. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
42
97. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
98. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro.
99. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la
cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
100. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es
elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro.
101. La lamparade palletsesfabricadaconherramientasmanualesde formacuadrada,con luminaria de candelaled,lacual es
elaboradaenlineade produccionsujetadasconpernosylalamparallevael colornatural.
102. La lamparade palletsesfabricadaconherramientasmanualesde formacuadrada,con luminariade candelaled,lacual es
elaboradaenlineade produccionsujetadasconpernosylalamparallevael colorcaoba.
43
CONCLUSIÓN.
Como grupo de trabajo se concluye, que el desarrollo de nuevos productos se ha convertido en un factor clave para lograr el éxito
empresarial, este proceso conlleva la realización de un conjunto complejo de actividades, en las que deben intervenir la mayoría de las
áreas funcionales de la organización; y si con este fundamento nos concientizamos, y al desarrollar estos nuevos productos, sean
elaborados con materia prima reciclada con un bajo impacto contaminante
44
45

666

  • 1.
    UNIVERSIDAD TECNOLÓGICA DEEL SALVADOR MATERIA: INVESTIGACION Y DESARROLLO DEL PRODUCTO. TEMA: - 10 IDEAS DE PRODUCTOS ELABORADOS CON MATERIA PRIMA RECICLADA -RECICLAJE DE MATERIA PRIMA. - IDENTIFICAR OPORTUNIDADES. -PASOS PARA DISEÑAR UN PLAN DE PRODUCTO. DOCENTE: ING. CARLA PUENTE. ALUMNOS: NOMBRES CARNET DIAZ ACEVEDO, JOSE LUIS 22-5637-2008 FLORES LANDAVERDE, ERIC ANTONIO 22-1700-2011 LOPEZ FUENTES, JUAN RAMON 22-3144-2010 ORTIZ MENDOZA, CRUZ ANTONIO 22-6021-2007 VANEGAS HERNANDEZ, JOEL 22-0308-2008 SÁBADO, 19 DE MARZO DE 2016
  • 2.
    INDICE. PAG INTRODUCCION………………………………………………………………………………………………………………3 OBJETIVO………………………………………………………………………………………………………………………..4 MATERIALES RECICLADOSEN EL SALVADOR……………………………………………………………………5 TRATAMIENTODEL RECICLADODE PALETSEN EL SALVADOR……………………………………….…………7 PRODUCTOSELABORADOSCON MATERIA PRIMA RECICLADA………………………………………………….….8. CONCLUSION……………………………………………………………………………………………………………………………….12 ENVUDODE OPORTUNIDADES…………………………………………………………………………………………………….13 PASOSPARA DISEÑARUN PLAN DE OPRTUNIDADES……………………………………………………………………15 PASO1: IDENTIFICAROPORTUNIDADES………………………………………………………………………………………15 PASO2: EVALUARY DAR PRIORIDAD A LOS PROYECTOS……………………………………………………………..19 PROYECTOSSELECCIONADOS……………………………………………………………………………………………………..20 PASO3: ASIGNARRECURSOSY PLANEARTIEMPOS……………………………………………………………………..21 PASO4: COMPLETARPLANEACION DEL ANTEPROYECTO…………………………………………………………….32 PASO5: REFLEXIONAREN LOS RESULTADOS Y PROCESOS……………………………………………………………25 IDENTIFICACION DELASNECESIDADESDEL CLIENTE……………………………………………………………………26 PASO6: ESPECIFICACIONES DELPRODUCTO…………………………………………………………………………………29 PASO7: GENERACION DEL COMCEPTO………………………………………………………………………………………..31 ESLOGANSDE LASPALETS……………………………………………………………………………………………………………32 CONCLUSION……………………………………………………………………………………………………………………………….43
  • 3.
    INTRODUCCION En el siguientetrabajoel lectorencontraralasempresasque se encargande recolectarlos productosa reciclary las empresasque reciclanlosmateriales que hancompradoy así fabrican un nuevoproducto,ademásel lectorencontrara10 ideasde nuevosproductosafabricar con los que estaría cuidandoel medioambiente ademásde ganardinerodándoleunnuevociclode vidaa esosproductosque su únicocaminoerael basureroy contaminarel medioambiente. En el siguiente trabajoel lectorencontraralaidentificaciónde oportunidadesasícomoel embudo de oportunidades que se realizóendondese encontraralasfuentesde oportunidades,mercadeo y ventas,lasorganizacionesde investigaciónydiseño,clientesactualesypotenciales,proveedores inventoresysocioscomercialesademásel lectorencontraralospasospara diseñarunplande productoenel cual encontraralossiguientespuntosque sonidentificaroportunidades,evaluary dar prioridada proyectos,asignarrecursosyplaneartiempos,completarplaneacióndel anteproyectoylareflexiónenlosresultadosyel procesoconel seguimientoel seguimientode estospasospara un plande producto el lectorsabrácomo como elegirunaoportunidadyel procesoque conllevaparaelegirestaoportunidad.
  • 4.
    OBJETIVO: Que el lectorencuentreeneste trabajolasempresasque reciclanproductoasícomolas empresas que se encargan de comercializarloparallevárseloalasempresasque comoya lomencionamosse encargande reciclarestamateriaprimapara hacer susproductosy ponerlosala venta,ademásen este trabajoel lectorconocerálo que sonlos10 productoselaborados conmateriaprima recicladaloque losconvierte enproductosamigablesconel medioambiente. Que el lectorconozca por este trabajo ex aulacomo identificaroportunidadesycomoestas oportunidades hande pasardespuésde seridentificadasporel embudode oportunidades, posteriormente el lectorde este trabajoencontraralospasosparadiseñarunplande producto donde se identificó oportunidades,se evaluóydioprioridadaproyectos,se asignórecursosyse planeótiempos,posteriormente se completólaplaneacióndel anteproyectoyse reflexionó enlos resultadosyel proceso.
  • 5.
    II. ALCANCES YLIMITACIONES ALCANCES En esta fase el alcance particular se centra en el logro de las especificaciones del producto razonadas a partir de las necesidades de los clientes investigadas en el proceso de entrevista. LIMITACIONES  Falta de colaboración por parte de las personas abordadas a la hora de responder sobre el tema de reciclaje y la entrevista acerca de las características del mueble propuesto.  Dificultad para la investigación en la competencia, ya que no se determinaba un producto similar al propuesto en el proyecto por lo que se tomó en base a la necesidad básica del cliente ( muebles para sala de espera), lo cual no genera una comparación precisa con la idea de proyecto.
  • 6.
    III. MARCO TEORICO. INDUSTRIADEL RECICLADO/REUSO (Reducir, Reusar y Reciclar). MARCO TEORICO Reciclaje. El reciclado, es una de las alternativas utilizadas en la reducción del volumen de los residuos sólidos. Se trata de un proceso, también conocido como reciclaje, que consiste básicamente en volver a utilizar materiales que fueron desechados y que aún son aptos para elaborar otros productos o refabricar los mismos. Buenos ejemplos de materiales reciclables son los metales, el vidrio, el plástico, el papel o las pilas. A diferencia del reciclado, la reutilización es toda operación en la que el envase concebido y diseñado para realizar un número mínimo de circuitos, rotaciones o usos a lo largo de su ciclo de vida, es rellenado o reutilizado con el mismo fin para el que fue diseñado. Son muchas las razones para reciclar: se ahorran recursos, se disminuye la contaminación, se alarga la vida de los materiales aunque sea con diferentes usos, se logra ahorrar energía, se evita la deforestación, se reduce el 80% del espacio que ocupan los desperdicios al convertirse en
  • 7.
    basura, se puededisminuir el pago de impuestos por concepto de recolección de basura y al mismo tiempo se genera empleo y riqueza. La mayor parte de los desechos son reutilizables y reciclables, el problema estriba en que al mezclarlos se convierten en basura. Así que una de las soluciones al problema de la basura es no hacerla, separando los desechos para poder reciclar. Hay que tener en cuenta también que resulta prácticamente imposible que la basura desaparezca por sí sola; basta con saber el tiempo que necesitan algunos materiales para deteriorarse en la naturaleza: un tallo de bambú puede tardar en desaparecer de 1 a 3 años, pero los plásticos o las botellas de cristal pueden permanecer intactos de 500 a 1.000 años. Es importante que comprendamos que para ayudar a nuestro planeta es necesario tomar en cuenta la regla de las tres “R”: Reducir, Reusar, Reciclar. LAS TRES R EN LA PRÁCTICA. Hay gente que piensa que a las tres “R” habría que agregarle algunas R más. Por ejemplo Repensar que implica que los algunos productos deben ser diseñados nuevamente para hacerlos menos contaminantes, menos consumidores de recursos, etc. Para otros es importante el Responder y con esto se refieren a que si ves algo que no te gusta de un producto porque daña el ambiente podrías escribirle a los productores para hacerles saber tu preocupación. Reducir es lo primero que tenemos que tratar de hacer porque es la mejor forma de prevenir y no curar. Esto quiere decir que hay que EVITAR que se genere la basura comprando más sabiamente y utilizando los productos de la manera correcta. ¿Cómo?: a) Comprando siempre productos con menor cantidad de envase. b) Evitando comprar cosas que contengan sustancias peligrosas y, si son súper necesarias, asegurarse de tener lo justo y no más que eso.
  • 8.
    c) Procurando nodesperdiciar alimentos. d) No comprando productos descartables que son el enemigo Nº1 del ambiente. e) Teniendo cuidado al utilizar productos contaminantes para no derramar o desperdiciar Reusar es tratar de darle algún uso a la basura antes de tirarla, por ejemplo, forrar las cajas, frascos o latas y usarlas para guardar cosas. Reciclar es una actividad que desarrollan muchas empresas y personas, consiste en rescatar la basura para volver a utilizarla. Del papel y cartón, se puede recuperar cerca del 40% a través del reciclaje, si no están revueltos con basura que los moje o manche. En la actualidad se reciclan materiales muy diversos; los más comunes son el papel, el vidrio y los envases. Otros materiales que se reciclan son las pilas y baterías, pues son altamente contaminantes al contener elementos como el mercurio (pilas botón), el cinc (pilas tradicionales), el níquel y el cadmio (en los ordenadores y teléfonos móviles) o el manganeso (baterías de electrodomésticos). También se encuentra en auge el reciclado de los consumibles ligados a la informática, como los cartuchos de tinta o tóner de las impresoras láser, y los propios equipos informáticos. EL RECICLADO EN EL SALVADOR. El mercado de reciclaje opera como cualquier otro mercado de bienes y servicios, donde existen consumidores y ofertantes. A nivel local e internacional funciona a través de intermediarios (en pequeño o grande) que facilitan los acopios para los recolectores y consumidores. Este mercado es regido básicamente por las leyes de la oferta y demanda, las cuales se enuncian de la siguiente manera :
  • 9.
    Ley de laOferta: “Cuanto más se eleven los precios de un producto o bien, mayores serán las cantidades que los empresarios estarán dispuestos a ofrecer, en un determinado tiempo” Ley de la demanda: “Cuanto más se eleven los precios de un producto o bien, menores serán las cantidades que los consumidores estarán dispuestos y en condiciones de adquirir , en un determinado tiempo”. La tendencia actual del mercado, en cuanto a oferta y demanda se manifiesta de la siguiente manera: Es preferible vender en el exterior y no abastecer la local, debido a que existen mejores precios en el mercado internacional; y por el otro lado, que el consumidor local de reciclables debe importar lo que el mercado local no es capaz de abastecer en cuanto a calidad y cantidad. El 80% del mercado opera de manera informal, sector que se ve menos favorecido en cuanto al remate de precios y las condiciones de trabajo en que se encuentran para realizar la recuperación de materiales. El otro 20% es el sector formal, quienes se encargan de abastecer el mercado local y de exportar. El mercado de reciclaje presenta una movilidad muy intensa debido a las tendencias que experimenta, entre las que sobresalen las siguientes:  Demanda y precios internacionales de determinados materiales.  Precios altos de insumos vírgenes.  Alianzas empresariales que presionan la reconversión de las tecnologías productivas.  Competitividad en el mercado.  Beneficios fiscales. En el mercado se identifican también actores que cumplen ciertas funciones dentro del flujo de cada material, después de la observación de campo, se puede identificar al menos, los siguientes:
  • 10.
    GENERADORES. Es el grupoen el que se inicia la actividad del mercado de reciclaje, aquí se incluyen domicilios, industrias, comercios, instituciones y cualquier otro establecimiento en el que se generen desechos sólidos y éstos contengan material con potencial reciclable o reusable. RECOLECTORES/PEPENADORES Es el grupo de personas o empresas que se dedican a la actividad de recuperación en los puntos de generación y botaderos a cielo abierto a cambio de conseguir ingresos. Este grupo usualmente identifica las fuentes de generación más atractivas en cuanto a volumen de captación, limpieza de los materiales, accesibilidad y otros. Para este grupo los lugares con mayor potencial de captación de materiales son: los domicilios (casa por casa), en calle a los rellenos sanitarios y en botaderos. Sus materiales son vendidos a intermediarios minoristas o mayoristas. INTERMEDIARIOS MINORISTAS. Es el grupo de personas que se dedica a la compra y venta, captando directamente del recolector o pepenador en centros de acopio a pequeña escala. Usualmente la actividad de recuperación es diaria en pequeños volúmenes que son almacenados hasta alcanzar cantidades que vuelvan rentable el flete hasta los intermediarios mayoristas, procesadores, maquiladores, recicladores o compradores de insumos reciclables. Este grupo, al igual que el de pepenadores y recolectores es difícil de cuantificar por el carácter informal en el que operan y la espontaneidad o movilidad con que aparecen y desaparecen del mercado. INTERMEDIARIOS MAYORISTAS. Es el grupo de personas o empresas que se dedican a la compra y venta y obtienen el material reciclado directamente del recolector o pepenador, intermediarios minoristas que acopian a pequeña escala. Los intermediarios mayoristas, desde el punto de vista jurídico y de acuerdo a las exigencias de sus clientes, operan formalmente, ya que en su mayoría se dedican a la exportación de materiales o colocación en el mercado local, especialmente al sector industrial, y para eso se requiere formar parte del sistema legal del país.
  • 11.
    PROCESADORES y MAQUILADORES. Esel grupo de personas o empresas que se dedican al procesamiento o maquila de materiales reciclables. Este es el sector que prepara los insumos que serán agregados al proceso de producción de la industria que incorpora material reciclable procesado a sus productos. En este grupo también se incluyen algunos intermediarios, sea minorista o mayorista los que consideran como valor agregado el maquilado. Este grupo, por sus características se ubica en el sector formal. CONSUMIDORES. Son las personas o empresas que utilizan materiales reciclables procesados, preparados por los maquiladores, y que se convierten en parte de su materia prima, como insumo en su proceso. Es el grupo en el que termina el ciclo del mercado; donde se sustituye materia prima virgen por materiales reciclables procesados para la fabricación de sus productos. En este grupo se incluyen los compradores de materiales para reuso. BROKERS. La mayoría de intermediarios venden y compran sus materiales en el mercado internacional a través de Brokers. Un Broker es una firma, sociedad o profesional independiente que presta servicios de compra y venta de valores; al igual que los agentes de bolsa tradicionales, su función es informar acerca de las operaciones y transacciones financieras que el usuario puede realizar para aprovechar mejor las oportunidades que surjan en materiales reciclables. En el mercado nacional, no se identifica ninguna empresa o persona en esta categoría de actores. En esta figura se hace muy difícil conocer el destinatario final de los materiales pero es la más eficiente ya que las cantidades colocadas pueden ser ilimitadas.
  • 12.
    Los actores quese han mencionado son los que determinan la dinámica del mercado de reciclaje, sin embargo, se perfilan dos mercados: El Mercado Nacional y el Mercado Internacional. Materiales que se reciclan en el salvador. Papel y cartón. El Reciclaje de papel es una de las formas de reciclar más beneficiosas para el medio ambiente, en gran parte por el coste medioambiental que tiene obtenerlo. El reciclado de papel, tiene por norma general producir de nuevo papel, llamado papel reciclado. para obtenerlo, se consigue bien por papel molido, que es el que se obtiene de trozos y recortes de papel provenientes de manufacturas de papel, de papel pre-consumo o bien de papel post-consumo, que se obtiene principalmente de revistas, periódicos y todo tipo de documentos que solemos tirar. Cuando la planta de reciclado selecciona el papel, y lo encuentra adecuado para reciclar, se le llama desecho de papel. El proceso de reciclaje del papel En primer lugar, la pastificación del papel, que consiste en añadir disolventes químicos para que las fibras del papel se separen. El segundo paso del reciclado de papel consiste en una criba de todo aquel material que no es papel. A continuación se centrifuga todo el material, para que estos se separen por su densidad, para su posterior paso, que es la flotación, donde se elimina la tinta con burbujas de aire. Toda esta pasta de papel, se lava a continuación para eliminar las pequeñas partículas que pudieran quedar, para finalmente blanquear el papel con peróxido de hidrógeno o hidrosulfito de sodio. Vidrio. El reciclaje de vidrio es el proceso mediante el cual se convierten desechos devidrio en materiales que servirán para la creación de nuevos productos. Este reciclaje permite reducir la cantidad de residuos destinados a vertederos, lo que supone un ahorro tanto de materias primas como de energía respecto a la fabricación de vidrio a partir de materias primas nuevas.
  • 13.
    Proceso de recicladodel vidrio. Este proceso del reciclaje del vidrio, tiene un ciclo circular tal como vemos en la imagen. Tras el uso de este material, y si lo depositamos en los contenedores verdes, el vidrio pasa por una fase de recogida, para su posterior tratamiento en una planta de reciclaje. Vemos como de esta sencilla forma, hacemos que el vidrio pueda tener muchas más vidas y por tanto generamos una menor cantidad de residuos. Reciclaje de plástico. El reciclado de plástico es el proceso de recuperación de desechos de plásticos. Las tres principales finalidades del plástico reciclado son la reutilización directa, el aprovechamiento como materia prima para la fabricación de nuevos productos y su conversión como combustible o como nuevos productos químicos. Antes de su reciclaje, los plásticos se clasifican de acuerdo a su tipo de resina. Aunque se han utilizado varios métodos a lo largo del tiempo para distinguir las resinas, actualmente se utilizan los infrarrojos. Después de separarlos se trituran y se eliminan las impurezas, como las etiquetas de papel. Luego se funde y se divide en esferas pequeñas que posteriormente se utilizan para la fabricación de otros productos.
  • 14.
    Existen tres principalestipos de reciclaje: Reciclaje mecánico: método que consiste en separar los plásticos por clase, lavarlos y triturarlos hasta convertirlos en pequeños trozos que se fundirán en moldes para producir nuevos productos. Reciclaje químico: método que consiste en la degradación del plástico mediante calor para resultar nuevamente moléculas simples. Recuperación energética: método que convierte el plástico en un combustible para la generación de energía. El reciclaje del aluminio es uno de los más rentables para la industria, ya que se aprovecha prácticamente la totalidad de los desechos. El aluminio se recicla de latas, cables, embalajes, muebles o perfiles de construcción, así como de todas las virutas que se producen en la industria al fabricar objetos con este material. El proceso del reciclaje del aluminio, comienza con la recolección de dicho material, para su posterior traslado a la planta de reciclaje, donde se separa, limpia y se aplasta creando grandes bloques. El aluminio se funde, creando de nuevo láminas de este material, listas para un nuevo uso. El aluminio, tras el hierro y el acero, es el metal más utilizado en el mundo, y es uno de los materiales que menos reciclamos. por esto, es muy importante concienciar a la gente que hay que reciclar el aluminio, que encontramos en envases y en el propio papel de aluminio en nuestros hogares, y en coches, barcos, edificios y muchos usos más, a nivel industrial. El aluminio, aunque es muy cuantioso en nuestro planeta, tiene unos altos costes de extracción, especialmente energéticos. Reciclando aluminio, se ahorra un 94% de ese coste energético. Es un material además que no pierde propiedades tras varios procesos de reciclado. Todo ello hace que prácticamente la totalidad del aluminio empleado en la industria, sea reciclado, a pesar que a nivel doméstico no se recicle prácticamente. Reciclaje de las llantas.
  • 15.
    El reciclado dellantas puede ser un buen proyecto de reciclaje ya que hay muchas llantas de donde trabajar para poner un buen uso al hule. ¿Por qué? Según la Asociación Nacional de Distribuidores de Llantas (Andellac), cada año en nuestro país se desechan 25 millones de neumáticos viejos. Ya sea que se quemen en hornos de cemento o que se depositen en tiraderos a cielo abierto. Esto representa un grave problema de salud por las emisiones de sustancias tóxicas y una amenaza para el medio ambiente. ¿Cómo hacerlo? Se trata del acopio y reciclado de llantas y hule de todo tipo, que al pasar por un proceso de trituración, se pulverizan para que su reutilización en la fabricación de suelas de zapatos, mouse pad, macetas, mangueras, juegos infantiles, loseta o para la pavimentación de avenidas y carreteras. También encontramos oportunidades en las llantas hacer uso de ella como una segunda opción para el diseño de una línea o familia de producto nuevos. Reciclaje de pallets. Cada vez es más común la práctica de reciclar y de reutilizar pallets para la fabricación de nuevos productos y aplicaciones. La versatilidad de la madera permite construir una gran variedad de productos. EL MERCADO NACIONAL Y EL MERCADO INTERNACIONAL. El Mercado Nacional cumpletodo el ciclo desde la generación hasta la incorporación de materiales reciclables procesados a los productos, a diferencia del Mercado Internacional donde solamente interactúan los Intermediarios Mayoristas, Los Procesadores y Maquiladores y los Consumidores (éstos últimos en el carácter de compradores de reciclables ya maquilados, es decir materiales con valor agregado). El diagrama que se presenta a continuación, muestrael ciclo que cumple el mercado de reciclaje y cómo cada uno de los actores ya especificados interviene en cada etapa del ciclo.
  • 16.
    FLUJO DEL MERCADODE RECICLAJE Habiéndose definido el ciclo del mercado de reciclaje, el flujo que siguen los materiales con potencial reciclable en función de las etapas del manejo integral de desechos sólidos. En la figura Nº1 se reflejan los actores que intervienen en cada etapa del recorrido de los materiales, como la actividad que propician dicho recorrido y finalmente la condición del material resultante de dicha actividad. a. PRINCIPALES MATERIAS PRIMAS PARA EL RECICLAJE / REUSO.
  • 17.
    MATERIALES RECICLABLES Los materialescon potencial reciclable son aquellos desechos que han sido recuperados y que por sus propiedades y características pueden convertirse en recurso a través del reprocesamiento para luego ser incorporados como materia prima en la fabricación de productos. El reciclaje implica dar una nueva vida al material en cuestión, lo que ayuda a reducir el consumode recursos y la degradación del planeta. Luego de realizar consultas exploratorias en el mercado de reciclables y su importancia entre los diferentes actores (pepenadores, intermediarios, maquiladores y consumidores) y revisar los siguientes estudios más recientes en el tema se han obtenido información que se proporciona en el cuadro nº 1 El proceso de reciclaje tiene una balanza de ventajas e inconvenientes. Es fundamental que en la balanza pesen más las ventajas que los inconvenientes, ya que como se ha dicho, el reciclaje, es una iniciativa positiva. Fundamentalmente, los beneficios son los que han de posicionarse de forma que la balanza vaya a favor de los beneficios. El tratamiento de reciclaje puede llevarse a cabo de manera total o parcial, según cada caso con algunos materiales, es posible que el proceso de reciclaje tenga una
  • 18.
    balanza de ventajase inconvenientes. Las ventajas del reciclaje son varias y tienen diversos aspectos, tanto ecológicos como económicos y sociales. a) A NIVEL ECOLÓGICO:  Se conserva el ambiente y se reduce la contaminación.  Se alarga la vida útil de los sistemas sanitarios.  Se protegen los recursos naturales renovables y no renovables.  El reciclaje ayuda a prolongar la vida y utilidad de los recursos.  Prácticamente todo lo que vemos a nuestro alrededor puede ser reciclado.  Reciclar papel evita una buena cantidad de talas innecesarias y también la contaminación de grandes cantidades de agua que conlleva la fabricación del papel. b) A NIVEL ECONÓMICO  Se ahorra materia prima en la manufactura de productos nuevos con materiales reciclables.  El proceso del reciclaje ha creado un mercado económico y ha generado numerosos puestos de trabajo. c) A NIVEL SOCIAL  Crecimiento de la conciencia ecológica, promoviendo un comportamiento responsable en relación con el medio ambiente por parte de las empresas y ciudadanos.
  • 19.
     Mas accesoa fuentes de agua más acceso a fuentes de alimentos.  Menos Enfermedades ocasionadas producto de la contaminación.  Generación de empleo ya que el proceso necesita se realizan en diversas fases llevadas a cabo por distintos trabajadores.  Menor impacto ambiental, debido a la reducción de los desechos producidos por el consumo y Optimización de los recursos naturales. Las principales desventajas del reciclaje son las siguientes:  Falta de información de como se debe almacenar correctamente los residuos para distribuirlos en los centros de reciclaje, lo cual puede generar fauna nociva en casa.  No todos los materiales que se anuncian como reciclables son recibidos por las empresas recicladoras.  No hay reglas claras para aceptar el material a reciclar por parte de las recicladoras.  La poca cantidad que pagan por kilogramo, desincentiva a muchos que batallaron para reunir dichos materiales.  En materia de materiales reciclados, algunos son de menor calidad que los de primera generación, ejemplo puntual: el unicel reciclado solo se ocupa para algunos empaques y a petición del cliente por su menor precio y calidad.
  • 20.
  • 21.
    Tema 2: 10PRODUCTOS ELABORADOS CON MATERIA PRIMA RECICLADA. - PRODUCTO 1: JUEGO DE SALA ELABORADO CON LLANTAS. - DESCRIPCION DE USO: Son tantos los neumáticos que son desechados en el mundo que darles un uso funcional, después de su vida útil es una tarea muy difícil, es por lo cual se ha pensado en crear un hermoso juego de sala que salga de lo común en una casa hechos con llantas de carro que ya terminaron su vida útil. - - PRODUCTO 2: VASOS Y TASAS ELABORADOS CON EMBASES DE CERVEZA O BOTELLAS DE LICOR. - DESCRIPCION DE USO: Estas bonitas tasas y vasos elaboradas con botellas de cerveza o licor son una forma muy útil de reciclar y poderle dar un segundo ciclo de vida a estos artículo que muchas veces terminan en basureros contaminando el medio ambiente. Estos vasos y tasas pueden ser utilizados como adornos de sala o en bares a la vez pueden usarse para ingerir alguna bebida ya sea alcohólica o no.
  • 22.
    1 - PRODUCTO 3:ELEGANTE LAMPARA DECORATIVA ELABORADA CONPRODUCTOS PLASTICOS DESCRIPCION DE USO: Esta elegante lámparaelaboradacon productosplásticosque yaterminaronsuciclode vidapuede ser usada para adornarel foco de una casa exactamente enlasalade una casa o enun restaurante obar. - PRODUCTO 4: COCINAECONOMICAELABORADA CON MATERIA PRIMA RECICLADA. -DESCRIPCION DEUSO: Esta cocina elaboradaconmateriaprima recicladay que usara gas propanoseráuna rápidaopciónpara las personasque difícilmente puedencomprarunabuenacocinade gas propanopor dificultadesimpuestasporsueconomía. - PRODUCTO 5: PEQUEÑA MASETA DECORATIVA HECHAS CON FOCOS - DESCRIPCION DE USO: Conla pequeñamasetadecorativase le puede darun nuevo ciclode vidaa losfocos que se fundierony que solose puedenbotar.La pequeñamasetadecorativase puede utilizarparaadornarla casa u oficinaconfloresnaturales de una maneramuy llamativa.
  • 23.
    2 - PRODUCTO 6:JUEGODE SALA CON TARIMAS DE PALET DESCRIPCION DE USO: Este bonitojuegode salaelaboradocon tarimasde palletes económicoysale de locomún para adornar lasala de una casa u oficina. - PRODUCTO 7: ROPERO DE PALET - Descripción de uso:Este roperohechode palletpara guardar la ropa esuna buenaopciónpara salirdel roperocomúnque siempre se hautilizadoyesuncambiobonitoy sobre todo económicoparael bolsillo de lapersonaque lodesee comprar. - PRODUCTO 8: LAMPARA DECORATIVA DE PALET. - DESCRIPCION DE USO: Es una lámparadecorativapara lasala o cualquiertipode negociolacual será barnizaday con agujeros decorativos que le aranmuyespecial asimple vistaademásse usara un focoahorrativode energíaeléctrica.
  • 24.
    3 - PRODUCTO 9:BANCO DECORATIVO CON LLANTA. - DESCRIPCION DE USO: La elaboraciónde bancopara sentarse a ver televisiónensusratoslibresesunabuenaopcióneleganteytípica que adornar cualquiersaladonde seaocupadayque ademásserá muyconfortable paraquienlaocupe. PRODUCTO 10: PORTA MASETA PARA MESA O PORTA VELA PARA MESA HECHA CONLATILLA DE ATUN. - DESCRIPCION DE USO: De nuevolaslatas de atún puedenserel centrode unaideanovedosaparareciclar.Esta vezusandopinzas para la ropa que puedesluegopintarobarnizar. -
  • 25.
    4 1.2 EVALUAR YDAR PRIORIDAD A PROYECTOS. Para la evaluacion de oportunidades aplicamos la técnica denominada EMBUDO DE OPORTUNIDADES con filtro de LAS CUATRO PERSPECTIVAS: LAS CUATRO PERSPECTIVAS Una de las técnicas de evaluación de oportunidades de negocio es por medio del embudo de oportunidades en donde se utilizan dos de las cuatro perspectivas, en donde se definirá la oportunidad optima entre los proyectos planteados, en base al análisis de cada proyecto presentado en el cuadro del embudo de oportunidades utilizando la estrategia competitiva y plataforma de productos se considero tres criterios fundamentales como son el ámbito económico, variedad de productos a realizar, daño provocado por la durabilidad del material reciclable al medio ambiente. Las perspectivas a utilizar son: a) Estrategia competitiva. Se utilizará esta perspectiva desde el punto de análisis de la oportunidad que el proyecto puede proporcionar, y se orientará a lograr liderazgo en costos. b) Plataforma de productos. Se utilizará para evaluar el proyecto y ver la versatilidad que posee en crear diversos productos para lograr una mejor cobertura del mercad
  • 26.
    5 EMBUDO DE OPORTUNIDADES. FUENTEDE OPORTUNIDADES MERCADEO VENTAS ORGANIZACIONES DE INVESTIGACION Y DISEÑO CLIENTES ACTUALES Y POTENCIALES PROVEEDORES INVENTORES Y SOCIOS COMERCIALES Juego de sala elaborado con llantas usadas Este producto se comercializara en tiendas y almacenes de prestigio Se espera que con el juego de sala elaborado con llantas se obtenga altas ventas Este diseñodel juegode sala elaborado con llantas tendrá el fin de reusar las llantas usadas Este producto será enfocado a un segmento de la población que sea de clase media baja Los proveedores: puestos de llantas usadas Socios comerciales: almacenes de venta de muebles Vasos y tasas elaborados con botellas de licor o cervezas El producto será comercializado en diferentes puestos de venta. Con este producto decorativo se espera tener un considerable número de ventas Este producto es creado por diversas organizaciones con el fin de reciclar los envases usados de cerveza. Los clientes actuales y potenciales de este producto son bares y personas coleccionistas Proveedores: Puestos de materia prima reciclada Comerciales: Almacenes de productos decorativos. Elegante lámpara decorativo elaborada con materiales plásticos reciclados Este producto será comercializado en almacenes Se esperaque este producto tenga un número llamativo de ventas Este artículo es creado por diversas organizaciones con el objetivo de reciclar las botellas plásticas que ya fueron usadas Los clientes actuales y potenciales de este producto son personas que les llama la atención los artículos hechos de materia prima reciclada Proveedores: Puestos de materia prima reciclada Comerciales: Almacenes de productos decorativos
  • 27.
    6 FUENTE DE OPORTUNIDADES MERCADEO VENTASORGNIZACIONES DE INVESTIGACION Y DISEÑO CLIENTES ACTUALES Y POTENCIALES PROVEEDORES INVENTORES Y SOCIOS COMERCIALES Cocina económica elaborada con materia prima reciclada Este producto será comercializadoen almacenesque vendan productos de líneablanca Con este producto se esperatenerun gran númerode ventas por su precioeconómico Este producto es elaborado por distintas organizacionescomo una cocina económica Los clientesactuales y potencialesde este producto son aquellaspersonas que buscan una cocina a bajo precio Proveedores: Puestos de materia prima reciclada. Comerciales: Almacenescon venta de productos de líneablanca Pequeñamaseta decorativa hecha con focos quemados Este producto será comercializadoen distintosalmacenes Con este producto se esperatenerun considerable númerode ventas Este producto ya es elaborado por distintas organizacionesque trabajan con materia prima reciclada Los clientesactualesy potencialesde este producto son aquellas personas que buscan adornar su casa u oficinacon adornos hechoscon materia prima reciclada Proveedores: Puestosde materia prima reciclada Comerciales: Almacenesde productos decorativos Juegode sala con tarimas de pallet Este producto será comercializadoen distintosalmacenes Con este producto se esperatenerun gran númerode ventas. Este artículo que sale de lo común eselaborado por distintas organizacionesque trabajan con tarimas de pallet Los clientes potencialesde este producto son personas que buscan salir de lo común a la hora de comprar Proveedores: puestosde venta de pallet Comerciales: Almacenesde productos para el hogar
  • 28.
    7 FUENTE DE OPORTUNIDADES MERCADEO VENTASORGNIZACIONES DE INVESTIGACION Y DISEÑO CLIENTES ACTUALES Y POTENCIALES PROVEEDORES INVENTORES Y SOCIOS COMERCIALES Banco decorativo elaborado con llantas Este producto se comercializara en tiendasy almacenes de prestigio Se esperaque con el banco para la sala elaborado con llantas se obtenga altas ventas Este diseñodel banco de sala elaboradocon llantas tendrá el fin de reusar las llantas usadas Este producto será enfocado a un segmento de la población que sea de clase media baja Los proveedores: puestos de llantas usadas Socios comerciales: almacenesde venta de muebles Porta maseta para mesa o porta vela para mesa hechacon latillade atún Este producto será comercializadoen tiendas Espera que este producto decorativo tenga un considerable númerode ventas al ser un adorno llamativo Estos productos elaboradospor distintasorganizaciones con el finde reciclar. Este producto decorativo será utilizadoen restaurantes de prestigio Proveedores: puestosde venta de materia prima reciclada Socios comerciales: Almacenesde venta de productos decorativos
  • 29.
    8 PASO 1: IDENTIFICAROPORTUNIDADES Tiposde proyectos Produ ctos Descripcióndel producto Imágenes Derivados de plataformas de Producto ya existente.- 1 Juego de sala elabor ado con llantas Este juegode sala será elaboradocon llantasya utilizadas. 2 Vasos y tasas elabor adas con envas esde cervez a o licor Estos vasosserán elaboradoscon envasesusados como materia primareciclada 3 Lámpa ra de techo Lámpara elaborada de cucharas desechablesy botellaplásticaen desuso(Mas componentes eléctricos) 4 Cocina elabor ada con materi a prima recicla da La cocinaestará hechacon materia primareciclada para gas propano
  • 30.
    9 5 Peque ña maset a decor ativa hecha con fotos quem ados Esta pequeña masetadecorativa secolocara en mesaso jugueteras 6 Juego de sala con tarima s de pallet Este bonitojuego de sala elaborado con tarimasde palletes económicoysale de lo común,para salau oficina 7 Roper o de pallet Este ropero hecho de palletpara guardar ropa es una buenaopción para salirde lo común 8 Lámpa ra decor ativa de pallet Esta lámpara decorativase usara enla sala o cualquiertipode negocio.
  • 31.
    10 9 Banco decor ativo elabór ela con llantas El bancodecorativo elaboradocon llantasesuna buenaopción elegante ytípica para adornar cualquiersala 1 0 Porta vela para mesa hecha con latillas de atún y chuch os de ropa Elaboradacon latillasde atúnesta puede serel centro de una idea novedosa. Hasta aqui
  • 32.
  • 33.
    12 PASO 2: EVALUARY DAR PRIORIDAD A LOS PROYECTOS CUADRO DE VALORACION:ALTO(3),MEDIO(2) Y BAJO (1). Evaluar y dar prioridad a proyectos Método de Evaluación: Estrategia Competitiva (La estrategia competitiva de una organización define un método básico de abordar mercados y productos con respecto a la competencia.) Puntuaciones del 0 al 10 N º NOMBRE DEL PRODUCTO LIDERAZGO TECNOLOGI CO LIDERAZGO DECOSTOS CONCENTRACIÓN EN EL CLIENTE IMITATIVA TOTAL EN PORCENTAJE. EX IS TE NO EXISTE COSTO DE MANO DE OBRA MANEJA SISTEMA DE PRODUCCIÓN USA METODOS DE MANUFACTURA CLIENTES NUEVOS COMPRAS MASIVAS SEGMENTACIÓN DE MERCADO GRADO DE INNOVACIÓN SUMA. Alto Medio Bajo Total 1 COCINA ECONOMICA DE GAS PROPANO - Bajo (1) Medio (2) Medio (2) Alto (3) Alto (3) Medio (2) Medio (2) Alto (3) 18 38% 50% 12% 100% 2 LAMPARA DE PALLET - Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100% 3 VASOS Y TASAS ELABORADOSCON ENVASES DE CERVEZA O LICOR - Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100% 4 LAMPARA DE TECHO - Bajo (1) Bajo (1) Bajo (1) Bajo (1) Alto (1) Alto (3) Bajo (1) Medio (2) 11 25% 12% 63% 100% 5 ROPERO DE PALLET - Bajo (1) Bajo (1) Bajo (1) Bajo (1) Alto (3) Medio (2) Bajo (1) Bajo (1) 11 38% 12% 50% 100% 6 BANCO CON LLANTA - Bajo (1) Alto (3) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) 10 25% 50% 25% 100% 7 JUEGO DE SALASALA DE PALLET - Bajo (1) Medio (2) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) 9 12% 50% 38% 100% 8 MASETA DECORATIVA HECHA CON FOCOS - Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Medio (2) 9 24% 38% 38% 100% 9 JUEGO DE SALA ELBORADO CON LLANTAS Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) 8 24% 38% 38% 100% 1 0 PORTAVELA. Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1) Bajo (1= Bajo (1) Bajo (1) 8 24% 38% 38% 100%
  • 34.
    13 Proyectos seleccionados. - Cocinaeconomica de gas propano - Lampara de pallet - Vasos y tasa elaboradas xon cervezas y tasas de licor Evaluar y dar prioridad a proyectos Método de Evaluación: Estrategia Competitiva (La estrategia competitiva de una organización define un método básico de abordar mercados y productos con respecto a la competencia.) Puntuaciones del 0 al 10 N º NOMBRE DEL PRODUCTO LIDERAZGO TECNOLOGI CO LIDERAZGO DECOSTOS CONCENTRACIÓN EN EL CLIENTE IMITATIVA TOTAL EN PORCENTAJE. EX IS TE NO EXISTE COSTO DE MANO DE OBRA MANEJA SISTEMA DE PRODUCCIÓN USA METODOS DE MANUFACTURA CLIENTES NUEVOS COMPRAS MASIVAS SEGMENTACIÓN DE MERCADO GRADO DE INNOVACIÓN SUMA. Alto Medio Bajo Total 1 COCINA ECONOMICA DE GAS PROPANO - Bajo (1) Medio (2) Medio (2) Alto (3) Alto (3) Medio (2) Medio (2) Alto (3) 18 38% 50% 12% 100% 2 LAMPARA DE PALLET - Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100% 3 VASOS Y TASAS ELABORADOSCON ENVASES DE CERVEZA O LICOR - Bajo (1) Bajo (1) Bajo (1) Medio (2) Alto (3) Alto (3) Medio (2) Bajo (1) 14 25% 25% 50% 100%
  • 35.
    14 PASO 3: ASIGNARRECURSOS Y PLANEAR TIEMPOS. N ACTIVIDADES RESPONSAMBLES RECURSOS TIEMPO Febrero 2016 Marzo 20016 Abril 2016 Mayo 2016 Junio 2016 S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4 S 1 S 2 S 3 S 4 1 IDENTIFICAR OPORTUNIDADES. JOSE DIAZ. 2 EVALUARY DAR PRIORIDADA LOS PROYECTOS. JUAN LOPEZ 3 ASIGNARRECURSOSY PLANIFICARTIEMPOS. CRUZ ANTONIO. 4 CONTEMPLAR PLANEACION DEL ANTEPROYECTO. JOEL VANEGAS. 5 REFLECCIONAREN LOS RECURSOS Y EL PROCESO. ERIC FLORES. 6 7 8 9 10
  • 36.
    15 PASO 4: COMPLETARPLANEACION DEL ANTEPROYECTO. DECLARACION DE MISION Cocina economica de gas propano Descripción del producto Cocinaeconómicade gas propanopara personasque deseenahorrardineroalahora de comprar unacocina. Propuestade valor Con lacocina económicase podránrealizardiferentestiposde platosde comidasinimportarel tiempode usode la cocina. Objetivosdel negocio Con estacocinaayudar la economíade la familiasalvadoreñaque nopuede adquirirunacocinatradicional por dificultades económicas. Esta cocina a pesarde serde un costo menora las cocinasque actualmente se encuentranenel mercadosu tiempode duraciónseráigual o mayora las cocinasque son de mayor precio. Mercado primario Familiatradicional salvadoreña Mercado segundario Negociosque comienzan operacionesconunbajopresupuesto Suposiciones y Restricciones Presupuesto, alcance ytiempo. Involucrados Proveedorde la,materiaprima Compradoresyusuarios. Distribuidoresyrevendedores
  • 37.
    16 PASO 4: COMPLETARPLANEACION DEL ANTEPROYECTO. DECLARACION DE MISION Lámpara de pallet Descripción del producto Es una lámparade ahorroelaboradacon tarimasde pallet Propuestade valor Lámpara de palletequipadaconunfoco ahorrativoel cual se conecta a 120 voltiosya unafrecuenciade 60 Hz Objetivosdel negocio -Serlíderesenlafabricaciónyventade lámparasde palletparael hogar, el negocioola oficina. - Que este productoseautilizadocomobase a lahora de diseñarlasala,oficinaonegocio Mercado primario Familiasopersonasque adornanlasala de su casa u oficinaonegocio Mercado segundario Empresasdiseñadorasde salasde hogaru oficinas Suposiciones y Restricciones Presupuesto, alcance ytiempo. Involucrados Proveedorde la,materiaprima Compradoresyusuarios. Distribuidoresyrevendedores
  • 38.
    17 PASO 4: COMPLETARPLANEACION DEL ANTEPROYECTO. DECLARACION DE MISION Juego de sala de pallet Descripción del producto Este bonitojuegode salade palletesunaformamuy útil de darle un toque elegante alasalade nuestracasa, oficinaunegocio. Propuestade valor Introduciral mercadoun bonitojuegode sala, ergonómicoparalasala de una casa, oficinaunegocio Objetivosdel negocio Elaborar unjuegode sala que tengagran aceptaciónenel mercadopor su costoy que ademásadorne la salade un hogar,oficinaonegocio. Mercado primario Familiasopersonasque adornanlasala de su casa u oficinaonegocio Mercado segundario Empresasdiseñadorasde salasde hogaru oficinas Suposiciones y Restricciones Presupuesto, alcance ytiempo. Involucrados Proveedorde lamateriaprima Compradoresyusuarios. Distribuidores yrevendedores
  • 39.
    18 ELECCION Y JUSTIFICACIONDEL PRODUCTO A DESARROLLAR Las características e insumos del material reciclado como son: Los precios de las pallets a bajo costo que están dados por el mercado, las condiciones de reciclado son buenas, la singularidad del producto es atractiva, la creación de diseños llamativos, el mercado primario y secundario es bastante extenso, la contribución al cuido del medio ambiente y generación de empleos son contribuciones que dan valor al desarrollo de productos con pallets reciclables. Por tanto que considerando el proceso de evaluación anteriormente descrito se selecciona el proyecto de producto de: “Diseñar una lámpara a partir de pallets reciclados, para contribuir al medio ambiente, de bajo costo, con diseños llamativos, de buena calidad.” 5. IDENTIFICACIÓN DE NECESIDADES DEL CLIENTE 5.1 DATOS SIN PROCESAR DE LOS CLIENTES. Para el logro de la identificación de las necesidades del cliente el método utilizado en la recolección de información es mediante una entrevista dirigida al mercado primario. Preguntas de la entrevista 1- Prefiere lámpara de techo o de mesa. 2- Qué tipo de foco le gustaría. 3- Como le gustaría el diseño. 4- Que le cambiaria.
  • 40.
    19 Cliente Usos típicosque puede darle a este tipo de lámpara. Que le gusta de este diseño. Que no le gusta de este diseño. Que puede mejorarse de este diseño. 1 Para iluminar la sala Que es material reciclado. La forma para instalarla. Que se dé fácil instalación. 2 Para iluminar el cuarto Es atractivo Se ve muy pesado Que sea liviano 3 Para iluminar el comedor Que es de focos La forma para instalarla Que sea de fácil instalación 4 Para iluminar el cuarto Es atractivo El tamaño Que sea liviano 5 Para iluminar la sala Que es de material reciclado La forma para instalarla Que sea de fácil instalación 6 Para iluminar la sala Que es de focos Se muy grande Que sea liviano 7 Para iluminar el comedor Que es atractivo El foco Que sea candela led 8 Para iluminar la sala Que es de material reciclado La forma para instalarla Que sea de fácil instalación 9 Para iluminar la sala Que es de focos Se muy pesado Que sea liviano
  • 41.
    20 10 Para iluminarla sala Es atractivo Que es de foco Que sea de candela led 11 Para iluminar el comedor Es atractivo Las forma de instalación Que sea de fácil instalación 12 Para iluminar la sala Que es de foco Se ve muy pesado Que sea liviano 13 Para iluminar la sala 14 Para iluminar el cuarto 15 16 Para iluminar la sala 17 18 19 20 Para iluminar la sala
  • 42.
    21 PASO 5: REFLEXIONAREN LOS RESULTADOS Y PROCESOS. 1. En el embudo de oportunidades están agrupadas buenas ideas y diverso conjunto de oportunidades del producto que podemos desarrollar. 2. Se puede verificar que el plan de producto concuerda con la estrategia competitiva que se busca. 3. Se ha asignado suficiente recursos en el desarrollo del producto para seguir la estrategia competitiva que se pretende lograr. 4. El equipo principal esta consiente y acepta los desafíos de la declaración de la misión resultante.
  • 43.
    22 5. El equipotrabajo no ha encontrado limitantes de gran magnitud por lo que se permite obtener los mejores resultados.
  • 44.
    23 5) IDENTIFICACION ENLAS NECESIDADES DE LOS CLIENTES. REDACCION DE LA INFORMACION DELOS USUARIOS DE LA LAMPARA DE PALLET. Encuestarealizadaporel grupo de diseño PRODUCTO: Lampara de palets 1) Uso tipicode la lamparade palets. R// Para iluminarunlugar 2) ¿Que le gustariaque tuvieralalampara de palets?. R// Multiplescoloresparaescoger. 3) ¿Que no le gustade lalampara de palets?. R// El tamaño que tiene. 4) ¿Que le cambiaria?. R// El tamaño.
  • 45.
    24 5) ¿Que sugerenciasharia?. R//Que fuerafabricadaendistitasformasytamañosasi como con variedadde colores 6) ¿Qué colorde luzle gustariaque emanarala lampara? R// Me gustariaque fueracolorfluorecente. 7) ¿ Estaria dispuestoustedacomprarla lamparade palet? R// Si,siempre ycuandotuvieraundiseñoatractivo,unprecioaccesible yunfocoahorrativo,si esledmejor. -Que sealámparade techo………………...15 personas - Que tengafocosahorrativos…………….20 personas - Que seade focospequeños………………5personas - Que seade fácil instalación……………….3personas - Que seatipocandela…………………………5 personas - Consensorde encendidoyapagado..2 personas - Diseñoatractivo……………………………....15personas - Que seade pesoliviano……………..…….6personas - Que su precioseaaccesible…………….20personas - Coloresde diseñovariados……..………6personas
  • 46.
    25 - Que seade material duradero…….…12personas. CARACTERISTICAS. Buen diseño. Tipode foco - Lampara de techo * - Que sea tipocandela*** - Que sea de facil instalacion*** - Focospequeños*** - Que sea de tipocandela*** - Focos ahorrativos * - Diseñoatractivo* - De pesoliviano*** Segmentode mercado - Coloresvariadosensudiseño*** Imnovacion. - Que sea barata * - Con censorde encendidoyapagado*** Calidad. - Material duradero**
  • 47.
    26 IMPORTANCIA DE LASESTRELLAS Primaria* Segundaria** Terciaria*** N NECESIDAD IMPORTANCIA 1 La lampara es de foco ahorrativo * 2 la lampara es de precio accesible * 3 la lampara es de techo * 4 la lampara tiene diseño atractivo * 5 la lampara es de material durable ** 6 la lampara es de focos pequeños *** 7 la lampara tiene iluminaria tipo candela *** 8 la lampara es de peso liviano *** 9 la lampara tiene diversidad de colores *** 10 la lampara es de fácil instalación *** 11 la lampara tiene sensor de encendido y apagado *** N NECESIDAD IMPORTANCIA 1 la lampara es de precio accesible 1 2 la lampara tiene diseño atractivo 1 3 la lampara es de fácil instalación 1
  • 48.
    27 4 la lamparaes de techo 2 5 la lampara es de material durable 2 6 la lampara es de focos pequeños 3 7 la lampara tiene iluminaria tipo candela 3 8 la lampara es de peso liviano 3 9 La lampara es de foco ahorrativo 4 10 la lampara tiene diversidad de colores 4 11 la lampara tiene sensor de encendido y apagado 5
  • 49.
    28 6) ESPECIFICACIONES DELPRODUCTO. N. Necesidad Importancia 1 La lampara tiene tubo fluorecente led 1 2 La lampara tiene poco peso 1 3 La lampara tiene diseño atractivo 1 4 La lampara es colgante 2 5 La lampara tiene precio accesible 3 N. Unidad Valor IMPORTANCI A Unidades P1 P2 P3 Margen Aceptable Valor Ideal 1 1 Longituddel tubo 1 mm 1210 1210 1210 1210 1210 2 1 Diametrodel tubo 1 mm 31 40 36  30 < 40 3 1 Voltage 1 V 220 110 110  110 < 220 4 1 Corriente 1 A 0.17 1.5 2.5  0.17 < 10 5 1 Potencia 1 W 15 40 40  15 < 40 6 1 Temperaturade calor 1 K 3000 4000 6500  3000 < 6500 7 1 Iluminacion 1 Lux 34.6 24.2 24.2  24 < 35 8 2 Masa total 1 Kg 1.5 2.5 2.0  1.5 < 2.5 9 2 Densidaddel material 1 g/cm3 0.3 0.4 0.9  0.3 < 0.9 10 3 Presentacion 1 Subj 1 2 1  1 < 2 11 4 Masa de la lampara 2 Kg 1.5 2.5 2.0  1.5 < 2.5 12 4 Longitud 2 mm 2000 21.50 2300  2000 < 300 13 4 Ancho 2 mm 7.50 7.75 810  700 < 900 14 4 Altura 2 mm 220 283 255  200 < 300 15 5 Costode fabricacion 3 $ 15 2.3 32  1.5 < 40
  • 50.
    29 Caja negra. Caja transparente. Maderade pallets Sistema electrico Encendido. Dispositivo de iluminaria Diseño del producto Energia electrica Interruptor Iluminacion con dedecoracion Tubo fluorecente Tubo fluorecente Energiaelectrica Interruptor Lampara
  • 51.
    30 7)GENERACION DE COMCEPTO Materia prima HerramientasForma Luminaria Mano de obra Sujetadores Color Pallets Electricas Rectangular Candela led Linea de produccion Pernos Caoba Manuales Cuadra Candela fluorecente Operario unico Argollas atornilladas Negro Triangular Foco fluorecente Arnez Natural Redonda Foco led
  • 52.
    31 Eslogans de lalampara de pallets. 1. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 2. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro. 3. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural. 4. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 5. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba. 6. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba. 7. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 8. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada con operario unico sujetadas con pernos y la lampara lleva el color caoba. 9. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
  • 53.
    32 10. La lamparade pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 11. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 12. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 13. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 14. La lampara de pallets es fabricada con herramientas electricas de forma triangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 15. La lampara de pallets es fabricada con herramientas electricas de forma redonda, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 16. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 17. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro. 18. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural.
  • 54.
    33 19. La lamparade pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 20. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba. 21. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba. 22. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 23. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada con operario unico sujetadas con pernos y la lampara lleva el color caoba. 24. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 25. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 26. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de foco fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 27. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de foco led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
  • 55.
    34 28. La lamparade pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 29. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 30. La lampara de pallets es fabricada con herramientas manuales de forma triangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 31. La lampara de pallets es fabricada con herramientas manuales de forma redonda, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 32. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 33. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 34. La lampara de pallets es fabricada con herramientas electricas de forma triangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 35. La lampara de pallets es fabricada con herramientas electricas de forma redonda, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
  • 56.
    35 36. La lamparade pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 37. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 38. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 39. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de foco led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 40. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 41. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en operario unico sujetadas con pernos y la lampara lleva el color caoba. 42. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 43. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba. 44. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba.
  • 57.
    36 45. La lamparade pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 46. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro. 47. La lampara de pallets es fabricada con herramientas electricas de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural. 48. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 49. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 50. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro. 51. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural. 52. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
  • 58.
    37 53. La lamparade pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba. 54. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color negro. 55. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 56. La lampara de pallets es fabricada con herramientas manuales de forma triangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 57. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 58. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 59. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco fluorecente, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 60. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 61. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
  • 59.
    38 62. La lamparade pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada con operario unico sujetadas con arnez y la lampara lleva el color natural. 63. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 64. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural. 65. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollaz atornilladas y la lampara lleva el color natural. 66. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color caoba. 67. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color negro. 68. La lampara de pallets es fabricada con herramientas manuales de forma rectangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 69. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural.
  • 60.
    39 70. La lamparade pallets es fabricada con herramientas manuales de forma triangular, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 71. La lampara de pallets es fabricada con herramientas manuales de forma redonda, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 72. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 73. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 74. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco fluorecente, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 75. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de foco led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 76. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color negro. 77. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 78. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada con operario unico sujetadas con arnez y la lampara lleva el color caoba.
  • 61.
    40 79. La lamparade pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada con operario unico sujetadas con arnez y la lampara lleva el color negro. 80. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada con operario unico sujetadas con arnez y la lampara lleva el color natural. 81. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con arnez y la lampara lleva el color natural. 82. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural. 83. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba. 84. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro. 85. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color natural. 86. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro. 87. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro.
  • 62.
    41 88. La lamparade pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color natural. 89. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color caoba. 90. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con argollas atornilladas y la lampara lleva el color negro. 91. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 92. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro. 93. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural. 94. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 95. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 96. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba.
  • 63.
    42 97. La lamparade pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color caoba. 98. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro. 99. La lampara de pallets es fabricada con herramientas electricas de forma cuadrada, con luminaria de candela fluorecente, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color natural. 100. La lampara de pallets es fabricada con herramientas manuales de forma cuadrada, con luminaria de candela led, la cual es elaborada en linea de produccion sujetadas con pernos y la lampara lleva el color negro. 101. La lamparade palletsesfabricadaconherramientasmanualesde formacuadrada,con luminaria de candelaled,lacual es elaboradaenlineade produccionsujetadasconpernosylalamparallevael colornatural. 102. La lamparade palletsesfabricadaconherramientasmanualesde formacuadrada,con luminariade candelaled,lacual es elaboradaenlineade produccionsujetadasconpernosylalamparallevael colorcaoba.
  • 64.
    43 CONCLUSIÓN. Como grupo detrabajo se concluye, que el desarrollo de nuevos productos se ha convertido en un factor clave para lograr el éxito empresarial, este proceso conlleva la realización de un conjunto complejo de actividades, en las que deben intervenir la mayoría de las áreas funcionales de la organización; y si con este fundamento nos concientizamos, y al desarrollar estos nuevos productos, sean elaborados con materia prima reciclada con un bajo impacto contaminante
  • 65.
  • 66.