“INVENTARIO DE CONDICIÓN DE
UNA CARRETERA”
UNIVERSIDAD NACIONAL DE UCAYALI
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL
CARRETERA PE-5N TRAMO
“BOQUERÓN - PREVISTO”
CURSO: CAMINOS II
DOCENTE:
Ing. Mg. Eleuterio Pérez Sagastegui
GRUPO: 03
UBICACIÓN Inicio de carretera Fin de carretera
 CODIGO: PE-5N
 NOMBRE COLOQUIAL: Corredor Vial Interoceánico Norte
“Fernando Belaunde Terry” / Longitudinal de la Selva Norte
 Tipo: Carretera Nacional
 Responsable de mantenimiento: Provias Nacional
 INICIO: Emp. PE-5S (Puente Reither) / PK: 000+000
 FIN: Pte. La balsa (Frontera con Ecuador) / PK 1546+438
 LONGITUD ESTIMADA: 1546.438 km
AREA DE TRABAJO
LINEA ROJA: Tramo recorrido a pie detallado
LINEA VERDE: Tramo recorrido en movilidad
LINEA CELESTE: Tramo a pie no detallado
COORDENADAS UTM DE LOS
POSTES DE KILOMETRAJE
HERRAMIENTAS
1. REGLA DE 1MTS
2. WINCHA DE 50 MTS
3. WINCHA DE 5 MTS
4. TABLERO DE CAMPO
EQUIPO DE PROTECCION DE SEGURIDAD
PERSONAL
1-. CASCOS TIPO JOCKEY DE
PLASTICO.
2-. CAMISA INDUSTRIAL
MANGALARGA.
3-. PANTALON DE
SEGURIDAD (JEAN O DRILL).
4-. ZAPATOS DE SEGURIDAD
O BOTAS.
1
2
3
4
1-. CASCOS TIPO JOCKEY DE
PLASTICO.
5-. PONCHO IMPERMEABLE
6-. BOTAS.
EPP PARA TEMPORADA
DE LLUVIA
1
5
6
EPP PARA CLIMA
TEMPLADO
DETERIORO Y FALLAS EN
PAVIMENTO FLEXIBLE
Carretera PE-5N: tramo Boquerón–Previsto.
Progresiva = 425+639.304
CD1 (Primera parte de la calzada) / (ancho calzada : 11.70 m)
PRV1 (Punto de referencia 1/roca)
1er Día
Progresiva = 425+691
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de referencia 1 / roca) = 52 m
Fisura longitudinal
Gravedad 3 :
ancho > 3 mm
Fisuras longitudinales
Gravedad 3 :
ancho > 3 mm
0.03 x 12.8. m2
0.03 x 17.40m2
0.03 x 18.80. m2
Progresiva = 425+696
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de referencia
1 / roca)=57 m
Fisuras Transversales
Gravedad 3 :
ancho > 3 mm
0.04 x 8.4 m2
0.03 x 4.1m2
Progresiva = 425+730
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de referencia 1 / roca) = 91 m
Progresiva = 425+764
CD1 (Primera parte de la
calzada)
distancia a PRV1 (Punto de
referencia 1/roca)=125 m
Fisuras transversales
Gravedad 3 :
ancho > 3 mm
0.04 x 4.57 m2
0.03 x 4.63 m2
0.70 x 0.60 m2
Progresiva = 425+779
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de referencia 1/roca) = 140 m
Progresiva = 425+791
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de referencia 1/roca) = 152 m
SEÑALIZACIÓN
Puente angosto
SEÑALIZACIÓN
Curva
Progresiva = 425+802
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de
referencia 1 / roca) = 162.72 m
Progresiva = 425+818
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de
referencia 1 / roca) = 179.67 m
Fisura longitudinal
Gravedad 2 :
ancho > 1 mm y <= 3 mm
Bache
Gravedad 1 :
diámetro < 0.2 m
0.04 x 5.37 m2
D=0.18m
Progresiva = 425+829
CD1 (Primera parte de la calzada)
distancia a PRV1 (Punto de
referencia 1 / roca) = 190 m
Progresiva = 425+839
CD2 (ancho calzada : 7.10 m)
PRV2 (Punto de referencia virtual 2 / baranda
puente naranja)
Parchados
Gravedad 2 :
reparación de fisuras
longitudinales, en
buen estado
Coordenadas
Cuneta
1.72 x 3.37 m2
1.68 x 1.40 m2
Progresiva = 425+854
CD2 - distancia a PRV2 = 15 m
Piel de cocodrilo
Gravedad 2 :
entre 0.3 m y 0.5 m
Bache
Gravedad 2 :
diámetro entre
0.2 m y 0.5 m
4.1 x 4.63 m2
D=0.45m
Progresiva = 425+868
CD2 - distancia a PRV2 = 29 m
Fisuras longitudinales
Gravedad 1 :
ancho <= 1 mm
Fisuras transversales
Gravedad 1 :
ancho <= 1 mm
0.4 x 0.001 m2
0.35x 0.001m2
0.001x 2.63 m2
0.001x 1.4 m2
CD2 - distancia a PRV2 = 64 m
Progresiva = 425+903 Progresiva = 425+938
CD2 - distancia a PRV2 = 99 m
Progresiva = 425+994
CD2 - distancia a PRV2 = 155 m
Peladura
Gravedad 2 :
desprendimiento del
concreto asfáltico
6.1x8.2 m2
Progresiva = 426+000
CD2 - distancia a PRV2 = 160 m
Peladura
Gravedad 3 :
continúo con
aparición de la base
granular
Poste de kilometraje
7x8 m2
Progresiva = 426+015
CD2 - distancia a PRV2 = 175 m
Progresiva = 426+029
CD2 - distancia a PRV2 = 189 m
Ahuellamiento
Gravedad 2 :
profundidad > 6 mm
y <= 12 mm
Bache
Gravedad 3 :
diámetro > 0.5 m
Profundidad. 10mm
3.64x1.45 m2
Progresiva = 426+040
CD3 (ancho calzada : 8.70 m)
PRV3 (Punto de referencia virtual 2 /
baranda de seguridad vial blanco)
Progresiva = 426+096
CD3 - distancia a PRV3 = 56 m
Ahuellamiento
Gravedad 3 :
profundidad > 12 mm
Cuneta Profundidad. 14mm
2.1x2.65 m2
Progresiva = 426+126
Progresiva = 426+149
CD3 - distancia a PRV3 = 86 m CD3 - distancia a PRV3 = 109 m
SEÑALIZACIÓN
Perfil irregular
Bache
Gravedad 3 :
diámetro > 0.5 m
Ahuellamiento
Gravedad 3 :
profundidad > 12 mm
D=0.90m
Progresiva = 426+169
CD3 - distancia a PRV3 = 129 m
Progresiva = 426+183
CD3 - distancia a PRV3 = 143 m
SEÑALIZACIÓN
Perfil irregular
Baches
Gravedad 2 :
diámetro entre
0.2 y 0.5 m
D=2.1m
D=1m
Progresiva = 426+240
CD4 (ancho calzada : 9 m, ancho de berma 1.1 m)
PRV4 (Punto de referencia virtual 4 / borde de canaleta)
SEÑALIZACIÓN
Puente angosto
Cuneta
Medición de la
calzada
Progresiva = 426+256 Progresiva = 426+260
CD4 - distancia a PRV4 = 16 m CD4 - distancia a PRV4 = 20 m
SEÑALIZACIÓN
Perfil irregular
Bache
Gravedad 3 :
diámetro > 0.5 m
D=0.85m
D=1.3m
Progresiva = 426+280
CD4 - distancia a PRV4 = 30 m
Progresiva = 426+290
CD4 - distancia a PRV4 = 40 m
Ahuellamiento
Gravedad 3 :
profundidad > 12 mm
SEÑALIZACIÓN
Perfil irregular
Profundidad 14mm
Progresiva = 426+303
CD4 - distancia a PRV4 = 63 m
Peladura
Gravedad 3 :
continúo con
aparición de la base
granular
Bache
Gravedad 3 :
diámetro > 0.5 m
D=0.95m
Progresiva = 426+330
CD4 - distancia a PRV4 = 90 m
Ahuellamiento
Gravedad 3 :
profundidad > 12 mm
Ahuellamiento
Gravedad 2 :
profundidad > 6 mm
y <= 12 mm
Profundidad 7mm
Progresiva = 426+350
CD4 - distancia a PRV4 = 110 m
Progresiva = 426+408
CD4 - distancia a PRV4 = 168 m
Baches
Gravedad 2 :
diámetro entre
0.2 y 0.5 m
D=0.46m
D=0.35m
Progresiva = 426+429
CD4 - distancia a PRV4 = 189 m
Progresiva = 426+440
CD5 (ancho calzada : 9 m, ancho de berma 1.1 m)
PRV5 (Punto de referencia virtual 5 / borde de canaleta)
Cuneta
SEÑALIZACIÓN
Información general
Progresiva = 426+460
CD 5 -distancia a PRV4 = 20 m
Progresiva = 426+471
CD5 - distancia a PRV4 = 31 m
Fisura longitudinal
Gravedad 3 :
ancho > 3 mm
Fisura longitudinal
Gravedad 2 :
desprendimiento del
concreto asfáltico
Ancho=10mm
Progresiva = 426+515
CD5 - distancia a PRV4 = 75 m
Progresiva = 426+520
CD5 - distancia a PRV4 = 80 m
SEÑALIZACIÓN
Curva
Fisura transversal
Gravedad 1 :
ancho <= 1 mm
Progresiva = 426+570
CD4 - distancia a PRV4 = 130 m
Progresiva = 426+579
CD5 - distancia a PRV4 = 139 m
Fisura transversal
Gravedad 1 :
ancho <= 1 mm
Fisura longitudinal
Gravedad 1 :
ancho <= 1 mm
Progresiva = 426+592
CD5 - distancia a PRV4 = 152 m
Progresiva = 426+600
CD5 - distancia a PRV4 = 160 m
Fisura longitudinal
Gravedad 1 :
ancho <= 1 mm
Piel de cocodrilo
Gravedad 1 :
> 0.5 m
CD6
distancia a PRV6 = 26 m
2do Día
CD6 (ancho calzada: 9 m,
ancho de berma 1.1 m)
PRV6
Progresiva = 426+640 Progresiva = 426+666
SEÑALIZACION
Perfil Irregular
SEÑALIZACION
Curva
Progresiva = 426+693
CD6
distancia a PRV6 = 53 m
Progresiva = 426+702
CD6
distancia a PRV6 = 62 m
Bache
Gravedad 1:
diámetro<0.2m
Muro de
Contención
(33x0.3)
diámetro 0.18 m
Progresiva = 426+731
CD6
distancia a PRV6 = 91 m
Progresiva = 426+739
CD6
distancia a PRV6 = 99 m
Bache
Gravedad 2:
diámetro entre
0.2 a 0.5 m
Peladura
Gravedad 2
diámetro 0.45 m
CD6
distancia a PRV6 = 104 m
Progresiva = 426+744
CD6
distancia a PRV6 = 104 m
PUNTO
CRITICO
Bache
Gravedad 3:
diámetro >0.5 m
diámetro 0.6m
Progresiva = 426+751
CD6
distancia a PRV6 = 111m
Progresiva = 426+752
CD6
distancia a PRV6 = 112 m
Parchado
Gravedad 2
Bache
Gravedad 3:
diámetro>0.5 m
diámetro 3.3 m
Progresiva = 426+753
CD6
distancia a PRV6 = 113 m
Progresiva = 426+778
CD6
distancia a PRV6 = 138 m
PUNTO CRITICO
PUNTO CRITICO
Progresiva = 426+792
CD6
distancia a PRV6 = 152 m
Progresiva = 426+792
CD6
distancia a PRV6 = 152 m
Bache
Gravedad 3:
diámetro>0.5 m
Junta de 6 cm
diámetro 1.20 m
Progresiva = 426+802
CD6
distancia a PRV6 = 162 m
Bache
Gravedad 2:
diámetro entre
0.2 a 0.5 m
Bache
Gravedad 3:
diámetro >0.5 m
diámetro 0.35 m
diámetro 0.65 m
Progresiva = 426+807
CD6
distancia a PRV6 = 167 m
Peladura
Gravedad 1
Progresiva = 426+815
CD6
distancia a PRV6 = 175 m
Parchado
Gravedad 2
Progresiva = 426+840
Distancia a PRV7 = 167 m (Punto de
referencia virtual 7 / Alcantarilla)
Distancia a PRV7 = 167 m (Punto de
referencia virtual 7 / Alcantarilla)
Progresiva = 426+868
CD7
distancia a PRV7 = 28 m
Ahuellamiento
Gravedad 3 :
profundidad > 12 mm
Progresiva = 426+888
CD7
distancia a PRV7 = 48 m
PUNTO
CRITICO
Progresiva = 426+891
CD7
distancia a PRV7 = 51 m
SEÑALIZACION
Perfil Irregular
Progresiva = 426+930
CD7
distancia a PRV7 = 90 m
Ahuellamiento
Gravedad 3 :
profundidad > 12 mm
Progresiva = 426+990
Baches
Gravedad 3:
diámetro > 0.5 m
CD7
distancia a PRV7 = 150 m
Bache
Gravedad 3:
diámetro > 0.5 m Bache
Gravedad 3:
diámetro > 0.5 m
Progresiva = 426+990
CD7
distancia a PRV7 = 150 m
Piel de cocodrilo
Gravedad 2: malla
entre 0.3 y 0.5
Bache
Gravedad 3:
diámetro > 0.5 m
Bache
Gravedad 3:
diámetro > 0.5 m
CD7
distancia a PRV7 = 160 m
CD7
distancia a PRV7 = 163 m
Progresiva = 427+000 Progresiva = 427+003
CD7
distancia a PRV7 = 198 m
Progresiva = 427+038
SEÑALIZACION
Zona de derrumbes
Poste de
kilometraje
Lado izquierdo
del PC en la vía
CD8
(ancho calzada : 9.3 m,
ancho de berma 1.1 m)
Progresiva = 427+040
PRV8
(Punto de referencia
virtual 8 / borde de
canaleta)
CD8
distancia a PRV8 = 1 m
Progresiva = 427+041
Bache
Gravedad 3:
diámetro > 0.5 m
Lado derecho del
PC de la vía
SEÑALIZACION
Curva
DETERIORO Y FALLAS EN CARRETERA NO
PAVIMENTADA
Bache
Gravedad 3:
diámetro > 0.5 m
Bache
Gravedad 2:
diámetro entre
0.2 a 0.5 m
Progresiva = 427+044
CD8
distancia a PRV8 = 4 m
Progresiva=427+139
CD8 - distancia a PRV8 = 99 m
Bache
Gravedad 3:
diámetro > 0.5 m
2.62 x 2.22 m
CD8
distancia a PRV8 = 163 m
Progresiva = 427+203
Baches
Gravedad 3:
diámetro > 0.5 m
SEÑALIZACION
Progresiva = 427+213
CD8
distancia a PRV8 = 173 m
PRV9 (Punto de referencia
virtual 9 / roca)
Progresiva = 427+240
Ahuellamiento
ancho calzada : 13 m
Progresiva = 427+247
CD9
distancia a PRV9 = 7 m
Progresiva = 427+265
Bache
Gravedad 3:
diámetro > 0.5 m
CD9
distancia a PRV9 = 25 m
PUNTO
CRITICO
Progresiva = 427+280 Progresiva = 427+360 Progresiva = 427+380
CD9
distancia a PRV9 = 40 m
CD9
distancia a PRV9 = 140 m
CD9
distancia a PRV9 = 120 m
Bache
Gravedad 3:
diámetro > 0.5 m
Bache
Gravedad 3:
diámetro > 0.5 m
Bache
Gravedad 3:
diámetro > 0.5 m
Progresiva = 427+397
CD9
distancia a PRV9 = 157 m
Baches
Gravedad 3:
diámetro > 0.5 m
Progresiva = 427+422
CD9
distancia a PRV9 = 182 m
Baches
Gravedad 3:
diámetro > 0.5 m
Progresiva = 427+440
CD10
PRV10 (Punto de referencia
virtual 10 / roca)
ancho calzada : 14.60 m
Ahuellamiento
Gravedad 3:
Profundidad > 12 mm
5.11 x 48.816 m
Progresiva = 427+469
CD10
distancia a PRV10 = 29 m
SEÑALIZACION
Curva
Bache
Gravedad 3:
diámetro > 0.5 m
Progresiva = 427+494 Progresiva = 427+521 Progresiva = 427+545
CD10
distancia a PRV10 = 81 m
CD10
distancia a PRV10 = 54 m
PUNTO
CRITICO
SEÑALIZACION
Derrumbes
CD10
distancia a PRV10 = 105 m
Ahuellamiento
Gravedad 3:
Profundidad > 12 mm
Bache
Gravedad 3:
diámetro > 0.5 m
Progresiva = 427+580
Progresiva = 427+640
CD10
distancia a PRV10 = 140 m
Parchado
PRV11
(Punto de
referencia
virtual 11 /
borde de
canaleta)
CD11 (ancho calzada : 9.30 m,
ancho de berma : 1.00 m)
SEÑALIZACION
Curva
Progresiva = 427+657
CD11
distancia a PRV11 = 17 m
Progresiva = 427+681 Progresiva = 427+724
CD11
distancia a PRV11 = 41 m
PUNTO
CRITICO
CD11
distancia a PRV11 = 84 m
SEÑALIZACION
Curva
Parchado
Progresiva = 427+724 Progresiva = 427+805 Progresiva = 427+840
CD11
distancia a PRV11 = 165 m
CD11
distancia a PRV11 = 84 m
CD12 (ancho calzada : 9.30
m, ancho de berma : 1.00 m)
Baches
Gravedad 1 :
diámetro < 0.2 m
PUNTO
CRITICO
Ahuellamiento
Gravedad 3:
Profundidad > 12 mm
PRV12
(Punto de
referencia
virtual 12 /
borde de
carretera)
CD12
distancia a PRV12 = 23 m
Progresiva = 427+863
SEÑALIZACION
Perfil Irregular
Progresiva = 427+884
CD12
Distancia a PRV12 = 44m
Progresiva = 427+898
CD12
distancia a PRV12 = 58 m
Progresiva = 427+947 Progresiva = 427+952
CD12
distancia a PRV12 = 107 m
CD12
distancia a PRV12 = 112 m
PUNTO
CRITICO
Progresiva = 427+960 Progresiva = 427+965
CD12
distancia a PRV12 = 120 m
CD12
distancia a PRV12 = 125 m
SEÑALIZACION
Perfil Irregular
Progresiva = 427+976 Progresiva = 428+000
CD12
distancia a PRV12 = 136 m
CD12
distancia a PRV12 = 160 m
PUNTO
CRITICO
Poste de kilometraje
DETERIORO Y FALLAS EN PAVIMENTO FLEXIBLE
Progresiva = 428+002
CD12
distancia a PRV12 = 162 m
Bache
Gravedad 3 :
diámetro > 0.5 m
Progresiva = 428+028
CD12
distancia a PRV12 = 188 m
Baches
Gravedad 3 :
diámetro > 0.5 m
CD13 (ancho calzada : 8.80 m,
ancho de berma : 0.92 m)
Progresiva = 428+040 Progresiva = 428+114
PRV13
(Punto de
referencia
virtual 13 /
señal de
tránsito)
SEÑALIZACION
Perfil Irregular
Progresiva = 428+137
CD13
distancia a PRV13 = 97 m
CD13
distancia a PRV13 = 74 m
Piel de cocodrilo
Gravedad 2 :
entre 0.3 m y 0.5 m
SEÑALIZACION
Curva Cerrada
Señal de
transito
PUNTO
CRITICO
Progresiva = 428+140
CD13
distancia a PRV13 = 100 m
CD13
Distancia a PRV13 = 119 m
Progresiva = 428+159
Baches
Gravedad 2 :
diámetro entre
0.2 y 0.5 m
Progresiva = 428+191 Progresiva = 428+240
CD13
distancia a PRV13 = 151 m
CD14 (ancho calzada : 9.50 m,
ancho de berma : 0.90 m)
PRV14
(Punto de
referencia
virtual 14 /
borde de
carretera)
Progresiva = 428+261 Progresiva = 428+330
CD14
distancia a PRV14 = 21 m
CD14
distancia a PRV14 = 90 m
Progresiva = 428+365 Progresiva = 428+408
CD14
distancia a PRV14 = 125 m
CD14
distancia a PRV14 = 168 m
Muro de
Contención
a los
costados
SEÑALIZACION
Curva
Progresiva = 428+440 Progresiva = 428+484 Progresiva = 428+540
CD15 (ancho calzada : 9.50 m,
ancho de berma : 0.90 m)
CD15
distancia a PRV15 = 100 m
CD15
distancia a PRV15 = 44 m
PRV15
(Punto de
referencia
virtual 15 /
borde de
canalera)
SEÑALIZACION
Curva
SEÑALIZACION
Curva y
Contracurva
Progresiva = 428+579
CD15
Distancia a PRV15 = 139 m
PRV16 (Punto de
referencia virtual
16 / señal de
tránsito)
Progresiva = 428+829
CD16
distancia a PRV16 = 189 m
Progresiva = 428+640
CD16 (ancho calzada : 8.74 m,
ancho de berma : 1.00 m)
Señal de
transito
SEÑALIZACION
Curva
Baches
Gravedad 2 :
diámetro
entre 0.2 y
0.5 m
Progresiva = 428+840 Progresiva = 428+856
Progresiva = 428+847
PRV17 (Punto de
referencia virtual
17 / señal de
tránsito)
CD17
Distancia a PRV17 = 7 m
CD17
distancia a PRV17 = 16 m
CD17 (ancho calzada : 8.40 m,
ancho de berma : 0.90 m)
SEÑALIZACION
Curva
SEÑALIZACION
Curva
Progresiva = 432+639
PUNTO
CRITICO
Poste de kilometraje
SEÑALIZACION
Curva
-9.0886, -75.7350
(Lat, Long)
Ubicación del
acero expuesto
Aceros de la
armadura del
pavimento rígido
expuestos
CALIFICACION PARA TIPO DE DETERIORO (1ER TRAMO DE 200m)
AREA DE LA
SECCION EVALUADA
(m)
PORCENTAJE DE EXTENSION
DEL DETERIORO/ FALLA
LONG ANCHO Aij=AREA As=AREA Efij=( Aij / As )*100 Efp
0 = SIN
FALLAS
1=LEVE
(Efp=Menor a 10%)
2=MODERADO
(Efp=entre 10 y 30%)
3=SEVERO
(Efp=Mayor a 30%)
3 17.4 0.03 0.522 2340 0.022307692 DAÑO 2 GRAVEDAD 3
2 5.37 0.04 0.2148 2340 0.009179487 DAÑO 2 GRAVEDAD 2
3 12.8 0.03 0.384 2340 0.016410256 DAÑO 2 GRAVEDAD 3
3 18.8 0.03 0.564 2340 0.024102564 DAÑO 2 GRAVEDAD 3
2 1.72 3.37 5.7964 2340 0.247709402 DAÑO 5 GRAVEDAD 2
2 1.68 1.4 2.352 2340 0.100512821 DAÑO 5 GRAVEDAD 2
0 2340 0.000000000 DAÑO 5 GRAVEDAD 0
1 DIAMETRO 0.18 DAÑO 7 GRAVEDAD 1
DIAMETRO DAÑO 2 GRAVEDAD 0
DIAMETRO DAÑO 2 GRAVEDAD 0
3 8.4 0.04 0.336 2340 0.014358974 DAÑO 8 GRAVEDAD 3
3 4.1 0.03 0.123 2340 0.005256410 DAÑO 8 GRAVEDAD 3
3 4.63 0.03 0.1389 2340 0.005935897 DAÑO 8 GRAVEDAD 3
3 4.57 0.04 0.1828 2340 0.007811966 DAÑO 8 GRAVEDAD 3
11
SUMA PUNTAJE DE CONDICION
1
FIS.
LONG.
PARCHADOS
BACHES
FIS.
TRANS.
CANTIDAD DE
BACHES
1
0 0 2
0 0 1
4
0
0
0.009893272
0
0
0
1
1
1
0.205221753
EXTENSION DE PROMEDIO
PONDERADO
0 1
MEDIDAS
AREA DE DETERIORO (m2)
NUMERO DE DETERIOROS
0.019890642
NOMBRE
0 0 4
PUNTAJE E CONDICION SEGÚN EXTANSION DE CADA TIPO E DETERIORO /
FALLA
PUNTAJE DE
CONDICION
RESULTANTE POR
CADA TIPO DE
DETERIRORO/FALLA
GRAV(G)
CALIFICACION= 989
CONDICION= BUENA
CALIFICACION PARA TIPO DE DETERIORO (2DO TRAMO DE 200m)
AREA DE LA
SECCION EVALUADA
(m)
PORCENTAJE DE EXTENSION
DEL DETERIORO/ FALLA
LONG ANCHO Aij=AREA As=AREA Efij=( Aij / As )*100
0 = SIN
FALLAS
1=LEVE
(Efp=Menor a 10%)
2=MODERADO
(Efp=entre 10 y 30%)
3=SEVERO
(Efp=Mayor a 30%)
2 4.1 4.63 18.983 1580 1.201455696 DAÑO GRAVEDAD
1 0.001 1.4 0.0014 1580 0.000088608 DAÑO 2 GRAVEDAD 1
1 0.001 2.63 0.00263 1580 0.000166456 DAÑO 2 GRAVEDAD 1
2 3.64 1.45 5.278 1580 0.334050633 DAÑO 2 GRAVEDAD 2
3 2.1 2.65 5.565 1580 0.352215190 DAÑO 2 GRAVEDAD 3
2 6.1 8.2 50.02 1580 1.329113924 DAÑO 2 GRAVEDAD 2
3 7 8 56 1580 1.329113924 DAÑO 2 GRAVEDAD 3
1 DIAMETRO 0.45 DAÑO 7 GRAVEDAD 1
3 DIAMETRO 4 DAÑO 2 GRAVEDAD 3
1 0.4 0.001 0.0004 1580 0.000025316 DAÑO 8 GRAVEDAD 1
1 0.35 0.001 0.00035 1580 0.000022152 DAÑO 8 GRAVEDAD 1
10
GRAV(G)
MEDIDAS
AREA DE DETERIORO (m2)
NUMERO DE DETERIOROS
LONGITUD DE DETERIORO NOMBRE
0 0 2
0
PUNTAJE E CONDICION SEGÚN EXTANSION DE CADA TIPO E DETERIORO /
FALLA
PUNTAJE DE CONDICION RESULTANTE
POR CADA TIPO DE DETERIRORO/FALLA
0 1
0 1
0 1
1
0 1
SUMA PUNTAJE DE CONDICION
1
FIS.
LONG.
BACHES
FIS.
TRANS.
0
CANTIDAD DE
BACHES
1
0 0
0
0
0
0
1 0 0 2
AHUELLAMIE
NTO
PELADURA
2
2
0 0 2
CALIFICACION= 990
CONDICION= BUENA
MUCHAS GRACIAS

Más contenido relacionado

Último

SO5. s5. Unidad 2. Sectorización_-639808213.pdf
SO5. s5. Unidad 2. Sectorización_-639808213.pdfSO5. s5. Unidad 2. Sectorización_-639808213.pdf
SO5. s5. Unidad 2. Sectorización_-639808213.pdf
StayBe1
 
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADESRECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
yanicsapernia5g
 
PROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cad
PROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cadPROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cad
PROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cad
angel66k
 
6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...
6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...
6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...
jose880240
 
auditoria fiscalizacion inspecciones de seguridad
auditoria fiscalizacion inspecciones de seguridadauditoria fiscalizacion inspecciones de seguridad
auditoria fiscalizacion inspecciones de seguridad
NELSON QUINTANA
 
Inmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJH
Inmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJHInmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJH
Inmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJH
Vivafornai
 

Último (20)

SO5. s5. Unidad 2. Sectorización_-639808213.pdf
SO5. s5. Unidad 2. Sectorización_-639808213.pdfSO5. s5. Unidad 2. Sectorización_-639808213.pdf
SO5. s5. Unidad 2. Sectorización_-639808213.pdf
 
Sesión de Clase A dde sistemas de riego y otras obras
Sesión de Clase A dde sistemas de riego y otras obrasSesión de Clase A dde sistemas de riego y otras obras
Sesión de Clase A dde sistemas de riego y otras obras
 
portafolio final manco 2 1816827 portafolio de evidencias
portafolio final manco 2 1816827 portafolio de evidenciasportafolio final manco 2 1816827 portafolio de evidencias
portafolio final manco 2 1816827 portafolio de evidencias
 
ESTUDIO DE TRAFICO PARA EL DISEÑO DE TIPOS DE VIAS.pptx
ESTUDIO DE TRAFICO PARA EL DISEÑO DE TIPOS DE VIAS.pptxESTUDIO DE TRAFICO PARA EL DISEÑO DE TIPOS DE VIAS.pptx
ESTUDIO DE TRAFICO PARA EL DISEÑO DE TIPOS DE VIAS.pptx
 
Semana 1 - Introduccion - Fluidos - Unidades.pptx
Semana 1 - Introduccion - Fluidos - Unidades.pptxSemana 1 - Introduccion - Fluidos - Unidades.pptx
Semana 1 - Introduccion - Fluidos - Unidades.pptx
 
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADESRECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
 
Instrumentacion para el control de procesos.pdf
Instrumentacion para el control de procesos.pdfInstrumentacion para el control de procesos.pdf
Instrumentacion para el control de procesos.pdf
 
PROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cad
PROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cadPROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cad
PROGRAMANDO PARA AUTOCAD CON VBA -1.pdf-cad
 
slideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdf
slideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdfslideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdf
slideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdf
 
6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...
6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...
6.1-Proclamación de la II República, la Constitución y el bienio reformista-L...
 
INFORME de actividades para pago de servicio
INFORME de actividades para pago de servicioINFORME de actividades para pago de servicio
INFORME de actividades para pago de servicio
 
Instalacion de un Sistema contra incendio
Instalacion de un Sistema contra incendioInstalacion de un Sistema contra incendio
Instalacion de un Sistema contra incendio
 
auditoria fiscalizacion inspecciones de seguridad
auditoria fiscalizacion inspecciones de seguridadauditoria fiscalizacion inspecciones de seguridad
auditoria fiscalizacion inspecciones de seguridad
 
S06_s2+-+Centro.pdf qiieiejanahshsjsnndjd
S06_s2+-+Centro.pdf qiieiejanahshsjsnndjdS06_s2+-+Centro.pdf qiieiejanahshsjsnndjd
S06_s2+-+Centro.pdf qiieiejanahshsjsnndjd
 
docsity-manzaneo-y-lotizacion para habilitacopm urbana
docsity-manzaneo-y-lotizacion para habilitacopm urbanadocsity-manzaneo-y-lotizacion para habilitacopm urbana
docsity-manzaneo-y-lotizacion para habilitacopm urbana
 
Arquitecto cambio de uso de suelo Limache
Arquitecto cambio de uso de suelo LimacheArquitecto cambio de uso de suelo Limache
Arquitecto cambio de uso de suelo Limache
 
50870516-hidroponia. descargado en novppt
50870516-hidroponia. descargado en novppt50870516-hidroponia. descargado en novppt
50870516-hidroponia. descargado en novppt
 
UNIDAD III Esquemas de comunicacion pptx
UNIDAD III Esquemas de comunicacion pptxUNIDAD III Esquemas de comunicacion pptx
UNIDAD III Esquemas de comunicacion pptx
 
1. Equipos Primarios de una Subestaciones electricas
1. Equipos Primarios de una Subestaciones electricas1. Equipos Primarios de una Subestaciones electricas
1. Equipos Primarios de una Subestaciones electricas
 
Inmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJH
Inmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJHInmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJH
Inmunología AMIR 14va EdiciónNM,NLKKJHKLJHKJLBHLKJH
 

Destacado

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Saba Software
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
Simplilearn
 

Destacado (20)

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
 

Grupo 03 (Boquerón - Previsto).pptx

  • 1. INTEGRANTES: 1. Ángel Maíz, Bill Warner 0002190406 2. Mego Kojagura, Ayumi Andrea 0002200412 3. Rodriguez Cosme, Anapaula 0002200423 “INVENTARIO DE CONDICIÓN DE UNA CARRETERA” UNIVERSIDAD NACIONAL DE UCAYALI ESCUELA PROFESIONAL DE INGENIERÍA CIVIL CARRETERA PE-5N TRAMO “BOQUERÓN - PREVISTO” CURSO: CAMINOS II DOCENTE: Ing. Mg. Eleuterio Pérez Sagastegui GRUPO: 03
  • 2. UBICACIÓN Inicio de carretera Fin de carretera  CODIGO: PE-5N  NOMBRE COLOQUIAL: Corredor Vial Interoceánico Norte “Fernando Belaunde Terry” / Longitudinal de la Selva Norte  Tipo: Carretera Nacional  Responsable de mantenimiento: Provias Nacional  INICIO: Emp. PE-5S (Puente Reither) / PK: 000+000  FIN: Pte. La balsa (Frontera con Ecuador) / PK 1546+438  LONGITUD ESTIMADA: 1546.438 km
  • 3. AREA DE TRABAJO LINEA ROJA: Tramo recorrido a pie detallado LINEA VERDE: Tramo recorrido en movilidad LINEA CELESTE: Tramo a pie no detallado COORDENADAS UTM DE LOS POSTES DE KILOMETRAJE
  • 4. HERRAMIENTAS 1. REGLA DE 1MTS 2. WINCHA DE 50 MTS 3. WINCHA DE 5 MTS 4. TABLERO DE CAMPO
  • 5. EQUIPO DE PROTECCION DE SEGURIDAD PERSONAL 1-. CASCOS TIPO JOCKEY DE PLASTICO. 2-. CAMISA INDUSTRIAL MANGALARGA. 3-. PANTALON DE SEGURIDAD (JEAN O DRILL). 4-. ZAPATOS DE SEGURIDAD O BOTAS. 1 2 3 4 1-. CASCOS TIPO JOCKEY DE PLASTICO. 5-. PONCHO IMPERMEABLE 6-. BOTAS. EPP PARA TEMPORADA DE LLUVIA 1 5 6 EPP PARA CLIMA TEMPLADO
  • 6. DETERIORO Y FALLAS EN PAVIMENTO FLEXIBLE Carretera PE-5N: tramo Boquerón–Previsto. Progresiva = 425+639.304 CD1 (Primera parte de la calzada) / (ancho calzada : 11.70 m) PRV1 (Punto de referencia 1/roca) 1er Día
  • 7. Progresiva = 425+691 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1 / roca) = 52 m Fisura longitudinal Gravedad 3 : ancho > 3 mm Fisuras longitudinales Gravedad 3 : ancho > 3 mm 0.03 x 12.8. m2 0.03 x 17.40m2 0.03 x 18.80. m2
  • 8. Progresiva = 425+696 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1 / roca)=57 m Fisuras Transversales Gravedad 3 : ancho > 3 mm 0.04 x 8.4 m2 0.03 x 4.1m2
  • 9. Progresiva = 425+730 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1 / roca) = 91 m Progresiva = 425+764 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1/roca)=125 m Fisuras transversales Gravedad 3 : ancho > 3 mm 0.04 x 4.57 m2 0.03 x 4.63 m2 0.70 x 0.60 m2
  • 10. Progresiva = 425+779 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1/roca) = 140 m Progresiva = 425+791 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1/roca) = 152 m SEÑALIZACIÓN Puente angosto SEÑALIZACIÓN Curva
  • 11. Progresiva = 425+802 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1 / roca) = 162.72 m Progresiva = 425+818 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1 / roca) = 179.67 m Fisura longitudinal Gravedad 2 : ancho > 1 mm y <= 3 mm Bache Gravedad 1 : diámetro < 0.2 m 0.04 x 5.37 m2 D=0.18m
  • 12. Progresiva = 425+829 CD1 (Primera parte de la calzada) distancia a PRV1 (Punto de referencia 1 / roca) = 190 m Progresiva = 425+839 CD2 (ancho calzada : 7.10 m) PRV2 (Punto de referencia virtual 2 / baranda puente naranja) Parchados Gravedad 2 : reparación de fisuras longitudinales, en buen estado Coordenadas Cuneta 1.72 x 3.37 m2 1.68 x 1.40 m2
  • 13. Progresiva = 425+854 CD2 - distancia a PRV2 = 15 m Piel de cocodrilo Gravedad 2 : entre 0.3 m y 0.5 m Bache Gravedad 2 : diámetro entre 0.2 m y 0.5 m 4.1 x 4.63 m2 D=0.45m
  • 14. Progresiva = 425+868 CD2 - distancia a PRV2 = 29 m Fisuras longitudinales Gravedad 1 : ancho <= 1 mm Fisuras transversales Gravedad 1 : ancho <= 1 mm 0.4 x 0.001 m2 0.35x 0.001m2 0.001x 2.63 m2 0.001x 1.4 m2
  • 15. CD2 - distancia a PRV2 = 64 m Progresiva = 425+903 Progresiva = 425+938 CD2 - distancia a PRV2 = 99 m
  • 16. Progresiva = 425+994 CD2 - distancia a PRV2 = 155 m Peladura Gravedad 2 : desprendimiento del concreto asfáltico 6.1x8.2 m2
  • 17. Progresiva = 426+000 CD2 - distancia a PRV2 = 160 m Peladura Gravedad 3 : continúo con aparición de la base granular Poste de kilometraje 7x8 m2
  • 18. Progresiva = 426+015 CD2 - distancia a PRV2 = 175 m Progresiva = 426+029 CD2 - distancia a PRV2 = 189 m Ahuellamiento Gravedad 2 : profundidad > 6 mm y <= 12 mm Bache Gravedad 3 : diámetro > 0.5 m Profundidad. 10mm 3.64x1.45 m2
  • 19. Progresiva = 426+040 CD3 (ancho calzada : 8.70 m) PRV3 (Punto de referencia virtual 2 / baranda de seguridad vial blanco) Progresiva = 426+096 CD3 - distancia a PRV3 = 56 m Ahuellamiento Gravedad 3 : profundidad > 12 mm Cuneta Profundidad. 14mm 2.1x2.65 m2
  • 20. Progresiva = 426+126 Progresiva = 426+149 CD3 - distancia a PRV3 = 86 m CD3 - distancia a PRV3 = 109 m SEÑALIZACIÓN Perfil irregular Bache Gravedad 3 : diámetro > 0.5 m Ahuellamiento Gravedad 3 : profundidad > 12 mm D=0.90m
  • 21. Progresiva = 426+169 CD3 - distancia a PRV3 = 129 m Progresiva = 426+183 CD3 - distancia a PRV3 = 143 m SEÑALIZACIÓN Perfil irregular Baches Gravedad 2 : diámetro entre 0.2 y 0.5 m D=2.1m D=1m
  • 22. Progresiva = 426+240 CD4 (ancho calzada : 9 m, ancho de berma 1.1 m) PRV4 (Punto de referencia virtual 4 / borde de canaleta) SEÑALIZACIÓN Puente angosto Cuneta Medición de la calzada
  • 23. Progresiva = 426+256 Progresiva = 426+260 CD4 - distancia a PRV4 = 16 m CD4 - distancia a PRV4 = 20 m SEÑALIZACIÓN Perfil irregular Bache Gravedad 3 : diámetro > 0.5 m D=0.85m D=1.3m
  • 24. Progresiva = 426+280 CD4 - distancia a PRV4 = 30 m Progresiva = 426+290 CD4 - distancia a PRV4 = 40 m Ahuellamiento Gravedad 3 : profundidad > 12 mm SEÑALIZACIÓN Perfil irregular Profundidad 14mm
  • 25. Progresiva = 426+303 CD4 - distancia a PRV4 = 63 m Peladura Gravedad 3 : continúo con aparición de la base granular Bache Gravedad 3 : diámetro > 0.5 m D=0.95m
  • 26. Progresiva = 426+330 CD4 - distancia a PRV4 = 90 m Ahuellamiento Gravedad 3 : profundidad > 12 mm Ahuellamiento Gravedad 2 : profundidad > 6 mm y <= 12 mm Profundidad 7mm
  • 27. Progresiva = 426+350 CD4 - distancia a PRV4 = 110 m Progresiva = 426+408 CD4 - distancia a PRV4 = 168 m Baches Gravedad 2 : diámetro entre 0.2 y 0.5 m D=0.46m D=0.35m
  • 28. Progresiva = 426+429 CD4 - distancia a PRV4 = 189 m Progresiva = 426+440 CD5 (ancho calzada : 9 m, ancho de berma 1.1 m) PRV5 (Punto de referencia virtual 5 / borde de canaleta) Cuneta SEÑALIZACIÓN Información general
  • 29. Progresiva = 426+460 CD 5 -distancia a PRV4 = 20 m Progresiva = 426+471 CD5 - distancia a PRV4 = 31 m Fisura longitudinal Gravedad 3 : ancho > 3 mm Fisura longitudinal Gravedad 2 : desprendimiento del concreto asfáltico Ancho=10mm
  • 30. Progresiva = 426+515 CD5 - distancia a PRV4 = 75 m Progresiva = 426+520 CD5 - distancia a PRV4 = 80 m SEÑALIZACIÓN Curva Fisura transversal Gravedad 1 : ancho <= 1 mm
  • 31. Progresiva = 426+570 CD4 - distancia a PRV4 = 130 m Progresiva = 426+579 CD5 - distancia a PRV4 = 139 m Fisura transversal Gravedad 1 : ancho <= 1 mm Fisura longitudinal Gravedad 1 : ancho <= 1 mm
  • 32. Progresiva = 426+592 CD5 - distancia a PRV4 = 152 m Progresiva = 426+600 CD5 - distancia a PRV4 = 160 m Fisura longitudinal Gravedad 1 : ancho <= 1 mm Piel de cocodrilo Gravedad 1 : > 0.5 m
  • 33. CD6 distancia a PRV6 = 26 m 2do Día CD6 (ancho calzada: 9 m, ancho de berma 1.1 m) PRV6 Progresiva = 426+640 Progresiva = 426+666 SEÑALIZACION Perfil Irregular SEÑALIZACION Curva
  • 34. Progresiva = 426+693 CD6 distancia a PRV6 = 53 m Progresiva = 426+702 CD6 distancia a PRV6 = 62 m Bache Gravedad 1: diámetro<0.2m Muro de Contención (33x0.3) diámetro 0.18 m
  • 35. Progresiva = 426+731 CD6 distancia a PRV6 = 91 m Progresiva = 426+739 CD6 distancia a PRV6 = 99 m Bache Gravedad 2: diámetro entre 0.2 a 0.5 m Peladura Gravedad 2 diámetro 0.45 m
  • 36. CD6 distancia a PRV6 = 104 m Progresiva = 426+744 CD6 distancia a PRV6 = 104 m PUNTO CRITICO Bache Gravedad 3: diámetro >0.5 m diámetro 0.6m
  • 37. Progresiva = 426+751 CD6 distancia a PRV6 = 111m Progresiva = 426+752 CD6 distancia a PRV6 = 112 m Parchado Gravedad 2 Bache Gravedad 3: diámetro>0.5 m diámetro 3.3 m
  • 38. Progresiva = 426+753 CD6 distancia a PRV6 = 113 m Progresiva = 426+778 CD6 distancia a PRV6 = 138 m PUNTO CRITICO PUNTO CRITICO
  • 39. Progresiva = 426+792 CD6 distancia a PRV6 = 152 m Progresiva = 426+792 CD6 distancia a PRV6 = 152 m Bache Gravedad 3: diámetro>0.5 m Junta de 6 cm diámetro 1.20 m
  • 40. Progresiva = 426+802 CD6 distancia a PRV6 = 162 m Bache Gravedad 2: diámetro entre 0.2 a 0.5 m Bache Gravedad 3: diámetro >0.5 m diámetro 0.35 m diámetro 0.65 m
  • 41. Progresiva = 426+807 CD6 distancia a PRV6 = 167 m Peladura Gravedad 1 Progresiva = 426+815 CD6 distancia a PRV6 = 175 m Parchado Gravedad 2
  • 42. Progresiva = 426+840 Distancia a PRV7 = 167 m (Punto de referencia virtual 7 / Alcantarilla) Distancia a PRV7 = 167 m (Punto de referencia virtual 7 / Alcantarilla)
  • 43. Progresiva = 426+868 CD7 distancia a PRV7 = 28 m Ahuellamiento Gravedad 3 : profundidad > 12 mm Progresiva = 426+888 CD7 distancia a PRV7 = 48 m PUNTO CRITICO
  • 44. Progresiva = 426+891 CD7 distancia a PRV7 = 51 m SEÑALIZACION Perfil Irregular Progresiva = 426+930 CD7 distancia a PRV7 = 90 m Ahuellamiento Gravedad 3 : profundidad > 12 mm
  • 45. Progresiva = 426+990 Baches Gravedad 3: diámetro > 0.5 m CD7 distancia a PRV7 = 150 m Bache Gravedad 3: diámetro > 0.5 m Bache Gravedad 3: diámetro > 0.5 m
  • 46. Progresiva = 426+990 CD7 distancia a PRV7 = 150 m Piel de cocodrilo Gravedad 2: malla entre 0.3 y 0.5 Bache Gravedad 3: diámetro > 0.5 m Bache Gravedad 3: diámetro > 0.5 m
  • 47. CD7 distancia a PRV7 = 160 m CD7 distancia a PRV7 = 163 m Progresiva = 427+000 Progresiva = 427+003 CD7 distancia a PRV7 = 198 m Progresiva = 427+038 SEÑALIZACION Zona de derrumbes Poste de kilometraje Lado izquierdo del PC en la vía
  • 48. CD8 (ancho calzada : 9.3 m, ancho de berma 1.1 m) Progresiva = 427+040 PRV8 (Punto de referencia virtual 8 / borde de canaleta) CD8 distancia a PRV8 = 1 m Progresiva = 427+041 Bache Gravedad 3: diámetro > 0.5 m Lado derecho del PC de la vía
  • 49. SEÑALIZACION Curva DETERIORO Y FALLAS EN CARRETERA NO PAVIMENTADA Bache Gravedad 3: diámetro > 0.5 m Bache Gravedad 2: diámetro entre 0.2 a 0.5 m Progresiva = 427+044 CD8 distancia a PRV8 = 4 m
  • 50. Progresiva=427+139 CD8 - distancia a PRV8 = 99 m Bache Gravedad 3: diámetro > 0.5 m 2.62 x 2.22 m
  • 51. CD8 distancia a PRV8 = 163 m Progresiva = 427+203 Baches Gravedad 3: diámetro > 0.5 m SEÑALIZACION Progresiva = 427+213 CD8 distancia a PRV8 = 173 m
  • 52. PRV9 (Punto de referencia virtual 9 / roca) Progresiva = 427+240 Ahuellamiento ancho calzada : 13 m Progresiva = 427+247 CD9 distancia a PRV9 = 7 m Progresiva = 427+265 Bache Gravedad 3: diámetro > 0.5 m CD9 distancia a PRV9 = 25 m PUNTO CRITICO
  • 53. Progresiva = 427+280 Progresiva = 427+360 Progresiva = 427+380 CD9 distancia a PRV9 = 40 m CD9 distancia a PRV9 = 140 m CD9 distancia a PRV9 = 120 m Bache Gravedad 3: diámetro > 0.5 m Bache Gravedad 3: diámetro > 0.5 m Bache Gravedad 3: diámetro > 0.5 m
  • 54. Progresiva = 427+397 CD9 distancia a PRV9 = 157 m Baches Gravedad 3: diámetro > 0.5 m
  • 55. Progresiva = 427+422 CD9 distancia a PRV9 = 182 m Baches Gravedad 3: diámetro > 0.5 m Progresiva = 427+440 CD10 PRV10 (Punto de referencia virtual 10 / roca) ancho calzada : 14.60 m Ahuellamiento Gravedad 3: Profundidad > 12 mm 5.11 x 48.816 m
  • 56. Progresiva = 427+469 CD10 distancia a PRV10 = 29 m SEÑALIZACION Curva Bache Gravedad 3: diámetro > 0.5 m
  • 57. Progresiva = 427+494 Progresiva = 427+521 Progresiva = 427+545 CD10 distancia a PRV10 = 81 m CD10 distancia a PRV10 = 54 m PUNTO CRITICO SEÑALIZACION Derrumbes CD10 distancia a PRV10 = 105 m Ahuellamiento Gravedad 3: Profundidad > 12 mm Bache Gravedad 3: diámetro > 0.5 m
  • 58. Progresiva = 427+580 Progresiva = 427+640 CD10 distancia a PRV10 = 140 m Parchado PRV11 (Punto de referencia virtual 11 / borde de canaleta) CD11 (ancho calzada : 9.30 m, ancho de berma : 1.00 m) SEÑALIZACION Curva Progresiva = 427+657 CD11 distancia a PRV11 = 17 m
  • 59. Progresiva = 427+681 Progresiva = 427+724 CD11 distancia a PRV11 = 41 m PUNTO CRITICO CD11 distancia a PRV11 = 84 m SEÑALIZACION Curva Parchado
  • 60. Progresiva = 427+724 Progresiva = 427+805 Progresiva = 427+840 CD11 distancia a PRV11 = 165 m CD11 distancia a PRV11 = 84 m CD12 (ancho calzada : 9.30 m, ancho de berma : 1.00 m) Baches Gravedad 1 : diámetro < 0.2 m PUNTO CRITICO Ahuellamiento Gravedad 3: Profundidad > 12 mm PRV12 (Punto de referencia virtual 12 / borde de carretera)
  • 61. CD12 distancia a PRV12 = 23 m Progresiva = 427+863 SEÑALIZACION Perfil Irregular Progresiva = 427+884 CD12 Distancia a PRV12 = 44m Progresiva = 427+898 CD12 distancia a PRV12 = 58 m
  • 62. Progresiva = 427+947 Progresiva = 427+952 CD12 distancia a PRV12 = 107 m CD12 distancia a PRV12 = 112 m PUNTO CRITICO
  • 63. Progresiva = 427+960 Progresiva = 427+965 CD12 distancia a PRV12 = 120 m CD12 distancia a PRV12 = 125 m SEÑALIZACION Perfil Irregular
  • 64. Progresiva = 427+976 Progresiva = 428+000 CD12 distancia a PRV12 = 136 m CD12 distancia a PRV12 = 160 m PUNTO CRITICO Poste de kilometraje DETERIORO Y FALLAS EN PAVIMENTO FLEXIBLE
  • 65. Progresiva = 428+002 CD12 distancia a PRV12 = 162 m Bache Gravedad 3 : diámetro > 0.5 m
  • 66. Progresiva = 428+028 CD12 distancia a PRV12 = 188 m Baches Gravedad 3 : diámetro > 0.5 m
  • 67. CD13 (ancho calzada : 8.80 m, ancho de berma : 0.92 m) Progresiva = 428+040 Progresiva = 428+114 PRV13 (Punto de referencia virtual 13 / señal de tránsito) SEÑALIZACION Perfil Irregular Progresiva = 428+137 CD13 distancia a PRV13 = 97 m CD13 distancia a PRV13 = 74 m Piel de cocodrilo Gravedad 2 : entre 0.3 m y 0.5 m SEÑALIZACION Curva Cerrada
  • 68. Señal de transito PUNTO CRITICO Progresiva = 428+140 CD13 distancia a PRV13 = 100 m CD13 Distancia a PRV13 = 119 m Progresiva = 428+159 Baches Gravedad 2 : diámetro entre 0.2 y 0.5 m
  • 69. Progresiva = 428+191 Progresiva = 428+240 CD13 distancia a PRV13 = 151 m CD14 (ancho calzada : 9.50 m, ancho de berma : 0.90 m) PRV14 (Punto de referencia virtual 14 / borde de carretera)
  • 70. Progresiva = 428+261 Progresiva = 428+330 CD14 distancia a PRV14 = 21 m CD14 distancia a PRV14 = 90 m
  • 71. Progresiva = 428+365 Progresiva = 428+408 CD14 distancia a PRV14 = 125 m CD14 distancia a PRV14 = 168 m Muro de Contención a los costados SEÑALIZACION Curva
  • 72. Progresiva = 428+440 Progresiva = 428+484 Progresiva = 428+540 CD15 (ancho calzada : 9.50 m, ancho de berma : 0.90 m) CD15 distancia a PRV15 = 100 m CD15 distancia a PRV15 = 44 m PRV15 (Punto de referencia virtual 15 / borde de canalera) SEÑALIZACION Curva SEÑALIZACION Curva y Contracurva
  • 73. Progresiva = 428+579 CD15 Distancia a PRV15 = 139 m PRV16 (Punto de referencia virtual 16 / señal de tránsito) Progresiva = 428+829 CD16 distancia a PRV16 = 189 m Progresiva = 428+640 CD16 (ancho calzada : 8.74 m, ancho de berma : 1.00 m) Señal de transito SEÑALIZACION Curva Baches Gravedad 2 : diámetro entre 0.2 y 0.5 m
  • 74. Progresiva = 428+840 Progresiva = 428+856 Progresiva = 428+847 PRV17 (Punto de referencia virtual 17 / señal de tránsito) CD17 Distancia a PRV17 = 7 m CD17 distancia a PRV17 = 16 m CD17 (ancho calzada : 8.40 m, ancho de berma : 0.90 m) SEÑALIZACION Curva SEÑALIZACION Curva
  • 77. Ubicación del acero expuesto Aceros de la armadura del pavimento rígido expuestos
  • 78. CALIFICACION PARA TIPO DE DETERIORO (1ER TRAMO DE 200m) AREA DE LA SECCION EVALUADA (m) PORCENTAJE DE EXTENSION DEL DETERIORO/ FALLA LONG ANCHO Aij=AREA As=AREA Efij=( Aij / As )*100 Efp 0 = SIN FALLAS 1=LEVE (Efp=Menor a 10%) 2=MODERADO (Efp=entre 10 y 30%) 3=SEVERO (Efp=Mayor a 30%) 3 17.4 0.03 0.522 2340 0.022307692 DAÑO 2 GRAVEDAD 3 2 5.37 0.04 0.2148 2340 0.009179487 DAÑO 2 GRAVEDAD 2 3 12.8 0.03 0.384 2340 0.016410256 DAÑO 2 GRAVEDAD 3 3 18.8 0.03 0.564 2340 0.024102564 DAÑO 2 GRAVEDAD 3 2 1.72 3.37 5.7964 2340 0.247709402 DAÑO 5 GRAVEDAD 2 2 1.68 1.4 2.352 2340 0.100512821 DAÑO 5 GRAVEDAD 2 0 2340 0.000000000 DAÑO 5 GRAVEDAD 0 1 DIAMETRO 0.18 DAÑO 7 GRAVEDAD 1 DIAMETRO DAÑO 2 GRAVEDAD 0 DIAMETRO DAÑO 2 GRAVEDAD 0 3 8.4 0.04 0.336 2340 0.014358974 DAÑO 8 GRAVEDAD 3 3 4.1 0.03 0.123 2340 0.005256410 DAÑO 8 GRAVEDAD 3 3 4.63 0.03 0.1389 2340 0.005935897 DAÑO 8 GRAVEDAD 3 3 4.57 0.04 0.1828 2340 0.007811966 DAÑO 8 GRAVEDAD 3 11 SUMA PUNTAJE DE CONDICION 1 FIS. LONG. PARCHADOS BACHES FIS. TRANS. CANTIDAD DE BACHES 1 0 0 2 0 0 1 4 0 0 0.009893272 0 0 0 1 1 1 0.205221753 EXTENSION DE PROMEDIO PONDERADO 0 1 MEDIDAS AREA DE DETERIORO (m2) NUMERO DE DETERIOROS 0.019890642 NOMBRE 0 0 4 PUNTAJE E CONDICION SEGÚN EXTANSION DE CADA TIPO E DETERIORO / FALLA PUNTAJE DE CONDICION RESULTANTE POR CADA TIPO DE DETERIRORO/FALLA GRAV(G) CALIFICACION= 989 CONDICION= BUENA
  • 79. CALIFICACION PARA TIPO DE DETERIORO (2DO TRAMO DE 200m) AREA DE LA SECCION EVALUADA (m) PORCENTAJE DE EXTENSION DEL DETERIORO/ FALLA LONG ANCHO Aij=AREA As=AREA Efij=( Aij / As )*100 0 = SIN FALLAS 1=LEVE (Efp=Menor a 10%) 2=MODERADO (Efp=entre 10 y 30%) 3=SEVERO (Efp=Mayor a 30%) 2 4.1 4.63 18.983 1580 1.201455696 DAÑO GRAVEDAD 1 0.001 1.4 0.0014 1580 0.000088608 DAÑO 2 GRAVEDAD 1 1 0.001 2.63 0.00263 1580 0.000166456 DAÑO 2 GRAVEDAD 1 2 3.64 1.45 5.278 1580 0.334050633 DAÑO 2 GRAVEDAD 2 3 2.1 2.65 5.565 1580 0.352215190 DAÑO 2 GRAVEDAD 3 2 6.1 8.2 50.02 1580 1.329113924 DAÑO 2 GRAVEDAD 2 3 7 8 56 1580 1.329113924 DAÑO 2 GRAVEDAD 3 1 DIAMETRO 0.45 DAÑO 7 GRAVEDAD 1 3 DIAMETRO 4 DAÑO 2 GRAVEDAD 3 1 0.4 0.001 0.0004 1580 0.000025316 DAÑO 8 GRAVEDAD 1 1 0.35 0.001 0.00035 1580 0.000022152 DAÑO 8 GRAVEDAD 1 10 GRAV(G) MEDIDAS AREA DE DETERIORO (m2) NUMERO DE DETERIOROS LONGITUD DE DETERIORO NOMBRE 0 0 2 0 PUNTAJE E CONDICION SEGÚN EXTANSION DE CADA TIPO E DETERIORO / FALLA PUNTAJE DE CONDICION RESULTANTE POR CADA TIPO DE DETERIRORO/FALLA 0 1 0 1 0 1 1 0 1 SUMA PUNTAJE DE CONDICION 1 FIS. LONG. BACHES FIS. TRANS. 0 CANTIDAD DE BACHES 1 0 0 0 0 0 0 1 0 0 2 AHUELLAMIE NTO PELADURA 2 2 0 0 2 CALIFICACION= 990 CONDICION= BUENA