HOJA DE CALCULO PARA SUPERESTRUCTURA DEL PUENTE PEATONAL
ALAHUAYLLA
a) DISEÑO DE VIGA "T":
1.00 DATOS:
Luz libre : 10.0 m
Ancho de vía : 2.00 m
Longitud total : 10.40 m
Longitud de soporte: 0.40 m
Sobrecarga : 500.0 kg/m2
Carga puntual : 500 kg (en el centro)
2.0 PREDIMINSIONAMIENTO:
i) h = L/12=10.40/12 ⇒ h = 0.87 m.
ii) h = L/15=10.40/15 ⇒ h = 0.64 m.
iii) h = 0.07xL=0.07x10.40 ⇒ h = 0.73 m.
De estos valores asumiremos el tercer caso h ≈ 0.75 m.
USAR: ESPESOR DE LOSA h = 0.10 m.
ANCHO DE BASE DE VIGA b = 0.30 m.
ALTURA DE VIGA PRINCIPAL h = 0.75 m.
3.0 METRADO DE CARGA MUERTA:
CARGA REPARTIDA:
Losa : 1.00x2.30x0.10x2.40 = 0.552 tn/m
Viga principal : 1.00x0.30x0.60x2.40 = 0.432 tn/m
P=500 Kkg
w=1.0 tn/m
10.40 m.
Sardinel : 1.00x0.15x0.15x2.40x2 =0.108 tn/m
.
1.092 tn/m.
OTRAS CARGAS:
Columneta :0.20x0.15x0.90x2.40x10/10.40 = 0.0623 tn/m
Tubería FºGº de 2" :3x2x1.00x0.005 = 0.0300 tn/m
.
0.0923 tn/m.
Total de carga muerta = 1.184 tn/m.
4.0 CALCULO DE ESFUERZO CORTANTE Y MOMENTO MAXIMO:
i) Esfuerzo máximo y momento máximo por carga muerta:
MD = wL^2/8 = 1.186*10.40^1/8 ⇒ MD = 16.01 Tn -m.
VD= WxL/2 = 1.184x10.40/2 ⇒ VD = 6.157 Tn -m.
ii) Esfuerzo máximo y momento máximo por carga viva:
ML =wL^2/8 + PL/4 =.0x10.40^2/8+0.5x10.40/4 ⇒ ML =14.82Tn-m.
VL= WxL/2 +P/2 = 1.0x10.40/2 + 0.50/2 ⇒ VD = 5.45 Tn -m.
WD=1.184 tn/m
10.40 m.
WL=1.00 tn/m
10.40 m.
P=0.50 tn
POR SERVICIO:
MT = MD + ML = 16.01 + 14.62 = 30.83 tn-m
VT = VD + VL = 6.157 + 5.45 = 11.607 tn.
POR ROTURA:
MU = 1.4MD +1.7ML = 16.01(1.4) + 14.62(1.7) = 47.608 tn-m
VU = 1.3(VD + 5VL/3) = 1.3(6.157 + 5.45x5/3) = 19.81 tn.
5.0 CALCULO DE ACERO PARA VIGA PRINCIPAL
El diseño se considerará como viga T:
b ≤ L/4 ⇒ b ≤ 10.40/4 = 2.60
b ≤ 16xbw ⇒b ≤ 16x0.30 = 4.80
b ≤ bw + S ⇒ b ≤ 0.30+2.0 = 2.30
Se asume b = 2.30 m.
(*) CHEQUEO DE PERALTE POR SERVICIO:
DATOS:
f'c = 210 kg/cm2; Fr = 4200 kg/cm2
fc = 0.40 f'c ; fc = 84 kg/cm2
fs = 0.4fy; fs = 1680 kg/cm2
Cálculos:
n = Es/Ec = 2.10x1066/(15000(210)^2) = 9.66
r = fs/fc = 20; k = n/(n+r) = 9.66/(9.66+20) = 0.326
j = 1 - k/3 = 1 - 0.326/3 = 0.891
d = [(2xM)/(fcxjxkxb)]^2 =
d = [(2x30.83x10^2)/(84x0.891x0.326x230)]^2=33.15 cm
dmín = 33.15 cm ∠ 67 cm. L.q.q.d. Ok.
(**) CALCULO DE ACERO POR ROTURA:
d = 0.68; Mu = 47.608 tn-m; b = 230 cm; a = 8
As = Mu/[φfy(d-a/2) = 47.608x10^5/[0.9x4200(68-8/2)] =
As = 19.70 cm2
a = Asfy/(0.85xf'cxb) = 19.70x4200/(0.85x210x230) = 2.02
a = 1.92; As = 18.80 cm2
Considerando 8 varillas φ 3/4" y la d corregida es:
d =h - Y = 75 - 10 + 65.0 cm
Para d=65.0; b=230.0; Mu = 47.608x10^5 kg-cm.
a = 2.0; As = 19.80 cm2
Tomando φ 3/4" = 19.60/2.80= 7.07 varillas
TOMAR 8 VARILLAS φ 3/4"
As = 22.80 cm2
(...) Comprobación zona comprimida:
a = 0.35C; C = a/0.85: c=2/0.85=2.35 cm
Luego c=2.35 ∠∠ hlosa = 10 cm. CONFORME
(...) Verificación de cuantías:
ρb = (0.85xf'c xB1)/fy x (0.003xEs/0.003xEs+Fy)
Para valores : Es = 2.1x106
; fy = 4,200 Kg/cm2
; B1 = 0.85;
f'c = 210 Kg/cm2
ρb = 0.036
ρmáx = 0.75xPb = 0.0271
Cuantía de la viga: ρ = As/bxd = 22.80/230x65; ρ= 0.0015
Luego: ρ< ρmáx ; 0.0015 <0.0271 OK
(...) Para no verificar deflexión:
fmáx = 0.18f'c/fy = 0.18x210/4200 = 0.009>0.0015 OK
(...) Verificación por fatiga en servicio:
Mmáx = MD + ML = 30.83 tn.m
Mmín = MD = 16.01 tn.m
fsmáx = Mmáx/Asxjxd = 30.83x105
/22.80x0.891x65 ; fmáx = 2334.8 Kg/cm
fsmín = Mmín/Asxjxd = 16.01x105
/22.80x0.801x65 ; fmín = 1212.5 Kg/cm
Rango de esfuerzos actuantes
fmáx - fmín = (2334.8 - 1212.5) ; ∆fact = 1122.3 Kg/cm
Rango de esfuerzos admisibles
fp = 1635.36 - 0.36xfmín
fP = 1635.36 - 0.36x1212.5 ; fP = 1198.86 > fact =1122.3
** DISEÑO DEL ESTRIBO PARA VIGA PRINCIPAL POR CORTE:
VD = 6.157tm VL = 5.45tm VU = 19.81tm
νu = Vu/φbxd = (19.81x1000)/(0.85x30x65) ; νu=11.95 Kg/cm2
(...) Esfuerzo resistente del concreto
νc = φ[0.5f'c1/2
+ (175xDensidadxνuxd)/Mu]
νc = 0.85[0.5x2101/2
+ (175x0.0015x19.81x103
x65)/(47.608x105
]
νc = 6.22 Kg/cm2
Luego: νu - νc = (11.95 - 6.22) = 5.73 Kg/cm2
Tomando φ 3/8" con AV = 2x0.71 = 1.42 ; φ 3/8"
S =AVxfy/(νu - νc)b = 1.42x4200/(5.73x30) ; S=34cm
Se tomará estribos φ 3/8" 1φ@.05 ; 4 φ@.10; resto @.20
(...) Acero lateral (10% As principal)
AsxL = 0.10x22.80 ; AsxL= 2.3cm2
Tomando φ 1/2" con As = 1.27 y 2.3/1.27 =2 varillas;
USAR ACERO LATERAL : AsL = 2φ 1/2"
b) DISEÑO DE LOSA DEL PUENTE PEATONAL:
(...) CALCULO DE CARGA MUERTA:
Losa : 1.00x0.10x1.00x2.40 = 0.36 tn/m
Sardinel : 1.00x0.15x0.15x2.40 = 0.054 tn/m
Columneta + Baranda : 0.0032 + 0.015 = 0.020 tn/m
Carga puntual extremo : 0.054 + 0.020 = 0.074 tn/m
(...) MOMENTO MAXIMO Y ESFUERZO MAXIMO POR CARGA MUERTA:
MD = PxL + (WxL2
/2) = 0.074X0.925 + (0.36X1.02
/2) ; MD = 0.25tn
VD = P + WxL = 0.074 + 0.36X1.0 ; VD = 0.43tn
(...) MOMENTO MAXIMO Y ESFUERZO MAXIMO POR CARGA VIVA:
MV = 0.01x0.925 + (0.50X0.852
/2) ; MV = 0.25tn/m
VV = 0.01 + 0.5x0.85 ; VV = 0.435tn
(...) CALCULO DEL PERALTE DE LOSA POR SERVICIO:
M = MD + MV = 0.25 + 0.20 ; MV = 0.45tn.m
D = (2M/f'cxjxb)1/2
= (2x0.45x105
/84x0.891x0.326x100);
d = 6.07cm
(...) CALCULO DEL PEREALTE POR ROTURA:
MU = 1.3 + 5/3(ML)]
MU = 1.3[0.25 + 5/3x0.20] ; Mu = 0.76tn.m
d = h - (r+φest + φAs) ; d = 10 - (3 + 1.27) ;
d= 5.73
(...) CALCULO DEL ACERO:
MU = 0.76tn.m ; d=5.73cm ; b=100.0cm ; a=0.89 ; As = 3.81cm2
Asumimos φ1/2" 1.27/3.81 = 0.30
Tomar φ1/2"@.30
(...) Acero mínimo para la sección
Asmín = (14/fy)xbxd = (14/4200)x100x10 ; Asmín = 3.34 cm2
Por lo tanto: Asmín < As calculado OK
(...) Acero temperatura; Ast = 0.0018xbxt
Ast = 0.0018x100x10 ; Ast = 1.80cm2
Asumimos φ3/8" ; 0.72/1.80 ;
TOMAR : 1φ3/8"@.35cm
Acero positivo tomar 2/3 Asp en ambos lados
2/3(3.34) = 2.23cm2
; 0.72/2.23 = 0.30
TOMAR : 1φ 3/8"@.30 en cada lado.
(...) Verificación por esfuerzo cortante
VU = 1.3[VD + 5/3(VL)}
VU = 1.3[0.434 + 5/3x0.435] = 1.51tn
VC = φ[0.5(f'c)1/2
+ (175xDensidad x VU xd)/MU]
Densidad = As/bxd = 3.34/100x5.73 ; Densidad = 0.0058
VC = 0.85[0.5(210)1/2
+ (175x0.0058x1.51x103
x5.73)/(0.76x105
)]
VC = 6.20 Kg/cm2
VU = VU/φbxd = 1.51x1000/(0.85x1000x5.73) = 3.10 Kg/cm2
<VC OK

Más contenido relacionado

La actualidad más candente

126300217 diseno-de-vigas-t
126300217 diseno-de-vigas-t126300217 diseno-de-vigas-t
126300217 diseno-de-vigas-t
keyla280
 
Alambres y torones
Alambres y toronesAlambres y torones
Alambres y torones
ehriosa
 
229232889 diseno-losa-aligerada-metodo-de-coeficientes
229232889 diseno-losa-aligerada-metodo-de-coeficientes229232889 diseno-losa-aligerada-metodo-de-coeficientes
229232889 diseno-losa-aligerada-metodo-de-coeficientes
Michel Rodriguez
 

La actualidad más candente (20)

Diseño tijeral inicial
Diseño tijeral inicialDiseño tijeral inicial
Diseño tijeral inicial
 
Cimentaciones - Roberto Morales
Cimentaciones - Roberto MoralesCimentaciones - Roberto Morales
Cimentaciones - Roberto Morales
 
ACI 350_ESPAÑOL.pdf
ACI 350_ESPAÑOL.pdfACI 350_ESPAÑOL.pdf
ACI 350_ESPAÑOL.pdf
 
Diseño zapata aislada interior o central
Diseño zapata aislada interior o centralDiseño zapata aislada interior o central
Diseño zapata aislada interior o central
 
DISEÑO DE ZAPATAS EXCEL Y SAFE 12.3.2
DISEÑO DE ZAPATAS EXCEL Y SAFE 12.3.2 DISEÑO DE ZAPATAS EXCEL Y SAFE 12.3.2
DISEÑO DE ZAPATAS EXCEL Y SAFE 12.3.2
 
Predimensionamiento 2006 ing. roberto morales
Predimensionamiento 2006   ing. roberto moralesPredimensionamiento 2006   ing. roberto morales
Predimensionamiento 2006 ing. roberto morales
 
126300217 diseno-de-vigas-t
126300217 diseno-de-vigas-t126300217 diseno-de-vigas-t
126300217 diseno-de-vigas-t
 
Detallado acero de refuerzo en Vigas de Concreto Armado
Detallado acero de refuerzo en Vigas de Concreto ArmadoDetallado acero de refuerzo en Vigas de Concreto Armado
Detallado acero de refuerzo en Vigas de Concreto Armado
 
Manual safe-en-espanol
Manual safe-en-espanolManual safe-en-espanol
Manual safe-en-espanol
 
Manual puente vigas i preesforzado - csi bridge
Manual puente vigas i   preesforzado - csi bridgeManual puente vigas i   preesforzado - csi bridge
Manual puente vigas i preesforzado - csi bridge
 
ESTRUCTURACIÓN UPN LN
ESTRUCTURACIÓN UPN LNESTRUCTURACIÓN UPN LN
ESTRUCTURACIÓN UPN LN
 
3. cargas-vehiculares.
3. cargas-vehiculares.3. cargas-vehiculares.
3. cargas-vehiculares.
 
9 puentes tipo losa_lrfd-orig
9 puentes tipo losa_lrfd-orig9 puentes tipo losa_lrfd-orig
9 puentes tipo losa_lrfd-orig
 
ALBAÑILERÍA CONFINADA DE SAN BARTOLOME
ALBAÑILERÍA CONFINADA DE SAN BARTOLOMEALBAÑILERÍA CONFINADA DE SAN BARTOLOME
ALBAÑILERÍA CONFINADA DE SAN BARTOLOME
 
Vientos
VientosVientos
Vientos
 
Alambres y torones
Alambres y toronesAlambres y torones
Alambres y torones
 
Memoria de calculo de estructura s
Memoria de calculo de estructura sMemoria de calculo de estructura s
Memoria de calculo de estructura s
 
229232889 diseno-losa-aligerada-metodo-de-coeficientes
229232889 diseno-losa-aligerada-metodo-de-coeficientes229232889 diseno-losa-aligerada-metodo-de-coeficientes
229232889 diseno-losa-aligerada-metodo-de-coeficientes
 
Diseño de alcantarillas
Diseño de alcantarillasDiseño de alcantarillas
Diseño de alcantarillas
 
11. norma e.030 diseño sismorresistente
11. norma e.030 diseño sismorresistente11. norma e.030 diseño sismorresistente
11. norma e.030 diseño sismorresistente
 

Similar a Calculo para puente peatonal

Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
carlos
 
Diseño muro de contencion ca
Diseño muro de contencion caDiseño muro de contencion ca
Diseño muro de contencion ca
edd Apellidos
 
Diseño muro de contencion ca
Diseño muro de contencion caDiseño muro de contencion ca
Diseño muro de contencion ca
edd Apellidos
 
226696672 metodo-cross-docx
226696672 metodo-cross-docx226696672 metodo-cross-docx
226696672 metodo-cross-docx
Michel Rodriguez
 
Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25
Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25
Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25
Hector Silva
 

Similar a Calculo para puente peatonal (20)

Muro contension raul1
Muro contension raul1Muro contension raul1
Muro contension raul1
 
Puentes
PuentesPuentes
Puentes
 
Concreto armado
Concreto armadoConcreto armado
Concreto armado
 
Calculo de losa aligerada
Calculo de losa aligeradaCalculo de losa aligerada
Calculo de losa aligerada
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigas
 
Muro voladizo gian
Muro voladizo gianMuro voladizo gian
Muro voladizo gian
 
Solucionario p2 conc. avanzado
Solucionario p2 conc. avanzadoSolucionario p2 conc. avanzado
Solucionario p2 conc. avanzado
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
 
Diseño de Escalera
Diseño de EscaleraDiseño de Escalera
Diseño de Escalera
 
Notas de calculo
Notas de calculoNotas de calculo
Notas de calculo
 
Diseño muro de contencion ca
Diseño muro de contencion caDiseño muro de contencion ca
Diseño muro de contencion ca
 
Diseño muro de contencion ca
Diseño muro de contencion caDiseño muro de contencion ca
Diseño muro de contencion ca
 
Precast driven pile 450 x450
Precast driven pile 450 x450Precast driven pile 450 x450
Precast driven pile 450 x450
 
Sesión n° 08
Sesión n° 08Sesión n° 08
Sesión n° 08
 
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
 
problemas resueltos
problemas resueltosproblemas resueltos
problemas resueltos
 
226696672 metodo-cross-docx
226696672 metodo-cross-docx226696672 metodo-cross-docx
226696672 metodo-cross-docx
 
Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25
Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25
Grupo edific (excel ingenieria-civil blogspot-com)_2018_07_11_14_26_25
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
design of water section concrete structures
design of water section concrete structuresdesign of water section concrete structures
design of water section concrete structures
 

Último

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Último (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Calculo para puente peatonal

  • 1. HOJA DE CALCULO PARA SUPERESTRUCTURA DEL PUENTE PEATONAL ALAHUAYLLA a) DISEÑO DE VIGA "T": 1.00 DATOS: Luz libre : 10.0 m Ancho de vía : 2.00 m Longitud total : 10.40 m Longitud de soporte: 0.40 m Sobrecarga : 500.0 kg/m2 Carga puntual : 500 kg (en el centro) 2.0 PREDIMINSIONAMIENTO: i) h = L/12=10.40/12 ⇒ h = 0.87 m. ii) h = L/15=10.40/15 ⇒ h = 0.64 m. iii) h = 0.07xL=0.07x10.40 ⇒ h = 0.73 m. De estos valores asumiremos el tercer caso h ≈ 0.75 m. USAR: ESPESOR DE LOSA h = 0.10 m. ANCHO DE BASE DE VIGA b = 0.30 m. ALTURA DE VIGA PRINCIPAL h = 0.75 m. 3.0 METRADO DE CARGA MUERTA: CARGA REPARTIDA: Losa : 1.00x2.30x0.10x2.40 = 0.552 tn/m Viga principal : 1.00x0.30x0.60x2.40 = 0.432 tn/m P=500 Kkg w=1.0 tn/m 10.40 m.
  • 2. Sardinel : 1.00x0.15x0.15x2.40x2 =0.108 tn/m . 1.092 tn/m. OTRAS CARGAS: Columneta :0.20x0.15x0.90x2.40x10/10.40 = 0.0623 tn/m Tubería FºGº de 2" :3x2x1.00x0.005 = 0.0300 tn/m . 0.0923 tn/m. Total de carga muerta = 1.184 tn/m. 4.0 CALCULO DE ESFUERZO CORTANTE Y MOMENTO MAXIMO: i) Esfuerzo máximo y momento máximo por carga muerta: MD = wL^2/8 = 1.186*10.40^1/8 ⇒ MD = 16.01 Tn -m. VD= WxL/2 = 1.184x10.40/2 ⇒ VD = 6.157 Tn -m. ii) Esfuerzo máximo y momento máximo por carga viva: ML =wL^2/8 + PL/4 =.0x10.40^2/8+0.5x10.40/4 ⇒ ML =14.82Tn-m. VL= WxL/2 +P/2 = 1.0x10.40/2 + 0.50/2 ⇒ VD = 5.45 Tn -m. WD=1.184 tn/m 10.40 m. WL=1.00 tn/m 10.40 m. P=0.50 tn
  • 3. POR SERVICIO: MT = MD + ML = 16.01 + 14.62 = 30.83 tn-m VT = VD + VL = 6.157 + 5.45 = 11.607 tn. POR ROTURA: MU = 1.4MD +1.7ML = 16.01(1.4) + 14.62(1.7) = 47.608 tn-m VU = 1.3(VD + 5VL/3) = 1.3(6.157 + 5.45x5/3) = 19.81 tn. 5.0 CALCULO DE ACERO PARA VIGA PRINCIPAL El diseño se considerará como viga T: b ≤ L/4 ⇒ b ≤ 10.40/4 = 2.60 b ≤ 16xbw ⇒b ≤ 16x0.30 = 4.80 b ≤ bw + S ⇒ b ≤ 0.30+2.0 = 2.30 Se asume b = 2.30 m. (*) CHEQUEO DE PERALTE POR SERVICIO: DATOS: f'c = 210 kg/cm2; Fr = 4200 kg/cm2 fc = 0.40 f'c ; fc = 84 kg/cm2 fs = 0.4fy; fs = 1680 kg/cm2 Cálculos: n = Es/Ec = 2.10x1066/(15000(210)^2) = 9.66 r = fs/fc = 20; k = n/(n+r) = 9.66/(9.66+20) = 0.326 j = 1 - k/3 = 1 - 0.326/3 = 0.891 d = [(2xM)/(fcxjxkxb)]^2 = d = [(2x30.83x10^2)/(84x0.891x0.326x230)]^2=33.15 cm dmín = 33.15 cm ∠ 67 cm. L.q.q.d. Ok. (**) CALCULO DE ACERO POR ROTURA: d = 0.68; Mu = 47.608 tn-m; b = 230 cm; a = 8 As = Mu/[φfy(d-a/2) = 47.608x10^5/[0.9x4200(68-8/2)] = As = 19.70 cm2 a = Asfy/(0.85xf'cxb) = 19.70x4200/(0.85x210x230) = 2.02 a = 1.92; As = 18.80 cm2 Considerando 8 varillas φ 3/4" y la d corregida es:
  • 4. d =h - Y = 75 - 10 + 65.0 cm Para d=65.0; b=230.0; Mu = 47.608x10^5 kg-cm. a = 2.0; As = 19.80 cm2 Tomando φ 3/4" = 19.60/2.80= 7.07 varillas TOMAR 8 VARILLAS φ 3/4" As = 22.80 cm2 (...) Comprobación zona comprimida: a = 0.35C; C = a/0.85: c=2/0.85=2.35 cm Luego c=2.35 ∠∠ hlosa = 10 cm. CONFORME (...) Verificación de cuantías: ρb = (0.85xf'c xB1)/fy x (0.003xEs/0.003xEs+Fy) Para valores : Es = 2.1x106 ; fy = 4,200 Kg/cm2 ; B1 = 0.85; f'c = 210 Kg/cm2 ρb = 0.036 ρmáx = 0.75xPb = 0.0271 Cuantía de la viga: ρ = As/bxd = 22.80/230x65; ρ= 0.0015 Luego: ρ< ρmáx ; 0.0015 <0.0271 OK (...) Para no verificar deflexión: fmáx = 0.18f'c/fy = 0.18x210/4200 = 0.009>0.0015 OK (...) Verificación por fatiga en servicio: Mmáx = MD + ML = 30.83 tn.m Mmín = MD = 16.01 tn.m fsmáx = Mmáx/Asxjxd = 30.83x105 /22.80x0.891x65 ; fmáx = 2334.8 Kg/cm fsmín = Mmín/Asxjxd = 16.01x105 /22.80x0.801x65 ; fmín = 1212.5 Kg/cm Rango de esfuerzos actuantes fmáx - fmín = (2334.8 - 1212.5) ; ∆fact = 1122.3 Kg/cm
  • 5. Rango de esfuerzos admisibles fp = 1635.36 - 0.36xfmín fP = 1635.36 - 0.36x1212.5 ; fP = 1198.86 > fact =1122.3 ** DISEÑO DEL ESTRIBO PARA VIGA PRINCIPAL POR CORTE: VD = 6.157tm VL = 5.45tm VU = 19.81tm νu = Vu/φbxd = (19.81x1000)/(0.85x30x65) ; νu=11.95 Kg/cm2 (...) Esfuerzo resistente del concreto νc = φ[0.5f'c1/2 + (175xDensidadxνuxd)/Mu] νc = 0.85[0.5x2101/2 + (175x0.0015x19.81x103 x65)/(47.608x105 ] νc = 6.22 Kg/cm2 Luego: νu - νc = (11.95 - 6.22) = 5.73 Kg/cm2 Tomando φ 3/8" con AV = 2x0.71 = 1.42 ; φ 3/8" S =AVxfy/(νu - νc)b = 1.42x4200/(5.73x30) ; S=34cm Se tomará estribos φ 3/8" 1φ@.05 ; 4 φ@.10; resto @.20 (...) Acero lateral (10% As principal) AsxL = 0.10x22.80 ; AsxL= 2.3cm2 Tomando φ 1/2" con As = 1.27 y 2.3/1.27 =2 varillas; USAR ACERO LATERAL : AsL = 2φ 1/2" b) DISEÑO DE LOSA DEL PUENTE PEATONAL:
  • 6. (...) CALCULO DE CARGA MUERTA: Losa : 1.00x0.10x1.00x2.40 = 0.36 tn/m Sardinel : 1.00x0.15x0.15x2.40 = 0.054 tn/m Columneta + Baranda : 0.0032 + 0.015 = 0.020 tn/m Carga puntual extremo : 0.054 + 0.020 = 0.074 tn/m (...) MOMENTO MAXIMO Y ESFUERZO MAXIMO POR CARGA MUERTA: MD = PxL + (WxL2 /2) = 0.074X0.925 + (0.36X1.02 /2) ; MD = 0.25tn VD = P + WxL = 0.074 + 0.36X1.0 ; VD = 0.43tn (...) MOMENTO MAXIMO Y ESFUERZO MAXIMO POR CARGA VIVA: MV = 0.01x0.925 + (0.50X0.852 /2) ; MV = 0.25tn/m VV = 0.01 + 0.5x0.85 ; VV = 0.435tn (...) CALCULO DEL PERALTE DE LOSA POR SERVICIO: M = MD + MV = 0.25 + 0.20 ; MV = 0.45tn.m D = (2M/f'cxjxb)1/2 = (2x0.45x105 /84x0.891x0.326x100); d = 6.07cm (...) CALCULO DEL PEREALTE POR ROTURA: MU = 1.3 + 5/3(ML)] MU = 1.3[0.25 + 5/3x0.20] ; Mu = 0.76tn.m d = h - (r+φest + φAs) ; d = 10 - (3 + 1.27) ; d= 5.73
  • 7. (...) CALCULO DEL ACERO: MU = 0.76tn.m ; d=5.73cm ; b=100.0cm ; a=0.89 ; As = 3.81cm2 Asumimos φ1/2" 1.27/3.81 = 0.30 Tomar φ1/2"@.30 (...) Acero mínimo para la sección Asmín = (14/fy)xbxd = (14/4200)x100x10 ; Asmín = 3.34 cm2 Por lo tanto: Asmín < As calculado OK (...) Acero temperatura; Ast = 0.0018xbxt Ast = 0.0018x100x10 ; Ast = 1.80cm2 Asumimos φ3/8" ; 0.72/1.80 ; TOMAR : 1φ3/8"@.35cm Acero positivo tomar 2/3 Asp en ambos lados 2/3(3.34) = 2.23cm2 ; 0.72/2.23 = 0.30 TOMAR : 1φ 3/8"@.30 en cada lado. (...) Verificación por esfuerzo cortante VU = 1.3[VD + 5/3(VL)} VU = 1.3[0.434 + 5/3x0.435] = 1.51tn VC = φ[0.5(f'c)1/2 + (175xDensidad x VU xd)/MU] Densidad = As/bxd = 3.34/100x5.73 ; Densidad = 0.0058 VC = 0.85[0.5(210)1/2 + (175x0.0058x1.51x103 x5.73)/(0.76x105 )] VC = 6.20 Kg/cm2 VU = VU/φbxd = 1.51x1000/(0.85x1000x5.73) = 3.10 Kg/cm2 <VC OK