Más de Vida L Merino Andrade (10) Cronog.valoriz x mes insn 2012-1. Id Item DESCRIPCION Duración Rend. Metrado
0 NUEVO LABORATORIO DE EMERGENCIA PARA EL INSN 120 días
1 ESTRUCTURAS 102 días
2 01 OBRAS PROVISIONALES 9 días
3 01.01 OFICINA, ALMACEN, CASETA DE GUARDIANIA 5 días 7.7778 36
4 01.02 CERCO DE MADERA H= 2.20m 4 días 11.1111 40.5
5 01.03 CARTEL DE OBRA DE 3.60 x 2.40 m 1 día 4.4444 1
6 02 TRABAJOS PRELIMINARES 65 días
7 02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 10 días 1.11 1
8 02.02 DESMONTAJE Y TRASLADO DE LA IMAGEN DE SAN MARTIN DE PORRAS 2 días 0.5556 1
9 02.03 DESMONTAJE DE PUERTA ANTIPANICO EXISTENTE Y TRASLADO A NUEVA UBICACION (AUDITORIO SAN MARTIN)2 días 0.5556 1
10 02.04 TRAZO Y REPLANTEO DE EJES Y NIVELES 1 día 555.5556 204.48
11 02.05 RETIRO DE PISO DE ADOQUINES DE CONCRETO 2 días 44.4444 57.6
12 02.06 DEMOLICION DE FALSO PISO Y POLLOS DE CONCRETO 1 día 11.1111 5.89
13 03 MOVIMIENTO DE TIERRAS 70 días
14 03.01 LIMPIEZA DE TERRENO INICIAL, DURANTE Y AL FINAL DE LA OBRA 70 días 11.1111 204.48
15 03.02 EXCAVACION PARA CIMIENTOS Y/O ZAPATA EN TERRENO NORMAL 6 días 4.4444 47.73
16 03.03 NIVELACION INTERIOR Y APISONADO 2 días 111.1111 127.84
17 03.04 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS 3 días 20 46.26
18 03.05 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) R= 25m3/dia 1 día 27.7778 1.92
19 04 CONCRETO SIMPLE 24.2 días
20 04.01 SOLADOS DE CONCRETO fc= 100 kg/cm2 H= 4" 1 día 111.1111 24.78
21 04.02 FALSO PISO DE 4" DE CONCRETO 1:10 2 días 122.2222 207.87
22 05 CIMIENTOS Y SOBRECIMIENTOS 3 días
23 05.01 CIMIENTOS CORRIDOS 1:10 CEMENTO-HORMIGON + 30% PIEDRA 1 día 33.3333 11.37
24 05.02 CONCRETO PARA SOBRECIMIENTOS 1:8+30% PM 1 día 13.3333 3.62
25 05.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO 1 día 17.7778 11.7
26 06 CONCRETO ARMADO 59 días
27 06.01 ZAPATAS 2 días
28 06.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 1 día 27.7778 10.37
29 06.01.02 ACERO PARA VIGAS GRADO 60 1 día 333.3333 199.58
30 06.02 VIGAS DE CIMENTACION 4 días
31 06.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 1 día 24.4444 3.48
32 06.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION HASTA 0.30m2 días 22.2222 40.6
33 06.02.03 ACERO PARA VIGAS DE CIMENTACION GRADO 60 2 días 333.3333 420.32
34 06.03 COLUMNAS 23 días
35 06.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 2 días 22.2222 22.74
36 06.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 14 días 8.8889 367.81
37 06.03.03 ACERO PARA COLUMNAS GRADO 60 11 días 333.3333 3543.15
38 06.04 VIGAS 29 días
39 06.04.01 CONCRETO EN VIGAS f'c=210 kg/cm2 2 días 24.4444 32.98
40 06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 10 días 10 381.38
41 06.04.03 ACERO PARA VIGAS GRADO 60 10 días 333.3333 6115.2
42 06.05 LOSAS ALIGERADAS 26 días
43 06.05.01 CONCRETO PARA LOSAS ALIGERADAS f'c=210 kg/cm2 1 día 31.1111 29.51
44 06.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 7 días 16.6667 337.21
45 06.05.03 ACERO PARA LOSAS ALIGERADAS GRADO 60 5 días 333.3333 1479.5
46 06.05.04 LADRILLO HUECO DE ARCILLA 15x30x30cm PARA TECHO ALIGERADO 2 días 1777.7778 2810
47 06.06 ESCALERAS 23 días
48 06.06.01 CONCRETO PARA ESCALERAS f'c=210 kg/cm2 1 día 22.2222 3.06
49 06.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS 4 días 5.5556 19.21
50 06.06.03 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS 1 día 333.3333 105.54
51 07 ALBAÑILERIA 13 días
52 07.01 MUROS DE SOGA LADRILLO CON CEMENTO-CAL-ARENA 13 días 10 513.39
53 08 VARIOS 5 días
54 08.01 ESCALERA METALICA DE ESCAPE A= .90m 5 días 0.2222 1
55 ARQUITECTURA 40 días
56 09 REVOQUES ENLUCIDOS Y MOLDADURAS 9 días
57 09.01 TARRAJEO FROTACHADO EN MUROS INTERIORES MEZCLA C:A, E= 1.5cm 9 días 16.6667 888.28
58 09.02 TARRAJEO FROTACHADO EN MUROS INTERIORES Y EXTERIORES MEZCLA C:A, E= 1.5cm9 días 11.1111 398.77
59 09.03 VESTIDURA DE DERRAMES E= 1.5cm MEZCLA 1:5 8 días 20 296.6
60 09.04 TARRAJEO DE COLUMNAS E= 1.50cm, MEZCLA 1:4 4 días 10 36.96
61 09.05 TARRAJEO DE VIGAS E= 1.50cm, MEZCLA 1:4 8 días 7.7778 55.68
62 10 REVESTIMIENTOS 2 días
63 10.01 LOSA DE CONCRETO M-40, M-41 REVEST. PLANCHA ACERO INOXIDABLE 2 días 27.7778 27.8
64 11 CIELORASOS 17 días
65 11.01 CIELORRASOS CON MEZCLA CEMENTO-ARENA 17 días 11.1111 337.21
66 12 PISOS Y PAVIMENTOS 13 días
67 12.01 CONTRAPISO E=40mm MEZCLA 1:5 2 días 133.3333 214.07
68 12.02 PISO DE TERRAZO PULIDO INCLUYE GRADAS - ESCALERAS 7 días 5.5556 152.42
69 12.03 PISO DE CERAMICO 40x40cm 11 días 8.8889 97.11
70 12.04 PISO PORCELANATO .60x.60m 9 días 16.6667 136.46
71 13 ZOCALOS Y CONTRAZOCALOS 19 días
72 13.01 CONTRAZOCALOS 13 días
73 13.01.01 CONTRAZOCALO DE CERAMICO h= .10cm 10 días 22.2222 208.95
74 13.01.02 CONTRAZOCALO DE TERRAZO H= 10cm 3 días 11.1111 28.4
75 13.02 ZOCALOS 13 días
76 13.02.01 ZOCALO PORCELANATO h= 1.00m 5 días 13.3333 65.22
77 13.02.02 ZOCALO DE CERAMICO 0.30x0.30m 6 días 11.1111 60.47
78 14 CARPINTERIA DE MADERA 6 días
79 14.01 PUERTA CONTRAPLACADA CON PLANCHA MDF TIPO P-2 (.70x2.10) 2 días 5.5556 5.88
80 14.02 PUERTA CONTRAPLACADA CON PLANCHA MDF TIPO P-2 (1.00x2.10) 1 día 5.5556 4.2
81 14.03 PUERTA CONTRAPLACADA CON PLANCHA MDF Y AC. INOX. TIPO P-2 (1.00x2.10)1 día 5.5556 2.1
82 14.04 PUERTA CONTRAPLACADA CON PLANCHA MDF Y AC. INOX. TIPO P-3 (0.90x2.10)2 días 5.5556 5.67
83 14.05 PUERTA CONTRAPLACADA CON PLANCHA MDF Y AC. INOX. TIPO P-4 (1.20x2.10)2 días 5.5556 10.08
84 14.06 PUERTA CONTRAPLACADA CON PLANCHA MDF Y AC. INOX. TIPO P-5 (1.00x2.10) INC. VENTANA3 días 5.5556 12.6
85 14.07 PUERTA CONTRAPLACADA CON PLANCHA MDF Y AC. INOX. TIPO P-6 (1.20x2.10) INC. VENTANA1 día 5.5556 5.04
86 14.08 MUEBLE BAJO DE MELAMINA PARA KITCHENET 2 días 1.1111 2.15
87 14.09 COUNTER DE ATENCION DE MELAMINE CON TABLERO POSTFORMADO 6 días 1.1111 6
88 15 CARPINTERIA METALICA Y DE ALUMINIO 4 días
89 15.01 BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 2" PARANTE DE 1" x 1m4 días 6.6667 25.2
90 15.02 PUERTA DE VIDRIO TEMPLADO E= 10mm TIPO P-1 (2.55x3.00m) 1 día 1.1111 1
91 15.03 PUERTA DE VIDRIO TEMPLADO E= 10mm TIPO P-1" (2.00x3.00m) 1 día 1.1111 1
92 15.04 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO 6mm TIPO Ve-1 1 día 33.3333 17.63
93 15.05 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO REFLEJANTE 8mm TIPO Ve-2 1 día 44.4444 13.9
94 15.06 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO REFLEJANTE 8mm TIPO Ve-3 1 día 44.4444 32.9
95 15.07 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO 6mm TIPO Ve-4 1 día 33.3333 5.86
96 15.08 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO 6mm TIPO Ve-5 1 día 33.3333 8.4
97 15.09 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO 6mm TIPO Ve-6 1 día 33.3333 4.9
98 15.10 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO 6mm TIPO Ve-7 1 día 33.3333 5.25
99 15.11 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO 6mm TIPO Ve-8 1 día 33.3333 1.58
100 15.12 VENTANA DE ALUMINIO TIPO Ve-9 1 día 33.3333 0.38
101 15.13 VENTANA DE ALUMINIO CON VIDRIO TEMPLADO DE 6mm TIPO Ve-10 1 día 22.2222 5.25
102 15.14 ESPEJOS DE .60 x .90m, E= 6mm 1 día 33.3333 5
103 15.15 CANTONERA ANTIDESLIZANTE DE ALUMINIO 1 día 55.5556 33
104 15.16 MUEBLE TIPO M-8 1 día 27.7778 12.25
105 16 COBERTURAS 7 días
106 16.01 COBERTURA DE LADRILLO PASTELERO ASENTADO CON MEZCLA 7 días 22.2222 138.12
107 17 PINTURA 13 días
108 17.01 PINTURA VINILICA EN MUROS INTERIORES Y EXTERIORES 2 MANOS 10 días 31.1111 1132.11
109 17.02 PINTURA VINILICA EN CIELORRASO 2 MANOS 13 días 27.7778 337.21
Detalles
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
mes 1 mes 2 mes 3 mes 4 mes 5
S 52,903.45 S 103,629.38 S 126,661.64 S 129,437.02
S 41,122.58 S 86,376.51 S 56,171.36 S 6,289.96
S 9,947.59
S 5,606.64
S 3,298.32
S 1,042.63
S 1,615.10 S 553.11
S 540.00
S 553.11
S 523.88
S 353.75
S 139.39
S 58.08
S 3,301.47 S 1,547.11 S 287.62
S 958.72 S 990.68 S 287.62
S 1,176.54
S 501.13
S 1,166.21
S 55.30
S 473.79 S 6,256.89
S 473.79
S 6,256.89
S 2,664.10
S 1,562.01
S 771.68
S 330.41
S 23,120.53 S 78,572.51 S 33,491.02
S 3,474.01
S 2,551.95
S 922.06
S 3,998.74
S 909.50
S 1,147.36
S 1,941.88
S 15,647.78 S 22,336.43
S 5,832.13
S 2,254.68 S 13,528.05
S 13,393.10 S 2,976.25
S 40,488.50 S 14,745.33
S 9,094.89
S 17,886.72
S 22,601.78 S 5,650.44
S 14,480.49 S 17,403.92
S 7,925.80
S 10,379.32
S 4,101.17 S 2,734.12
S 6,744.00
S 1,267.09 S 1,341.77
S 875.28
S 1,267.09
S 466.49
S 21,839.61
S 21,839.61
S 6,289.96
S 6,289.96
S 59,512.36 S 97,255.26
S 23,853.60 S 2,345.01
S 11,504.21 S 1,438.03
S 7,255.84 S 906.98
S 2,882.95
S 746.22
S 1,464.38
S 5,682.04
S 5,682.04
S 5,925.77 S 1,823.32
S 5,925.77 S 1,823.32
S 25,193.76 S 2,847.35
S 4,056.63
S 10,113.07
S 3,291.32 S 1,880.76
S 7,732.74 S 966.59
S 315.52 S 11,385.20
S 315.52 S 4,018.13
S 3,387.08
S 315.52 S 631.05
S 7,367.07
S 4,110.16
S 3,256.91
S 16,706.52
S 1,519.10
S 1,090.91
S 631.24
S 1,472.73
S 2,618.18
S 3,359.54
S 1,343.82
S 1,161.00
S 3,510.00
S 42,599.05
S 1,826.75
S 2,964.37
S 2,741.62
S 4,086.46
S 6,951.39
S 16,453.29
S 1,358.29
S 1,947.04
S 1,135.77
S 1,216.90
S 366.23
S 36.78
S 610.37
S 341.80
S 303.27
S 258.72
S 4,223.71
S 4,223.71
S 11,441.17
S 8,388.94
S 2,960.70
Total
S 412,631.48
S 189,960.40
S 9,947.59
S 5,606.64
S 3,298.32
S 1,042.63
S 2,168.21
S 540.00
S 553.11
S 523.88
S 353.75
S 139.39
S 58.08
S 5,136.19
S 2,237.01
S 1,176.54
S 501.13
S 1,166.21
S 55.30
S 6,730.68
S 473.79
S 6,256.89
S 2,664.10
S 1,562.01
S 771.68
S 330.41
S 135,184.06
S 3,474.01
S 2,551.95
S 922.06
S 3,998.74
S 909.50
S 1,147.36
S 1,941.88
S 37,984.21
S 5,832.13
S 15,782.73
S 16,369.35
S 55,233.83
S 9,094.89
S 17,886.72
S 28,252.22
S 31,884.41
S 7,925.80
S 10,379.32
S 6,835.29
S 6,744.00
S 2,608.86
S 875.28
S 1,267.09
S 466.49
S 21,839.61
S 21,839.61
S 6,289.96
S 6,289.96
S 156,767.62
S 26,198.61
S 12,942.24
S 8,162.82
S 2,882.95
S 746.22
S 1,464.38
S 5,682.04
S 5,682.04
S 7,749.09
S 7,749.09
S 28,041.11
S 4,056.63
S 10,113.07
S 5,172.08
S 8,699.33
S 11,700.72
S 4,333.65
S 3,387.08
S 946.57
S 7,367.07
S 4,110.16
S 3,256.91
S 16,706.52
S 1,519.10
S 1,090.91
S 631.24
S 1,472.73
S 2,618.18
S 3,359.54
S 1,343.82
S 1,161.00
S 3,510.00
S 42,599.05
S 1,826.75
S 2,964.37
S 2,741.62
S 4,086.46
S 6,951.39
S 16,453.29
S 1,358.29
S 1,947.04
S 1,135.77
S 1,216.90
S 366.23
S 36.78
S 610.37
S 341.80
S 303.27
S 258.72
S 4,223.71
S 4,223.71
S 11,441.17
S 8,388.94
S 2,960.70
OBRA : NUEVO LABORATORIO DE EMERGENCIA PARA EL INSN
UBICACION: BREÑA - LIMA - LIMA
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA pag. 1 de 2
COSTOS A: ENERO 2012
CLIENTE: INSTITUTO NACIONAL DE SALUD DEL NIÑO (INSN)
Project Profesional © 2010 (Microsoft Corporation - Version 14.0.5128.5000)
2. Id Item DESCRIPCION Duración Rend. Metrado
110 17.03 PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS 1 día 33.3333 9.8
111 18 CERRAJERIA 5 días
112 18.01 CERRADURA TIPO PERILLA 2 días 11.1111 21
113 18.02 CERRADURA DE SOBREPONER 3 GOLPES 1 día 11.1111 2
114 18.03 BISAGRA ALUMINIZADA CAPUCHINA 3 1/2" x 3 1/2" 5 días 13.3333 66
115 INSTALACIONES SANITARIAS 98 días
116 19 SALIDAS DE DESAGUE 5 días
117 19.01 SALIDAS DE DESAGUE PVC 4" 2 días 3.3333 5
118 19.02 SALIDAS DE DESAGUE PVC 3" 3 días 4.4444 12
119 19.03 SALIDAS DE DESAGUE PVC 2" 5 días 4.4444 22
120 19.04 SALIDAS DE VENTILACION PVC 2" 5 días 3.3333 14
121 20 RED DE DISTRIBUCION 14.2 días
122 20.01 TUBERIA DE PVC- SAL Ø 6" 1 día 22.2222 11
123 20.02 TUBERIA DE PVC- SAL Ø 4" 5 días 16.6667 68.85
124 20.03 TUBERIA DE PVC- SAL Ø 2" 4 días 22.2222 88.83
125 20.04 EXCAVACION DE ZANJAS DE .40x.50m P/TUB. DESAGUE 10.2 días 3.3333 168.65
126 20.05 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS 3 días 20 54.81
127 20.06 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) R= 25m3/dia 1 día 27.7778 5.48
128 21 ACCESORIOS 2 días
129 21.01 SUMIDERO DE 3" PROVISION Y COLOCACION 1 día 8.8889 7
130 21.02 REGISTRO DE BRONCE CROMADO DE 2" 2 días 6.6667 8
131 21.03 REGISTRO DE BRONCE DE 4" 2 días 4.4444 6
132 22 CAMARAS DE INSPECCION 2 días
133 22.01 CAJA DE REGISTRO DE ALB. 12"x24" TAPA CONCRETO 2 días 4.4444 5
134 22.02 BUZON DE CONCRETO PARA DESAGUE 2 días 0.5556 1
135 23 SISTEMA DE AGUA FRIA 10 días
136 23.01 SALIDA DE AGUA FRIA PVC-CLASE 10 DE 1/2" Ø 10 días 3.3333 33
137 24 RED INTERIOR DE AGUA FRIA 3 días
138 24.01 RED DE DISTRIBUCION TUBERIA Ø1/2" PVC-SAP 3 días 27.7778 64.52
139 24.02 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP 2 días 27.7778 32.12
140 24.03 RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP 2 días 27.7778 35.77
141 24.04 RED DE DISTRIBUCION TUBERIA DE 1 1/4" PVC-SAP 1 día 27.7778 6.5
142 25 LLAVES Y VALVULAS 2 días
143 25.01 VALVULA COMPUERTA PESADA DE BRONCE DE UNION ROSCADA 1/2" 2 días 6.6667 8
144 25.02 VALVULA COMPUERTA PESADA DE BRONCE DE UNION ROSCADA 3/4" 1 día 5.5556 5
145 25.03 VALVULA COMPUERTA DE BRONCE DE 1" 1 día 4.4444 2
146 26 SISTEMA DE AGUA DE LLUVIA 1 día
147 26.01 GARGOLAS DE CONCRETO PARA LA EVACUACION PLUVIAL 1 día 5.5556 2
148 27 APARATOS Y ACCESORIOS SANITARIOS 6 días
149 27.01 LAVATORIO TIPO A-3 1 día 6.6667 6
150 27.02 LAVADERO DE ACERO INOXIDABLE DE UNA POZA CON ESCURRIDERO TIPO B-91 día 3.3333 1
151 27.03 INODORO TIPO C-4 2 días 4.4444 6
152 27.04 URINARIO DE LOSA C-9 COLOR BLANCO 1 día 3.3333 1
153 27.05 LAVADERO DE LIMPIEZA TIPO B-67 1 día 6.6667 2
154 27.06 DUCHA TIPO F-1 1 día 5.5556 3
155 27.07 GRIFERIA PARA DUCHA TIPO F-1 1 día 6.6667 3
156 27.08 GRIFERIAS EN M-39 2 días 5.5556 6
157 27.09 GANCHO METALICO H-3 3 días 1.1111 3
158 27.10 JABONERA DE LOSA H-5 6 días 1.1111 6
159 27.11 DISPENSADOR DE JABÓN J-1 6 días 1.1111 6
160 27.12 PAPELERA DE LOSA EMPOTRADA H-6 6 días 1.1111 6
161 27.13 BARRA METALICA EN DUCHA INC. CORTINA POLIESTER H-7TOALLERO DE LOSA COLOR BLANCO1 día 8.8887 2.5
162 27.14 COLOCACION DE ACCESORIOS SANITARIOSTOALLERO DE LOSA COLOR BLANCO4 días 11.1111 34
163 28 VARIOS 1 día
164 28.01 SALIDA PARA GAS PROPANO 1 día 5.5556 2
165 28.02 RED DE TUBERIA DE COBRE 1/2" 1 día 33.3333 28.8
166 28.03 BALON DE GAS INCLUIDO REGULADOR DE ALTA PRESION 1 día 1.1111 1
167 29 PRUEBAS HIDARAULICAS 2 días
168 29.01 PRUEBA HIDRAULICA DE AGUA 1 día 111.1111 96.64
169 29.02 PRUEBA HIDRAULICA DESAGUE 2 días 111.1111 158.1
170 30 EMPALME A RED EXISTENTE 1 día
171 30.01 EMPALMEA RED EXISTENTE AGUA FRIA 1 1/4" A 3/4" 1 día 4.4444 1
172 INSTALACIONES ELECTRICAS 88.8 días
173 31 SUMINIST. E INST. SALIDAS ELECTRICAS 52.8 días
174 31.01 SALIDA DE TECHO 10 días 7.7778 68
175 31.02 SALIDA PARA TOMACORRIENTE DOBLE CON TOMA A TIERRA 11 días 5.5556 57
176 31.03 SALIDA PARA INTERRUPTORES SIMPLES 4 días 5.5556 22
177 31.04 SALIDA PARA INTERRUPTORES DOBLES 3 días 5.5556 15
178 31.05 SALIDA PARA INTERRUPTORES DE CONMUTACION 1 día 5.5556 4
179 32 SUMINIST. E INST. DE TABLEROS ELECTRICOS 1 día
180 32.01 TABLERO TD-1 1 día 2.2222 1
181 32.02 TABLERO TD-2 1 día 2.2222 1
182 33 ALIMENTADORES 2 días
183 33.01 ALIMENTADOR 3-1x25mm2 NYY+1x10mm2 NYY - TUB PVC-P 50 mm 2 días 18.8889 35
184 33.02 ALIMENTADOR 3-1x16mm2 NYY+1x10mm2 NYY - TUB PVC-P 50mm 1 día 27.7778 6
185 34 SUMINIST. E INST. DE ARTEFACTOS DE ILUMINACION 4 días
186 34.01 ARTEFACTO ADOSADO A TECHO CON LAMPARA FLUORESCENTE DE 3x36w 4 días 11.1111 44
187 34.02 LUMINARIA TODO PLASTICO CUADRADO C/LAMPARA FLUORESCENTE CIRCULAR 32w2 días 11.1111 22
188 34.03 LUMINARIA DE EMERGENCIA CON 2 LAMPARAS INCANDESCENTES DE 20w + BATERIA, CARGADOR Y ENCHUFE1 día 8.8889 5
189 35 POZO TOMA A TIERRA 2 días
190 35.01 POZO A TIERRA SISTEMA NORMAL 2 días 0.5556 1
191 36 CAJAS DE PASE 4 días
192 36.01 CAJA DE PASE CUADRADA 1 día 11.1111 3
193 36.02 CAJA DE PASE CUADRADA DE 100x100x50mm PESADA 1 día 22.2222 4
194 36.03 PRUEBAS ELECTRICAS DE AISLAMIENTO Y RESISTIVIDAD 2 días 0.5556 1
195 37 CIRCUITOS DERIVADOS 1 día
196 37.01 SALIDA PARA TELEFONO INTERNO, EXTERNO Y TV 1 día 4.4444 3
197 37.02 SALIDA PARA COMPUTO 1 día 4.4444 4
198 38 VARIOS 4 días
199 38.01 MANTENIMIENTO DE POZO A TIERRA EXISTENTE 4 días 0.6667 5
Detalles
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
Costo
mes 1 mes 2 mes 3 mes 4 mes 5
S 91.53
S 2,425.60
S 1,592.22
S 204.40
S 628.98
S 11,780.87 S 11,424.22 S 9,352.92
S 4,903.48
S 469.50
S 1,224.48
S 1,658.58
S 1,550.92
S 9,853.23 S 1,171.11
S 400.95
S 1,923.67
S 1,614.93
S 5,545.21
S 368.47 S 1,013.29
S 157.82
S 894.77
S 286.37
S 286.32
S 322.08
S 1,927.64
S 628.35
S 1,299.29
S 2,196.15
S 2,196.15
S 1,625.05
S 732.95
S 371.63
S 432.46
S 88.01
S 1,293.97
S 622.00
S 441.35
S 230.62
S 234.46
S 234.46
S 6,478.41
S 2,036.34
S 309.20
S 1,294.80
S 233.93
S 616.44
S 232.08
S 113.43
S 466.56
S 67.50
S 135.00
S 162.00
S 81.00
S 183.75
S 546.38
S 1,384.43
S 107.08
S 944.35
S 333.00
S 402.31
S 125.63
S 276.68
S 193.00
S 193.00
S 5,828.65 S 10,977.92 S 16,538.88
S 5,299.86 S 7,233.02
S 3,794.40
S 5,299.86
S 1,793.44
S 1,290.30
S 354.88
S 1,980.20
S 771.85
S 1,208.35
S 1,764.70
S 1,634.50
S 130.20
S 9,835.36
S 6,266.92
S 2,067.34
S 1,501.10
S 1,707.17
S 1,707.17
S 717.90
S 200.64
S 79.72
S 437.54
S 528.79
S 219.15
S 309.64
S 4,278.45
S 4,278.45
Total
S 91.53
S 2,425.60
S 1,592.22
S 204.40
S 628.98
S 32,558.01
S 4,903.48
S 469.50
S 1,224.48
S 1,658.58
S 1,550.92
S 11,024.34
S 400.95
S 1,923.67
S 1,614.93
S 5,545.21
S 1,381.76
S 157.82
S 894.77
S 286.37
S 286.32
S 322.08
S 1,927.64
S 628.35
S 1,299.29
S 2,196.15
S 2,196.15
S 1,625.05
S 732.95
S 371.63
S 432.46
S 88.01
S 1,293.97
S 622.00
S 441.35
S 230.62
S 234.46
S 234.46
S 6,478.41
S 2,036.34
S 309.20
S 1,294.80
S 233.93
S 616.44
S 232.08
S 113.43
S 466.56
S 67.50
S 135.00
S 162.00
S 81.00
S 183.75
S 546.38
S 1,384.43
S 107.08
S 944.35
S 333.00
S 402.31
S 125.63
S 276.68
S 193.00
S 193.00
S 33,345.45
S 12,532.88
S 3,794.40
S 5,299.86
S 1,793.44
S 1,290.30
S 354.88
S 1,980.20
S 771.85
S 1,208.35
S 1,764.70
S 1,634.50
S 130.20
S 9,835.36
S 6,266.92
S 2,067.34
S 1,501.10
S 1,707.17
S 1,707.17
S 717.90
S 200.64
S 79.72
S 437.54
S 528.79
S 219.15
S 309.64
S 4,278.45
S 4,278.45
OBRA : NUEVO LABORATORIO DE EMERGENCIA PARA EL INSN
UBICACION: BREÑA - LIMA - LIMA
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA pag. 2 de 2
COSTOS A: ENERO 2012
CLIENTE: INSTITUTO NACIONAL DE SALUD DEL NIÑO (INSN)
Project Profesional © 2010 (Microsoft Corporation - Version 14.0.5128.5000)