APICO ofrece una variedad de servicios de ingeniería civil y construcción, incluyendo estudios estructurales, geológicos e hidrológicos, control de calidad, estudios geotécnicos, topografía, construcción menor y mantenimiento, diseño arquitectónico, estudios de impacto ambiental y extracción y ensaye de núcleos de concreto. La empresa ha trabajado en proyectos de oficinas, aeropuertos, fraccionamientos, plantas industriales y más en varias ciudades de Nuevo León y
11. DISEÑO DE PAVIMENTOS
FRACC. COLINAS DE SANTA FE,
SABINAS, COAHUILA.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart
your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have
enough memory to open the image, or the image may have
been corrupted. Restart your computer, and then open the file
again. If the red x still appears, you may have to delete the
image and then insert it again.
14. ESTUDIO HIDROLOGICO
PROYECTO PLAZA MR 450
CLIENTE: AZCUNAGA ARQUITECTOS
SAN PEDRO GARZA GARCIA, NL.
METODO RACIONAL AMERICANO
NOMENCLATURA:
tc= 5.00
Tr Area Lcp Cr S Ir Q
5 0.0008 0.024 0.600 0.005 159.429 0.021
10 0.0008 0.024 0.600 0.005 188.657 0.024
20 0.0008 0.024 0.600 0.005 224.531 0.029
50 0.0008 0.024 0.600 0.005 266.880 0.035
100 0.0008 0.024 0.600 0.005 298.916 0.039
ANALISIS HIDROLOGICO DEL PREDIOEN CONDICIONES NATURALES
PROYECTO: PROYECTO DE EDIFICIO EN LOMAS DE SAN FRANCISCO
LOCALIZACION: MONTERREY, N.L.
CUENCA: 1
FECHA: JUNIO DEL 2015
A = AREA DE LA CUENCA, EN KM2.
Lcp = LONGITUD DEL CAUCE PRINCIPAL, EN KM
S = PENDIENTE DEL CAUCE PRINCIPAL, ADIMENSIONAL
Cr = COEFICIENTE DEL METODO RACIONAL.
Ir= INTENSIDAD METODO RACIONAL, EN MM/HR. PARA (d=tc)
tr = PERIODO DE RETORNO, EN AÑOS.
Q= GASTO, en m3/s
Tc= TIEMPO DE CONCENTRACION DE KIRPICH,min
21. REALIZACIÓN DE PROYECTOS PLANIMETRICOS Y
ALTIMETRICOS, DISEÑO DE PLANOS Y RENDERS.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your
computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your
computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
25. APICO
RFC: API140512G35
(81) 20 89 69 49
(044) 811 953 9931
José Alfredo Jiménez #135, Col. Lomas del Roble, San
Nicolás de los Garza, Nuevo León
contacto@apico.com.mx
www.apico.com.mx