Más contenido relacionado RR_TAYI.pdf1. Item Referencia Plano Objeto Referencia Total
1 T101/T201/T301/T104/T204 Materiales RR200 23,010,563
2 T101/T201/T301/T104/T204 MDO RR200 42,000,000
3 T103/T203 Materiales RR201 9,204,225
4 T103/T203 MDO RR201 16,800,000
5 T102/T202/T302 Materiales RR203 15,151,650
6 T102/T202/T302 MDO RR203 28,080,000
7 TSGE Materiales RR204 11,807,050
8 TSGE MDO RR204 20,720,000
9 A1-DIAGRAMA FUERZA Materiales RR205 19,742,056
10 A1-DIAGRAMA FUERZA MDO RR205 8,320,000
11 TSGN Materiales RR206 3,412,683
12 TSGN MDO RR206 4,800,000
13 TSN1 Materiales RR207 3,108,425
14 TSN1 MDO RR207 4,640,000
15 TSN2 Materiales RR208 6,531,400
16 TSN2 MDO RR208 11,520,000
17 TSEVTP Materiales RR209 2,689,200
18 TSEVTP MDO RR209 3,840,000
19 TSBIE Materiales RR210 3,231,600
20 TSBIE MDO RR210 4,800,000
21 TSB3 Materiales RR211 3,308,600
22 TSB3 MDO RR211 4,800,000
23 TSA1 Materiales RR212 2,668,600
24 TSA1 MDO RR212 3,680,000
25 TSEM Materiales RR213 5,163,600
26 TSEM MDO RR213 8,480,000
27 TSB1 Materiales RR214 4,576,200
28 TSB1 MDO RR214 4,800,000
29 TSB2 Materiales RR215 4,576,200
30 TSB2 MDO RR215 4,800,000
31 CANALETA 40x10 con unión Materiales - 9,180,000
32 CANALETA 20x10 con unión Materiales - 4,500,000
33 CANALETA 40x10 MDO - 3,000,000
34 CANALETA 20x10 MDO - 1,500,000
35 GENERADOR 75KVA Materiales - 158,000,000
36 GENERADOR 75KVA MDO - 18,000,000
37 GENERADOR 75KVA + PUESTA + GRUA MDO - 4,500,000
488,942,052
289,862,052
199,080,000
PRESUPUESTO TABLEROS ELECTRICOS
PROVEEDOR RR ELECTRICIDAD
CONTACTO ROBERTO RAMIREZ
MANO DE OBRA
NUMERO TELEFÓNICO (0981) 510-600
TOTAL
Resumen
MATERIALES
2. Obs: Se paga el 100% materiales eléctricos y el 100% lo referente al generador
ENTREGA 312,362,052
PENDIENTE 176,580,000