AfterPost  [más allá de la fotografía]
AfterPost  [más allá de la fotografía]

  Un proyecto comisariado por Sema D’Acosta
                 para Espacio Iniciarte Sevilla
                               27.05 / 27.07 2010
JUNTA DE ANDALUCÍA                                                                   AGRADECIMIENTOS           Pamela Hernández
Consejero de Cultura Paulino Plata Cánovas                                           Alberto de Juan           Pilar Citoler
Viceconsejera de Cultura Dolores Carmen Fernández Carmona                            Alfonso de la Torre       Pilar Linares
Secretario General de Políticas Culturales Bartolomé Ruiz González                   Alfredo Viñas             Rafael Ortiz
Directora General de Museos y Promoción del Arte Inmaculada López Calahorro          Álvaro Alcázar            Rocío Calvo
Director Gerente del Instituto de las Artes y las Letras Luis Miguel Jiménez Gómez   Beatriz Pastrana          Rosa Juanes
                                                                                     Carles Taché              Rosalía Benítez
                                                                                     Clara Arnuncio            Rosalía Ortiz
EXPOSICIÓN                                                                           Concha de Aizpuru         Soledad Lorenzo
Comisario Sema D’Acosta                                                              Dan Benveniste            Tania Iglesias
Asistencia comisariado Marta del Corral                                              Diego Ruiz Alcubilla      Vicente Rabasco
Producción Instituto Andaluz de las Artes y las Letras                               Eduardo D’Acosta          Yolanda Rodríguez
Diseño de comunicación underbau [Juanjo Justicia+Joaquín Labayen]                    Elba Benítez
                                                                                                               Colección fotografía Universidad de Salamanca
Montaje Gonzalo Posada y Grupo 956 S.L.                                              Enrique Tejerizo
                                                                                                               Colección Circa XX-Pilar Citoler
Carpintería Lioch Carpinteros S.L.                                                   Fernando Pradilla
                                                                                                               Fundación Cajasol, Sevilla
                                                                                     Francisco del Río
                                                                                                               Fundación Rafael Botí, Córdoba
                                                                                     Helga de Alvear
                                                                                                               Fundación Telefónica, Madrid
CATÁLOGO                                                                             Ignacio Tovar
                                                                                                               Galería Alfredo Viñas, Málaga
Instituto Andaluz de las Artes y las Letras                                          Israel Caballero
                                                                                                               Galería Álvaro Alcázar, Madrid
                                                                                     Joaquín García Martín
                                                                                                               Galería Benveniste Contemporary, Madrid
Edita JUNTA DE ANDALUCÍA. Consejería de Cultura                                      Jorge Rigol
                                                                                                               Galería Carles Taché, Barcelona
                                                                                     Juan María Vélez
                                                                                                               Galería Cubo Azul, León
Textos Alberto Martín, Sema D’Acosta y Óscar Fernández                               Juana de Aizpuru
                                                                                                               Galería Elba Benítez, Madrid
Traducción Anna Rose Thomas                                                          Laura Fernández Orgaz
                                                                                                               Galería Fernando Pradilla, Madrid
Diseño editorial underbau [Juanjo Justicia+Joaquín Labayen]                          Laura Ramón
                                                                                                               Galería Fúcares; Madrid
Producción Instituto Andaluz de las Artes y las Letras                               Margarita González
                                                                                                               Galería Helga de Alvear, Madrid
Impresión TecnoGraphic                                                               María Montero Sierra
                                                                                                               Galería Juana de Aizpuru, Madrid
                                                                                     María Platero
                                                                                                               Galería Max Estrella, Madrid
© de los textos: sus autores                                                         Marta Puerta
                                                                                                               Galería Oliva Arauna, Madrid
© de las fotografías: sus autores                                                    Matías González Andrieu
                                                                                                               Galería Rafael Ortiz, Sevilla
© de la edición: JUNTA DE ANDALUCÍA. Consejería de Cultura                           Myriam Castro
                                                                                                               Galería Sandunga, Granada
© Vik Muniz, Daniel Canogar, Luis Gordillo, JJunco, VEGAP, Sevilla, 2010             Norberto Dotor
                                                                                                               Museo Patio Herreriano, Valladolid
                                                                                     Oliva Arauna
ISBN: 978-84-8266-999-1                                                              Óscar Romero              Bar El Pelícano, Sevilla
DL: SE-6682-2010                                                                     Pablo Suárez              Hotel Plaza Santa Lucía, Sevilla
Presentación
                              Paulino Plata




                  Un contexto
               para AfterPost
                            Alberto Martín




      ¿Qué es una imagen
        fotográfica hoy?
                            Sema D’Acosta




                                Obras
   Eugenio Ampudia / Dionisio González
    / Vik Muniz / Sherrie Levine / Jacobo
      Castellano / James Casebere / José
     Miguel Pereñíguez / Juan Francisco
      Casas / Juan Carlos Robles / Daniel
    Canogar / Pierre Gonnord / Gabriella
  Gerosa / Miguel Ángel Tornero / Carlos
        Aires / Germán Gómez / MP&MP
   Rosado / Aitor Ortiz / Helena Almeida
   / Luis Gordillo / Carlos Pérez Siquier /
 John Baldessari / Juan Francisco Isidro
   / Gregory Crewdson / Cristina Lucas /
   Sergio Prego / Alejandro Sosa / Lucas
Gómez / Gonzalo Puch / Juan del Junco
  / Manolo Bautista / Miki Leal / Rogelio
     López Cuenca / Juan Carlos Bracho
      TEXTOS: ÓSCAR FERNÁNDEz / SEMA D’ACOSTA




                            Autores
                     Biografías resumidas




                   English texts
  Presentation / A context for AfterPost /
   What is a photographic image today?
Presentación
     Paulino Plata
Presentación del Consejero de Cultura
Paulino Plata Cánovas




Fiel a su compromiso de apoyo al arte contemporáneo, la Consejería de Cultura de la
Junta de Andalucía presenta en Sevilla la muestra AfterPost. Más allá de la fotografía, un
proyecto del comisario hispalense Sema D’Acosta.
   A lo largo de estos cinco años, el programa Iniciarte se ha distinguido por una intensa
labor dirigida a promocionar a todos los que integran el sector de la creación más directa-
mente conectada con nuestro tiempo: artistas, críticos, comisarios, estudiantes e industrias
culturales.
   Es importante seguir trabajando con constancia para avanzar en ese objetivo. La línea
de Ayudas del Programa Iniciarte constituye una apuesta firme y decidida de la Consejería
de Cultura por el arte contemporáneo que abarca de todas las fases de la creación: inves-
tigación y formación, producción y difusión de proyectos.
   Si el año pasado en la exposición Landscape: the eternal return el fotógrafo José María
Mellado trataba de poner de manifiesto cómo el hombre moderno se afana por lograr un
lugar en la Historia, la intención de esta nueva iniciativa es reflexionar sobre el significado
de la imagen fotográfica, para lo cual se plantea un escenario abierto donde el espectador
pueda extraer sus propias conclusiones.
   El comisario ha seleccionado trabajos de artistas consagrados que dialogan con obras
de artistas noveles. Estamos convencidos de que esta sugestiva combinación cumplirá las
expectativas de todos aquellos que visiten la exposición.




                                                                                              7
Un contexto
para AfterPost
      Alberto Martín
Un contexto para AfterPost                                                                        parece sencilla y plenamente asentada, la fotografía se ha establecido por fin como la
Alberto Martín                                                                                    expresión artística más destacada de nuestro tiempo. Parece haberse cumplido el sueño
                                                                                                  perseguido durante tanto tiempo («la fotografía tiene su propia utopía, que se manifiesta
                                                                                                  particularmente en el museo de arte», Boris Groys)3: la fotografía como arte, pero ahora
                                                                                                  más que nunca como un fantasma. Ahora bien, la condición fantasmal de las imágenes
                                                                                                  electrónicas es muy diferente: «Fantasmización. En buena medida, las [imágenes] electró-
En cierta manera se podría decir de esta exposición, titulada de manera elocuente AfterPost.      nicas poseen la cualidad de las imágenes mentales, puro fantasma. Aparecen en lugares
Más allá de la fotografía, que trata a un mismo tiempo de la escasez y de la sobreabundan- –de los que inmediatamente se esfuman–. Son espectros, puros espectros, ajenos a todo
cia de la fotografía. Pero antes de entrar en ello, empecemos por el principio. La tesis del      principio de realidad.» (José Luis Brea)4. Es una fotografía desmaterializada que no necesita
proyecto recorre dos caminos bien delimitados: por una parte la presencia generalizada            ya encarnarse en un objeto ni dialogar con el soporte, su naturaleza es la circulación y la
de la fotografía en la escena artística, una realidad cada vez más acentuada que ha llevado       difusión, y su estado natural es la interacción, la manipulación y la proliferación.
hasta sus últimas consecuencias la porosidad entre los diferentes medios, y ha dado como             Al igual que ocurre con su condición fantasmal, también es diferente el lugar en el que
resultado que lo fotográfico aparezca como un medio en permanente expansión. Por otra,            residen y acontecen los dos contextos antes aludidos: la fotografía en la esfera artística y el
el desarrollo de la imagen digital que vendría a perturbar el estatuto de la fotografía hasta     desarrollo de la imagen digital. Ciertamente, la fotografía ahora prolifera en los museos, y
el punto, ¿tal vez?, de modificar radicalmente su naturaleza. En cierta manera, cada vez          lo hace precisamente en el momento en que el medio fotográfico, a través de la tecnología
que aparecen mencionados estos dos elementos, evidentes y omnipresentes, se tiende                digital, no sólo alcanza un estado de plena ubicuidad y desmaterialización, sino que en
a plantear su confluencia en un panorama cuya definición más clara sería la de un doble           cierta manera también reencuentra sus vínculos con la esfera social. Una paradoja que
proceso de expansión: la masiva generación y circulación de imágenes provocada por la             no deja de hacer visible e incluso refuerza la tensión entre la fotografía como práctica
revolución digital y la difusa y generalizada contaminación de los diferentes medios por          social cotidiana y expandida y su entrada en el museo5. Doble abundancia de diferente
la fotografía. Ambos contextos, el de la fotografía en la esfera artística y el del desarrollo    signo: abundancia en el museo que entra en contraste con aquella que caracteriza a las
de la imagen digital, terminan así por hablarnos, aunque por diferentes caminos, de la            imágenes electrónicas y que deriva de un lugar natural asentado en la circulación y la
sobreabundancia, la expansión o la fluidez. Pero sus itinerarios y sus etapas son en buena        proliferación incesante sin necesidad de llegar a materializarse en un soporte o localizarse.
medida divergentes. Lo es por ejemplo el carácter fantasmal de la fotografía o de la imagen       Si el lugar de la fotografía en arte es el museo, el lugar de la imagen en la esfera digital es
en uno y otro contexto. En efecto, y lo hemos visto especialmente a lo largo de la última         en realidad un no-lugar. Podría decirse también que la fotografía ahora más que nunca,
década, la fotografía se ha colado como un fantasma en la práctica artística explotando su        en su infiltración por la esfera del arte, se hipermaterializa, reforzando la presencia y
capacidad combinatoria y su condición de medio hiperfluido. Un proceso imparable de               la importancia de los soportes, justamente ahora que la revolución digital provoca un
irrigación y contaminación, mutación y adaptación, que ha generado también sus propias            desvanecimiento de los mismos, haciendo innecesaria la encarnación en un objeto6. Se
consecuencias sobre la fotografía, especialmente una progresiva disolución o dispersión           contraponen el museo y las prácticas sociales asociadas a la fotografía que ahora, desde
de su especificidad como medio, hasta el punto de que para algunos autores, como por              lo digital, devuelven a lo fotográfico su estrecha conexión con los usos y las funciones. De
ejemplo Paul Ardenne, ya no existiría un medio artístico que sería la fotografía, sino que ésta   nuevo entran en tensión, como en otros momentos recientes de la historia de la relación
habría accedido a una nueva condición como vector de una imaginería proteiforme1. Algo            entre fotografía y arte (por ejemplo, el conceptual), la pulsión antiestética que dialoga con
similar expresa Geoffrey Batchen en un contundente y simple resumen de dicha situación:           los usos y funciones del medio fotográfico, con la perfección estilística que abre un campo
lo fotográfico aparece en todas partes pero en ningún lugar determinado2. La conclusión           de negociación estética. En este sentido, puede recordarse cómo se ha señalado con



                                                                                                                                                                                              11
claridad que los avances digitales desde el campo del arte han servido fundamentalmente          o más comúnmente instituido. Quizás haya que buscarlo, por el contrario, como apunta
para facilitar la porosidad de la fotografía con otros medios, para acentuar la hibridación,     Richard Shiff en el mencionado artículo El alma fotográfica, en prácticas que ponen a
profundizar en las capacidades plásticas de dicho proceso y desplegar todo su potencial          prueba todo lo que parece natural al medio. Este mismo autor señala la reproducción
de manipulación7. Con razón Geoffrey Batchen decía que la posfotografía, encarnada en            manual de imágenes producidas con tecnologías mecánicas y electrónicas como una de
este acentuado nivel de porosidad, podía suponer la entrada en una era posterior, aunque         esas posibles pruebas11. Es oportuno explorar dicha transferencia en el contexto concreto
no totalmente más allá de la fotografía.8 La inscripción de otro modo de ver, condición          de AfterPost, propuesta expositiva que contiene un buen número de obras que global-
necesaria para un más allá de la fotografía, parece que aún está por llegar. De momento          mente podrían incluirse en tal procedimiento. Son numerosos los aspectos que aparecen
lo que si parece es que el juego de la negociación estética a partir de la fotografía está       implicados en este tipo de «prueba». Casi todos ellos parecen recordarnos elementos
más animado que nunca.                                                                           implicados en la imagen o la visión que el «automatismo» tiende a oscurecer. La corpo-
     Hasta aquí la abundancia. La escasez por su parte podría derivar del comentario             reidad, la temporalidad, la superficie. Parecen recordarnos, como ya hacía Paul Virilio
citado más arriba acerca de que hoy encontramos lo fotográfico en todas partes pero en           hace más de dos décadas12, que «los materiales de visión pasan por el cuerpo del artista
ningún lugar determinado. Podemos parafrasear a Jean-Luc Nancy para preguntarnos si              en la misma medida en que la luz es la que fabrica la imagen». Un rastro de manualidad,
existe ese lugar, aunque sea remoto o permanezca escondido. Se preguntaba por su parte           de corporeidad, cuya naturaleza hoy, en el nuevo contexto de la fotografía digital, quizás
Nancy: «¿Que queda del arte? Acaso sólo un vestigio. Eso es, al menos, lo que se dice en         adquiera un sentido inverso al que pudo tener, por ejemplo, en la época de plenitud del
nuestros días, una vez más. Al proponer como título de esta conferencia «El vestigio del         diálogo entre pintura y fotografía de los años 60 a 8013. Si entonces los temas de la foto-
arte», simplemente tengo en vista lo siguiente: de suponer que, en efecto, no queda más          grafía entraron en la pintura, la huella de la mano del artista cedía el paso a la huella del
que un vestigio –a la vez una huella evanescente y un fragmento casi inasible–, esto mismo       aparato, y se consideraba central construir una distancia respecto al carácter indicial o
podría ser apto para ponernos sobre la pista del propio arte o, cuando menos, de algo que        referencial de lo fotográfico, hoy las cosas suceden, al menos visto desde la fotografía, de
le fuera esencial, si podemos plantear la hipótesis de que lo que queda es también lo que        un modo casi inverso. No es difícil observar cómo en gran medida los temas de la pintura
más resiste. A continuación, tendremos que preguntarnos si ese algo esencial no será             o sus preocupaciones han entrado en la fotografía o se han convertido en tema para ella;
también del orden del vestigio, y si el arte en su totalidad no manifiesta mejor su naturaleza   o cómo es precisamente la huella del aparato la que cede el paso a la huella del artista.
o su meta cuando se convierte en vestigio de sí mismo: cuando apartado de la grandeza            Igualmente, hoy no parece que el asunto central sea tratar de poner de relieve que la
de las obras que crean mundos, parece pasado y ya no muestra más que su pasaje».9                fotografía es el medio que altera nuestro modo de ver o tratar de desnaturalizar el realismo
     Podríamos ahora sustituir arte por fotografía en esta larga cita y buscar el vestigio de    fotográfico como medio fundamental de imaginar el mundo objetivo. En el contexto de
la fotografía entre la selección de obras que forman esta exposición, preguntarnos si real-      la imagen digital, probablemente ya no se trate de la fotografía y nuestro modo de ver,
mente lo que queda es también lo que más resiste. De hecho, esta muestra permite una             sino de la imagen y nuestro modo de vivir con ella, el flujo y la proliferación. Asimismo, el
doble mirada, evidentemente repasar la masiva infiltración de la fotografía ya aludida, pero     intento de desnaturalizar el realismo fotográfico, en un contexto en el que las imágenes
también observar el rastro que va dejando entre los múltiples procesos de transfiguración        mentales ya adquieren o pueden adquirir un carácter prácticamente factual, bien podría
que permite el medio. Es en estos rastros concretos, en estas marcas específicas que             dejar el paso a una rendición frente a esa pretensión.
aporta singularmente lo fotográfico, donde podemos encontrar finalmente ese vestigio                Para la fotografía esa «manualidad» devuelve también un sitio central a la temporalidad,
de la fotografía. En cierta medida, sería como preguntarse (retomando para la ocasión el         una temporalidad abolida en la perseverante búsqueda de la instantaneidad y la fidelidad.
título de un interesante texto de Richard Shiff) por el alma de la fotografía10, y encontrar     La huella del proceso se enfrenta abiertamente a la independencia y el automatismo
que lo que resiste, aquello que esencializa el medio, no es precisamente lo más evidente         del aparato. El mencionado Richard Shiff utiliza una precisa imagen para describir esta



12
diferencia. Analizando, en su caso, el proceso de trabajo de Chuck Close, habla de intimidad     1.   Paul Ardenne, «La fotografía en la era de la abolición del control», en Cruce de caminos. Sobre el arte y la fotografía,

corporal, una intimidad que tiene que ver con el proceso a través del cual la visión se va            La Casa Encendida, Madrid, 2006, pp. 93-98.
                                                                                                 2.   Geoffrey Batchen, Arder en deseos. La concepción de la fotografía, Gustavo Gili, Barcelona, 2004, p. 215.
materializando a medida que el artista se abre paso a través de la imagen14. Un abrirse
                                                                                                 3.   Boris Groys, «El lugar de la fotografía», en Joan Fontcuberta (ed.), ¿Soñarán los androides con cámaras fotográficas?,
paso que supone una precisa lectura y extrapolación de datos visuales, una sintetización
                                                                                                      Ministerio de Cultura, Madrid, 2008, p. 182.
de la información contenida en la imagen y una cuidadosa articulación de sensaciones y           4.   José Luis Brea, Las tres eras de la imagen. Imagen-materia, film, e-image, Akal, Madrid, 2010, p. 67.
significados. Procesos constructivos, elaboraciones, que desplazan la atención hacia algunos     5.   Es interesante observar, por ejemplo, cómo esta tensión asoma indirectamente una y otra vez a lo largo de la

aspectos generalmente «menores» si se consideran desde el campo fotográfico. Uno de                   argumentación desarrollada por Boris Groys en su artículo mencionado en la nota 3.
                                                                                                 6.   José Luis Brea, Las tres eras de la imagen, op. cit.
ellos es la atracción hacia la superficie de la imagen fotográfica, territorio particularmente
                                                                                                 7.   Para este aspecto puede verse: Paul Ardenne, La fotografía en la era de la abolición del control, op.cit. y Michaela
conflictivo y complejo, donde el espacio puede ser colapsado, comprimido, desorientado
                                                                                                      Fiserova, Image photographique: de la critique de l’art plastique à la conversation visuelle, 2 marzo 2006,
o reconstruido, donde trama y dibujo dialogan, o donde la materialidad de la superficie               METAPHORES: http://www.sens-public.org/spip.php?article237.
puede ofrecer diversos niveles de resistencia frente a la imagen y la experiencia figura-        8.   Geoffrey Batchen, Arder en deseos, op. cit., pp. 214-215.

tiva15. Una materialidad que como bien señala Geoffrey Batchen, desde una perspectiva            9.   Jean-Luc Nancy, Las Musas, Amorrortu, Buenos Aires, 2008, p. 113.
                                                                                                 10. Richard Shiff, «El alma fotográfica», en David Green (ed.), ¿Qué ha sido de la fotografía?, Gustavo Gili, Barcelona,
histórica, «llama la atención hacia ese aspecto de las fotografías habitualmente reprimido
                                                                                                      2007, pp. 102-123.
en la conciencia que tenemos de ellas, su presencia física como cosas»16.                        11. Richard Shiff, El alma fotográfica, op. cit., p. 123.
   Un último elemento, más problemático, e incluso discutible, sería el modo en que se           12. Paul Virilio, La máquina de visión, Cátedra, Madrid, 1989, p. 29.
ponen en primer plano las intenciones del autor. Michael Fried abre una vía interesante          13. Para un interesante análisis de las implicaciones de dicho diálogo y de dicho periodo se pueden consultar, entre

de análisis en este sentido, en su estudio acerca del punctum de Roland Barthes17, al                 otros, los textos de Ralph Rugoff y Barry Schwabsky incluidos en el libro The Painting of Modern Life, Hayward
                                                                                                      Publishing, Londres, 2007.
profundizar en la conexión y separación entre artefacto fotográfico e intencionalidad.
                                                                                                 14. Richard Shiff, El alma fotográfica, op. cit., p. 104.
Situándonos en el contexto de la fotografía digital afirma:                                      15. Estos aspectos son abordados de un modo especialmente relevante por Richard Shiff, El alma fotográfica, op. cit.
   «… el deseo hiperbólico de Barthes de separar la fotografía (ideal) de las intenciones de     16. Geoffrey Batchen, «Aterrador fantasma de antiguo esplendor»: Qué es la fotografía», en David Green (ed.), ¿Qué
su autor encontraría su contrapartida en el creciente uso de técnicas digitales por parte de          ha sido de la fotografía?, Gustavo Gili, Barcelona, 2007, p. 26.

fotógrafos con ambición, con el fin de crear artefactos fotográficos cada parte de los cuales    17. Michael Fried, El Punctum de Roland Barthes, Cendeac, Murcia, 2008.
                                                                                                 18. Michael Fried, El Punctum de Roland Barthes, op. cit, p. 90, nota 47.
podía ser vista como la manifestación en potencia de una intención artística»18.
   Se pone en primer plano aquí, evidentemente, el papel que juega el nivel de control
artístico en una fotografía, y si hoy la fotografía «como arte» puede seguir dejando en
manos del aparato algo que se escape a la intencionalidad del artista.
   En contraste, quizás lo que está en juego ahora es cómo ofrecer resistencia al amane-
ramiento que pueda derivarse de una renovada preeminencia o presencia de lo mecánico
en el medio digital. Probablemente esos «vectores» de resistencia puedan encontrarse
también, o todavía, en los «vestigios» de lo fotográfico.




                                                                                                                                                                                                                          13
¿Qué es una imagen
  fotográfica hoy?
          Sema D’Acosta
¿Qué es una imagen fotográfica hoy?                                                                   AfterPost. Más allá de la fotografía reflexiona en torno a lo que significa una imagen
Sema D’Acosta                                                                                      fotográfica actualmente, esbozando un escenario abierto donde el espectador pueda sacar
                                                                                                   sus propias conclusiones. Evidentemente la idea de los límites de la fotografía no es algo
                                                                                                   nuevo, ya se planteó a finales de los años sesenta cuando algunos artistas conceptuales
                                                                                                   empiezan a utilizarla la cámara con fines no fotográficos. De hecho, es un cuestionamiento
                                                                                                   consustancial a la postmodernidad y sus derivaciones. Lo que sí es novedoso dentro de
          «Todo empezó con un ensayo sobre algunos de los                                          este proyecto es que esa frontera se convierta en el argumento de una exposición, ya
           problemas estéticos y morales planteados                                                que todas las obras seleccionadas trascienden los confines de lo fotográfico y se sirven
           por la omnipresencia de las imágenes fotográficas;                                      de la imagen como herramienta, un instrumento que pone en entredicho coordenadas
           pero cuanto más pensaba en lo que son las fotografías,                                  fundamentales que definen el hecho fotográfico tradicional (tiempo, espacio, instantanei-
           más complejas y sugestivas las encontraba.»1                                            dad, reproductibilidad…) No se pretende cuestionar aquí esas fronteras para marcar un
                                                                                                   borde inclusivo y otro exclusivo, no; la fotografía como lenguaje es muy sólido y no da pie
           SUSAN SONTAG                                                                            a equivocaciones. Ahora bien, como género es un medio muy permeable que facilita una
                                                                                                   ósmosis continuada. Por su capacidad de adaptación y porosidad se adapta a cualquier
                                                                                                   formato y disciplina con facilidad. Lo fotográfico es un concepto que hoy lo impregna casi
El arte que más vivo ha entrado en el nuevo siglo es la fotografía. Con un inmenso universo        todo. ¿Hasta dónde llega? ¿Qué abarca? Hay una zona intermedia, ambigua y mudable,
por delante y una vez superada su documental (y obsolescente) condición sine qua non,              que participa de lo fotográfico sin ser necesariamente una fotografía, un terreno envolvente
el feraz desarrollo tecnológico de los últimos lustros ha abierto las puertas a una disciplina     y expansivo que rodea a lo fotográfico sin depender de los condicionantes técnicos que
que crece y se expande de manera logarítmica. La revolución digital ha permitido un                lo constituyen. Es ahí, en ese intersticio desubicado, donde se sitúan la mayoría de los
ensanche tan amplio de sus fundamentos, que en su enriquecimiento caben casi todas las             trabajos presentes en esta colectiva.
posibilidades, incontrolable infinitud que acapara cualquier disciplina artística sin establecer      En nuestros días, una fotografía no es sólo una imagen arquetípica reproducible; se
fronteras previas. En el siglo XXI la fotografía se ha convertido en algo sustancialmente          ha transformado en un conglomerado complejo de ingredientes que supera en mucho
diferente de lo que fue en el siglo XX. No aparece en su estado puro, sino que se mezcla           la función mnemotécnica que había ostentado tradicionalmente. La noción tal como se
e hibrida con otros planteamientos expresivos convenidos, ya sea pintura, dibujo, vídeo o          entiende hoy, se aproxima más a un concepto inclusivo, participado, mestizo y heterogéneo
instalación. La era de la posfotografía propugna la superación de la imagen como icono             que nada tiene que ver con la «imagen-crónica» que había definido el género desde sus
indicial y su dilatación hacia otros campos, una circunstancia que ha sido estudiada en las        inicios. De hecho, pocos son los fotógrafos que perviven atrincherados en ese sentido
últimas décadas desde muchos flancos por diferentes teóricos (Roland Barthes, Rosalind             domesticado del término. Todo lo contrario. Cada vez son más los autores que recurren a
Krauss, Susang Sontag, Philippe Dubois, Geoffrey Batchen, Paul Ardenne, Vilém Flusser,             la fotografía por el acopio de posibilidades que permite. Los creadores de cualquier rama
Denis Roche, Peter Osborne, Boris Groys, Regis Durand, José Luis Brea, Víctor del Río,             la aprovechan como procedimiento, fin o punto de arranque porque es un mecanismo
etc.) También los artistas han escrito al respecto preocupados por la exacta ubicación de          rápido para captar sensaciones, crear asociaciones y establecer ideas.
sus prácticas, conscientes de que sus trabajos superaban en complejidad y profundidad                 Nuestra generación está viviendo un momento crucial y extremadamente complejo, un
el mero registro o la instantaneidad (Duane Michals, Victor Burgin, Jeff Wall, Allan Sekula,       estado liminar hacia un estatus fotográfico nuevo todavía, no definido. AfterPost atestigua
Joan Fontcuberta, Jorge Ribalta, etc.)                                                             esa tesitura explorando los discursos actuales que fluctúan en torno a la imagen fija y/o



                                                                                                                                                                                            17
sus derivaciones. Es necesario indagar esos límites para investigar cómo se calan los          mismo tiempo, el rápido desarrollo de las eternamente sofisticadas tecnologías digitales y
medios creativos en torno a un epicentro que sustancialmente siempre es fotográfico. O         electrónicas ha expandido los límites de lo propiamente fotográfico. La consecuencia más
fílmico. La imagen en movimiento no es más que una extensión de la imagen fija. El artista     evidente ha sido que ahora resulta muy difícil decir con exactitud dónde y cómo vamos a
alemán Thomas Demand comentaba en una entrevista reciente: «Considero fundamental              trazar las fronteras que separan la fotografía del cine o el vídeo o, incluso, de cualquiera
el papel de la fotografía en la sociedad actual. Todo el mundo tiene una cámara en su móvil,   de las otras formas de material icónico, gráfico o textual que hoy día podemos reunir y
millones de personas utilizan la red para subir y distribuir imágenes. Hoy todos sabemos,      mostrar en la pantalla del ordenador. Definitivamente ya no podemos suponer que la
en definitiva, cómo hacer una foto pero también cómo leerla. Esto, para los artistas, crea     imagen fija impresa fotográficamente es la forma arquetípica de la fotografía, sino una
un contexto muy interesante desde el que trabajar si lo comparamos con el conocimiento         de las muchas realizaciones posibles de una serie de aparatos tecnológicos y prácticas
que tiene el público en general sobre, por ejemplo, los vaciados de bronce.»2                  configuradas alrededor de la producción del campo visual. La fotografía, por lo tanto, ya
     A la hora de interpretar una imagen, lo esencial ya no resulta lo que históricamente      no tiene (si es que alguna vez la tuvo) ninguna estabilidad ontológica.»3 «A finales del
hemos asimilado de la condición fotográfica. Esa premisa permanece intacta sea cual sea        siglo XX la importancia del medio fotográfico en el arte ha llegado a ser evidente. Aunque
el medio y toma un valor u otro dependiendo de su presentación o nuestros propios juicios.     las raíces de este protagonismo podrían encontrarse en décadas anteriores, es entre los
Internet y los medios de comunicación conciben universos equivalentes que conviven             ochenta y noventa cuando se consolida un discurso claro en torno al medio fotográfico.
indistintos para crear no una sola realidad, sino muchas paralelas y diferentes. Nuestro       Ese protagonismo no se traduce sólo en la aparición de un nuevo género artístico (en
imaginario colectivo está sustentado en imágenes que absorbemos continuamente, no              contra de lo que dicen sus textos programáticos) que se hace un hueco definitivo entre
en visiones reales extraídas de la experiencia. En estos tiempos de continuada virtualidad,    otros de mayor tradición, sino también en la consolidación de un marco estable basado
la vivencia se confunde con la imaginación. Asimilamos figuraciones ya hechas que              en un circuito especializado de galerías, publicaciones e instituciones. Y es precisamente
asumimos como verdaderas sin deslindar lo verosímil de lo real, dos dimensiones que            de la crisis de los géneros artísticos tradicionales de donde parecen surgir soluciones para
cada vez aparecen más acopladas. La imagen digital ayuda a aprender (y aprehender)             rehabilitar las potencialidades icónicas de la imagen a través de la fotografía.»4
esa realidad nueva, un suceso manipulable, cambiable y harto enrevesado que ni siquiera           Es innegable que la fotografía comparece ante nosotros ahora como una nueva categoría
necesita materializarse. Puede ser un archivo volátil que retocamos hasta la inverosimilitud   habilitada por su situación de inespecificidad. Su condición intermedia entre la práctica
o comunicamos de manera instantánea. Los signos descontaminados ya no tienen cabida,           artística y otras variantes compartidas genera debates de calado sociológico, filosófico y
son consideraciones del pasado. Ahora habitamos la era de la posfotografía.                    político que superan las consideraciones estéticas habituales. En su ensayo Teoría de los
                                                                                               desplazamientos5, Rosalind Krauss es una de las que inicialmente aborda estas divergen-
                                                                                               cias de la imagen contemporánea, convirtiéndose en pionera de una abundante literatura
EL CONTEXTO DE LA POSFOTOGRAFÍA                                                                sobre el asunto. Curiosamente, esta misma crítica de arte norteamericana fue también de
Hoy por hoy la fotografía es una idea inagotable sin una noción exacta. Ha alcanzado un        las primeras en advertir en 19796 cómo se estaba empezando a utilizar el término escul-
estatus de tal autonomía y ósmosis, que su condición supera lo icónico, lo sintáctico y lo     tura para referirse a «cosas» bastante diferentes de la tradición estatuaria convencional.
representativo. «En los años noventa la fotografía fue omnipresente en galerías y museos       «Categorías como la escultura o la pintura han sido amasadas, extendidas y retorcidas en
pero en maneras en las que su identidad se vio radicalmente reconfigurada. Mediante su         una demostración extraordinaria de elasticidad, una exhibición de la manera en que un
incorporación a una amplia gama de prácticas artísticas, la fotografía fue progresivamente     término cultural puede alargarse para incluir casi cualquier cosa»7. Según sus palabras, la
pensada en términos de su interrelación, por una parte, con los medios de la pintura y         escultura rompía sus fronteras con la arquitectura, el paisaje, las construcciones o la mera
la escultura y, por otra, con las formas híbridas de la instalación y la performance. Al       señalización de lugares. Se trataba de trabajos desubicados que no podían encajarse en



18
lo pictórico y que se construían con espacio, materia, acción, movimiento, luz, o incluso       alejan de lo fotográfico, sí evidencia un cisma entre la comprensión y comunicación de la
imágenes, en un cerco que abarcaba cuatro vectores marcados por lo conocido, lo inexis-         imagen. «El concepto mismo [postmedia] prefigura la creencia de que nos encontramos
tente, lo perdurable y lo efímero. Esta desnaturalización del término (que lo abre a la alea-   ante una nueva situación histórica que afecta a las formas de recepción y circulación de
toriedad o la incertidumbre y que incluye hasta la inmaterialidad), no ha desmerecido los       la imagen, y cuyas implicaciones van más allá de lo meramente visual para constituirse en
caminos más tradicionales, pero sí ha variado la consideración de la expresión escultórica      una problemática que afecta a la construcción de la realidad y a los modos de intercambio
y la valoración del objeto, convirtiendo el panorama actual en un horizonte heterogéneo         informacional. A la actualidad de la condición postmedia subyace una crisis larvada de
y disperso. Basta repasar la última edición del Sculpture Projects Muenster desarrollada        la representación.»9
en 2007 en la ciudad alemana de Münster –quizás uno de los proyectos más serios y                  Esta nueva instauración de lo fotográfico que ha depreciado su estimación documental
sólidos de Europa en relación con esta disciplina–, para descubrir que en él se incluían        y ha expandido su ámbito de acción hacia otros terrenos más intelectuales, es el resultado
vídeos, performances, acciones en la naturaleza o intervenciones urbanas. ¿Qué podemos          de una progresiva dislocación acaecida en el último medio siglo. Será a partir de los años
inferir de esta imprevisible evolución sufrida por la escultura en los últimos cuarenta años?   sesenta cuando el concepto empiece a resquebrajarse, puesto en tela de juicio primero
Sencillo, los encasillamientos en las disciplinas artísticas tienden a desaparecer, sólo es     por los artistas conceptuales y luego por los cineastas estructuralistas. En 1962 Edward
cuestión de esperar las circunstancias adecuadas que los desajusten.                            Ruscha produce una edición limitada de libros de fotografías bajo el nombre de Veintiséis
   La fotografía ha experimentado un proceso análogo al de la escultura, en el sentido          Gasolineras. Las fotos son asépticas, frías, irrelevantes; no destacan por nada ni tienen
de que también en ella han comenzado a desdibujarse los límites que la enmarcaban y             especial interés. Están realizadas sin cuidado técnico y no pretenden ir más allá de lo
definían. Sabemos que su ubicación ha cambiado, pero aún nos falta perspectiva histórica        enunciativo, son sólo un registro elemental. El autor no procura acaparar protagonismo ni
para comprender dónde se encuentran ahora esos límites, pues el imparable desarrollo            definir un estilo; se desprende del género en su valoración tradicional e incluso presenta el
tecnológico de los últimos años ha hecho del cambio, hábito. Estamos, de algún modo,            trabajo en un formato popular renunciando a su diferenciación artística. Twemtysix Gasoline
ante una nueva «tradición de la ruptura», como explicara Octavio Paz en relación con la         Station es un objeto (ya no una simple imagen) que mezcla baja y alta cultura. Como medita
literatura. Realmente su reconocimiento es un problema historicista (tendemos a reducir la      Jeff Wall en «Señales de indiferencia»10 Ruscha está desmontando con esta serie la técnica
realidad humana a su condición histórica apoyándose en referentes conocidos y valorados)        fotográfica en un ejercicio de negación. Evidentemente subyace en toda la idea un guiño
que por falta de perspectiva no es evaluable desde nuestro presente. La progresión técnica      pop irónico, pero también una reconsideración de lo fotográfico como algo diferenciado
va solapando etapas con suma celeridad, estableciendo en cada progreso un marco de              de lo que abarcaba el género hasta entonces en su relación con lo artístico. «El cuidado
acción alterado que sitúa a la fotografía a mitad de camino entre la historia del arte y las    con el que se edita el libro, incluso si las fotografías son técnicamente malas, apunta a
variantes tecnológicas que se van produciendo.                                                  que Ruscha está jugando también en el terreno de una estatización de lo banal que no
   El critico de arte y pensador José Luis Brea ha analizado la repercusión en el arte de los   excluye el interés por la confección efectista del soporte, es decir, por la manufactura de
nuevos escenarios creativos proporcionados por el uso de Internet, un escenario inédito         sus obras»11 La obra de Ruscha se inscribe en una tendencia muy común en la segunda
para la acción creadora que trastoca todos los conceptos anteriores. Brea denomina al           mitad del siglo XX, que se acerca a lo cultural utilizando el arte como arma crítica liberadora
momento actual que vivimos «era Postmedia», un dominio donde la circulación pública             capaz de romper los límites formales establecidos. No se trata de transgredir los géneros,
de la información ya no está exhaustivamente sometida a la regulación jerarquizada              algo que sería más bien una forma de vanguardismo, sino de reubicar el discurso12.
característica de los tradicionales mass-media (estructuralmente orientados a la produc-           Un elemento clave también a tener en cuenta es que la fotografía tomó contacto en
ción social del consenso), sino que se adapta a cada usuario de manera pormenorizada e          estos años con la semiótica, empezando a ser interpretada, decodificada, analizada y
independiente.8 Aunque el libro ahonda en cuestiones relacionadas con el Net.art que se         reensamblada no como una imagen, sino como un texto. Muchos artistas conceptuales



                                                                                                                                                                                            19
norteamericanos parten de lo fotográfico y derivan su trabajo hacia otros territorios que         del siglo XX, una consideración que la equipara con el respeto histórico y la reverencia que
cuestionan qué es y qué no es una obra de arte, llevando hasta márgenes impensados                había recibido la pintura. A partir de entonces e insuflados por esta confianza, comienzan
ciertas premisas duchampianas. Algunos creadores discurrieron por aspectos performativos          a aparecer grandes formatos (Jeff Wall, Jean Marc Bustamante, Hannah Collins, Günther
y otros lingüísticos (Dan Graham, Joseph Kosuth, Lawrence Weiner); pero en la mayoría             Förg, Cindy Sherman, Thomas Struth), suben vertiginosamente los precios hasta alcanzar
de sus experiencias, la fotografía jugaba un papel destacado como valor testimonial. Se           en poco tiempo cotas millonarias, en las galerías se exhiben cada vez más fotografías, las
servían de ella para patentizar sus obras o ponerlas en entredicho, la desvinculaban de           grandes colecciones empiezan a incorporarlas con normalidad, se crean festivales específicos
una idea o la asociaban a otra, pero siempre buscando cuestionar su esencia. A partir de          en los cinco continentes y se cuelgan fotografías en los museos como si fuesen cuadros
entonces, la fotografía quedó emplazada en un territorio mixto entre lo social y lo cultural,     para ser contempladas como se mira un lienzo, superponiendo dos idiomas diferenciados
imposible de abandonar. Esta tendencia expansiva ha perdurado hasta hoy superpo-                  que comienzan a compartir terrenos y a cobrar la misma relevancia
niendo perspectivas década tras década. «A finales de los años setenta y en los ochenta              La exposición «Los géneros de la pintura», organizada por Rosa Olivares a mediados
la interrelación entre la teoría y la práctica se manifestó a través de la obra de artistas que   de los años noventa en Gran Canaria, Madrid y Sevilla, precisamente abordaba esta
trataron de reexaminar el lugar de la fotografía en la cultura de la imagen en su conjunto        relación simbiótica entre pintura y fotografía, explicando cómo el bodegón, el paisaje
y de acuerdo con la función del arte ante los medios de masas»13.                                 y el retrato acostumbrados, estaban siendo retomados por la fotografía con absoluta
     Víctor del Río propone un doble enfoque para entender por qué la fotografía ha tomado        vigencia cuando ya habían sido abandonados por la pintura al considerarlos modos de
tanto protagonismo en las últimas décadas. «El primer itinerario incorpora el medio fotográ-      representación pertenecientes a épocas pasadas. «Es así como la fotografía desarrolla
fico mediante híbridos con otros soportes. La fotografía aparece entonces indirectamente          la existencia de los géneros clásicos de una manera libre y sin prejuicios, respetando y
legitimada por un proceso que parte de la crisis de otros géneros artísticos. Un proceso          utilizando una tradición estética y usando una iconología aceptada popularmente, pero
de hibridación que aprovecha precisamente la inespecificidad de lo fotográfico, su devenir        sin el peso con que esta tradición lastra a la pintura. De una manera renovada y limpia,
no asociado a una tradición, para enriquecer los contenidos artísticos. Los espacios de las       como si se empezase a reescribir la historia del arte desde el principio pero sin tener que
instalaciones y el potencial escenográfico de la fotografía dan lugar a soluciones instalativas   recalar en cada etapa histórica, repitiendo y utilizando solamente lo que se quiere, un
y pictóricas. De estas hibridaciones posibles, la que se establece con la pintura sería una       método totalmente postmoderno en el que todo vale y en el que, una vez más, el fin justi-
de las más fructíferas. El eje entre Andy Warhol, Robert Rauschenberg, Christian Boltanski,       fica cualquier medio y en el que se pueden mezclar influencias, gustos, todo sin temor al
Sigmar Polke o Gerhard Richter sugiere el espectro de posibilidades que se presenta y             crítico, sin temor al historiador. Es un juego sin castigo. Los elementos que en la pintura
del que participan otros muchos artistas. El discurso artístico se abre así a la imagen           son considerados excesivamente tradicionales y poco renovadores, en la fotografía son los
fotográfica por una vía de suplantación de lo pictórico. La ambigüedad intencionada con           puntos clave de su desarrollo y aceptación como un lenguaje inmerso en la más radical
la que trabajan estos artistas apunta a un primado de la imagen por encima de su origen           de las modernidades.»15
técnico y, por ende, de su adscripción a un género concreto» .    14
                                                                                                     Esta nivelación entre pintura y fotografía (una vinculación sobre el «inconsciente pic-
     La segunda ruta considera el tratamiento que recibe la fotografía como tableau. Desde        tórico» sobre la que ahonda F. Javier Panera en algunos de sus ensayos) acaba con un
finales de los años ochenta, determinados artistas y teóricos (entre los primeros, Regis          debate histórico en cuanto al valor artístico de sus respectivos productos. Matiza Walter
Durand) empiezan a estimar la obra fotográfica como si fuesen cuadros. Es decir, comienzan        Benjamin: «De hecho, esta disputa era la expresión de un vuelco en la historia universal del
a valorarla al mismo nivel que tradicionalmente había recibido la pintura, sin ningún tipo        que no se daban cuenta ninguno de los dos contendientes. La época de la reproductibilidad
de complejo. Sin entrar en asuntos estilísticos, son dos lenguajes diferenciados y ésa no         técnica desligó el arte de su fundamento cultural, extinguiendo para siempre el brillo de
es la cuestión, lo esencial es la dignificación que alcanza la obra fotográfica a la conclusión   su autonomía. Ello trajo consigo un cambio en la función del arte que no fue planteado ni



20
estudiado durante el siglo XIX, e incluso se le ha escapado durante largo tiempo al siglo XX,   uno a su manera, pero siempre anteponiendo rigor y conceptualismo. Candida Höfer, Andreas
que es el que ha vivido el desarrollo del cine» Un planteamiento interesante, que se dilucida   Gursky, Thomas Ruff, Axel Hütte y Thomas Struth forman parte de ese grupo inicial de discí-
por asimilación empática y sin entrar en ningún tipo de conflictos, sesenta años después        pulos, un quinteto colocado hoy entre los mejores fotógrafos de la actualidad. De la segunda
que el pensador alemán escribiera «La obra de arte en la época de su reproductibilidad          promoción, Elger Esser y Simone Nieweg, son dos de los pupilos más aventajados.
técnica». Continúa Benjamin: «en un primer momento se malgastó mucha agudeza en                    Vancouver, en la costa pacífica de Canadá, está considerada una de las ciudades con
decidir si la fotografía era o no un arte, sin haberse planteado previamente si la invención    mayor calidad de vida del planeta. Es el tercer centro de producción cinematográfica y
de la fotografía no había cambiado el carácter global del arte.»16                              televisiva de Norteamérica después de Los Ángeles y Nueva York. Será aquí a partir del
   La percepción del arte después del nacimiento de la fotografía adquirió un valor dife-       trabajo de Jeff Wall y su fotografía escenificada, cuando germine un tipo de imagen de gran
rente desligado de la exclusividad y vinculado con la ubicuidad. Ya no era necesario viajar     formato muy vinculada con lo fílmico, un instante suspendido de una historia sin resolver
al lugar donde se hallaba la obra para poder verla, ni siquiera era necesario concretar una     que encuentra su continuidad en obras como las de Gregory Crewdson o Erwin Olaf.
imagen para que fuera disfrutada por el espectador; estos conceptos se trastocan con la            La Escuela de Boston caracteriza sus fotografías no por manifestar el mundo, sino por
llegada de la fotografía, que se convierte en una expresión nueva en constante evolución        constatarlo a través de experiencias propias. Es lo real según unos rasgos antisociales,
apta para todas las masas y rabiosamente contemporánea. Una expresión nueva cuyo                e incluso distópicos, de los diversos estilos de vida alternativos. En la obra de autores
paradigma más consistente será el cine.                                                         como Nan Goldin, Jack Pierson, Corinne Day, Jurgen Teller, David Armstrong o Wolfgang
   Las narraciones fotográficas, entendiendo como tales los relatos visuales de situaciones     Tillmans, lo mundano se reelabora a través de una iconografía de la miseria y los detritus
extraordinarias expandidos por el periodismo gráfico para dar conocimiento de qué ocurría       de la existencia contemporánea vivida en un estado de descontento social y psíquico. 17
en lugares inaccesibles (especialmente conflictos políticos o confrontaciones bélicas), ya      En España, podríamos situar a Alberto García-Alix en esta misma línea. Son trabajos mal
no sirven. Son historias icónicas del pasado que fundamentaban su fuerza expresiva en la        encuadrados, borrosos y de una estudiada informalidad, donde lo importante no es la mirada,
composición y en la posibilidad de mostrar escenas inauditas. Agotados sus recursos por la      sino la vivencia que se comunica través de una subjetivización extrema (en las antípodas
sobreabundancia de representaciones que nos asaltan a diario, lo que ofrecen ahora nos          de la Nueva Objetividad alemana, escrupulosamente neutra), un modo de manifestar la
parece ordinario, común, extemporáneo. Son imágenes que ya conocemos cuya sintaxis              presencia corporal del fotógrafo en un campo afectivo compartido. En muchos casos, la
nos resulta consabida. La imagen-crónica o la imagen-documento aparecen ahora como              intimidad queda registrada de manera diarística como recuerdo de una autobiografía
salvoconductos de otro tiempo que no pueden ser vistos del mismo modo que cuando                salpicada de momentos de gran carga emotiva. Quizás la pieza más emblemática de esta
fueron generadas, se han modificado las reglas de re-interpretación de una imagen y se          tendencia sea el diaporama con banda sonora de The Ballad of Sexual Dependency de
han abierto diferentes frentes. En su libro «La cámara lúcida» Roland Barthes declara la        Nan Goldin, que figura en colecciones como la de la Tate Modern o la del MOMA, una
imposibilidad desde el punto de vista de la semiótica de analizar una imagen circunscri-        sucesión de instantes vividos con más de setecientas imágenes.
biéndonos, sólo, a su nivel informativo.                                                           El último núcleo y por ahora el de menor recorrido, lo hemos situado en Helsinki por ser
   Comoquiera que sea valorado, en la complexión de la fotografía reciente podemos dife-        el centro más establecido, aunque podríamos extenderlo a todos los países escandinavos
renciar varios focos fundamentales que han marcado, y marcan, algunas de las tendencias         porque en la mayoría surgen prácticas similares. Los fotógrafos de la Helsinki School prac-
de más calado y profusión del panorama. Una suerte de puntos cardinales que podríamos           tican una particular poética del paisaje y establecen unos vínculos muy especiales con la
ubicar en cuatro ciudades diferentes: Düsseldorf, Vancouver, Boston y Helsinki. Cuando          Naturaleza; correspondencias entre el entorno y los seres humanos que implican respeto
Bernd & Hilla Becher empezaron a dar clases en los años setenta en la Academia de Arte de       e integración. Son artistas que también abordan de un modo personal los sentimientos
Düsseldorf, rápidamente una primera generación de alumnos absorbe sus enseñanzas. Cada          personales (los recuerdos, las ensoñaciones, los deseos), impresiones que exteriorizan a



                                                                                                                                                                                         21
veces de manera inquietante y otras de manera misteriosa. Destacan Elina Broterus, Aino          indicial de ese sujeto queda reiterada y reforzada (…) Es un tipo de experimentación del
Kannisto y Roni Horn, que aunque nació en Nueva York, mantiene un nexo especial con              retrato mucho más apasionante que la que puede ofrecer cualquier fotografía única y
Islandia, país al que se siente emocionalmente vinculada.                                        sin manipular. La hibridez del objeto ayuda a salvar la distancia entre quien observa y es
                                                                                                 observado, entre el parecido y el sujeto (entre la simple semejanza y «algo más»).19
                                                                                                    Una fotografía además de imagen, es un ente físico que adquiere unas connotaciones
MÁS ALLÁ DE LA IMAGEN (LA FOTOGRAFÍA COMO ObJETO, ACTO, IDEA… O ALGO INEXPLICAbLE)               interpretables en función de su apariencia, relación y presentación. Una imagen repre-
Para muchos teóricos, el verdadero dilema de lo fotográfico en nuestro tiempo es la supe-        senta, sin duda, pero nunca puede desprenderse del soporte, que aporta significados
ración de la iconicidad hacia lo objetual. Lo preponderante hoy no es, particularmente,          fundamentales para la lectura y sentido de esa obra. Su condición de objeto lo deter-
qué contiene una imagen sino cómo se comunica, de qué forma y manera. La fotografía              mina y configura. La manera en la que recibimos la información, relaciona esa totalidad
ha pasado de exteriorizarse por un método técnico fiable y unidireccional, a ser un «todo»       (imagen+objeto+contexto) con nuestra cultura, además de con experiencias fijadas en
que comporta infinidad de matices significantes con valores denotativos. Empezó hace             el inconsciente colectivo, que entendemos y desciframos. Ahora bien, esas asociaciones
algo menos de dos siglos por la coincidencia de unos parámetros científicos exactos, que         pueden llevar a error, porque una imagen no es siempre lo que parece.
maravillaron por su capacidad para superar en presteza la habilidad manual. Ahora es una            Otro aspecto poco usual a considerar de la fotografía, es valorar su naturaleza como
forma artística omnipresente cuya alquimia ha desaparecido. Ya no es relevante controlar ni      acto performativo, una circunstancia que acrecienta y condiciona la información visual que
la toma ni el proceso, las gradaciones de alrededor son más sugerentes y acarrean mayor          nos muestra y que ha investigado con profundidad Philippe Dubois en su libro «El acto
complejidad. «La posfotografía no es, por tanto, el resultado de un cambio en la tecnología de   fotográfico.» Aclara en la introducción de su estudio: «si hay en la fotografía una fuerza
producción de la imagen, y no responde a los endebles dilemas teóricos entre lo analógico        viva irresistible, si hay en ella algo que me parece de una gravedad absoluta es que, con la
y lo digital. La composición originaria de las imágenes, el hecho de que tengan un origen        fotografía, ya no nos resulta posible pensar la imagen fuera del acto que la hace posible.»
químico o numérico resulta en la mayor parte de los casos anecdótico. Es la constitución de      La foto no es sólo una imagen (el producto de una técnica y una acción, el resultado de un
un soporte fotográfico donde se describe una serie de pragmáticas con las que la imagen          hacer y de un saber-hacer, una figura de papel que se mira simplemente en su delimitación
cobra relevancia más allá del acto fotográfico para constituirse como obra.»18                   de objeto cerrado), es también, de entrada, un verdadero acto icónico; una imagen, si se
     Un ejemplo que puede ilustrar esta idea, es la reflexión que desarrolla Geoffrey Batchen    quiere, pero como trabajo en acción, algo que no se puede concebir fuera de sus circuns-
tras encontrar un objeto fotográfico en una tienda de antigüedades de Nueva York. Su             tancias, fuera del juego que la anima, sin hacer literalmente la prueba: algo que es a la vez
argumentación cuestiona el excluyente discurso tradicional que decide, en relación con           y por tanto una imagen-acto, pero sabiendo que este «acto» no se limita trivialmente al
unos criterios puristas ya superados, qué es y que no es fotografía. Batchen halló un gran       gesto de la producción propiamente dicha de la imagen (el gesto de la «toma») sino que
vidrio de marco grueso con unos rosetones tejidos con cabello, un amplio adorno de flores        incluye también el acto de su recepción y de su contemplación.»20 Como refieren David
de cera en forma de corona y una pequeña imagen de una mujer joven en el centro. El              Green y Joanna Lowry con acierto, fue C. S. Pierce quien demostró que el signo indicial
conjunto, en toda su lánguida tristeza, es un monumento intimista a la ausencia de un ser        fotográfico guarda menos relación con sus orígenes causales que con el modo de aludir
querido que va más allá del mero recordatorio. Las sensaciones globales que transmite,           al hecho de su propia inscripción. «Las fotografías no son indiciales sólo porque la luz se
potenciadas por el modo de presentación, superan en mucho las de una simple fotografía           registre en un instante en una porción de película fotosensible sino, primero y ante todo,
y nos hacen entender de alguna manera no explicable, asuntos que tienen que ver con              porque se hicieron»21. Los autores diferencian dos ejemplos deícticos. El más evidente y
la muerte, el respeto, el amor y la memoria. «La hibridez de este objeto también ofrece          entendible: una imagen es la huella de un instante sucedido. El otro, más abstracto pero
una experiencia del retrato más intensa. Al añadir una muestra de cabello, la presencia          no menos importante, el acto de fotografiar es un hecho performativo que apunta hacia un



22
momento preciso en el tiempo. Ambos son consustanciales a la captación de una imagen.            existencia»23. En estas imágenes de Barry destaca un componente no visual imperceptible
Es curioso como esta distinción no fue precisada por teóricos sino evidenciada por artistas      para el que observa la fotografía, que debe ser acreditado por el artista como notario de
conceptuales de los años setenta que intentaban cuestionar con sus propuestas el estatus         unos hechos que superan lo material y por tanto deben certificarse para ser creíbles.
documental de una fotografía como salvaguarda probatoria de los hechos.                             Las cámaras digitales compactas y los móviles con cámara incorporada, han convertido
   Existe una interdependencia entre un instante y su registro que es mucho más que la           la acción fotográfica en algo distinto a lo que entendíamos tradicionalmente. En cualquier
representación de un incidente momentáneo. Dos ejemplos comprensibles y clarificadores           momento, de cualquier manera y desde cualquier posición puede surgir una foto sin que
serían: el primero la fotografía Authorization (1969) de Michael Snow que puede verse en         eso signifique ni conlleve nada especial. En las convocatorias donde coinciden personas se
la Galería Nacional de Canadá (Ottawa). La imagen contiene un espejo y cinco polaroids           disparan tomas de manera ordinaria sin una intención concreta. Las instantáneas quedan
ordenadas pegadas sobre él. Al observar los clichés con atención descubrimos que leídos          registradas hasta acumular miles, metamorfoseando lo que antes era un momento diferen-
en progresión cronológica representan lo que está aconteciendo delante del espejo, que           ciado cuyo recuerdo se desvelaba días después, en algo cotidiano sin mayor trascendencia.
no es más que la constatación del hecho fotográfico. Los acontecimientos expuestos son           No se concreta la imagen sobre papel como ocurría antaño, sino que de forma natural
los que, literalmente, han constituido la obra tal como la vemos. Es decir, narran su historia   disponemos de un archivo en píxeles que visionamos en una pantalla u opcionalmente
al mismo tiempo que la crean. Son a la vez el acto de realización y su memoria. Además a         materializamos en un formato físico. Además, se pueden hacer cientos de fotos sin per-
través de la simple contemplación de esas instantáneas el espectador puede desmontar             juicio, basta con desechar las que no nos convencen. Ni siquiera hace falta esperar para
su fabricación22. Lo que cuentan las imágenes es sólo eso, no hay más, la obra de Snow           saber cómo será la imagen porque al instante podemos verla. Suprimimos el revelado y
es una reflexión metalingüística en torno al acto mismo de hacer una fotografía.                 el positivado, evidenciando que el procesado ya no es necesario. Se comprime tanto el
   El segundo sería la serie sobre gases inertes realizada por Robert Barry también en           procedimiento, que desde que hacemos la foto hasta que la visionamos pasan apenas
1969, un conjunto de imágenes y textos adjuntos que explican la acción de liberar varios         segundos, un lapso que antes necesitaba varias fases, dedicación y mucho tiempo. Cuando
fluidos invisibles en localizaciones concretas próximas a Los Ángeles. El artista soltó a la     aparece la primera cámara Kodak en 1888, se afianza una fórmula que ha perdurado más
atmósfera un litro de criptón sobre Beverly Hills, xenón en las montañas, argón en las playas    de un siglo con éxito mundial: se cargaba la cámara con un rollo, se exponía la película, se
y helio en el desierto. Su idea era generar un acto efímero, inmaterial e imperceptible a        llevaba a un laboratorio y finalmente se imprimían las copias. El método supuso un cambio
la vista. Las fotografías pretenden mostrar esas acciones pero, por supuesto, no puede           radical en la difusión y apreciación de fotografía, ya que sólo había que pulsar el disparador
verse nada más que lugares reales vacíos: una porción de desierto, una playa aislada, un         e ir a recoger los resultados una vez entregado el rollo expuesto («Usted apriete el botón
parque silencioso y un paraje rocoso. «El registro fotográfico que hizo Barry de esas obras      y nosotros haremos el resto» fue el famoso eslogan de la compañía de George Eastman a
no-visibles puede parecer conscientemente inútil y absurdo, sin embargo, esas imágenes           finales del siglo XIX). Al estar el revelado al alcance de cualquiera a módicos precios, su
pueden ser relevantes para que comprendamos las limitaciones de una forma de escritura           utilización se convirtió en una nueva forma de comunicación masiva.
indicial concreta. Si a cierto nivel esas imágenes se muestran como una prueba documental           Acostumbrados a la celeridad inconsciente de hoy, que no requiere ningún tipo de
que da fe de un estado de cosas, también queda claro que están claramente pensadas               destreza, este sistema nos parece obsoleto y caduco. Si el método inventado por Kodak
para llegar al límite del potencial documental de la fotografía. A la vez que nos ofrecen el     popularizó la fotografía al convertirla en un lujo alcanzable por el pueblo, la eclosión digi-
rastro indicial del momento de la liberación del gas, también muestran la imposibilidad          tal en su dispersión incontrolada la ha vulgarizado al transformarla en algo sumamente
de registrarlo, y nuestra atención, en cambio, se desplaza al acto mismo de fotografiar          superficial. Cuando ahora hacemos una foto ya no pensamos en la fotografía, ni siquiera
como momento de autentificación. Así, no se pretende que la fotografía represente el gas         la tenemos en cuenta. No consideramos la selección del encuadre ni necesitamos un
inerte invisible sino que nos dirija hacia él y, mediante la acción de señalar, establezca su    acondicionamiento adecuado, la banalización es absoluta. Esta particularidad ha dado



                                                                                                                                                                                            23
lugar a un nuevo subgénero específicamente fotográfico nacido espontáneamente de la                se diferencia sólo por su original factura, una consecución con bolígrafo que asimismo
baja cultura a principios del siglo XXI. Una variedad especialmente procaz en lo retratístico,     despierta admiración por ser un medio sencillo, accesible y familiar.
que reconocemos más que por la imagen registrada –intrascendente y anecdótica– por                    Se puede conseguir hacer de manera hiperrealista un paisaje o un retrato sin que
la actitud desprejuiciada de los protagonistas, el ángulo subjetivado de la cámara y por la        apenas llamen la atención porque el público entiende ese género como propio de la
cercanía entre retratado y retratista, que comparten un momento de complicidad que en              tradición pictórica y su finalización, sea más o menos parecida con lo que ven nuestros
otras condiciones estaría vedado. En cualquier caso, pocas veces se solivianta la intimidad de     ojos, no nos extraña, la hemos asimilado durante centurias. Pero optar por una variedad
alguno de ellos y ambos se dejan llevar por el contexto hasta el paroxismo o el absurdo.           de imagen nueva puramente fotográfica, descuadra esquemas y desconcierta al espec-
     Para que estas instantáneas (habituales en Facebook, Twitter, Flickr o registradas            tador, que se ve seducido por algo que reconoce con facilidad y que muestra, en toda
en el móvil) alcancen un estatus de artístico, necesitan un lixiviado que las singularice,         su complejidad, una sencilla ejecución.
reconversión que en el caso de los dibujos realizados con bolígrafo Bic azul de Juan                  Independientemente de su plasmación final –bien sea mecánica o manual, digital o
Francisco Casas es más que evidente. Las obras de Casas no dejan de ser fotografías                química–, hemos asimilado cierta idea de lo fotográfico igual que hemos aprendido a repre-
nunca, aunque su terminación sea manufacturada y su finalización técnica se corresponda            sentar un espacio tridimensional sobre una superficie plana, por medio de convenciones
con un dibujo en extremo fidedigno, en ellas subyace siempre un componente que la                  incorporadas culturalmente. A través de asociaciones que establecemos con imágenes
sustancia: cierta idea inexplicable de lo fotográfico (inherente, inevitable) que las constituye   comunes interpretables, entendemos una imagen como fotográfica igual que las líneas
y caracteriza. El conocido autorretrato de Chuck Close de 1968 en el que aparece con               de fuga las leemos como profundidad. El hecho de que su concreción sea análoga con el
actitud desaliñada fumando un pitillo, es un precedente que mantiene enormes conco-                formato tradicional de presentación de lo fotográfico, cada vez resultará más anecdótico.
mitancias con la obra de Casas. Empero, el hecho que los diferencia es que el lienzo del           Parangonando el concepto de trabajo de autores consagrados a nivel internacional como
norteamericano se muestra como una obra aislada, desclasada y dentro del Pop Art, sin              Thomas Demand o James Casebere, que concluyen sus obras recurriendo a una cámara
relación directa con ningún formato fotográfico de su tiempo. «Para Close, un medio (la            fotográfica, con el procesamiento de un joven artista como José Miguel Pereñíguez, cuya
pintura) se convirtió en el medio de otro (la fotografía) y reprodujo a mano una imagen            técnica se basa en el uso del grafito, podemos inferir que ambos grupos de piezas son
que se había originado en un mecanismo que operaba él mismo. Aunque la intimidad, el               más semejantes que disímiles. Con matices personales, el fundamento procesual es casi
rigor y los mecanismos de la visión –la mecánica humana al igual que la mecánica de la             el mismo, lo único que las diferencia es su terminación. Es mucho más lo que las acerca
máquina– se encuentren entre las motivaciones artísticas permanentes de Close, nunca               que aquello que las distancia. Más que una distinción taxonómica que decida que uno es
ha pretendido poner a prueba las tecnologías de la representación contra ningún supuesto           un dibujo y otro una fotografía, deberíamos acudir al núcleo que las sustenta, fundamenta
estándar humano. Su interés no residía en retar en duelo al artista contra la máquina; en          y conecta. Sendos trabajos optan por disyuntivas parejas de índole intelectual: son una
cambio sí parece poner a prueba ambos medios para conocer sus respectivos límites.»24              representación de una representación desarrollada con calma después de una reflexión
Al valorar el trabajo de Casas, la precisión técnica no debería ser el factor determinante         profunda. Es como comparar una ballena y un elefante. Ambos son mamíferos y com-
que despertara, por su rigor, admiración. «Los Embajadores» (1533) pintados por Hans               parten semejanzas estructurales que no son reconocibles a simple vista (son de sangre
Holbein el Joven o «La Condesa de Vilches» (1821) de Federico de Madrazo van muy por               caliente, paren crías vivas que amamantan…) pero uno ha adaptado su organismo a la
delante en correlación con la realidad y lo superan también en mucho si nos detenemos a            vida marina y otro a la vida terrestre.
examinar los pormenores y atendemos a la precisión de los detalles. Las obras del andaluz             Un buen número de autores se ha centrado en la construcción de realidades a partir de
suman más componentes que la mera exactitud, y uno de los más interesantes es que                  pequeñas arquitecturas o escenografías, fotografiando maquetas o recreaciones espaciales
participa de un subgénero fotográfico actual popular y fácilmente reconocible, del que             que asemejan ser la realidad. Quizás el ejemplo más conocido sea el citado Thomas Demand



24
y es donde la idea riza más el bucle. El artista alemán selecciona una imagen publicada           vez superados su nivel informativo y simbólico, una tercera vía inexplicable que denomina
en un diario o revista, construye un modelo (en ocasiones a escala real) de ese encuadre          sentido obtuso, una especie de significante sin significado que resulta difícil nombrar (sin
con papel y cartón eliminando los detalles superfluos, y luego fotografía la escena con una       conocer la trama lo icónico queda mudo) que se halla entre la imagen y su descripción, entre
luz general neutra. Una vez terminado el proceso, destruye el prototipo. Sus fotos son la         la definición y la aproximación sin poder situarse en un lugar concreto. Una perturbación
imagen de una imagen de una imagen, reverberaciones de un suceso público aplacado                 innominada que más tarde el ensayista francés acabará llamando punctum.
por la asepsia, que comparece ante nosotros en su versión más desdramatizada. «De esta               Las imágenes fijas propician una lectura extensa y permiten al observador detenerse
forma este autor pone a prueba la mirada del espectador, que se encuentra notablemente            en aquellos elementos que relaciona con su experiencia. Son como estratos sedimentados
saturada por el consumo masivo de imágenes de la comunicación mediática. Demand                   que adquieren solidez cuando se miran con detenimiento, ya que no permiten apreciar su
sugiere que si ante sus imágenes la mirada es engañada, no es tanto por un efecto de              prolijidad en movimiento. Estas extrañas imágenes a medio camino entre lo cinematográfico
realidad que no poseen, sino por la rapidez con la que estamos obligados a mirar y percibir       y lo fotográfico, poseen algo indescriptible que las convierte en recónditas portadoras de
el mundo y, sobre todo, sus representaciones.»25 James Casebere también fabrica sus               huellas propias. «Otras variantes como la imagen-vídeo podrían confundir acerca de este
propias maquetas, pero utilizando la máxima economía de medios e intentando recrear               supuesto protagonismo de lo fotográfico. Sin embargo, y a pesar de algunas lecturas de las
arquitecturas centrípetas que aíslen la visión del espectador y le fuercen a centrarse en         relaciones entre fotografía, vídeo y cine, esa prioridad icónica de la imagen fija se mantiene.
la contemplación. Son espacios vacíos, aislados, misteriosos.                                     Ya en los análisis sobre el cine de Eisenstein Roland Barthes se trabaja sobre fotogramas
   Exactamente igual que los trabajos de Pereñíguez. Lugares ambiguos presentados                 como mónadas aisladas portadoras de aquel sentido obtuso que afectaba a todo el relato.
como escenarios de un suceso que ha acontecido o está por acontecer, pero que igno-               Pero, además, frente a la pretendida influencia de esos otros medios, es la capacidad
ramos; un instante entre tantos de una narración desconocida. El punto de vista posee             sedimentadora de la imagen fija como «cuadro» la que posibilita una nueva cristalización
un ángulo muy cinematográfico y se inmiscuye en la escena como un ojo omnisciente                 icónica.»27 Precisa Olivier Richon al respecto: «Barthes proponía llamar lo fílmico a esos
(superando el Cine-Verdad de Dziga Vertov) que, manteniendo una posición distanciada              detalles que se encuentran en las imágenes fijas que se resisten a la comunicación y a
emocionalmente de los hechos, los atestigua de manera notarial. Otros autores como Oliver         la significación. Lo fílmico es como una fotografía, como un fragmento o un fetiche que
Boberg, Javier Vallhonrat o Jorge Ribalta, también confeccionan maquetas para advertir            congela y subvierte la diégesis de la película. Permite una lectura vertical en la semiótica
al observador de la engañosa percepción de la realidad. No olvidemos que toda fotografía          del movimiento detenido: detalles del rostro, el objeto… en resumen, una atención a
es una construcción artificial que evoca otra realidad; no es la realidad misma, sino una         la elaboración de la imagen. En una imagen fija, lo fílmico es un fragmento fotográfico
representación manipulable.                                                                       que nos abre a ese «tercer sentido», compuesto de significadores que se resisten a la
    Si ya hemos comentado la fotografía como objeto, acto performativo o idea intrínseca, en      significación.»28 El propio Roland Barthes aclara en su libro «La cámara lúcida»: «en el
este repaso de algunos aspectos que van más allá de lo considerado estrictamente fotográfico,     cine, cuyo material es fotográfico, la foto, sin embargo no posee esta completud (y es una
es también interesante inspeccionar la imagen como un pellizco enigmático connatural a            suerte para él) ¿Por qué? Porque, presa en un fluir, la foto es empujada, estirada sin cesar
algunas representaciones en movimiento sacadas de contexto, planos que cada vez son               hacia otras vistas; sin duda hay siempre en el cine un referente fotográfico, pero dicho
más comunes dentro del panorama artístico por su potencial sugestivo y ambigüedad. En             referente se escurre, no reivindica su realidad.»29
1970 se publica en Cahiers du Cinema un texto de Roland Barthes titulado El tercer sen-              Desde que en 1895 los hermanos Lumière lograran proyectar imágenes en movimiento
tido26, que analizaba varios fotogramas obtenidos de películas del director soviético Sergei M.   e incluso antes, las fluctuaciones entre lo fílmico y lo fotográfico han oscilado en un viaje
Eisenstein como si fuesen fotografías. Son imágenes detenidas que permanecen suspendidas          de ida y vuelta, compartiendo unos confines neblinosos que aun todavía permanecen poco
en un limbo indescifrable, una serie de encuadres aislados que le llevan a proponer, una          nítidos. Los estudios de Muybridge y Marey en la década de 1880 van a ser determinantes



                                                                                                                                                                                              25
para el nacimiento del cine. Esas imágenes nuevas y dinámicas que se prodigan en                establecer, además, su propio vínculo con ellas.(…) Firmando estas imágenes «robadas»
los albores del siglo XX, quintaesencian el espíritu de la modernidad en un concepto:           les da autenticidad, devolviéndoles el aura que habrían perdido si fueran simples reproduc-
movimiento; una idea que va a ser determinante para el Futurismo, el Cubismo o Marcel           ciones, y les confiere tanto el estatus de obra única como el de mercancía. Su intención
Duchamp (recordemos su cuadro Desnudo bajando una escalera de 1912). El instante                no es negar estos conceptos, sino establecer su naturaleza dialéctica.»31
capturado y detenido varía, ya no es uno solo, son muchos. Se fragmenta o diluye a mitad           En esta misma línea el brasileño Vik Muniz, afincado en Nueva York, genera un tipo
de camino entre dos momentos. No condensa nada, no refleja nada, no pretende explicar           de apropiación muy singular. Elige iconos famosos extraídos del imaginario colectivo y
ni enseñar nada. Muestra un trance trivial, un segundo de una situación desarrollada. Esa       ampliamente reproducidos a nivel mundial, para hacer una reinterpretación personal de una
realidad fractal no es un momento ideal, sino un instante cualquiera.                           imagen célebre que transforma en algo nuevo, vinculado con la representación matriz pero
     Una vez alcanzadas las cotas más altas de la fotografía documental –Eugene Smith,          sustancialmente diferente. En muchos casos la copia que se obtiene es la documentación
Robert Frank, Walker Evans o Cartier-Bresson– y el cine clásico –Orson Welles, Mankiewivz,      del proceso de elaboración de esa imagen, una especie de performance que en la mayoría
Billy Wilder, John Ford, Frank Capra, George Cukor o Alfred Hitchkock– entendidas ambas         de los casos se realiza con materiales inusuales y perecederos (chocolate, sirope, azúcar…).
disciplinas como un lenguaje propio consolidado, los creadores se rebelan contra esa            «Muniz consigue activar nuestra memoria visual a través de las imágenes inconscientes
estabilidad y escogen otros derroteros menos transitados. De ahí las desviaciones que           que forman parte de nuestro bagaje cultural, y sus fotografías sirven al mismo tiempo
surgen a partir de los años sesenta. En cine con la «Nouvelle Vague» y los postulados del       como catalizador del recuerdo y como elemento de choque y contraste, ya que el engaño
estructuralismo introducidos por Adams Sitney en 1969, que derivan hacia lo experimen-          es detectado al primer golpe de vista.»32 «Sus obras nos hablan de la permeabilidad de
tal. En fotografía con la aparición de artistas que deciden usar imágenes como si fuesen        significados en el mundo de la imagen, donde las cosas no siempre son lo que parecen.
no-fotografías.                                                                                 Por eso le gusta recordar la frase de Godard: «Ce n’est pas du sang, c’est du rouge» [esto
     En los años ochenta emergen creadoras como Sherrie Levine, que optan de manera             no es sangre, es sólo pintura roja]. Como nos ha demostrado el cine y la televisión, muchas
perspicaz por el apropiacionismo, un modo inteligente de cuestionar la condición de repro-      veces los objetos reales son poco persuasivos a la hora de ser representados y no parecen
ductibilidad de la imagen y poner en evidencia algunas consideraciones de la fotografía         lo que son. De igual manera, hay materiales que dada su versatilidad pueden representar
tradicional, excesivamente obstruida por algunos teóricos (caso de Clement Greenberg,           lo que no son siendo incluso más creíbles que el material al que representan».33 Otros
que defendía la parcelación de cada medio específico de manera independiente) en un             territorios interesantes divergidos a partir de lo fotográfico en el último medio siglo, son los
empeño tan extremista como absurdo por resguardar su integridad. Dominique Barqué               que articulan texto e imagen en proyectos conceptuales de mayor calado que el simple
señala que es la artista que más lejos ha llegado en la negación radical de las nociones        registro memorístico o documental. Refiero algunos ejemplos sobresalientes sin entrar en
autor, obra y originalidad, dejando en entredicho axiomas hasta entonces incuestionables        precisiones, como pueden ser los trabajos de Sophie Calle, Martha Rosler (su pieza «The
como autoría y autenticidad. Si nos atenemos a la definición de Walter Benjamin sobre           Bowery en dos sistemas descriptivos inadecuados» de mediados de los años setenta es
autenticidad definida por un aquí y ahora que marca el original30, las imágenes de Levine       muy conocida) o Victor Burgin. Las vinculaciones que se establecen entre escenarios que
cumplen a rajatabla esa proposición. Son fotografías exactas de otra fotografía, un mise        carecen de indicios para ser interpretados/ubicados y las frases sueltas que acompañan
en abîme complejo de solucionar. «El apropiacionismo le sirve a Levine para explorar su         a esas imágenes, invitan al espectador a colegir significados abiertos no fijados.
relación con las obras y los autores que elige, una vinculación que, en ocasiones, ha defi-        «Los problemas derivados de la fotografía son hoy en gran medida una especie de per-
nido como edípica. Para Levine este método tiene una cualidad mágica: son dos imágenes          plejidad autoportante en el ámbito de la teoría. La serie de debates a los que ha dado lugar
superpuestas que aspiran a establecer una lectura alegórica del trabajo. Es el espectador       constituyen la deriva última de los proyectos artísticos de los setenta y de sus comentarios
el que se ve obligado a reconstruir el significado que para ella tienen estas fotografías y a   semióticos, psicoanalíticos o posestructurales. La réplica dilatada en el tiempo de algunas de



26
esas cuestiones debe verificarse, sin embargo, en un entorno completamente diferente al que                              9.   Del Río. op. cit. P. 145.
                                                                                                                         10. Wall J. Señales de indiferencia. «Indiferencia y singularidad. La fotografía en el pensamiento artístico contemporáneo».
sirvió de origen al discurso, de modo que nos encontramos con un extraño anacronismo»34,
                                                                                                                              P. 246-247. MACBA. Barcelona, 1997.
apunta con acierto del Río entendiendo que muchos dilemas en torno a lo fotográfico gene-
                                                                                                                         11. Del Río. op. cit. P. 100.
rados hace varias décadas, deben resolverse ahora en un contexto nuevo determinado por                                   12. Ibídem. P. 98.
circunstancias inéditas, coyuntura imprevista marcada por la supremacía de los adelantos                                 13. Lowry, J., Green, D., Campany, D. op. cit. P. 7.
tecnológicos y la ubicuidad de Internet. Obligatoriamente, esta revolución inmaterial afecta                             14. Del Río. op. cit. P. 80.
                                                                                                                         15. Olivares, R. El último cuadro. Catálogo «Los géneros de la pintura». P. 18. Madrid. 1994.
en mucho al mundo artístico, harto poroso a las mutaciones por su esencia experimental.
                                                                                                                         16. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. Sobre la fotografía. P. 108. Pre.Textos.
     «Una parte importante de los artistas jóvenes –nacidos en los años setenta y comien-
                                                                                                                              Valencia, 2008.
zos de los ochenta– que afrontan las urgencias innovadoras de la comunidad artística                                     17. Lowry, J., Green, D. De lo presencial a lo performativo: nueva revisión de la indicialidad fotográfica. «¿Qué fue de
internacional, está trabajando sobre una cuestión tan peliaguda como la de cambiar el                                         la fotografía?», p. 62. Editorial Gustavo Gili. Barcelona 2007.
modelo o sistema de los géneros tradicionales: el modelo de pintura, el de escultura y el                                18. Del Río. op. cit. P. 107.
                                                                                                                         19. 2: Batchen, G. Aterrador fantasma de antiguo esplendor. «¿Qué fue de la fotografía?». P. 21. Editorial Gustavo Gili.
de arquitectura. Un cambio de sistema de este calado –que afecta a los principios estruc-
                                                                                                                              Barcelona 2007.
turales de nuestras disciplinas visuales y espaciales “más clásicas”– (…) contribuye a
                                                                                                                         20. Dubois, P. Introducción. «El acto fotográfico». P.11. Paidós. Barcelona, 1986.
que las prácticas innovadoras de la estructura o modelo resulten apasionantes. Por una                                   21. Lowry, J., Green, D op. cit. P. 50.
parte, porque responden a la necesidad de configurar la sensibilidad de la mirada actual                                 22. Dubois, P. op. cit. P. 14-15.
que piden las imágenes de los sistemas visuales vigentes (la gráfica, la publicidad, el                                  23. Lowry, J., Green, D. op. cit. P. 50.
                                                                                                                         24. Shiff, R. El alma fotográfica. «¿Qué fue de la fotografía?». P. 105. Editorial Gustavo Gili. Barcelona 2007.
fotoperiodismo, el cine, el vídeo, la web…); y, por otra parte, porque el arte más crítico
                                                                                                                         25. Gómez Isla, J. «Fotografía de creación». Editorial Nerea. San Sebastián, 2005.
de los últimos diez años se produce íntimamente vinculado con las nuevas técnicas que
                                                                                                                         26. Barthes, R. «Lo obvio y lo obtuso». Paidós, 2009.
provocan el imaginario del presente».35                                                                                  27. Del Río. op. cit. P. 77.
                                                                                                                         28. Richon, O. Pensando las cosas. «¿Qué fue de la fotografía?», p. 78. Editorial Gustavo Gili. Barcelona 2007.
1. Sontag, S. «Sobre la fotografía.» P. 9.                                                                               29. Barthes, R. «La cámara lúcida» P. 156. Paidós, Barcelona, 1989.
2.   EL CULTURAL, 5 de mayo de 2008. Entrevista a Thomas Demand realizada por Javier Hontoria                            30. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. Sobre la fotografía. Pre.Textos. Valencia,
3.   Lowry, J., Green, D., Campany, D. Prefacio. «¿Qué fue de la fotografía?». P. 8. Editorial Gustavo Gili. Barcelona        2008.
     2007.                                                                                                               31. S. R. Extraído del comentario crítico sobre la obra «Interieurs Parisiens: 1-60 After Atget», (1997) que pertenece
4.   Del Río, V. «Fotografía Objeto». P. 75.                                                                                  a la Colección Fundación Telefónica. www.fundacion.telefonica.com
5.   Krauss, R. «Lo fotográfico. Por una teoría de los desplazamientos». Editorial Gustavo Gili. Barcelona 2004.         32. Gómez Isla, J. op, cit. P. 35.
6.   Krauss, R. «La escultura en el campo expandido» es un conocido ensayo publicado por primera vez en la revista       33. C. D. Extraído del comentario crítico sobre la obra «Chocolate Disaster,» (1999) que pertenece a la Colección
     «OCTOBER» en la primavera de 1979.                                                                                       Fundación Telefónica. www.fundacion.telefonica.com
7.   Krauss, R. «La escultura en el campo expandido». P. 60 Editorial Kairós 1985.                                       34. Del Río. op. cit. P. 12.
8.   Brea, J. L. «La era Postmedia». Editorial Centro de Arte Salamanca 2002.                                            35. Marín-Medina, J. Wilhelm Sasnal, iconos de lo cotidiano. EL CULTURAL, 4 de diciembre de 2009.




                                                                                                                                                                                                                                                 27
Obras
   Eugenio Ampudia / Dionisio González
    / Vik Muniz / Sherrie Levine / Jacobo
      Castellano / James Casebere / José
     Miguel Pereñíguez / Juan Francisco
      Casas / Juan Carlos Robles / Daniel
    Canogar / Pierre Gonnord / Gabriella
  Gerosa / Miguel Ángel Tornero / Carlos
        Aires / Germán Gómez / MP&MP
   Rosado / Aitor Ortiz / Helena Almeida
   / Luis Gordillo / Carlos Pérez Siquier /
 John Baldessari / Juan Francisco Isidro
   / Gregory Crewdson / Cristina Lucas /
   Sergio Prego / Alejandro Sosa / Lucas
Gómez / Gonzalo Puch / Juan del Junco
  / Manolo Bautista / Miki Leal / Rogelio
     López Cuenca / Juan Carlos Bracho
      TEXTOS: ÓSCAR FERNÁNDEz / SEMA D’ACOSTA
Eugenio Ampudia

Fuego frío II 2010
(site specific)
Vídeo instalación. Proyección de DVD sobre librería
Medidas variables. Estantería: 221 × 150 × 30 cm



Eugenio Ampudia utiliza las nuevas tecnologías para invitar
al espectador a reflexionar sobre el estatus de la cultura.
Utiliza para ello una serie de recursos como la ironía o el
humor, que se ponen en circulación a través de un lenguaje
visual que replica la apariencia directa e inmediata de los
medios de comunicación. La instalación Fuego Frío con la
que participa en AfterPost, constituye uno de sus ejercicios
más simbólicos. Sobre una estantería repleta de libros que
tratan temas relacionados con lo fotográfico, se proyectan
imágenes de llamas para simular un fuego figurado. La
multitud de lecturas que esta pieza porta se incrementa
aún más si la leemos en el contexto global de la muestra.
Y es que al instalarse al inicio de la exposición, casi como
preámbulo de la misma, se conforma como una invitación a
repensar, incluso a destruir, algunos de nuestros conceptos
heredados sobre qué es la fotografía.



30 / 31
Dionisio González


Comercial Santo Amaro 2007
Fotografía color, diasec + vídeo
180 × 400 cm



En el debate en torno a los límites de la imagen digital
brotan las panorámicas de Dionisio González. Las suyas
ya no son meras fotografías intervenidas. Como tampoco
su cometido se ciñe a una labor de retoque o énfasis del
material original. Aun cuando sus paisajes urbanos toman
como punto de partida escenarios marginales reales a los
que el artista, no sin riesgo, se desplaza para fotografiar-
los, las imágenes de González se posicionan más allá del
documento, sus preocupaciones tienen más que ver con
el espacio y la arquitectura que con el registro. Su trabajo
describe un territorio visual nuevo donde la coexisten-
cia de la imagen original y del postizo digital es total. Sin
embargo, esta coexistencia dista mucho de ser pacífica.
De hecho, lo más inquietante de su trabajo es el modo
como, a pesar de manejar con soltura sus herramientas,
niega el tono celebratorio de lo digital, en tanto universo
indiferente frente a lo real. González invierte esta tendencia
y se propone aproximar lo digital al orden de lo concreto,
a lugares reales donde el conflicto social y la desigualdad
no han sido desdibujados.



32 / 33
Vik Muniz

bread line during the Louisville flood, Kentucky, 1937,
after Margaret bourke-White 2008
Pictures of Paper. Fotografía b/n al bromuro de plata
155 × 127 cm
Ed. 6/10



El brasileño Vik Muniz genera un tipo de apropiación muy
singular. Elige iconos famosos extraídos de nuestro bagaje
cultural, para reinterpretar a su manera una imagen célebre.
En muchos casos la copia que se obtiene es la documen-
tación del proceso de elaboración de ese sucedáneo, una
especie de performance que en la mayoría de los casos
realiza con materiales inusuales y perecederos (chocolate,
sirope, azúcar, etc.), consiguiendo activar de este original
modo nuestra memoria visual. Sus fotografías sirven al
mismo tiempo como catalizador del recuerdo y como ele-
mento de choque y contraste, ya que el engaño es detec-
tado al primer golpe de vista. Sus obras nos hablan de la
permeabilidad de significados en el mundo de la imagen,
donde las cosas no siempre son lo que parecen.
   Lo que percibimos es una imagen inspirada en otra
imagen, una composición volumétrica fotografiada en ceni-
tal. Las conocidas recreaciones del artista provocan en un
principio sorpresa para a continuación hacernos reflexionar
sobre el poder evocador de las imágenes. Muniz se define
a sí mismo como escultor, fotógrafo, diseñador y pintor;
incluso ha utilizado la cámara para registrar sus obras de
Land Art.



34 / 35
Sherrie Levine

Interieurs Parisiens: After Atget 1997
Fotografía blanco y negro, serie de 50 fotografías
23,2 × 18,4 cm c/u
Ed. 4/5
Colección Fundación Telefónica



El adverbio inglés after que acompaña el título de muchas
obras de Sherrie Levine, describe la esencia de su proyecto
artístico. Con él la artista nos informa de la operación que
nos presenta, consistente, grosso modo, en volver a retratar
obras maestras de la fotografía clásica occidental. Con su
acción Levine pretende apropiarse de la historia dominante
de la fotografía con la intención de introducir en ella un
discurso crítico que, en algunos casos, puede llegar a
afectar al estatuto mismo de la imagen. Eugene Atget es
uno de los maestros que contribuyeron a fijar ese canon de
la fotografía moderna al que Levine pretende cuestionar. En
AfterPost se presenta un conjunto dedicado a los interiores
parisinos del fotógrafo francés. Una serie que, tras pasar
por el proceso de revisión de Levine, es desposeída del
aura inquebrantable de lo moderno. Así se convierte en un
material desauratizado que engrosa ese ingente repertorio
de imágenes del pasado que el arte de nuestro tiempo post-
histórico emplea de manera desacomplejada
   En los años ochenta creadoras como Sherrie Levine
optan de manera perspicaz por el apropiacionismo, un modo
inteligente de cuestionar la condición de reproductibilidad
de la imagen y poner en evidencia algunas consideraciones
de la fotografía tradicional. Dominique Barqué señala que
es la artista que más lejos ha llegado en la negación radi-
cal de las nociones autor, obra y originalidad, dejando en
entredicho axiomas hasta entonces incuestionables como
autoría y autenticidad.



36 / 37
Jacobo Castellano

Sin público 2009
Madera, cristal, metal y tela
215 × 420 × 79 cm
C.A.C. ACS, S.A. Museo Patio Herreriano, Valladolid



El espacio doméstico es para Jacobo Castellano el punto de
partida a partir del cual construye su obra. Una obra que se
sirve de lo cotidiano de una forma realmente singular y que
haya en él ese desorden metafísico que tan bien plasmaron
Perec o Blanchot en sus novelas. Lo cierto es que si algo
caracteriza al trabajo del artista de Jaén es su extrema
habilidad para extraer de ese caos íntimo un nuevo orden
donde las texturas y superficies convencionales se tornan
otra cosa. Gravedad, escala y espacialidad, soportan un
proyecto cuya apariencia entrópica no oculta un soberbio
rigor interno. La instalación es uno de los medios a través
de los que Castellano obtiene resultados más sugerentes.
Por esta vía reúne varios lenguajes expresivos, como la
fotografía, el collage o la escultura, sin que se pierda nunca
la coherencia interna de su trabajo.
   Sin Público es una pieza silenciosa, a medio camino
entre lo escultórico y lo fotográfico, que desglosa un itine-
rario de huellas propias a través de evocaciones personales,
recuerdos vinculados con lugares familiares borrosos, caso
por ejemplo de un cine rural que regentaba el abuelo del
artista en Porcuna o la casa donde vivió durante un tiempo
con sus padres. Esta proyección de imágenes posee una
contenida percusión dramática.



38 / 39
James Casebere

Nineveh Horizontal 2004
Impresión digital cromogénica sobre papel sobre
metacrilato
182 × 238 cm
Ed. 4/5 + 2 P.A.
Colección Circa XX-Pilar Citoler
Fotografía: Luis Toloba Fotógrafos


La arquitectura es el arte de modelar la luz y el espacio. Tal
vez sea esa la razón por la que sirva tan bien a los intereses
de James Casebere, para quien la fotografía constituye, por
encima de todo, un lenguaje autónomo que se expresa
precisamente en términos de luz, espacio, perspectiva,
etc. Para subrayar esta condición autorreferencial de la
imagen fotográfica el artista elude la localización real de su
trabajo para confinarla en un estudio. De esa manera, es
la arquitectura, en forma de maqueta, la que se aproxima
al fotógrafo, y no al revés. La inversión que de aquí resulta
obtiene unos frutos realmente misteriosos en tanto que
demuestra la capacidad de la fotografía para recrear un
ambiente monumental o para transmitir las sensaciones
más intensas por sí misma, independientemente de la
verosimilitud del motivo retratado. De algún modo, nos
encontramos ante un trabajo que se apoya en el simulacro
de la arquitectura para poner de manifiesto, paradójica-
mente, la capacidad de la fotografía de sustentarse a sí
misma y transmitir su propia realidad.



40 / 41
José Miguel Pereñíguez

La vía media 2009
Carbón y lápiz conté sobre cartón
120 × 90 cm


La otra vía 2009
Tiza, carbón y lápiz conté sobre cartón
105 × 75 cm



Independientemente de su plasmación final –bien sea          de piezas son más semejantes que disímiles. Con matices
mecánica o manual, digital o química–, hemos asimilado       personales, el fundamento procesual es casi el mismo, lo
cierta idea de lo fotográfico igual que hemos aprendido a    único que las diferencia es su terminación. El uno y el otro
representar un espacio tridimensional sobre una super-       optan por disyuntivas parejas de índole intelectual: son
ficie plana, por medio de convenciones incorporadas          una representación de una representación desarrollada
culturalmente. A través de asociaciones inconscientes,       después de una reflexión profunda.
entendemos una imagen como fotográfica igual que las            Un buen número de artistas actuales se ha centrado
líneas de fuga las leemos como profundidad. El hecho de      en la construcción de realidades a partir de pequeñas
que su concreción sea análoga con el formato tradicional     arquitecturas o escenografías, fotografiando maquetas o
de presentación de lo fotográfico, cada vez resultará más    recreaciones que asemejan ser la realidad. El resultado
anecdótico. Parangonando el concepto de trabajo de autores   son espacios vacíos, aislados, misteriosos. Exactamente
consagrados a nivel internacional como Thomas Demand         igual que los trabajos de Pereñíguez. Lugares ambiguos
o James Casebere, que concluyen sus obras recurriendo a      presentados como escenarios de un suceso desconocido
una cámara fotográfica, con el procesamiento de un joven     que ha acontecido o está por acontecer. Un instante entre
artista como José Miguel Pereñíguez, cuya técnica se basa    tantos de una narración ignorada que adquiere visos
en el uso del grafito, podemos inferir que ambos grupos      cinematográficos.



42 / 43
Juan Francisco Casas

Fuckartloveartistclick nº1 | nº2 | nº3 | nº4 2009
Rotulador y bolígrafo bic negro sobre papel
nº1, nº2 y nº4 26 × 41 cm
nº3 26 × 40 cm



En el último lustro, la eclosión descontrolada de cámaras
digitales ha vulgarizado la toma fotográfica hasta niveles
insospechadamente banales. Esta particular devaluación
ha dado lugar a un nuevo subgénero específicamente
fotográfico nacido espontáneamente de la baja cultura de
principios del siglo XXI. Variedad especialmente procaz en
lo retratístico (habitual en Facebook, Tuenti, Twitter, Flickr
o nuestro propio móvil) que para alcanzar estatus artístico
necesita un lixiviado que la singularice; reconversión que
en el caso de los dibujos realizados con boli Bic azul de
Juan Francisco Casas es más que evidente. Las obras de
Casas no quedan desposeídas de su componente fotográ-
fico nunca, aunque su terminación sea manufacturada y
su finalización técnica se corresponda con una imagen en
extremo fidedigna, en ellas subyace siempre algo que las
sustancia: cierta idea inexplicable de lo fotográfico (inhe-
rente, inevitable) que las constituye y caracteriza.
   Al valorar el trabajo de Casas, la precisión técnica no
debería ser el factor determinante que despertara, por
su rigor, admiración. Las obras del andaluz suman más
componentes que la mera exactitud, y uno de los más
interesantes es que participa de un subgénero fotográfico
actual popular y fácilmente reconocible, del que se dife-
rencia sólo por su original factura, una consecución con
bolígrafo que asimismo despierta admiración por ser un
medio sencillo, accesible y familiar.



44 / 45
Juan Carlos Robles

Amor de Dios 2007 | Sala X puerta trasera, 2007 |
Sala X 2007
Fotografías color con marco de madera
120 × 150 cm
190 × 164 cm



Juan Carlos Robles une en una misma imagen dos con-
ceptos de significado opuesto que mezclados originan uno
nuevo más irónico e inesperado. La llamativa entrada de
un cine porno en una casa sevillana de estilo regionalista,
es un oxímoron visual que produce extrañeza y nos lleva
a considerar la escena con atención. Con esta antítesis
el artista recurre a la paradoja para repensar esquemas
arquitectónicos decimonónicos asociados a la identidad
hispalense. Valores autóctonos apegados a este tipo de
construcciones neomudéjares cuyo uso supera en mucho
la artificiosidad que manifiesta. Una simple fachada, pura
apariencia, antesala de un mundo oculto de perversiones
y deseo.
   Las fotografías muestran el haz y el envés de una misma
realidad, representación que puede servir de metáfora para
ilustrar la parte más oscura de un sector determinado de
la sociedad, que vive cara a los demás pendiente de su
aspecto externo, mientras que a escondidas y en lugares
inconfesables se deja llevar por sus instintos más sórdidos.
Las imágenes horizontales, paralelas formalmente, refuerzan
el sentido fingido de lo arabesco.



46 / 47
Daniel Canogar

Pneuma III 2009
Proyector, cables de teléfono, disco duro multimedia,
ventiladores y estructura de madera
56 × 12 × 40 cm
Ed. 7



Podría afimarse que Daniel Canogar lleva tiempo desa-
rrollando para la imagen aquél concepto expansivo que
Rosalind Krauss aplicó a la escultura en 1978. De hecho
el artista se refiere a la serie Pneuma, a la que pertenece la
pieza con que participa en AfterPost, como una instalación
escultórica. Las razones de este devenir instalación del
trabajo de Canogar pueden rastrearse en múltiples fuentes,
si bien hay dos claves que parecen imponerse a las demás.
Una de ella vendría definida por su consideración de la
imagen como un ente dinámico, no estático. La otra, se
manifiesta en su inclinación hacia el análisis tecnológico
de la representación, lo que le lleva cada vez con más
intensidad a descomponer sus procesos y a aproximarse
a ella más como un dispositivo de visión que como una
herramienta para narrar. De todo ello resulta un trabajo
complejo y técnicamente elaborado que se ocupa, sin
embargo, de aspectos elementales como la luz (materia
prima de la fotografía) o la energía.



48 / 49
Pierre Gonnord

Senén 2009
Fotografía color siliconada sobre dibond, enmarcada
165 × 125 cm
Ed. 2/5 + 1 P.A.



Lo más importante en la obra de Pierre Gonnord es la
vivencia, por eso su trabajo es consecuencia de una expe-
riencia existencial enriquecedora. El artista entiende que
la fotografía sólo puede cristalizar cuando las relaciones
que se crean con el entorno son verdaderamente sinceras.
Todos sus proyectos tienen como nexo de unión la hones-
tidad ante la cámara, la conquista de un territorio ignoto
que le hace conocer más y mejor la naturaleza humana.
Para Pierre Gonnord es fundamental, por encima de la
imagen final que se obtiene, los vínculos que establecen
con las personas que va encontrando en el camino, un
modo de enriquecerse con los mundos que descubre a
través de los demás. Ser fotógrafo para Pierre Gonnord
significa escuchar y comunicar, entender y comprender,
empatizar y dignificar.
   En sus retratos, la composición, el uso de las luces y la
pose de los personajes pertenecen a la tradición pictórica
más convencional, un modo de representación de épocas
pasadas inadmisible en otros formatos, que con la fotografía
toma un sentido moderno alentado por el eclecticismo que
sostiene la posmodernidad. Se reinterpreta así un género
nuevo con un lenguaje consabido.



50 / 51
Gabriella Gerosa

Portrait of a young woman 2009
Vídeo enmarcado
57 × 47 × 14 cm
Ed. 5



La obra de Gabriella Gerosa funciona como un trampantojo
contemporáneo. Lo que vemos no es lo que parece, y su
trabajo nos confunde doblemente. Al observar este retrato, lo
primero que pensamos es que nos hallamos ante un cuadro.
El marco, el tamaño y la pose del personaje cumplen el
estándar compositivo de una pintura académica. Creemos
resolver el engaño al descubrir que es una representación
actual, pero todavía nos sorprendemos más al comprobar
que no estamos ante una imagen fija, sino contemplando
la emisión de un vídeo. Gerosa introduce el factor tiempo
en sus piezas –eliminando por completo elementos narra-
tivos o contextualizadores– para constituir un artificio que
desestabiliza esquemas prefijados en torno a una imagen
artística tradicional.
   La reinvención de los géneros clásicos de la pintura a
través de la fotografía es una de las primeras vertientes
que toma este medio en el siglo XIX. Hoy, casi dos siglos
después, esta reinterpretación de la historia del arte ya no se
hace de manera continuista ni de modo inocente, sino que
acude a las nuevas tecnologías para cuestionar la solidez
de los cánones y la permeabilidad de los formatos.



52 / 53
Miguel Ángel Tornero

Sin título (tapar algunos huecos) 2010
Vinilo adhesivo sobre fotografía
140 × 100 cm



Hasta 2007, la obra de Miguel Ángel Tornero se ha centrado
en la construcción de collages digitales que funcionaban
como escenarios descontextualizados. Como él mismo
describe, eran ejercicios de «épica cotidiana» en el que
las personas se convertían en personajes, los lugares en
decorados y los objetos en improvisado atrezo. En los últi-
mos años han pasado de recortar las imágenes con un
programa informático, a hacerlo directamente con tijeras y
sus propias manos, un proceso experimental que lo aleja de
la ortodoxia del medio, a la par que distancia sus fotografías
de los acabados usuales y de la estandarización.
   El resultado final se convierte así en un objeto único,
irreproducible, que se desprende de su parte narrativa
y supera la mera iconicidad, adquiriendo nuevos valores
plásticos derivados de las texturas del papel fotográfico, que
pasa de ser un simple soporte a parte esencial del trabajo.
En la pieza que aquí vemos el vinilo se pega desde detrás
de manera imperfecta, produciendo arrugas y puntos de
tensión. Lo que queda a la vista es la parte adhesiva, de
manera que, con el tiempo, la superficie irá ensuciándose y
acumulando motas de polvo y demás partículas que floten
en la atmósfera.



54 / 55
Carlos Aires

Love is in the air (inox edition) 2007
Instalación
Cuchillo grabado láser, fotografía enmarcada
Medidas variables


Todas las imágenes fueron encontradas en la colección
del Museo de la Fotografía en Amberes. Todas estas
fotografías están archivadas como «catástrofes».




La representación de la violencia constituye uno de los
argumentos dominantes del arte contemporáneo. Este es
también uno de los temas fetiche de Carlos Aires, quien se
aproxima a él desde una posición crítica que no elude las
contradicciones que el tema suscita. De hecho, la obra de
Aires enfrenta constantemente la naturaleza provocadora
de las representaciones de la violencia. Lo hace, no tanto
para neutralizarla a través de su estatización, sino para
mantener, incluso agudizar, su carácter punzante. El arte de
Aires es, pues, pretendidamente afilado y juega siempre en
el límite de lo polémico. Este coqueteo con la controversia
se produce, sin embargo, desde un juego retórico complejo
que no se detiene en el ejercicio fácil de la provocación.
    Es este planteamiento el que anima también la obra
que presenta en AfterPost. En ella el artista despieza las
imágenes de conflicto de las que parte y las descontextualiza
para justificarlas dentro de una instalación que no sólo no
las desactiva sino que, a través de un juego de espejos muy
atinado, hace al espectador más consciente de la grave-
dad de las mismas. Primero observamos siluetas aisladas
impresas sobre cuchillos, soporte que conlleva implícito
una importante dosis de violencia. Después descubrimos
las fotografías que contienen a los personajes, rescatados
de un momento en extremo cruel, y nos damos cuenta que
esas figuras neutras nacen de hechos atroces.



56 / 57
Germán Gómez

Claudio Guillermo Antonio José 2004
C-print e hilo
198,7 × 67,5 cm



La primera referencia que nos asalta frente a la obra de
Germán Gómez es la del hombre hecho a partir de muchos
hombres descrito por la escritora Mary Shelley. Desde luego
no faltan nexos entre este artista y una de las novelas que
inauguran la conciencia moderna del sujeto, ya que es la
versión actual de este sujeto fragmentario prefigurado en
Frankenstein la que Gómez se ha propuesto retratar. Para
ello ha dispuesto una manera muy particular de componer
la figura que hace coexistir, como en Shelley, lo artesanal
con lo tecnológico, lo mecánico con la carne. El resul-
tado son retratos llenos de conexiones con los modelos de
representación clásicos, incluido Miguel Ángel, pero que
introducen una mirada radicalmente nueva sobre éstos.
Es a través de la técnica fotográfica y de la sutura manual
como logra ese sorprendente giro en el género del retrato
que define a buena parte de su obra.



58 / 59
MP&MP Rosado 

Sin título (la intimidad) 2002
Terracota, pigmento, cera y pintura sobre papel
fotográfico.
200 × 300 × 60 cm



En un mundo donde todo es mezcla parece que la condi-
ción mestiza del arte ya no tuviera interés intrínseco si no
es a partir de los efectos locales que desencadena. Para
el caso de los hermanos MP&MP Rosado Garcés esta
consideración parece realmente oportuna, ya que el modo
como combinan recursos heterogéneos aspira no tanto al
mero efectismo de la mezcla sino a mantener el pulso de
una investigación sobre el sujeto, la identidad, el proceso
creativo, etc., que les acompaña desde su irrupción en la
escena artística. No es de extrañar, por esta razón, que
en su obra La intimidad la superposición de lenguajes
(fotográfico, escultórico y de instalación, en este caso) o
la coexistencia de planos y ejes distintos obedezcan a una
búsqueda mucho más profunda. Esa búsqueda, a pesar de
lo aparatoso de su formalización, se acomoda finalmente
en el orden de lo íntimo o de la poesía; en definitiva, en los
recodos más inaccesibles del sujeto.



60 / 61
Aitor Ortiz

Amorfosis 001 Configuración III 2009
Tubos de aluminio impresos
250 × 40 × 24 cm
Ed. 5



Desde los años noventa del pasado siglo la fotografía de
arquitectura se ha convertido en un tema realmente pro-
lífico. Sin duda, ha sido éste un matrimonio fructífero que
nos ha ayudado a interpretar la convulsa evolución de lo
urbana y el nuevo paisaje global así como a investigar los
límites mismos de lo fotográfico. Aitor Ortiz es un buen
ejemplo de aplicación de esta pareja de intereses en un
proyecto que se caracteriza, entre otras cosas, por saber
equilibrar las fuerzas de ambos. Esto se logra a partir de
una consideración muy generosa del hecho fotográfico que
permite al artista deshacerse de su planitud convencional
y traspasarlo a la tercera dimensión ocupando a modo
de escultura o instalación la sala de exposiciones. Toda
la obra de Ortiz podría definirse por su capacidad para
hacer convivir la fotografía con esa nueva condición física
que le imprime sin incurrir en un barroquismo vacío, sino
transfiriendo cualidades realmente arquitectónicas (trans-
parencia, solidez, organización del espacio) a las imágenes.
Desde lo fotográfico, ha sabido llegar a lo escultórico de
manera natural.



62 / 63
Helena Almeida

O Abraço (díptico) 2007
2 fotografías B/N C print
280 × 130 cm
Colección Fundación Telefónica



Se podría afirmar que el cuerpo es uno de los grandes
temas de la fotografía del siglo XX. Al menos a la suma
de este asunto, tan antiguo como el arte mismo, con la
tecnología –ya no tan nueva– de la fotografía, debemos
buena parte de los grandes hallazgos estéticos del siglo
anterior. Quizá sea el caso de Helena Almeida uno de los
que mejor representa la herencia de esta tradición en el
arte actual. Su obra, como la de muchos otros nacidos
durante la emergencia de los nuevos comportamientos
artísticos, ha brotado del encuentro entre cuerpo-fotografía-
pintura con un cuarto elemento, la performance. De todo
ello afloran imágenes llenas de una gran contundencia y
plasticidad en las que el cuerpo ya no es un ente estático
ni una materia inerte, sino que responde a coreografías y
gestos netamente marcados. Así, las fronteras entre artista
y obra aparecen difusas y adquieren un estatus intercam-
biable. Habitualmente la propia Almeida es protagonista
de sus piezas de modo autorreferencial. De esta manera,
la portuguesa se desvincula de la fotografía retratística,
basada en la búsqueda de lo singular, para adentrarse en
el territorio de lo simbólico y en la investigación sobre las
emociones humanas.
   En el díptico que aquí vemos, la artista aparece abrazada
a su marido, el arquitecto Artur Rosa, un pilar básico tanto
en su vida como en su trabajo. El matrimonio renuncia
a su propio ser individual para convertirse en un único
sujeto indiferenciado, acoplamiento que puede interpre-
tarse como un gesto mayúsculo de amor, entendimiento y
compenetración.



64 / 65
Luis Gordillo

Extensa biografía larga (proceso y derivaciones) 2010
Serigrafía, e impresión digital sobre lona con impresión
digital. Conjunto de 3 fotografías
255 × 500 cm. 100 × 35 cm c/u


Otros títulos alternativos: Darwin’s biographie / Espirales
contenidas en sí mismas / Darwin delantero centro / Darwin
delantero goleador / Darwin era atrevido / Espiraloides
espiralados / Entidades darwinianas



La obra de Luis Gordillo es circular y anticipa una noción
tan asumida hoy como la del trabajo del arte como pro-
ceso. No cabe duda que la paternidad que el arte español
reciente le atribuye está ganada a pulso. Y es que en su
obra las actitudes actuales, expresadas sobre todo en el
concepto abierto, en el trabajo en serie o en la interfe-
rencia de disciplinas artísticas, están presentes desde
hace décadas. Así queda de manifiesto también en la
serie de imágenes que presenta aquí. Se trata de pinturas
fotografiadas e intervenidas componiendo una cadena de
retroalimentación que condensa en un mismo soporte la
supuesta unidad de lo pictórico y la reproductibilidad de lo
fotográfico. Como se puede sospechar en este ejercicio de
condensación, los dos lenguajes salen mal parados. Sendas
variantes llegan a disolverse en una experiencia diferente
que niega los clichés sintácticos que la componen y que se
propone como alternativa, tan herética como cautivadora,
al encorsetamiento de ambos.
    Desde sus inicios, Gordillo ha utilizado la fotografía
como una herramienta útil para fragmentar y descomponer
la realidad, un hecho que las inagotables contingencias
derivadas de las nuevas tecnologías ha acentuado. Cada
vez es mayor su inclinación a la hibridación, la disolución
de fronteras y la combinación de trabajos analógicos y
digitales. Esta secuencia de imágenes que ahora vemos
nace a partir de la serie «Charles Darwin evoluciona», un
motivo inicial que ha cambiado significativamente.



66 / 67
Carlos Pérez Siquier

Sevilla 2006 | Sevilla 2000 | Cabo de Gata 1996
Fotografía color
50 × 50 cm | 100 × 100 cm
Colección Fundación Rafael Botí



Carlos Pérez Siquier se adelantó a la mirada fotográfica de
su tiempo. Sus instantáneas parecen formar parte de la era
digital tanto por su ejecución como por su temática. El artista
renuncia voluntariamente a la concepción figurativa de la
imagen y centra su interés en una suma de sensaciones
complejas derivada de las posibilidades compositivas del
color. Muchas de sus fotos son casi planas y retratan inten-
cionadamente muros o paredes, superficies que al carecer
de profundidad, anulan la perspectiva para convertirse en
una mezcla pura de formas, líneas y tonos. Con el paso de
los años, su obra cada vez se ha vuelto más conceptual.
Ha derivado progresivamente de una evidente influencia
Pop hasta la síntesis minimalista que vemos hoy, represen-
taciones que en muchos casos están más cercanas a la
pintura abstracta que a la propia fotografía.
    El trabajo de Pérez Siquier es eminentemente intuitivo.
Posee una amplia gama cromática que reproduce la diver-
sidad de matices que encontramos en las playas de su
Almería natal. Su obra refleja como ninguna otra el cambio
radical que supuso para España pasar de la difícil época de
la autarquía, gris y cerrada, al posterior periodo aperturista
que significó la llegada masiva de turistas extranjeros.



68 / 69
John Baldessari

blasted Allegories (Colorful Equation/Sentence): Stage
Line; Semi-Colon Shelf Life-Evaluative 1978
Fotografía color sobre tabla
39,6 × 100,6 cm


blasted Allegories (b.W. Sentence): Fondle Facts 1978
Fotografía color sobre tabla
63,6 × 53,6 cm


Colección Fundación Telefónica



John Baldessari es uno de los protagonistas del arte con-
ceptual. Tal etiqueta alude a un conjunto dispar de prácticas
artísticas que se reunieron en torno a la crítica del estatuto
de la obra de arte, de su mercado y de los códigos que
éste legitimaba. De manera que el trabajo producido a la
sombra de esta corriente, que nunca fue un movimiento
como tal, reformulaba todas las ideas adquiridas sobre lo
que era pertinente o no al arte. Baldessari constituye un
referente en esta línea ya que su trabajo tensiona de un
modo sorprendente los límites del arte hasta llevarlo al
absurdo o a la tautología. En su obra circulan con idéntico
rango la imagen, la pintura y el texto para construir un
universo esquivo y lleno de conflictos que el artista deja sin
resolver de forma premeditada. En su obra lo previsible no
tiene lugar, y es de los desencuentros y de los accidentes
que se producen entre los diferentes lenguajes que maneja
de donde se nutre. Con este trabajo el artista cuestiona
el sentido tradicional de la alegoría, presentando unos
montajes fotográficos donde cada imagen-texto, dada su
ambivalencia, adquiere varios significados.



70 / 71
Juan Francisco Isidro

Restauración 1989
Dos fotografías manipuladas
18 × 32 cm


On-Off 1988
Montaje con dos fotografías
20 × 33 cm


Sin título (fundas de cámara) 1989
Montaje con dos fotografías
20 × 32 cm


El uno doble 1988
Montaje con dos fotografías
20 × 32 cm



Por desgracia, el artista sevillano Juan Francisco Isidro falle-
ció en 1993 a la corta edad de 32 años. En su breve pero
prolífica carrera, fue uno de los creadores más sensibles y
prometedores de su época. Aunque sus fotografías se hicie-
ron hace más de veinte años, no han perdido un ápice de
vigencia. En dos décadas el panorama ha cambiado mucho
y sin embargo, su discurso intimista al margen de modas o
espectacularidades sigue sorprendiéndonos. Extraídas de
reflexiones cotidianas que huyen de lo grandilocuente, sus
secuencias consiguen crear determinado clímax poético
inexplicable, un ritmo frágil y delicado acompasado por
detalles inadvertidos de la vida diaria.
   Su trabajo conjuga planteamientos conceptuales con un
proceso lento y metódico. Los objetos que utiliza para conse-
guir estas alegorías visuales son extremadamente sencillos y
no están exentos ni de humor ni de ironía. Replantea desde
diferentes posiciones la mirada del espectador e incluso
compagina texto e imagen. Juan Francisco Isidro trabajó
tanto el papel como el lienzo, la madera o la fotografía, un
medio en el que hubiese avanzado hasta niveles insospecha-
dos por su inusual capacidad para imaginar y descubrir.



72 / 73
Gregory Crewdson

Sin título 2002
Serie Twilight
C-print
125 × 150 cm
Colección de fotografía de la Universidad de Salamanca



En esencia, cualquier historia no es más que la incorpo-
ración de infinitesimales momentos que se suceden. La
concatenación de situaciones y escenarios hace que una
narración exista, dando lugar a un relato-crónica. Si aislamos
uno de esos fotogramas, lo diseccionamos y observamos
con detenimiento, descubrimos que ese instante congelado
es capaz de desvelar muchas claves de la secuencia de la
que forma parte. Las imágenes escenificadas de Gregory
Crewdson tienen esa capacidad evocadora de lo fílmico, son
capítulos abiertos de una historia oculta que el observador
debe completar en su cabeza atendiendo a los indicios
que halla. En sus trabajos, la puesta en escena, la técnica
utilizada, el ángulo de cámara elegido y la logística empleada
son eminentemente cinematográficos; pero la morfología y
el sentido de la obra final siempre es fotográfico.
   El artista estadounidense recrea en sus obras escenas
misteriosas que mantienen en vilo al espectador, inquie-
tantes fabulaciones que transcurren en barrios residen-
ciales típicamente norteamericanos. El tiempo detenido y
la densidad narrativa de sus piezas, podemos relacionarlo
con la extrañeza de los cuentos de Raymond Carver o los
cuadros de Edward Hopper. En muchos aspectos, el trabajo
de Crewdson está más cercano a la dirección artística que
a la propia fotografía.



74 / 75
Cristina Lucas

Las fascistas 2004
Serie El viejo Orden
Fotografía color siliconada bajo metacrilato, enmarcada
110 × 140 cm
Ed. 3/3 + 1 P.A.



Una de las características fundamentales de la obra de
Cristina Lucas, es que pretende revelar con su trabajo
cómo en una sociedad eminentemente patriarcal como la
nuestra, la mujer ha sufrido durante siglos una consentida
desigualdad con respecto al hombre. Desde las estructuras
de poder, las autoridades e intelectuales han potenciado
una diferenciación negativa, jerarquización discriminatoria
alimentada por símbolos culturales que favorecen la exclu-
sión social. En un primer momento de su trayectoria, Lucas
se interesó por las acciones, pero pronto pasó a utilizar
otros medios de expresión como la fotografía, el video, el
dibujo o la instalación.
   Tanto sus imágenes fijas como en movimiento, poseen
una estudiada teatralidad que requiere una cuidadosa
preparación previa. En Las Fascistas, la artista recurre
a la ironía para representar un grupo de radicales amas
de casa –pertenecientes a tres generaciones distintas de
mujeres– concentradas en sus menesteres domésticos.
Una fotografía escenificada, de cariz fílmico, que muestra
un momento habitual en la vida de una buena y abnegada
esposa. Aunque en una primera impresión sus trabajos
pueden parecer ingenuos, revisados en profundidad poseen
una importante carga crítica.



76 / 77
Sergio Prego

black Monday 2006
Vídeo DVD
3’ 33’’
Ed. 5/8



Sergio Prego, que forma parte del grupo denominado Nueva
Escultura Vasca, utiliza los avances digitales como un ins-
trumento más para reflexionar sobre nuestra percepción del
espacio. Black Monday es una secuencia de vídeo montada
a partir de cientos de fotos tomadas por cuarenta cámaras
en un mismo instante. De las diferentes explosiones que
efectuó en una fábrica de Bilbao, obtiene esta corpórea
nube de humo danzante, materia inasible que aquí se
convierte en un objeto sólido (escultórico) que vemos en
tres dimensiones desde distintos puntos de vista.
   Salvando las distancias, la técnica es muy parecida a la
que usó Muybridge. Lo que ocurre es que las fotos decimo-
nónicas eran series temporales y aquí vemos un conjunto
de imágenes, de un momento específico, captadas desde
diferentes perspectivas. Es la tecnología lo que nos hace ver
el tiempo y el espacio de una forma distinta. Prego cosifica
un accidente y recurre a la linealidad para convertir un
instante en un relato, alterando las coordenadas espacio-
temporales que constituyen esa fracción de segundo para
llevar al límite de lo verosímil la propia realidad.



78 / 79
Alejandro Sosa Suárez      El trabajo de Alejandro Sosa se sustenta en una para-      de plano fijo son utópicas y parciales. Sus fotografías
                           doja imposible que se sitúa al espectador frente a una     transforman lo circular en lineal en un esfuerzo por
21/2000 2000               visión frontal de 360º. Retrata toda la circunferencia     entender la arquitectura que nos rodea e intentar cap-
Serie Romper el Círculo    que envuelve a un lugar fijo facilitándole una visión      turar la infinidad de matices que contienen los lugares
                           panorámica de su alrededor. De este modo crea una          que habitamos.
Gelatinobromuro de plata
                           nueva percepción de la realidad que no impone un               Estos bucles visuales convierten un espacio tridi-
60 × 320 cm
                           único punto de vista, sino más bien al contrario: ofrece   mensional en otro bidimensional, superando así la falsa
Colección Cajasol
                           campo abierto al observador para que reflexione sobre      profundidad que representa una fotografía. Es inevitable
                           las posibilidades del espacio, la forma de mirar y el      recordar, al mirar sus extensas imágenes horizontales,
                           modo en que percibimos la realidad. El ser humano se       movimientos de cámara en cine como el paneo o el
                           mueve de manera indeterminada y participa de múltiples     travelling, desplazamientos que sitúan la escena y facilita
                           perspectivas, por lo tanto las imágenes convencionales     la máxima información del lugar de los hechos.



80 / 81
Lucas Gómez             Las imágenes de Lucas Gómez son siempre fruto de la               La influencia del cine y el conocimiento del montaje       como un instante, sino como una suma de momentos y
                        espontaneidad. En ningún caso se originan tras una reflexión   son tan evidentes en el trabajo de Gómez, que casi podría     sensaciones.
Patio de colegio 2010   previa. Son fragmentos de vida diaria que no ha elegido,       decirse que lo que nos muestra está más cerca de lo video-       Si Alejandro Sosa cuestiona el punto de vista espacial,
Fotografía color        momentos cazados al azar que no sobresalen por nada            gráfico que de lo fotográfico. La obra seleccionada para      Lucas Gómez evidencia la temporalidad de una imagen. Si
18 × 100 cm             especial, forman parte de la cotidianeidad. Sus fotografías    AfterPost es el lapso de tiempo que dura un recreo infantil   nos detenemos a reflexionar el trabajo de ambos, podemos
                        hablan de él, de sus encuentros y circunstancias, de sus       (varios minutos condensados en una única imagen), un          llegar a la conclusión que las premisas espacio-temporales
                        viajes y pensamientos. Reflejan lo cambiante y poliédrica      periodo que se convierte en una incorporación de tiem-        inherentes a lo que tradicionalmente entendemos por foto-
                        que pueden resultar las casualidades que nos rodean.           pos que se superponen. Sus fotos hablan del presente no       grafía, también son discutibles.



82 / 83
Gonzalo Puch

Sin título 2010
Impresión por plotter e instalación
149 × 300 cm



La noción de imagen que maneja Gonzalo Puch ya no
posee ese carácter unívoco de antaño, lo que la convierte
en un dispositivo mucho más complejo donde las ideas y
los conceptos rigen. En paralelo a esta certeza, el artista
atiende a una serie de intereses como el medio ambiente,
el caos o la meteorología, que se reúnen en torno a una
preocupación vertebral: su condición artificiosa y de puesta
en escena. Todo ello deriva en un proyecto tan ambicioso
como apasionante: subrayar el potencial escenificado del
saber y dejar en evidencia los desajustes del hombre ante la
Naturaleza. Puch adopta para ello un discurso igualmente
ficcional donde el campo de la imagen se llena de elementos
preñados de significado y cuidadosamente organizados.
La idea misma de instantánea abandona su ser, y detrás
de ella también la condición bidimensional y enmarcada
de la imagen se erosiona. Quiere ello decir que el sentido
escénico, multifocal que rige su trabajo no sólo se expresa
en el contenido de sus imágenes sino en el display donde
las presenta. De manera que su trabajo conquista el espacio,
incorpora el audiovisual y la arquitectura efímera hasta
componer una especie de doble escenario complementario:
la fotográfico y lo instalativo.
   En la instalación que ha preparado para AfterPost
reflexiona en torno a la degradación de los entornos natu-
rales por la intervención humana.



84 / 85
Juan del Junco

breve epílogo ornitológico sobre qué es antes,
el artista o el ornitólogo 2010
Lightjet print
Medidas variables
Con la colaboración de la Estación Biológica
de Doñana / CSIC y la Casa de Velázquez



Hay en la fotografía de Juan del Junco un tratamiento de
la naturaleza realmente singular. El sentido de puesta en
escena que tiene todo su trabajo redunda de un modo
directo en la desnaturalización de sus imágenes. Éstas,
a su vez, toman como motivo en muchas ocasiones for-
mas animales o vegetales que aparecen como presencias
inanimadas y, usualmente, fuera de su entorno. Todo ello
desemboca en una imaginería de la naturaleza, próxima a
la taxonomía, que constituye el verdadero hallazgo de este
artista. En ocasiones, su trabajo ha coqueteado con otros
recursos como la narración suspendida, la introducción de
elementos inquietantes en una escena o la superposición
de códigos de lectura. De modo que lo previsible nunca
ha tenido lugar en su trabajo. Pero es en trabajos de corte
taxonómico como la serie Huevos, que presenta en AfterPost,
donde sus imágenes rozan lo extraordinario.



86 / 87
Manolo Bautista

Snooker Hotshots 2007
Vídeo PAL sonoro
8’ 15” loop



El cordobés Manolo Bautista utiliza como armas la ironía
y la paradoja para llevar la realidad al paroxismo de la
verosimilitud. Exprimiendo las posibilidades de una imagen
digital construye, con la escrupulosa paciencia de un ciru-
jano experto en nuevas tecnologías, universos imposibles
cargados de sugerencias. Sus trabajos están manipulados
con tanta destreza que confunden al espectador hasta el
punto de no saber distinguir con certeza dónde acaba
la realidad y comienza la ficción, un terreno ambiguo e
impreciso en el que nada es lo que parece.
   Su obra, que oscila de lo fotográfico a lo videográfico,
inventa una suerte de universos extraños que desconciertan
tanto como atrapan, elaborando situaciones singulares que
logran llevarnos a la reflexión por el camino de las ilusiones
creíbles. Colocar Snooker Hotshots en un bar como si fuese
una emisión extemporánea de un canal deportivo extranjero,
acerca esta pieza artística a un público desacostumbrado
que puede verse sorprendido de manera inesperada por
una retransmisión desconcertante.



88 / 89
Miki Leal

Serie The End 2009
Photo gravure a partir de fotolito directo
12 Estampas
Papel Hahnemühle, 350 g. blanco
41 × 58 cm c/u
Ed. 11



En el trabajo de Miki Leal, la fotografía funciona como motor
de arranque para la pintura. Cualquier manifestación popular
que cae en sus manos es susceptible de ser reinterpretada
por su peculiar estilo, que se apropia de esas imágenes
para concebir representaciones personales modificadas
con libertad. El cine, el jazz o la literatura son motivos ins-
piradores de su obra, una combinación reconducida hasta
el lenguaje pictórico que mezcla baja y alta cultura.
   La serie The End aglutina varios niveles a tener en cuenta:
la palabra, el cine y la pintura. Evidentemente nos encon-
tramos ante el fotograma final de una película, una imagen
fija que nos esclarece el momento de la historia en el que
nos hallamos. El relato ha concluido pero apenas atisba-
mos detalles. Las palabras que aparecen en las estampas
están sacadas de nuestro imaginario cinematográfico, y aun
estando escritas en un idioma que no conocemos, resultan
determinantes para ubicarnos con exactitud. El lenguaje son
símbolos que actúan de una u otra manera en función del
contexto, signos que interpretamos del mismo modo en una
fotografía o en un dibujo. Al ver estas piezas, es inevitable
recordar las pinturas escuetas y limpias de Ed Ruscha.



90 / 91
Rogelio López Cuenca

Le partage 1 2007
Vídeo monocanal de alta definición, fundido
encadenado
6’ loop
Ed. 1/5 + 1 P.A.




Rogelio López Cuenca interpreta la imagen como un texto.
Un texto visual, claro, cuyo código de lectura hegemónico
dista mucho de ser neutral o transparente. De manera
que su tarea consiste, grosso modo, en interrumpir el flujo
habitual de circulación de esas imágenes, interrumpir su
pulso «natural», para desvelar la condición contingente y
premeditada de ese código. A través de la mediación del
artista, distintas representaciones asociadas al mundo árabe
–que de otro modo jamás se contagiarían– son reconectadas
en un territorio común, el de su propio trabajo. Esta con-
dición excepcional de lo artístico, permite a López Cuenca
poner de manifiesto esas fricciones y conflictos que emergen
del encuentro de dos imaginarios, uno autorizado y el otro
no, nacidos del mismo lugar pero portadores de valores
asociados radicalmente distintos. En la serie Le Partage el
artista fusiona lo fotográfico y lo videográfico, generando
una imagen ambigua que no es ni una cosa ni la otra.



92 / 93
Juan Carlos Bracho

Todos nos sentimos mejor en la oscuridad 2009
Print
173 × 238 cm



Desde la era de los conceptualismos, existe una extraña
circularidad entre la acción artística y los mecanismos para
su documentación y transmisión. Desde ejercicios semi-
nales como los de Dennis Oppenheim en torno al dibujo y
al vídeo, se han desarrollado numerosos episodios de esta
tendencia que algunos denominan ahora dibujo expandido.
En ella se inscribe también la obra de Juan Carlos Bracho.
Su trabajo pretende incidir en ese mismo carácter circular
del proceso de creación y exposición en el que el dibujo,
como materia prima o punto de origen, sufre una serie de
desarrollos diferidos a través de su documentación mediante
fotografías o vídeos. Esta segunda vida de la obra, en soporte
digital, funciona, a un primer vistazo, como testimonio de
un proceso. Algo a lo que colabora la idea de secuencia que
siempre tienen estas imágenes. Pero, dentro del discurso
de Bracho, como de los pioneros como Oppenheim, esta
documentación no es un simple apéndice o residuo, sino
que conforma la obra en sí. Y es que su propósito, por
encima de todo, es dilatar el estatuto de pertinencia del
dibujo más allá de la inmediatez y la gestualidad que lo ha
caracterizado desde antiguo.



94 / 95
Autores
Biografías resumidas
Carlos Aires Ronda, Málaga, 1974                                   1939-1960, Universidad de zaragoza; Poéticas del siglo XX,                 La artista y su cuerpo son siempre los protagonistas: sus          Trabajó con ellas creando una especie de diccionario de
Vive y trabaja en Amberes y Madrid                                 Museo Regional de Arte Moderno, Cartagena; la muestra El              formas, sus posturas y su relación con los objetos de su estudio   imágenes, es decir, un lenguaje para hacer frases y párrafos. De
                                                                   Sur de nuevo, programada en el MNCARS, Madrid; Conductus              son las principales categorías de interacción empleadas -O         ahí nació esta serie, como fruto de todas las imágenes violentas
Ha realizado estudios de Bellas Artes en Granada, Holanda          Vocis, una acción urbana en el acueducto de Segovia, Festival         Atelier, 1983. Esta auto-representación a través del lenguaje      que pudo rescatar de las fotos cinematográficas. Este tipo de
(Tilburg), Estados Unidos (Columbus y Nueva York) y Amberes        Oxigenarte; Some politics of appropiation, Laznia Centre for          fotográfico tiene como objetivo último indagar en los límites      material es uno de los preferidos de Baldessari, y lo ha usado
(Bélgica). Ha obtenido ayudas como la beca Manuel Rivera,          Contemporary Art, Gdansk, Polonia; CIGE Feria de Arte de              de la representación –no hay que olvidar que sus orígenes          frecuentemente en sus obras hasta los años noventa.
Iniciarte, Fontys, Edith Fergus Gilmore o Fulbright. También fue   Pekin, China; Comunicacionismos, 10ª Bienal de la Habana,             coinciden con el apogeo de la performance y el debate surgido            Otra de las obras paradigmáticas de Baldessari es el vídeo
galardonado con importantes premios entre los que destacan:        Cuba; Banquete, Nodos y Redes en el zKM de Karlsruhe                  alrededor del arte conceptual.                                     Folding Hat (1970). La cinta muestra una secuencia de media
De Pont Award (Holanda), Art Premier (Holanda), 2º premio Prix     (Alemania); Intemperies, Bienal del Fin del Mundo en el                    Mientras Helena Almeida se introduce en el cuadro, los        hora del artista en primer plano sosteniendo un sombrero que
de la Jeune Peinture Belga (Bélgica) o 1er premio Generación       Goethe Institut de Sao Paulo (Brasil); PLAY, en la capilla del        procedimientos de la pintura se sitúan en el exterior de la        estruja y aplasta, como si fuese un juguete. Aunque a primera
2008 (Caja Madrid). En su trayectoria artística ha participado     MPH de Valladolid; H2O, en el Kursaal de San Sebastian;               imagen, sobre la fotografía en blanco y negro. En ocasiones la     vista no lo parezca, éste es un trabajo ligado intrínsecamente a
en muchas exposiciones, tanto nacionales como internacio-          Momentos-New Perspectives on Spanish Contemporary                     artista deviene una gran mancha negra –Espaço espesso, 1982;       este medio, ya que son acciones que se desarrollan mediante la
nales: How innocent is that? (Pavilion Unicredi, Bucarest)         Photography (Estocolmo); BIACS, Bienal Internacional de Arte          Negro Agudo, 1983– otras, su cuerpo se deja contaminar por         interacción entre el artista y la cámara de vídeo.
Danzad, danzad malditos (galería ADN, Barcelona), Rock my          Contemporáneo de Sevilla, Sevilla y Granada.                          brochazos de color que ensucian sus formas –Perdão, 1993.                Cuando Baldessari empieza a usar las imágenes de la
Religion (Museo Domus Artium, Salamanca) Psychic Realities             Actualmente muestra su trabajo en Tempestade, Centro              Sus imágenes nacen pues de la pintura, disciplina en la que        televisión y el vídeo, contribuye de una manera clara a desdi-
(Itinerante. Austria), Leere & Vision (MARTA-museum, Herford,      Cultural Solar Barao, Museo da Gravura, Cidades de Curitiva,          experimentó durante la década de los setenta para concluir         bujar los límites entre baja y alta cultura. El interés por hacer
Alemania), EuroPART/25peaces (MOMENTUM Museum,                     Brasil.                                                               identificando el cuadro-objeto con el propio autor en obras        llegar sus obras al público no especializado le hace crear obras
Viena), A day without sunshine is like night (Aeroplastic                                                                                como Desenho Habitado o Pintura Habitada, ambas de 1975.           como Stream of violence: From Front to Torrent (The begin-
Contemporary, Bruselas) IX Bienal de Jóvenes Creadores                                                                                   Pese a su más que evidente relación con la performance y           nings) (1996). Formada por cinco paneles de gran tamaño con
Europeos y Países del Mediterráneo(Roma). Su obra forma                                                                                  el body art, la artista somete todo su proceso creativo a una      fotografías en blanco y negro serigrafiadas por encima con una
parte de colecciones como Artium (Vitoria), CAC (Málaga),                                                                                imagen preconcebida, realizando minuciosos bocetos hasta           banda roja, que se colgaron en la fachada de un edificio en Los
Caja Madrid, National Belgium Bank, MAK (Viena), Junta de          Helena Almeida Lisboa (Portugal), 1934                                encontrar la representación deseada. Lo que contemplamos es        Ángeles.
Andalucía o Caja Sol.                                              Vive y trabaja en Lisboa                                              sólo el resto de una acción compleja que puede implicar una              El carácter postmoderno y didáctico que inunda muchas de
Para información más detallada visite su página web: www.                                                                                larga y cuidadosa elaboración.                                     sus obras tienen como claro ejemplo la Serie Goya (1997), en la
carlosiares.com                                                    Licenciada en pintura por la Escola Superior de Belas-Artes                                                                              que repite la estructura de obras míticas de la historia del arte
                                                                   de Lisboa, Helena Almeida es hija del escultor Leopoldo de                                                                               con sus ya conocidos recortes en blanco y negro.
                                                                   Almeida, madre de la artista Joana Rosa, y esposa de Artur                                                                                     Sus obras se encuentran en los mejores museos del mundo
                                                                   Rosa, arquitecto y escultor que también realiza sus fotografías.                                                                         y sus trabajos han tenido una gran influencia en artistas de
                                                                        Durante más de treinta años, el trabajo artístico de esta por-   John badessari National City, California (USA), 1931               generaciones posteriores, como en los neoconceptuales de
Eugenio Ampudia Melgar, Valladolid, 1958                           tuguesa se ha afirmado como portador de un lenguaje expresivo         Vive y trabaja en Los Ángeles                                      los ochenta y en otros fotógrafos «apropiacionistas». Su labor
Vive y trabaja en Madrid                                           en el que confluyen diversas disciplinas y actitudes. Aunque                                                                             como profesor, comenzada en los setenta y que llega hasta la
www.eugenioampudia.net                                             generalmente aparece representada en los manuales como                Desde que quemó sus obras pictóricas a finales de los sesenta      actualidad, ha sido muy importante y reconocida, tanto por los
                                                                   fotógrafa, su obra se encuentra íntimamente relacionada con           en un acto ritual de renuncia al formalismo y la autoexpresión     críticos como por sus propios alumnos, a los que hizo escribir
En la actualidad uno de los videoartistas españoles más recono-    otras artes plásticas, como la pintura y la escultura, debido al      que habían caracterizado el período posterior a la guerra, sobre   más de cien veces: «No haré más arte aburrido, no haré más
cidos. Su trabajo multidisciplinar recibió en 2008 la beca The     minucioso proceso de elaboración de las imágenes, y al empleo         todo al expresionismo abstracto, el nombre de John Baldessari      arte aburrido…»
Delfina Foundation (Londres) y el Premio AECA al mejor artista     de pigmentos y materiales complementarios en la realización           se ha relacionado con el arte conceptual.
español vivo representado en ARCO08.                               de las fotografías.                                                        A partir de ese momento empezó a interesarse por las
     Su trabajo indaga, bajo una actitud crítica con el sistema         Su discurso creativo encuentra su base en la auto-               interconexiones entre la imagen, siempre fotográfica, y la
establecido del Arte, en la idea misma de proceso artístico,       representación. No se trata meramente de autorretratos, la            palabra. Sus primeros trabajos al respecto fueron Pure Beauty
tanto del significado de la obra en sí como de los mecanismos      artista aparece siempre como modelo, escenificando distintas          (1966-1968) y An Artist (1966-1968), una serie alegórica de        Manolo bautista Lucena, Córdoba, 1974
tradicionales de promoción, contemplación e interpretación         facetas: como autora, como mujer, planteando sus dudas                fotografías tomadas de manera casual sobre las que escribió        Vive y trabaja en Sevilla y Berlín
de ésta. Su tarea pues, se centra en el cuestionamiento per-       personales ante la vida. Sus composiciones suelen presentarse         textos referidos a la historia del arte.                           www.manolobautista.com
manente del proceso creativo como medio de transmisión             como escenografías secuenciadas a la manera cinematográfica,                Después abandonó los presupuestos estrictamente concep-
de ideas y del artista como gestor de éstas y sus sistemas de      instaurando espacios donde Almeida consigue emplazar su               tuales dedicándose de lleno a la imagen. Su interés por las que    RESIDENCIAS

comunicación.                                                      subjetividad.                                                         proporcionaban la televisión y el cine le convierten en uno de     Künstlerhaus Bethanien GmbH. Berlin 2009
     Entre sus últimas exposiciones están: ¡Grande hazaña! Con          Pese a convertir su cuerpo –y la experiencia personal del        los pioneros del «apropiacionismo de la imagen». Una de sus        12 meses.
muertos, Sala Puerta Nueva, Córdoba; Aprendiendo a mirar.          mismo– en el objeto fundamental de su trabajo, en las obras de        primeras series y de las más celebradas es The violent space
25años de Rafael Ortiz, Espacio San Clemente, Sevilla;             Almeida no hay lugar para el relato autobiográfico, mostrándo-        (1975-1976) que realizó a partir del descubrimiento de las fotos   EXPOSICIONES INDIVIDUALES

     En juego en el Centro de Documentación de La Panera,          nos su fisonomía como único soporte y ve-hículo de comunica-          fijas de escenas de cine, utilizándolas con la intención de no     «Gemstones». Espacio Iniciarte. Córdoba. 2010
Lleida; Después de la alambrada. El arte español en el exilio.     ción -Ouve-me, 1979.                                                  crear nada artístico.                                              «Simulator» Künstlerhaus Bethanien GmbH. Berlin. 2009




                                                                                                                                                                                                                                                                          99
«On translation». Galería T20. Murcia. 2008                         Colección Iniciarte. Junta de Andalucía. Sevilla.                    PREMIOS Y BECAS (SELECCIÓN)                                                  Permanent photographic wall on footbridge, Parque Río
«Segundo asalto». Galería Rafael Ortiz. Sevilla.2007                Fundación Coca-Cola. Madrid.                                         Beca Hangar/CALQ-Quebec.                                                     Manzanares, Madrid, Spain
«Salvaje». Sala Capitulares. Córdoba.2006                           Colección Arte Contemporáneo. Museo Patio Herreriano. Valladolid.    III Concurso de Fotografía Purificación García. Primer premio                Daniel Canogar & Stephen Dean: Process in dialogue,
«The New Era». Galería Siboney. Santander. 2006                     C.A.A.C. Centro Andaluz de Arte Contemporáneo. Sevilla.              Generación 2005. Caja Madrid. Primer premio                                  Koldo Mitxelena, San Sebastián, Spain. Curated by
Galería Pedro Oliveira. Oporto. 2005                                Fundación Montenmedio.Vejer de la Frontera, Cádiz.                   VIII Premio de Fotografía y Pintura ABC. Primer accésit                      Cecilia Andersson
«Artificios».Galería Rafael Ortiz. Sevilla 2004                                                                                          Premio a la actividad artística. Junta de Andalucía                          Work for «The Brain», Museum of Natural History of
Sala de Star. Sevilla 2004                                                                                                                                                                                            New York, New York, USA
Sala de Arte UNICEF. Sevilla.2002                                                                                                        COLECCIONES (SELECCIÓN)                                               2009   Pneuma, Galerie Guy Bärtschi, Geneve, Switzerland
                                                                    Juan Carlos bracho La Línea de la Concepción, Cádiz, 1970            Fundación La Caixa                                                           Jerusalem Lights Festival, Jerusalem, Israel
EXPOSICIONES COLECTIVAS (SELECCIÓN)                                 Vive y trabaja en Barcelona                                          CGAC. Centro Gallego de arte contemporáneo                                   Lumen, Projection on the Arcos de Lapa, Río de Janeiro,
2010    European Night. Beijing. China                                                                                                   Comunidad de Madrid                                                          Brasil. Curated by Paulo Reis
        Instituto Cervantes. Shangay. China                         1993/97 Facultad de Bellas Artes de Cuenca. Universidad de           Centro de Arte la Panera                                                     Nodi, Mimmo Scognamiglio Artecontemporanea, Napoli,
2009   El sur de nuevo. MNCARS, Museo Nacional Centro de                    Castilla-La Mancha                                           Ministerio de Asuntos Sociales. Injuve                                       Italy
       Arte Reina Sofía. Madrid.                                    2000/03 Artista residente. Hangar. Barcelona                         Colección Cajasol                                                            Daniel Canogar, Galería Juan Silió, Santander, Spain
       Open Studios. Künstlerhaus Bethanien GmbH. Berlin.           2006    Artista residente. Axeneo7. Gatineau. Canadá                 Caja Madrid                                                                  Fuegos Fatuos, Abierto × obras, Matadero, Madrid,
       Auto. sueño y materia. Centro LABoral. Comisariado por                                                                            Colección Circa XX                                                           Spain
       Alberto Martín. Gijón                                        EXPOSICIONES (SELECCIÓN)                                             Colección de Fotografía Purificación García                                  Tangle, Mimmo Scognamiglio Artecontemporanea,
2008   Nuit Blanche. Paris. Francia                                 2010      Arco 10. Galería Carles Taché. Barcelona                   Fundación Rafael Botí                                                        Milán, Italy
       Bienal Internacional de Arte Contemporáneo de Sevilla.                 Diez+: Arte contemporáneo en los premios ABC.              Colección ABC                                                                Enredos, Galería Max Estrella, Madrid, Spain
       YOUniverse. Sevilla.                                                   Instituto Cervantes. Varsovia                                                                                                           Daniel Canogar, Guy Bärtschi Gallery, Geneve,
       Reacción en cadena. Galería Rafael Ortiz. Sevilla.                     AfterPost. Espacio Iniciarte. Sevilla                                                                                                   Switzerland
       Colección Iniciarte. Espacio Iniciarte. Sevilla              2009      Félix y su amiga F.2003-2009 (individual) Espacio                                                                                       Solo Project, Caprice Horn Gallery, Berlin, Germany
       PHE08. Colección Caja Burgos. Madrid                                   Iniciarte. Sevilla                                                                                                               2007   Other Bioligies, Sala Parpalló, Valencia, Spain
       Arte-Vida-Arte. Museo Vostell Malpartida. Cáceres.                     Magnificent obsessión (individual) Galería Carles Taché.   Daniel Canogar Madrid, 1964                                                  Daniel Canogar, Galería Maior, Pollença, Mallorca, Spain
       The Rencontres d’Arles 2008. Arles, Francia.                           Barcelona                                                  Vive y trabaja en Madrid                                                     Daniel Canogar, CAC Málaga, Spain
       Balelatina. Basel, Suiza.                                              Colección I. Centro de arte dos de Mayo. Madrid                                                                                         Clandestinos, Notte en Bianco, Public projection on San
       «Migrations». Paris. Francia                                           Light, camera, action. Arte Lisboa. Lisboa                 ESTUDIOS                                                                     Pietro in Montorio, Rome, Italy
       «Confabulaciones». Sala Puertanueva. Córdoba                 2008      Experiencia2. Museo de Bellas Artes de Santander           1990      M.A. with studies in photography, New York University/
       «Retando al vídeo». Centro Cultural de España, Lima. Perú.             I Premio Internacional de Pintura Guasch Coranty. Tecla              International Center of Photography, New York, USA          ÚLTIMAS EXPOSICIONES COLECTIVAS

                                                                              Sala. Barcelona                                            1987      B.A., Visual Communications, Complutense University of      2010   Fiax Lux, MACUF, Museo de Arte Contemporáneo Unión
PREMIOS Y BECAS                                                               Andalucía-Tokio-Andalucía. Instituto Cervantes. Tokio                Madrid, Spain                                                      Fenosa, A Coruña, Spain. Curated by Paulo Reis
Beca de estancia en Künstlerhaus Bethanien. Berlín                  2007      Un Hecho real (instalación). O debuxo por diante. CGAC.                                                                                 Atopía, CCCB, Centro de Cultura Contemporánea de
Premio Real Academia de Bellas Artes Santa Isabel de Hungría                  Santiago de Compostela                                     BECAS Y PREMIOS                                                              Barcelona, Barcelona, Spain. Curated by Iván de la
Primer premio Pepe Espaliú. Córdoba.                                          Poni Aloha (intervención). Aquí y ahora. Tiempo y espa-    1997      Pilar and Joan Miró grant for art project developing,              Nuez
Beca de Artes Plásticas Rafael Botí. 2003                                     cio. Sala de exposiciones Alcalá 31. Madrid                          Spain                                                              25 obras, 17 artistas, 4 relatos, Centro de Arte La
Adquisición Bienal de artes plásticas Rafael Botí. Córdoba.                   Video killed the painting star. Domus Artium. Salamanca              Ojo Crítico Art Award by RNE (National Spanish Radio)              Panera, Lérida, Spain
Beca de Artes Plásticas Junta de Andalucía.                                   I Have a drean (instalación). Fundación ABC. La noche      1996      Pepiniers grant, Instituto de la Juventud Europea, Madrid          Timeless Territorios, Art Algarve, Salt Mines, Algarve,
Generación 2006 Cajamadrid                                                    en blanco. Madrid                                                    Subsidy from the Canadian Ministry of Culture for Sous             Portugal. Curated by María and Lorena Corral
Ayudas a la creación artística INICIARTE.                                     La ilimitada energía del paisaje. Monasterio de San Juan             la Surface Project, Quebec, Canada                                 Bienal de Cerveira, Cerveira, Portugal. Curated by María
                                                                              de la Peña. Huesca                                         1995      Banff Centre for the Arts art residence, Banff, Alberta,           Fátima Lambert
OBRAS EN COLECCIONES PÚBLICAS                                       2006      XVI Proyectos de Arte Español (instalación). Arco’06.                Canada                                                             The End, Andy Warhol Museum, Pittsburgh, USA.
Fundación Cajamadrid                                                          Madrid                                                     1992      Budapest Academy of Arts art residence, Germinaciones              Curated by Eric Shiner
Instituto Andaluz de la Juventud.                                             Le dessin comme expérience (instalación). Studio                     project, Young European Artists Biennial, Hungary                  Banquete, Nodos y Redes, zKM, Center for Art
Fundación El Monte. Sevilla.                                                  Daïmon. Axeneo7. Gatineau. Canadá                          1987/89   Hispanic-US Joint Committee Scholarship to undertake               and Media, Karlsruhe, Germany. Curated by Karin
Instituto Andaluz de la Juventud.                                             Donner c’est aimer, aimer c’est partager (individual).               a Masters of Art in New York, USA                                  Ohlenschlager
Fundación Pepe Espaliú                                                        Galería Carmen de la Calle. Madrid                                                                                               2008   Inner and Outer Space, Mattress Factory Museum,
Fundación Rafael Botí. Córdoba.                                               The celestial ómnibus (intervención). Palacio de Caja      ÚLTIMAS EXPOSICIONES INDIVIDUALES                                            Pittsburgh, USA
Fundación Bancaxa. Valencia.                                                  Cantabria. Santillana del Mar                              2010      Light installation made for the atrium of the European             The discreet charm of technology, zKM, Center for Art
Centro de Arte Caja de Burgos. Burgos.                                        The sock strategy. Fundación El Monte. Sevilla                       Union Council for Spain’s Presidency of the European               and Media, Karlsruhe, Germany. Curated by Claudia
Ayuntamiento de Alcobendas. Madrid.                                           XVLIII Muestra Caja San Fernando (instalación). Sevilla              Union, Brussels, Belgium                                           Gianetti and Antonio Franco




100
Momentos-New perspectivs on Spanish Contemporary                    Granada y Premio Nacional de Fin de Carrera del             Colección del Ministerio de Asuntos Exteriores.                             Second International Biennial of Contemporary Art of
       Photography, Kulturhuset, Stockholm, Sweden. Curated                Ministerio de Educación y Ciencia.                          Colección de la Real Academia de España en Roma.                            Seville, Seville, Spain.
       by Thimothy Persons                                          2000   Certificado de Docencia del Tercer Ciclo de Estudios        Colección del Instituto de la Juventud, INJUVE, Madrid.                     Before the Camera, Norton Museum of Art, West Palm
       España, Arte Español 1957-2007. De Picasso, Miró, Dalí,             Universitarios de la Universidad de Granada.                Colección de Arte de la Junta de Andalucía.                                 Beach, FL.
       Tápies hasta nuestros días, Palazzo Sant’Elia, Palermo,      2002   Diploma de Suficiencia Investigadora del Tercer Ciclo de    Colección de Arte Caja Granada.                                             Helga de Alvear – Concepts for A Collection, Exhibition
       Italy. Curated by Demetrtio Paparoni                                Estudios Universitarios de la Universidad de Granada.       Colección Diputación Provincial de Cádiz.                                   Centre of Centro Cultural de Belém, Brazil.
       El discreto encanto de la tecnología, Museo Extremeño               Doctorado en la Facultad de Bellas Artes de la              Colecciones privadas en Francia, Alemania, los Países Bajos,                New York, New York: Fifty Years of Art, Architecture,
       e Iberoamericano de Arte Contemporáneo (MEIAC),                     Universidad de Granada.                                     Gran Bretaña, EE.UU., México, Colombia y España.                            Photography, Film and Video, Grimaldi Forum, Monaco.
       Badajoz, Spain. Curated by Claudia Giannetti                                                                                                                                                                Sublime Embrace: Experiencing Consciousness in
       Máquinas y Almas, Museo Nacional Centro de Arte              EXPOSICIONES INDIVIDUALES (SELECCIÓN)                                                                                                          Contemporary Art, Art Gallery of Hamilton, Hamilton,
       Reina Sofía (MNCARS), Madrid, Spain. Curated by              2010   Foreignaffairs. Galería Fernando Pradilla. Madrid. España                                                                               Ontario.
       Montxo Algora                                                2008   Bare(y)there. Galería Fernando Pradilla. Madrid. España                                                                                 Suspension, Dunn and Brown Contemporary, Dallas,
       Light messages, Museo Es Baluard, Palma de Mallorca,                Scope Basel 2008. Basilea, Suiza.                           James Casebere Lansing (USA), 1953                                          Texas.
       Spain. Curated by Marie Claire Uberquoi                             Real Academia de España en Roma. Italia                     Vive y trabaja en Nueva York.
                                                                    2007   Mis(s)behave(again). Sala Manolo Alés. La Línea, Cadiz.                                                                          COLECCIONES PÚBLICAS Y PRIVADAS

COLECCIONES PÚBLICAS                                                       MyLovingNation. Galería Ferrán Cano. Palma de               FORMACIÓN                                                            A.T.&T., South Plainfield, NJ.
Museo Patio Herreriano, Valladolid, Spain                                  Mallorca. España.                                           1979      M.F.A., California Institute of Arts, CA.                  Addison Gallery of American Art, Phillips Academy, Andover,
Coca Cola Foundation                                                2006   Sacrebleu! Galería Sandunga. Granada. España.               1977      Whitney Independent Study Program, New York, NY.           MA.
MUSAC, León, Spain                                                         Mis(s)behave. Sala Rivadavia. Diputación Provincial de      1976      B.F.A., Minneapolis College of Art and Design, MN.         Albright-Knox Museum, Buffalo, NY.
ARTIUM, Vitoria, Spain                                                     Cádiz. Cádiz. España.                                       1971/73   Michigan State University, MI.                             Peter Alger Collection, New York, NY.
Museé du Art Contemporain, Lyon                                     2005   Saturdaynighthbathroom. Galería Fernando Pradilla.                                                                               Allen Memorial Art Museum, Oberlin, OH.
Fundación Unión Fenosa, La Coruña, Spain                                   Madrid.                                                     PREMIOS                                                              American Patrons of Tate, New York, NY.
MNCARS, Museo Nacional Centro de Arte Reina Sofía, Madrid.          1999   [PI]. Centro de Lenguas Modernas. Universidad de Granada.   1999      Shortlisted for the Citibank Private Bank Photography      Baltimore Museum of Art, Baltimore, MD.
IMAC, Reus, Tarragona, Spain                                        1998   Haikús. Casa de Jaén. Granada.                                        Prize.                                                     Big Flower Press, New York, NY.
MEIAC, Museo Extremeño e Iberoamericano de Arte                                                                                        1995      John Simon Guggenheim Memorial Foundation Grant.           Birmingham Museum of Art, Birmingham, AL.
Contemporáneo, Badajoz, Spain                                       EXPOSICIONES COLECTIVAS (SELECCIÓN)                                1994      New York Foundation for the Arts Fellowship.               Brooklyn Museum of Art, Brooklyn, NY.
Salamanca University Collection, Salamanca, Spain                   2009   Diez +: Arte contemporáneo español en los premios           1990      National Endowment for the Arts, Visual Arts Fellowship.   Carnegie Museum of Art, Pittsburgh, PA.
Helga de Alvear Collection, Madrid, Spain                                  ABC. Instituto Cervantes de Moscú.                          1989      New York Foundation for the Arts Fellowship.               Capital Group, Los Angeles, CA.
CAM, Caja de Ahorros del Mediterráneo, Alicante, Spain                     El arte de la semejanza. Centro Cultural CAIXANOVA.         1986      National Endowment for the Arts, Visual Arts Fellowship.   Centro Galego Arte Contemporanea, Santiago de Compostella,
Ayuntamiento de Lleida, Spain                                              Vigo, España                                                1985      New York Foundation for the Arts Fellowship.               Spain.
FRAC Midi-Pyrenées, Toulousse, France                                      SCOPE BASEL. Basilea. Suiza.                                1982      National Endowment for the Arts, Visual Arts Fellowship.   Chase Manhattan Bank, New York, NY.
FNAC, Fonds National d’Árt Contemporain, Paris, France                     Arte Americas. Miami. EE.UU.                                1983      New York State Council on the Arts: Visual Artists         Contemporary Art Museum, University of South Florida, Tampa,
Art and Technology Foundation, Madrid, Spain                               SCOPE NY. New York. EE.UU.                                            Sponsored ProjectGrant.                                    FL.
Instituto de la Juventud, Ministerio de Asuntos Sociales, Madrid.   2008   Inventio Roma. Real Academia de San Fernando. Madrid                                                                             Dallas Museum of Art, Dallas, TX.
Rafael Tous Foundation for Contemporary Art, Barcelona, Spain              Inventio Roma. Real Academia de España en Roma.             ÚLTIMAS EXPOSICIONES INDIVIDUALES (SELECCIÓN)                        Davis Museum and Cultural Center, Wellesley, MA.
Fons d’Art Contemporani, Universidad Politécnica de Valencia.              Roma, Italia                                                2008      James Casebere, Andrew Jensen Gallery, Auckland, Nz.       Disney Collection, New York, NY.
Museum of Fine Arts of Álava, Vitoria, Spain                               KIAF, Feria Internacional de Arte en Corea. Seúl, Corea               James Casebere, Daniel Templon Gallery, Paris, France.     Emily Fisher Landau Collection, New York, NY.
Collectión of the City of Alcobendas, Madrid, Spain                        Scope Hantomps’08. New York, EE.UU.                                   James Casebere, Galleria Marabini, Bologna, Italy          Fogg Museum, Harvard University, Cambridge, MA.
C.O.S.I., Columbus, Ohio, USA                                              Scope London’08, Londres, Reino Unido                       2007      James Casebere; The Levant, Galeria Marabini, Bologna,     Fondazione Sandretto Rebaudengo per l’arte, Turin, Italy.
Musseum of Santander, Santander, Spain                              2007   ARCO. Feria Internacional de Arte Contemporáneo.                      Italy                                                      Fonds National d’Art Contemporain, Paris, France.
Museo Alejandro Otero, Caracas, Venezuela                                  Stand Junta de Andalucía y Stand Galería Sandunga de                  James Casebere: The Levant, Sean Kelly Gallery, New        General Mills Collection, Minneapolis, MN.
                                                                           Granada. IFEMA, Madrid. España.                                       York                                                       Goetz Collection, Munich, Germany.
                                                                           Arteaméricas. Feria Internacional de Arte                                                                                        Goldman Sachs, New York, NY.
                                                                           Contemporáneo Latinoamericano. Stand Galería                ÚLTIMAS EXPOSICIONES COLECTIVAS (SELECCIÓN)                          Solomon R. Guggenheim Museum, New York, NY.
                                                                           Fernando Pradilla de Madrid y Stand de Galería El           2008      Galería Helga de Alvear, Madrid, Spain                     Hallmark Collection, Kansas City, MO.
Juan Francisco Casas Ruiz La Carolina, Jaén, 1976                          Museo de Bogotá. Miami, Florida, EE.UU.                     2007      Façade, Architecture, Space, Cook Fine Art, New York,      High Museum of Art, Atlanta, GA.
Vive y trabaja en Madrid y en La Carolina, Jaén                                                                                                  NY.                                                        Hughes and Luce, L.L.P. Collection, Dallas, TX.
                                                                    OBRA EN MUSEOS Y COLECCIONES:                                                Imagination becomes Reality, Goetz Collection, Munich      Jewish Museum, New York, NY.
ESTUDIOS REALIZADOS                                                 Museo ARTIUM, Museo Vasco de Arte Contemporáneo, Vitoria.          2006      Extra-Ordinary: The Everyday Object in American Art,       Johnson & Johnson, New Brunswick, NJ.
1999   Licenciado en Bellas Artes por la Universidad de             Colección ABC, Madrid.                                                       Frist Center for the Visual Arts, Nashville, TN.           Los Angeles County Museum of Art, Los Angeles, CA.




                                                                                                                                                                                                                                                                      101
Metropolitan Museum of Art, New York.                                    ÚLTIMAS EXPOSICIONES INDIVIDUALES                                 Colección del Consejo Superior de Deportes. España                       Spaces,» Bureau for Open Culture, Columbus College of
Mukha Museum, Antwerp, Belgium.                                          2009   Jacobo Castellano. The solo Project. Basel, Suiza.         Hospital de San Juan de Dios. Espacio de Arte Contemporáneo.             Art & Design, Columbus, OH (catalogue) «Bad Habits,»
Museum of Fine Arts, Boston, MA.                                                Sin Público. Galería Fúcares_Madrid, España.               Almagro (Ciudad Real). España                                            Albright-Knox Art Gallery, Buffalo, NY
Museum of Fine Arts, Houston, TX.                                               Cuadrilátero. La casa Encendida. Madrid, España.           Colección Olor Visual. Barcelona. España                          2008   «A Show of Hands: Photographs and Sculpture from
Museum of Modern Art, New York, NY.                                      2008   Às Apalpadelas Galería Pedro Oliveira. Porto, Portugal.    Colección Pilar Citolar. Madrid. España                                  the Henry Buhl Collection,» January 12 to March
Museum of Modern Art, San Francisco, CA.                                        Puzzling question! (con Gonzalo Puch, comisario Alberto    Colección Prosegur. España                                               25, 2008, The Norton Museum of Art, West Palm
National Gallery of Art, Washington, DC                                         Martín) Sala Hospedería Fonseca. Salamanca – Hospital      Diputación Provincial de Granada. España                                 Beach, FL «Beyond the Backyard,» June 20 – August
National Gallery of Canada, Ottawa, Ontario, Canada.                            de San Juan de Dios. Espacio de Arte Contemporáneo,        Fundación Sorigué, Lerida. España                                        23, Museum of Contemporary Photography, Chicago.
Neuberger Berman LLC, New York, NY.                                             Almagro (Ciudad Real). España.                             Fundación Televisa. Méjico                                               «Diana und Actaeon – Der Verbotene Blick Auf Die
Neuberger Museum, State University of New York at Purchase,              2007   Podium. Galería Fúcares_Almagro, España.                   Universidad de Granada. España                                           Nacktheit,» Museum Kunst Palast, Düsseldorf, Germany
Purchase, NY.                                                            2006   16 Proyectos de Arte Español. Proyect Room, galería        Fundación Montenmedio Arte Contemporáneo. España                         (catalogue) «Invisible Rays: The Surrealism Legacy,»
Neue Galerie der Stadt Linz, Linz, Austria.                                     Fúcares. ARCO’06 (Comisariado: María de Corral).           Fundación Provincial de Artes Plásticas Rafael Botí. España              Sept 25-Dec 14, Rose Art Museum, Waltham, MA
New Orleans Museum of Art, New Orleans, LA.                                     Madrid.                                                                                                                             «Invitational Exhibition of Visual Arts,» March 12 – April
New School for Social Research, New York, NY.                                                                                                                                                                       5, The American Academy of Arts and Letters, New
Pacific Bell Collection, Los Angeles, CA.                                ÚLTIMAS EXPOSICIONES COLECTIVAS                                                                                                            York «Las Implicaciones de la Imagen,» Universidad
Pepsico Collection, Purchase, NY.                                        2010   «Itinerarios 0809». Fundación Marcelino Botín.                                                                                      Nacional Autónoma de México, Museo Universitario de
Progressive Corporation, Cleveland, OH.                                         Santander, España.                                         Gregory Crewdson Brooklyn, NY, 1962                                      Ciencias y Arte, Mexico City (catalogue) «Oh L’Amour:
Prudential, Newark, NJ.                                                  2009   El tiempo que venga. La colección IX. Comisariada por      Vive y trabaja New York                                                  Contemporary Photography from The Stéphane Janssen
Rose Art Museum, Waltham, MA.                                                   Daniel Castillejo. Artium. Centro Museo Vasco de Arte                                                                               Collection,» The Center for Creative Photography,
Revco Corporation, New York, NY.                                                Contemporáneo. Vitoria-Gasteiz, España                     FORMACIÓN                                                                Tuscan, Az. «Reality Check: Truth and Illusion in
San Diego Museum of Contemporary Art, San Diego, CA.                            Off Street. A Foundation (comisaria Blanca de la Torre y   1988   Yale School of Art, Yale University, New Haven, CT,               Contemporary Photography,» The Metropolitan Museum
St. Louis Art Museum, St. Louis, MO.                                            Mark Waugh). Londres, Reino Unido.                                M.F.A.                                                            of Art, New York. «Sheldon Survey: An Invitational,»
Tampa Museum of Art, Tampa, FL.                                                 Expanded Drawing. Comisariada por Pilar Ribal DNA          1985   SUNY Purchase, NY, B.A.                                           Sheldon Memorial Art Gallery, University of Nebraska,
Tate Modern, London, UK.                                                        Galerie. Berlín, Alemania.                                                                                                          Lincoln, NB. «to: Night, Contemporary Representations
United Yarn Corporation, Wayne, NJ.                                      2008   Uno + Uno, Multitud. Doméstico 08. (Comisariada por        PREMIOS                                                                  of the Night,» September 25 – December 6, 2008, The
University Art Museum, University of New Mexico, Albuquerque.                   Tania Pardo). Madrid, España.                              2004   Skowhegan Medal for Photography, Skowhegan School                 Bertha and Karl Leubsdorf Art Gallery, The Hunter
University of Iowa Museum of Art, Iowa City, IA.                                A limerence reaction. Galería Benveniste. Madrid,                 of Painting and Sculpture                                         College Art Galleries, New York, NY; September 25 –
Victoria and Albert Museum, London, England.                                    España.                                                                                                                             November 15, 2008, Times Square Gallery, The Hunter
Walker Art Center, Minneapolis, MN.                                             Condiciones de trabajo. Viajeros. Museo Provincial de      ÚLTIMAS EXPOSICIONES INDIVIDUALES                                        College Art Galleries, New York, NY (catalogue) «Untitled
Whitney Museum of American Art, New York, NY.                                   Cádiz, Cadiz y Sala Caja Sol. (Comisariada por Francisco   2009   La Fábrica Galería, Madrid. «Beneath the Roses,»                  (Vicarious),» Gagosian, New York «World’s Away: New
Williams College Museum of Art, Williamstown, MA.                               del Río). Sevilla, España.                                        Galerie Daniel Templon, Paris                                     Suburban Landscapes,» Walker Art Center, traveling to
                                                                                España. Arte español 1957.2007. Palazzo Sant’Elia.         2008   «Dream House,» Photology, Milan, Italy «Beneath the               Carnegie Museum, February 15, 2008 to May 18, 2008.
                                                                                (Comisariada por Demetrio Paparoni). Palermo, Italia.             Roses,» Luhring Augustine, New York «Beneath the
                                                                                Condiciones de Trabajo, Viajeros, con Chema                       Roses,» White Cube, London «Beneath the Roses,»            COLECCIONES

                                                                                Alvargonzález y Jesús Palomino. Museo de Cádiz. Cádiz,            Gagosian, Los Angeles «Gregory Crewdson: 1985–             Indianapolis Museum of Art, Indianapolis, IN Guggenheim
Jacobo Castellano Jaén, 1976                                                    España.                                                           2005,» Galerie Rudolfinum, Prague.                         Museum, New York, NY The Herbert F. Johnson Museum of
Vive y trabaja en Madrid                                                        «Inicial/08». Espacio Iniciarte. (Comisariada por Oscar    2007   «Drawing on Hopper: Gregory Crewdson/Edward                Art, Ithaca, New York The Broad Art Foundation, Santa Monica,
                                                                                Alonso Molina). Sevilla, España.                                  Hopper,» Williams College Museum of Art, Williamstown,     CA The Berkshire Museum, Pittsfield, MA The Contemporary
Licenciado en Bellas Artes. Universidad de Granada, 2000.                2007   De Granada a Gasteiz. Centro Museo Vasco de Arte                  MA «Gregory Crewdson: 1985–2005,» DA2. Domus               Museum, Honolulu, Hawaii The Malba-Collection, Buenos
                                                                                Contemporáneo. Artium. Vitoria, España.                           Artium 2002, Salamanca; Hasselblad Center, Göteborg,       Aires, Argentina The Museum of Contemporary Art, Los Angeles,
BECAS Y PREMIOS                                                                 Open Studios. International Studio and Curatorial                 Sweden; 2007/2008: Palazzo delle esposizioni, Rome         CA The American Contemporary Art from Misumi Collection,
2008/09   Premio Iniciarte a la Actividad Artística del 2008. Sevilla,          Program (ISCP). Nueva York, Estados Unidos.                2006   «Gregory Crewdson: Fotografien 1985-2005,»                 Museum of Contemporary Art, Tokyo, Japan The Art Institute
          España.                                                               Mapas, Cosmogonías y Puntos de Referencia. Centro                 Fotomuseum Winterthur, Winterthur, Switzerland;            of Chicago, Chicago, IL The Rose Art Museum, Brandeis
          Beca Fundación Marcelino Botín. International Studio                  Gallego de Arte Contemporáneo. CGAC. Santiago de                  Museen Haus Lange/ Haus Esters Krefeld, Krefeld,           University, Waltham, MA Brooklyn Museum of Art, Brooklyn,
          and Curatorial Program (ISCP). Nueva York, EE.UU.                     Compostela, España.                                               Germany; Fotomuseum Den Haag, Holland. «Fireflies,»        NY Los Angeles County Museum of Art, Los Angeles, CA Lowe
2006      Beca Manuel Rivera (Diputación Provincial de Granada.                                                                                   Skarstedt Fine Art, New York, NY. (exhibition catalogue)   Art Museum, The University of Miami, Coral Gables, FL John D.
          International Studio and Curatorial Program (ISCP).            COLECCIONES                                                                                                                         and Catherine T. Macarthur Foundation, Chicago Metropolitan
          Nueva York, Estados Unidos.                                    ARTIUM. Centro-Museo Vasco de Arte Contemporáneo. España          ÚLTIMAS EXPOSICIONES COLECTIVAS                                   Museum of Art, New York The Montclair Art Museum, Montclair,
1997      Beca Erasmus. Accademia di Belle Arti di Firenze.              Ayuntamiento de Granada. España                                   2009   «Invitational Exhibition of Visual Arts,» American         NJ Milwaukee Art Museum, Milwaukee, WI Musee des Beaux
          Florencia, Italia.                                             CGAC. Centro Gallego de Arte Contemporáneo. España                       Academy of Arts and Letters, New York, NY «Of Other        Arts de Montreal, Montreal, Canada Museo Nacional Centro




102
de Arte Reina, Madrid,Spain Museum of Contemporary Art,              2002   Video speaking pictures, Catalogue, Kunstraum Riehen,      BECAS Y PREMIOS                                                          Scope London. Galería Fernando Pradilla. Inglaterra. U.K.
Chicago, IL Museum of Fine Arts, Boston Museum of Modern                    Riehen/Basel, Switzerland                                  2008   Fotógrafo Revelación PhotoEspaña’08                               II Bienal de Arte Contemporáneo. Fundación Once.
Art, New York Norton Museum of Art, West Palm Beach, FL              1996   Das Paar in der Kunst, Catalogue of exhibition,                   IX Premio ABC de Pintura y Fotografía. Primer Accésit.            Madrid. España.
Orlando Museum of Art, Orlando, FL Philadelphia Museum                      Helmhaus zürich, Switzerland                               2007   Beca de la Real Academia de España en Roma.                       Museo de Bellas Artes de Santiago de Chile.
of Art, Philadelphia, PA Princeton University Art Museum,                   Fundación Alexander Clavel Awards, Riehen/Basilea,                Artista Español en la XXIV Bienal de Alejandría. Egipto.          Real Academia de España en Roma. Italia.
Princeton, NJ Progressive Corporation, Mayfield Village, OH                 Switzerland                                                2006   Seleccionado. I Premio Internacional de Fotografía Pilar          ARCO ’08. ABC. Madrid. España.
Saint Louis Art Museum, Saint Louis, MO San Francisco                1994   Hauttief, Catalogue of exhibition, Helmhaus zürich,               Citoler. Universidad de Córdoba.                                  Museo de Arte de San Paulo. Brasil.
Museum of Modern Art, San Francisco, CA Whitney Museum of                   Switzerland                                                       Seleccionado. Premio de Fotografía Ciudad de Palma
American Art, New York National Gallery of Victoria, Melbourne,                                                                               2006. Casal Solleric. Palma de Mallorca.
Australia Yale University Art Gallery, New Haven, CT                 PREMIOS Y BECAS                                                   2001   1º Premio Nacional de Fotografía Injuve 2001.
                                                                     2008   Förderbeitrag des Fachausschuss für Film, Foto und                2º Premio VI Edición Concurso «Todos Somos
                                                                            Video, Basel-Stadt und Baselland                                  Diferentes» Fundación de Derechos Civiles.                 Lucas Gómez Fernández San Sebastián, 1971
                                                                     2006   Förderbeitrag des Fachausschuss für Film, Foto und                                                                           Vive y trabaja en Sevilla y Málaga.
                                                                            Video, Basel-Stadt und Baselland                           EXPOSICIONES INDIVIDUALES (SELECCIÓN)

Gabriella Gerosa 1964                                                2005   Beca Kunstkredit Basel                                     2010   Moradores del Alma. MAMBA. Museo de Arte Moderno           Licenciado en Bellas Artes Granada, 1996.
Vive y trabaja en Basilea                                            2003   zONTA Regio Kulturpreis                                           de Barranquilla. Colombia
                                                                     2002   Förderbeitrag des Fachausschuss für Film, Foto und                De Padres y de Hijos. Galería Fernando Pradilla. Madrid.   EXPOSICIONES RECIENTES

SELECCIÓN DE EXPOSICIONES                                                   Video, Basel-Stadt und Baselland                           2009   PhotoEspaña’09. Room Mate Óscar. Madrid                    2010   Espacio Emergente Málaga. Individual.
2010   ART MASTERS ST.MORITz, Switzerland                            2001   Swiss Art Award, Eidgenössischer Preis für Kunst Basler           Galería El Museo. Bogotá, Colombia                         2009   Sala A4 Almería al desnudo. Colectiva.
       ARCO’10, Galería Max Estrella, Madrid, Spain                         Künstlerstipendium                                                Paisaje español. Galería Carlos Word. Guatemala            2008   Palacio del Obispo Retrospectiva premios Unicaja.
2009   Staatliche Kunstsammlungen Dresden, Schloss Pillnitz,         1996   Kulturförderpreis der Alexander Clavel Stiftung, Riehen/          Peregrinatio. Sagunto, Valencia                                   Colectiva.
       Germany                                                              Basel, Switzerland Förderbeitrag des Fachausschusses              Espai Quatre. Casal Solleric. Palma de Mallorca. España.   2007   Sala invisible Málaga, Paisaje Desnudo. Individual.
       ART Basel, Galerie Tony Wüthrich, Basel, Switzerland                 für Film, Foto und Video, Basel-Stadt und Baselland        2008   Galería Bertin-Toublanc. Miami. USA                               Certamen de Artes Plásticas Málaga (obra adquirida)
       Paris Photo’09, Galería Max Estrella, Paris, France                  Swiss Art Award, Eidgenössischer Preis für Kunst Basler           Festival YES zagreb. Croacia.                                     Colectiva.
2008   ART Basel, Galerie Tony Wüthrich, Basel, Switzerland                 Künstlerstipendium                                                Museo de Arte Moderno de Guatemala                                Expo. Premio Unicaja Fotografia (itinerante Andalucia)
       Laboratorio Kunsthalle Lugano, Switzerland                    1993   Swiss Art Award, Beca Kiefer Hablitzel                            Condenados. Photoespaña. Galería Fernando Pradilla.        2006   Bienal de Almería exposición ABIAC Colectiva.
2006   REGIONALE 7, Kunsthalle Basel, Switzerland                                                                                             Madrid.                                                           MálagaCrea CAC, Málaga Colectiva.
2005   Blumenmythos, Fondation Beyeler, Riehen /Basel,               OBRAS EN COLECCIONES PÚBLICAS                                            Fichados-Tatuados. Galería Fernando Pradilla. Espacio      2005   Arte Efímero en el Ateneo de Málaga. Colectiva.
       Switzerland                                                   Kunstmuseum Basel, Kupferstichkabinett, Basel, Switzerland               Proyectos. Madrid. España.                                 2004   Sala San Telmo Málaga, Viajes. Individual.
       Swiss Miss, Kunstmuseum Schwerin, Alemania                    Oeffentliche Kunstsammlung der Stadt, Basel, Switzerland                 MIART. Galería Fernando Pradilla. Milán. Italia.           2003   Exposición itinerante de Unicaja. (Sevilla, Málaga,
2003   Centre culturel Suisse, Paris, France                         Oeffentliche Kunstsammlung des Kanton, Basel, Switzerland         2007   Pabellón de España en la XXIV Bienal de Alejandría.               Almería ) Colectiva
       REGIONALE 4, Kunsthalle Basel, Switzerland                    Oeffentliche Sammlung der Stadt zürich, zürich, Switzerland              Egipto.
       zum Fest, Kunstraum Aarau, Switzerland                        Baden Württembergische Landesbank, Stuttgart, Germany                    Galería El Museo. Bogotá. Colombia.                        BECAS Y PREMIOS

2002   VIDEO SPEAKING PICTURES, Kunstraum Riehen,                    Royal Caribbean International, Miami, USA                                Galería Full Art. Sevilla. España.                         2006   Premio major guión y dirección. Festival Nacional de
       Switzerland                                                   National Versicherung, Basel, Switzerland                                Scope’07. Galería Fernando Pradilla. Basilea. Suiza.              Soria.
2000   Stillleben, Kaskadenkondensator, Basel, Switzerland           ROCHE, Basel, Switzerland                                                ARCO ’07. Project Room. Galería Fernando Pradilla.                Premio a la mejor videocreación de ficción en el 9º
1996   Das Paar in der Kunst, Museum Helmhaus, zürich,                                                                                        Madrid. España.                                                   Festival de Cine Español de Málaga por el cortometraje
       Switzerland                                                                                                                                                                                              «S/T»
       Akkumulator» FILIALE, Basel, Switzerland                                                                                        EXPOSICIONES COLECTIVAS (SELECCIÓN)                                      Premio RTVA al mejor vídeo andaluz en el Festival
1994   Hauttief, Museum Helmhaus, zürich, Switzerland                                                                                  2010   Cazadores de Sombras. Casa de España en México                    Almería en Corto 06 por el cortometraje «S/T»
       In Vitro, Kunst im öffentlichen Raum, Genf, Switzerland       Germán Gómez Gijón, 1972                                          2009   Kuntsi Museum of Modern Art, Vaasa, Finland.                      Primer premio en el certamen Málaga Crea, modalidad
       Bad zur Sonne, Steirischer Herbst, Graz, Austria              Vive y trabaja en Madrid                                                 SCOPE Basel. Galería Fernando Pradilla, Basilea, Suiza            de Artes Plásticas.
                                                                                                                                              MadridFoto. Galería Fernando Pradilla. Madrid, España      2004   Premio al mejor guión Andaluz en el Certamen de
PUBLICACIONES                                                        ESTUDIOS REALIZADOS                                                      Stenersen Museum. Oslo. Noruega.                                  cortometrajes andaluces 04.
2009   Still Life, Catalogue, Colección de Arte Estatal de Dresde.   2001   Diploma de Estudios Avanzados en Bellas Artes.             2008   Museo de Arte Contemporáneo, Panamá.                              Premio a la mejor producción almeriense en el Festival
       Schloss Pillnitz, Dresde, Germany                                    Universidad Complutense de Madrid.                                Kulturhuset. Stockholm. Suecia.                                   Internacional de Corto por «Dos».
2007   Publikation anlässlich der Dauerausstellung im Kulm           1998   Licenciado en Bellas Artes Universidad Complutense de             Photo Miami. Galería Fernando Pradilla. Florida. EEUU.     2003   Primer premio Unicaja de Fotografía 03
       Hotel, St.Moritz,Switzerland                                         Madrid.                                                           Nuit Blanche Paris. (European Night). Paris. Francia.             Primer premio del 6º Festival de Cine español de Málaga,
2005   Blumenmythos, Catalogue Fondation Beyeler, Riehen/            1993   Diplomado en Magisterio. Universidad Complutense de               Academia de San Fernando. «Inventio Roma». Madrid.                sección audiovisuales ficción 03 por el cortometraje
       Basel, Switzerland                                                   Madrid.                                                           España.                                                           «Dos»




                                                                                                                                                                                                                                                                     103
Primer premio festival Cortomanía de Córdoba por «Dos»             del Águila y la Parra de Santillana del Mar, Santander,     Maison Europeènne de la Photographie. París.                           Creación Artística Contemporánea grant, Consejería de
       Primer premio Baumann de videocreación por «Dos»                   España.                                                     Centre Nacional des Arts Plasttiques (CNAP), París.                    Cultura Junta de Andalucía, Spain
       Primer premio festival de Moncofa por «Dos»Premio al               «Colección de Pilar Citoler». Fundación Caixa Galicia.      Colección de la Comunidad de Madrid.                            2003   Artes Plásticas Daniel Vázquez Díaz grant, Diputación de
       mejor cortometraje andaluz en el 8º Festival de Cabra              Pontevedra, España.                                         Fundación de Fútbol Profesional. Madrid.                               Huelva, Spain
       por «Dos»                                                          «Cuestión Generacional», CGAC Centro Galego de Arte         Museo de Bellas Artes de Álava. Vitoria, España.                       Unicaja VII award, Certamen de Artes Plásticas, Málaga,
2002   Premio al mejor guión en el festival de audiovisuales de           Contemporánea, Santiago de Compostela, España.              Colección UNED, Universidad Nacional de Educación a                    Spain
       Cabra 02                                                    2008   ARCO’08. Stand Galería Juana de Aizpuru. Madrid.            Distancia. Madrid.                                              2001   Pilar Juncosa and Sotheby’s. Fundació Pilar i Joan Miró
       Primer premio del jurado y premio del público, sección             «Atemporalidad. Colección Pecar». Museo de Bellas           Gobierno de Cantabria, Santander, España.                              award, Mallorca, Spain
       audiovisuales, en el 5º Festival de cine español de                Artes de Santander. Santander, España.                      Encuentros de Fotografía de Coimbra, Portugal.                  2000   Gijón City Council grant for digital art production, Spain
       Málaga por el cortometraje «Uno».                                  «De lo humano». Centro Andaluz de Arte                      Celebrity Cruises Art Collection, USA.                                 Unicaja VI award, Certamen de Artes Plásticas, Málaga,
                                                                          Contemporáneo. Sevilla, España.                             Fonds Nacional d’Art Contemporain, Francia.                            Spain
                                                                          «Portrait & Paisaje du XXIe siècle», Espace Culturel ING.   21C MUSEUM Louisville, KY, USA.                                        Ayuda a la Creación Artística Contemporánea,
                                                                          Bruselas.                                                   Museum of Contemporary Art, Chicago, ILL, USA.                         Consejería de Cultura Junta de Andalucía, Spain
                                                                          «25 Fotografos Españoles» Intinirante desde Kiulur          Colección de Fotografía Antonio Pérez Martín.
Pierre Gonnord Cholet (Francia), 1963                                     huset, Estocolmo.                                           Diputación Provincial de Cádiz. España.                         ÚLTIMAS EXPOSICIONES INDIVIDUALES

Vive y trabaja en Madrid                                           2009   «FRAC Auvergne’s Collection in 2008 and 2009» FRAC          Museo de Arte Contemporáneo de Murcia, España.                  2010   Busan Biennale. Proyecto de Arte Público para la ciudad
                                                                          Auvergne. Francia                                           Ayuntamiento de Alcorcón, Madrid.                                      de Busan, Corea
ÚLTIMAS EXPOSICIONES INDIVIDUALES                                         ARCO’09. Stand de la Galería Juana de Aizpuru. Madrid.      Colección de la Fundación El Monte. Sevilla, España.                   Ensayos para un descampado, DA2, Domus Artium,
2007   «Paris-Sevilla». Galería Juana de Aizpuru. Madrid.                 «25 Fotógrafos Españoles» Itinerancia al Sternersen         Colección Fundación Telefónica, Madrid.                                Salamanca, Spain
       «El puente de la visión 2007». Museo de Bellas Artes de            Museum, Oslo.                                               Colección Ordóñez-Falcón de Fotografía, San Sebastián,                 Conflict in paradise, The Columns Art Center for Visual
       Santander. Santander, España.                                      «Prohibido el cante. Flamenco y Fotografía» Centro          España.                                                                and Performing Arts, Seul, South Corea
2008   «Testigos». Universidad de Salamanca, España.                      Andaluz de Arte Contemporáneo. Sevilla,España.              Colección Banco Espíritu Santo, Lisboa.                                Organogramas, Novalis Fine Arts Gallery, Turín, Italy
       «Sous la peau», Atelier des Forges, Les Rencontres                 «Pequeña historia da fotografía». Fondos de la Colección    Colección L’OREAL, España.                                      2009   Transfigured Schönberg, Museo Patio Herreriano,
       d’Arles, Arles, Francia.                                           del CGAC. Santiago de Compostela. España.                   Museo de Arte Contemporáneo de Castilla y León (MUSAC).                Valladolid, Spain
       «La interpretación muda», Dentro des Festival la Mar de            BASEL’09. Stand de la Galeria Juana de Aizpuru. Madrid.     Castilla y León, España.                                               Postopias, Fiedler Taubert Contemporary, Berlin,
       Musicas, Palacio Molina, Cartagena, España.                        Frieze. Stand Galería Juana de Aizpuru. Londres, Reino      Colección de Arte Museo Patio Herreriano, Valladolid, España.          Germany
       «Pierre Gonnord A l’épreuve du portrait.» 20e Festival             Unido.                                                      ARTIUM. Museo de Arte Contemporáneo de Álava, Vitoria,          2008   Elegía 1938, Solo Project, Arco ‘08, Galería Max Estrella,
       internatinal du photojournalisme de Perpignan, Eglise              Paris Photo. Stand Galería Juana de Aizpuru. Paris,         España.                                                                Madrid, Spain
       des Dominicains. Perpignan, Francia.                               Francia                                                     Colección Gobierno de Cantabria. Santander, España.                    This it’s true, The Columns Art Center for Visual and
       «Pierre Gonnord» FRAC Auvergne – Ecuries de Chazerat.              «Paisatges creuats». Colección Es Baluard. Palma de         Universidad de Salamanca, España.                                      Performing Art’s, Seoul, Korea
       Clermont Ferrand. Francia.                                         Mallorca.                                                   Colección Metrònom Rafael Tous, Barcelona.
       «Utopicos» Festival Fotografico de Helsinki Helsinki City   2010   «No singing Allowed Flamenco & Photography». Amster         Colección de Pilar Citoler, Madrid.                             ÚLTIMAS EXPOSICIONES COLECTIVAS

       Art Museum, Oslo.                                                  Yard Gallery, Instituto Cervantes New York, New York.       Colección de la Comunidad Autónoma de la Región de Murcia.      2010   10ª Bienal Martínez Guerricabeitia, Valencia, Spain
       «Bienal de Fotografía de Córdoba (Mapas del Sujeto)».              Itinerancia de la exposición en el Centro Andaluz de Arte   Museo de Bellas Artes de Santander, España.                            Pulse New York, Ftc. Contemporary,New York, USA
       Córdoba                                                            Contemporáneo.                                              Fundación Alorda-Derksen, Barcelona, España.                           Arte Fiera Bologna, Novalis Fine Arts Gallery, y
2009   «Pierre Gonnord». Frac de Auverge, Clemont Ferrand,                ARCO’10. Stand Galeria Juana de Aizpuru, stand              Museo d’art modern i contemporani Es Baluard, Palma de                 PROJECTB Art Conntemporary, Bolonia, Italy
       Francia.                                                           Comunidad de Madrid. Madrid                                 Mallorca                                                               Art Brussels’10, PROJECTB. Brussels, Belgium
       «Testimoni». Dentro del proyecto Made in Mad de                                                                                Ministerio de Industria Turismo y Comercio, Madrid, España.            Espacio Atlántico’10, Galería Max Estrella, Vigo, Spain
       la Comunidad de Madrid. Centro Internazionale di            PREMIOS, BECAS Y OTROS PROYECTOS:                                                                                                         ASIMTRYA FESTIVAL.Peru
       Fotografía. Milán (Italia)                                  2003    Beca del Programa «Villa Kujoyama» (Kioto/Japón).                                                                                 Faraway so close, Museo Nacional Soares Dos Reis,
       «Terre de Personne». Sala Alcalá, 31. Madrid                        AFAA/Asociación Française d’Action Artistique.                                                                                    Oporto Portugal
2010   «Terre de Personne». Xacobeo 2010. Santiago de                      Ministerio de Asuntos Exteriores Francés.                                                                                         Utopia? L’Art amb els drets humans, Museo de Arte
       Compostela                                                          Premio L’Oreal de Fotografía. Madrid.                      Dionisio González Gijón, 1965                                          Contemporaneo, Mallorca, Spain
                                                                   2004    Premio Purificación García, 3º puesto. Círculo de Bellas   Vive y trabaja en Sevilla                                              Paitsages creuats, ES Baluard, Mallorca, Spain
ÚLTIMAS EXPOSICIONES COLECTIVAS:                                           Artes. Madrid.                                                                                                             2009   Cazadores de Sombras, Centro Cultural de España en
2007   ARCO’07. Stand Galería Juana de Aizpuru. Madrid.            2005/06 «Cité Internacional des Arts». Paris. Francia              ÚLTIMAS BECAS Y PREMIOS                                                México, México DF, Mexico
       «En quête d’identité». Centre Photographique d’Ile          2008    Premio de la Fotografía de la Comunidad de Madrid          2007   Ayudas Iniciarte, Consejería de Cultura Junta de                Paris Photo ‘09, Galería Max Estrella, Renos Xippas, Paris
       de France, Francia. Obras procedentes de los Fonds                                                                                    Andalucía, Spain                                                El Dorado. On the promise of Human Rights, Kuntshalle
       National d’Art Contemporain, Paris.                         OBRAS COLECCIONES PUBLICAS Y PRIVADAS                                     Ayuda a la Creación Visual, Fundación Arte y Derecho,           Nürnberg, Germany
       «Colección Norte de Arte Contemporáneo». Casas              Museo Nacional Centro de Arte Reina Sofía. Madrid.                        Spain                                                           Scad, Red Gallery, Atlanta, USA




104
Usazur Nachahmung Empfohlen, The Uferhallen, Berlin,        Fonds National d’Art Contemporain, Paris, France                     estilo propio que, de un modo u otro, ha influido en el trabajo            Sus obras se encuentran en importantes colecciones
       Germany                                                     The Margolies Collection, Miami, USA                                 de muchos de los artistas pertenecientes a generaciones               públicas: Museo Nacional Centro de Arte Reina Sofía
       Home less home, Museum on the Seam, Socio-Political         Caldic Collection. Rotterdam, Netherlands                            posteriores.                                                          (Madrid, España), Museo de Bellas Artes de Bilbao, IVAM
       Contemporary Art Museum, Jerusalem, Israel                  Centro de Fotografía, Universidad de Salamanca, Spain                     Tras pasar por la Facultad de Derecho, comenzó su forma-         (Valencia, España), Fundación La Caixa (Barcelona, España),
       El Ángel Exterminador, El Bozar, Palais des Beaux Arts,     ARTIUM, Álava, Spain                                                 ción artística en la Escuela de Bellas Artes de Sevilla. Durante      Patio Herreriano (Valladolid, España), MACBA (Barcelona,
       Brussels, Belgium                                           Neuflize Vie Collection, Paris, France                               el desarrollo de su carrera, va asimilando de un modo personal        España), ARTIUM (Vitoria, España), Fundación Juan March
       Big Up, Centro de Arte Les Abattoirs, Pau, France           Song Eun Art Foundation, Seoul, Korea                                los nuevos lenguajes creativos de las últimas cinco décadas. Así      (Madrid, España), la Fundación AENA, CAAC (Sevilla, España),
       Cazadores de Sombras, Museo Nacional de Bellas Artes        University of California Contemporary Art Collection, USA            en 1958, tras vivir en París varios años, entra en contacto con       Caja Madrid (Madrid, España), Caja Sol (Sevilla, España),
       de La Habana, Cuba                                          MACUF, Museo Unión Fenosa, Spain                                     el Informalismo. Con posterioridad conoce el Pop Art, el cual le      ICO(Madrid), Museum Folkwang (Essen, Alemania), entre otros.
       Insiders le Floklore qui Vient, Musée d’Art Contemporain,   Centro Andaluz de Arte Contemporáneo, Spain                          ofrece nuevos e importantes medios plásticos de expresión. A la
       Bordeaux, France                                            Comunidad de Madrid, Spain                                           configuración de una estética propia le acompaña, de manera
       Atopia, CCCB, Centre de Cultura Contemporania de            Madrid City Council, Spain                                           paralela, su interés por plantear nuevos discursos desde el
       Barcelona, Spain                                            Alcobendas City Council, Spain                                       conocimiento e interés por el psicoanálisis, el cine y la música.
       The inaugural opening, The Incheon Art Center and           Caja San Fernando, Sevilla, Spain                                         Su trayectoria, siempre marcada por la experimentación           Juan Francisco Isidro Lora del Río, Sevilla, 1961-Sevilla, 1993
       Platform, Incheon, Korea                                    CAM, Caja de Ahorros del Mediterráneo, Alicante, Spain               continua así como por el cambio de registros en su producción,
       KIAF Art Fair, Korea                                        Fundació Pilar i Joan Miró, Mallorca, Spain                          ha sido enmarcada dentro de la abstracción, una definición            Realiza estudios de Arquitectura en la E.T.S.A. de Sevilla.
       New Perspectives on Spanish Contemporary                    Fundación Centro Ordóñez Falcón de Fotografía, San Sebastián,        que encorseta un trabajo que va más allá, en un afán de descu-
       Photography, Finland                                        Spain                                                                brimiento de nuevos horizontes plásticos. El uso de diferentes        1990   Premio L’Oréal. VI Edición.
       Confines, IVAM, Valencia, Spain                             DA 2, Domus Artium, Salamanca, Spain                                 medios le ha llevado a desarrollar un universo paralelo donde,        1992   Beca Banesto.
       There Goes the Neighbourhood, Museum of                     IVAM, Colección de Arte Contemporáneo, Valencia, Spain               superando la abstracción, conviven en el mismo plano refe-
       Contemporary Art, Cleveland, USA                            Diputación de Cádiz, Spain                                           rencias a la realidad, o a partes de la misma, con elementos          EXPOSICIONES INDIVIDUALES

       Scope Basel, Fiedler Taubert Contemporary, Basel,           Diputación de Málaga, Spain                                          imaginados, plenamente abstractos, simbólicos o narrativos. En        1987   Sala de Exposiciones de la Casa de la Cultura. Málaga.
       Switzerland                                                 Museo Casa Natal de Jovellanos, Ayuntamiento de Gijón, Spain         definitiva un lenguaje propio, rico y complejo, donde plasma          1988   Galería Rafael Ortiz. Sevilla.
       In the Photographic Image. The Columns Gallery, Seoul,      Instituto de la Juventud, Consejería de Asuntos Sociales, Junta      sus obsesiones e incertidumbres repetidamente, a modo de              1990   Galería Ángel Romero. Madrid.
       Korea                                                       de Andalucía, Spain                                                  cartografía mental.                                                   1991   Galería Rafael Ortiz. Sevilla.
       Pulse Miami, FTC Berlin, Miami, USA                         Palacio de Congresos, Sevilla, Spain                                      Muestra de la importancia de su trabajo son los premios          1992   Galería Elba Benítez. Madrid.
       Great Expectations. Contemporary Photography                Colección Unicaja, Málaga, Spain                                     recibidos a lo largo de todos los años de trayectoria profesional.           Galería Trazos Tres. Santander.
       Looks at Today’s Bitter Years, Le Casino; Forum d’Art       Colección Fundación Monte de Piedad, Sevilla, Spain                  Entre estos múltiples premios cabe destacar por su notoriedad y       1994   ABIERTO. BIENAL ‘94. Sala del Colegio Oficial de
       Contemporain, Luxembourg                                    Colección Prosegur, Spain                                            trascendencia el Premio Nacional de Artes Plásticas (1981) y el              Arquitectos de Almería.
       Big up 3, La Maison, Boucau, Bayonne, France                Colección Purificación García, Spain                                 reciente Premio Velázquez a las Artes Plásticas (2007).               1996   En la Torre Juan Francisco Isidro. Torre de los
       Extreme Frontiers, Urban Frontiers, IVAM, Valencia, Spain   Fundación Vázquez Díaz, Huelva, Spain                                     Remarcable también, su nombramiento como Doctor                         Guzmanes. La Algaba, Sevilla.
       Sur, Museo Nacional Centro de Arte Reina Sofía              CAB, Centro de Arte Caja Burgos, Spain                               Honoris Causa por la Facultad de Bellas Artes de Cuenca               2006   Laboratorio de silencios. Galería Rafael Ortiz. Sevilla.
       (MNCARS), Madrid, Spain                                     Ayuntamiento de Pamplona, Spain                                      (2008), la Medalla de Oro del Circulo de Bellas Artes de Madrid
       Feedforward-the Angel of History, LABoral Centro de         Societé Générale. Paris, France                                      (2004), el Premio Aragón-Goya de Pintura (2003), el Premi             ULTIMAS EXPOSICIONES COLECTIVAS

       Arte y Creación Industrial, Gijón, Spain                    West Collection, Oaks, USA                                           Ciutat de Barcelona d’Arts Plastiques (2000),el Premio Tomás          2003   Colección L’Oréal de Arte Contemporáneo. Sala de
       Paitsatges creuats, Es Baluard Museu d’Art Modern i         Rubel Collection, Beverly Hills, USA                                 Francisco Prieto de la Casa de la Moneda (1999), la Medalla                  Armas de la Ciudadela. Pamplona.
       Contemporani, Palma de Mallorca, Spain                      Tom Fenner Collection, Düsseldorf, Germany                           del Honor al Mérito en las Bellas Artes (1996), El Premio CEOE                La distancia y otros mundos. Galería Rafael Ortiz. Sevilla.
       Utopía, Alaró, Palma de Mallorca, Spain                     Fundación Coca-Cola, Spain                                           a las Artes Plásticas (1992), El Premio Andalucía de las Artes               Colección L’Oéeal de Arte Contemporáneo. Casal Solleric.
       Loop ‘09, Barcelona, Spain                                  Museo Patio Herreriano, Valladolid, Spain                            Plásticas (1991). Asimismo ha sido distinguido con la orden de               Palma de Mallorca.
       Vienna Art ‘09, Galeria Ulrich Fiedler, Vienna              Private Collections                                                  Caballero de las Artes y de las Letras por el ministerio de Cultura   2004   El papel, ese soporte. Galería Edurne. Madrid.
       Pulse New York, Ulrich Fiedler Gallery, New York, USA       Collection BES Art                                                   francés (2007).                                                       2006   FORO SUR ‘06. Feria Iberoamericana de Arte
       Videntes, CAB, Sala Amós Salvador, Logroño, Spain                                                                                     Su trabajo se ha mostrado internacionalmente de forma                   Contemporáneo. Stand Galería Rafael Ortiz. Cáceres.
       Arco ‘09, Galería Max Estrella, Madrid, Spain                                                                                    individual tanto en Museos y Centros como en Galería de Arte                 ARTE SANTANDER ‘06. Feria de Arte Contemporáneo.
       MadridFoto, Galería Max Estrella, Madrid, Spain                                                                                  Contemporáneo de España, Alemania, México, Francia, Brasil                   Stand Galería Rafael Ortiz. Santander.
       Art Brussels ‘09, Galería Max Estrella, Brussels, Belgium                                                                        y Estados Unidos. Entre sus innumerables muestra cabe                        VALENCIA ART ’06 Feria de Arte Contemporáneo. Stand
                                                                   Luis Gordillo Sevilla, 1934                                          destacar «Iceberg Tropical» en el MNCARS (Madrid, España) y                  Galería Rafael Ortiz. Valencia.
COLECCIONES PÚBLICAS                                               Vive y trabaja en Madrid                                             en el Kunst Museum (Bonn, Alemania), la mayor retrospectiva                  Colección 2006. Centro Andaluz de Arte
MNCARS, Museo Nacional Centro de Arte Reina Sofía, Madrid                                                                               realizada hasta el momento de su obra junto con una magnífica                Contemporáneo. Sevilla.
ING Collection, Amsterdam, Netherlands                             Luis Gordillo se ha convertido en el artista referente de la crea-   publicación que recoge un recorrido analizado personalmente           2009   Aprendiendo a mirar. 25 años de la Galería Rafael Ortiz.
Museum of Contemporary Photography, Chicago, USA                   ción pictórica española de las últimas décadas, marcando un          por el propio artista (2007-2008).                                           Centro de las Artes de Sevilla, caS. Sevilla.




                                                                                                                                                                                                                                                                                105
OBRAS EN MUSEOS Y COLECCIONES PÚBLICAS                                 Miki Leal Sevilla, 1974                                          Colección Arte Cotemporáneo, Patio Herreriano. Valladolid.          Levine resignifica la obra de grandes maestros del arte –siempre
Colección Banco de España. Madrid.                                     Vive y trabaja en Madrid                                         Colección Artium. Vitoria                                           hombres– y niega las nociones tradicionales de originalidad y
Colección L’Oréal. Madrid.                                                                                                              Colección Caja Madrid. Madrid                                       autoría, que han sido paradigmáticas del concepto patriarcal
Colección Telefónica. Madrid.                                          Licenciado en Bellas Artes, Universidad de Sevilla               Colección del Excmo. Ayuntamiento de Utrera. Sevilla.               de vanguardia. Al mismo tiempo se interroga sobre la idea de
Colección Testimoni. Fundación Caja de Pensiones. La Caixa.                                                                             Colección Fundación Tio Pepe. Jerez de la Frontera                  propiedad y el proceso de fetichización que sufre toda obra de
Barcelona.                                                             ÚLTIMAS EXPOSICIONES INDIVIDUALES                                Colección RED BULL, hangar 7, Salzburg                              arte por el mero hecho de llevar inscrita una firma.
Comunidad Autónoma de Extremadura.                                     2009   «Mikithology». Galería Fúcares. Almagro (Ciudad Real),    Comunidad de Madrid
Comunidad Autónoma de La Rioja.                                               España.                                                   Diputación de Cádiz
Comunidad Autónoma de Murcia.                                                 «Trasfábula» (Con Abraham Lacalle y Mp y MP Rosado).      Diputación de Málaga
Fundación Coca-Cola de España.                                                Sala de exposiciones Hospedería Fonseca. Universidad      Fundación Coca Cola. Madrid
Diputación Provincial de Sevilla.                                             de Salamanca. Salamanca, España.                          Fundación de la Caja de Badajoz. Sede Central de Badajoz.           Rogelio López Cuenca Nerja, Málaga, 1959
Centro Andaluz de Arte Contemporáneo. Sevilla.                                «The end». Benveniste Contemporary. Madrid, España.       Fundación El Monte. Sevilla                                         Vive y trabaja en Málaga
Museo José María Moreno Galván. Puebla de Cazalla. Sevilla.            2008   «Ieri, oggi, domani». Galería Alessandro Seno. Milán,     Fundación Focus Abengoa. Sevilla
Museo Nacional Centro de Arte Reina Sofía. Madrid.                            Italia.                                                   Fundación Unicaja. Málaga                                           Licenciado en Filosofía y Letras
                                                                              «Con el viento de cara». Galería Rafael Ortiz. Sevilla,   Instituto Andaluz de la Juventud. Sevilla
                                                                              España.                                                   Junta de Andalucía. Sevilla                                         ÚLTIMAS EXPOSICIONES INDIVIDUALES

                                                                              «Frenhofer y La Laguna». Galería Maribel López. Berlín,   MUSAC. Museo de Arte Contemporáneo de Castilla y León.              2007   «Málaga 1937». Sala Alameda, Diputación Provincial.
                                                                              Alemania.                                                 León                                                                       Málaga, España.*
Juan del Junco Jerez de la Fra, 1972                                   2007   «Balada Heavy» Galería Magda Bellotti. Madrid, España.    Museo de BBAA de Santander                                          2008   «Hojas de Ruta». Museo Patio Herreriano. Valladolid,
Vive y trabaja en Sevilla                                                     Galería Milagros Delicado. Cádiz, España.                 Museo Nacional Centro de Arte Reina Sofía. Madrid                          España.
                                                                                                                                        Universidad de Sevilla. Sevilla                                            «Le Partage». Galería Juana de Aizpuru. Madrid.
Artista visual que utiliza la fotografía, es miembro fundador de       ÚLTIMAS EXPOSICIONES COLECTIVAS                                                                                                             «Relecturas. Herramientos del Arte». Sala Parpalló,
The Richard Channin Foundation, colectivo artístico formado a          2010   «La Cabaña» / «De la Costa Azul a la Selva Negra».                                                                                   Valencia, España.
final de los 90 en Sevilla.                                                   Becas de Artes Visuales Cajasol 2010. Centro Cultural                                                                                «Avenida Ixtapaluca» Galeria Juana de Aizpuru. Madrid.
     Entre sus exposiciones individuales cabe destacar El                     Cajasol, Espacio Escala y Sala Imagen. Sevilla, España.                                                                       2009   «La Comunidad Desobrada». La ciudadela, Pamplona,
sueño del ornitólogo II (del Philloscopus sibilatrix a la Oxyura       2009   El tiempo que venga. La colección IX. Comisariada por     Sherrie Levine Hazleton, Pennsylvania (USA), 1947                          España.
jamaicensis) un proyecto específico para el Centro Andaluz                    Daniel Castillejo. Artium. Centro Museo Vasco de Arte     Vive y trabaja en New York                                                 «Gitanos de Papel (con Elo Vega)». Sal a Cajasol. Jerez
de Arte Cotemporáneo, Sevilla ; Lejos del paraíso en el Patio                 Contemporáneo. Vitoria-Gasteiz, España.                                                                                              de la Frontera, España.
de Escuelas de la Universidad de Salamanca; o el Naturalista                  AUTO. SUEÑO Y MATERIA. «La cultura del automóvil          Sherrie Levine es una de los principales miembros de una gene-             Galería Pedro Olveira. Oporto. Portugal
y lo habitado: trazas, huellas y el artificio del artista en la sala          como territorio crítico y creativo». Comisariada por      ración de artistas que, huyendo de la nueva tendencia pictórica            «Bienal Ventosul». Curitiba, Brasil
Cajasol de Sevilla. Ha participado dos veces en el festival Off de            Alberto Martín. LABoral Centro de Arte y Creación         neoexpresionista que dominaba el arte de los últimos setenta y             «Yo uso perfume para ocupar más espacio». Museo
Photoespaña y trabaja con las galerías Alfredo Viñas en Málaga                Industrial. Gijón, España. CA2M Centro de Arte Dos de     primeros años ochenta, comienza a explorar asuntos como los                Carrillo Gil.
y magda Belloti en Madrid                                                     Mayo. Mostoles, España.                                   de la originalidad, autenticidad y autoría, característicos de lo          «La mirada del otro» Universidad Nacional de Bogotá.
     Es ganador del IV Premio Internacional de fotografía con-         2008   Imágenes latentes. Comisariada por Alberto Martín.        que más tarde ha venido a llamarse neoconceptualismo.                      Colombia.
temporánea Pilar Citoler y ha disfrutado de numerosas becas                   Galería Fúcares_Madrid, España.                                Su primera obra destacada fue Shoe Sale (1977) y ese                  «Camuflajes» Casa Encendida. Madrid
entre las que citamos la de la Casa Velázquez y la Beca para                                                                            mismo año terminó una serie de dibujos, Sons and Lovers, que               «Rogelio López Cuenca» Festival: Mar de Músicas. Sala
proyectos de fotografía Cajasol.                                       BECAS Y PREMIOS                                                  parecen anunciar sus obras posteriores. En ellos enfrenta la               Muralla Bizantina. Cartagena. España
     Actualmente investiga sobre la relación entre fotografía y        2009   Beca Cajasol.                                             silueta reconocible de un presidente americano con la de una
ciencia, más específicamente entre el lenguaje fotográfico y la        2007   Premio Altadis de pintura 2006.                           figura femenina anónima; estos dibujos logran, a través de la       ÚLTIMAS EXPOSICIONES COLECTIVAS

ornitología, ciencia social que practica desde su más temprana         2006   Beca caja Madrid Proyecto BBC.                            repetición y de la variación, que el espectador sea el que genere   2007   «Geografías del Desorden». Centro de Historia, zaragoza,
infancia. Vive y trabaja en Andalucía                                  2004   Beca, Ayudas a la Creación Artística Contemporánea de     la historia que los une completando el significado de la obra.             España.
                                                                              la Consejería de Cultura de la Junta de Andalucía.             En 1979 Levine realizó ocho collages a partir de obras de             «Existencias» MUSAC. León
                                                                       2002   1º Premio. Certamen Nacional de Arte Joven (I.A.J.)       Leonard Feininger, fue la primera vez que se apropió de las                «Ciutats Platja» Asociación para las Artes
                                                                              Málaga.                                                   fotografías de otro artista. Ese mismo año refotografió seis de            Contemporáneas. Vic. Cataluña.
                                                                       1998   1º Premio para Artistas Jóvenes de la Fundación El        los desnudos masculinos de Edward Weston, así como algunos                 «Mediterraneo» Centre D’Art La Panera. LLeida
                                                                              Monte. Sevilla.                                           de los paisajes de Eliot Porter. Dos años después, su exposición           «La Palabra Imaginada» Museo Esteban Vicente.
                                                                                                                                        individual en la galería Metro Pictures provocó, por la novedad            Segovia
                                                                       OBRA EN COLECCIONES                                              de su propuesta, el debate en el medio artístico neoyorquino. En    2008   IX Bienal de Guerricabeitia. Valencia, España.
                                                                       Centro Andaluz de Arte Contemporáneo CAAC. Sevilla               ella presentó sus reproducciones de la serie fotográfica W.P.A.            ARCO’08. Stand Galería Juana de Aizpuru. Madrid.
                                                                       Colección Altadis. Madrid                                        Depression Series de Walker Evans. Con sus apropiaciones,                  Festival de Videoclip «Videolife». MUSAC, León, España.




106
«Arte=Vida=Arte» Museo Vostel, Malpartida. Cáceres.        Diputación de Málaga. Málaga, España.                                2009   «Light Years. Cristina Lucas» Centro de Arte Dos de         2010   «Dominó Caníbal». Proyecto de Arte Contemporáneo
       «Retorno a Anísala» MUSAC. León.                           Colección Caja Sol, Sevilla, España.                                        Mayo. Móstoles, Madrid.                                            Murcia. Sala Verónicas. Murcia
2009   «XIX Bienal de la Fotografía Internacional de Córdoba».    Colección Caja Burgos. Burgos.                                       2010   «Letargo Revolucionario». Espacio Iniciarte. Sevilla               «La rama dorada». MARCO Vigo, España y Frac Lorraine
       Córdoba, España.                                           Museo Patio Herreriano. Valladolid                                                                                                             Francia
       «Retrono a Anísala». MUSAC, León, España.                  MEIAC. Badajoz                                                       ÚLTIMAS EXPOSICIONES COLECTIVAS                                           «Crisisss. América Latina: arte y confrontación. 1910-
       «Heroirik ez Gehiago / No más Héroes». Artium, Victoria,                                                                        2007   ARCO’07. Stand Galería Juana de Aizpuru. Madrid.                   2010». Museo Del Palacio de Bellas Artes de la Ciudad
       España.                                                    BECAS Y PREMIOS                                                             Botánico. Comisariada por: Maria Azcoitia, Oliva María             de México
       «Lecturas Transversales». Colección Fundación              1991      III Beca Pablo Ruiz Picasso. Málaga, España.                      Rubio, Blanca de la Torre. Madrid.                                 «Despalzamientos». Cent4 de París, Francia
       Marcelino Botin, Santander                                 1992      Premio Andalucía de Artes Plásticas. Junta de                     III Bienal Internacional de Valencia. Valencia, España.            ARCO’10. Stand galeria Juana de Aizpuru. Madrid
       ARCO’09. Stand de la Galería Juana de Aizpuru. Madrid.               Andalucía, España.                                                «Historias Animadas» La Caixa. Mallorca, España.                   «LIF:Libertad, Igualdad,.Fraternidad». CAAM. Canarias.
       «Bienal Ventosul». Curitiba, Brasil                                  Premio El Ojo Crítico-Artes Plásticas. Radio Nacional de          «Encuentro Internacional Medellin’07-Prácticas artís-              «Miradas singulares voces plurales». Palacio provincial,
       «Camuflajes» Casa Encendida. Madrid. Itinerancia                     España.                                                           ticas Contemporáneas». Bienal de Medellín. Espacios                Cádiz.
       en Sala de exposiciones de zaragoza. Museo del             1995/96   Beca del Ministerio de Asuntos Exteriores. Madrid.                de Hospitalidad. Medellín, Colombia.
       Patrimonio Municipal de Málaga. Barcelona                            Academia Española de Bellas Artes en Roma.                        «Mujer, Arte y Género». Filmoteca de Andalucía.             BECAS Y CONFERENCIAS

       «¡Grande Hazaña! Con muertos. Sala Puertanueva.            1999/00   Beca Fundación Marcelino Botín de Artes Plásticas.                Córdoba.                                                    2002    Beca Fundación Marcelino Botín
       Córdoba                                                              Santander, España.                                                «Aquí y Ahora». Sala Alcalá 31. Madrid.                             «Itinerarios 2002-2003». X Becas de Artes Plásticas.
2010   «Camuflajes» Itinerancia de la exposición de la Casa       2001      Premio El Público Canal Sur Radio, España.                        «Je est il, Je sont ils?» Centre d’art Contemporain                 Sala de Exposiciones de la Fundación Marcelino Botín.
       Encendida, Madrid. Espacio para el Arte Caja Madrid,       2002      Premio Francisco de Goya. Ayuntamiento de Madrid.                 Maymac, Francia.                                                    Santander, España.
       zaragoza. Museo del Patrimonio Municipal de Málaga.                                                                                    «Jelly Border». Bienal de Estambul. Estambul.               2006/07 Beca Rijksakademie, Amsterdam.

       Barcelona.                                                                                                                      2008   «Las implicaciones de la imagen». MUCA Museo                2009    Beca «Cité Internacional des Arts» del Gobierno Francés.
       ARCO’10. Stand galeria Juana de Aizpuru, stand galeria                                                                                 Universitario de Ciencias y Artes. Ciudad México.                   Paris. Francia.
       Palma Dotze. Madrid                                                                                                                    ARCO’08. Stand Galería Juana de Aizpuru. Madrid.            2010    Conferencia «Light years» en Centre Pompidou, Francia,
                                                                  Cristina Lucas Jaén, España, 1973                                           Bienal de Estambul 2008.                                            dentro del programa Video et apres organizado por
OBRA EN MUSEOS Y COLECCIONES PUBLICAS                             Vive y trabaja entre Madrid y Ámsterdam                                     «En vivo encuentro». 28 Bienal de Sao Paulo, Brasil                 Christine Van Assche.
Museo de Arte Contemporáneo de Barcelona.                                                                                                     «Nuevas historias». Kulturus. Estocolmo, Suecia
Museo Nacional Centro de Arte Reina Sofía. Madrid.                Licenciada en Bellas Artes por la Universidad Complutense.                  «Tina b: Alternative Revolutions». Praga Contemporary       OBRAS EN MUSEOS Y COLECCIÓNES

Museo de San Telmo. San Sebastián, España.                        Madrid. 93/98                                                               Art Festival. República Checa                               INJUVE, Instituto de la Juventud, Ministerios de Asuntos
Museo de Bellas Artes de Álava. Vitoria, España.                  MFA (Master on Fine Arts) University of California Irvine.                  «One way one ticket». Instituto Valenciano de Arte          Sociales. Madrid.
Academia Española de Bellas Artes. Roma.                          Estudiante de intercambio 99/00                                             Moderno, Valencia                                           Ayuntamiento de Alcorcón, España.
Museo Nacional de Bellas Artes. La Habana.                        Coordinadora Jefe del Canal de Arte de Kataweb (España), por-               «The Gates of the Mediterráneo». Palazzo Piozzo.            Comunidad de Madrid.
Fundación Ludwig de Cuba. La Habana.                              tal perteneciente al grupo editorial El Expreso de Italia. (00/01)          Rivoli, Italia.                                             MUSAC. Museo de Arte Contemporáneo de Castilla. León,
Centro Andaluz de Arte Contemporáneo. Sevilla, España.            Programa de formación y gestión cultural en Casa de América,                «Geopolítica de la Animación». MARCO, Vigo                  España.
Colección Banco de España. Madrid.                                dirigido por Rafael Doctor (02)                                             Frieze. Stand Galería Juana de Aizpuru. Londres             IVAM Institut Valencià d’Art Modern, España.
Colección de la Biblioteca Nacional. Madrid.                      ISCP International Studio and Curatorial Program. New York.                 Paris Photo. Stand Galería Juana de Aizpuru. París          ARTIUM. Museo de Arte Moderno de Vitoria, España.
Colección Fundación La Caixa. Barcelona.                          USA (2003)                                                                  Art Basel Miami Beach. Stand Galería Juana de               FNAF Fondo Nacional de Arte de Francia.
Colección Fundación ICO. Madrid.                                  Rijksakademie Ámsterdam. 2006-2007                                          Aizpuru. Miami.                                             Colección ALTADIS Francia-España.
Colección Martínez Guerricabeitia. Universidad de Valencia,                                                                            2009   Integration and resistente in the global era. X Bienal de   Obra Social Caja Madrid. Madrid.
España.                                                           ÚLTIMAS EXPOSICIONES INDIVIDUALES                                           La Habana, Cuba.                                            Fundación Marcelino Botín. Santander, España.
Colección Ministerio de Asuntos Exteriores. Madrid.               2005      «Cristina Lucas, más Luz». Centro Cultural de España en           Dojima River Biennale 2009-Reflections: The World           L’Oreal España
Colección Fundación Coca Cola. Madrid.                                      República Dominicana / Centro Cultural Español, Miami,            Through Art-Dojima River Biennale, Osaka, Japón             Fundación NMAC, Montenmedio, Vejer, Cadiz, España.
Asociación Colección de Arte Contemporáneo. Madrid.                         USA.                                                              ARCO’09. Stand de la Galería Juana de Aizpuru.              Museo de Bellas Artes de Santander. España.
Collection Fondation Colás. París.                                          «Nunca verás mi Rostro». Centro Municipal de las Artes            Madrid.                                                     Fundación Coca-Cola. España.
Colección de la Diputación de la Rioja. Logroño, España.                    Buero Vallejo. Alcorcón, Madrid.                                  Art Basel ’09. Stand de la galería Juana de Aizpuru.        Diputación de Málaga. España.
Collection Fonds Nationals d’Art Contemporain. Paris.                       «El Eje Del Mal» Agencia Española de Cooperación                  Basel.                                                      The Centre National d’Art et de Culture Georges Pompidou,
Colección Caja de Asturias. Oviedo, España.                                 Internacional. Miami, USA.                                        «El Patio de mi Casa». (Casa de las Campanas), varias       Paris.
Colección UNED. Madrid.                                                     «Under The Gloss» Galería Valle Ortí. Valencia, España.           sedes. Córdoba                                              Colección de la Comunidad de Madrid.
IVAM. Valencia, España.                                           2008      «Caín y las hijas de Eva». Galería Juana de Aizpuru.              «Huésped». Colección MUSAC. Museo Nacional de               Isabel y Agustín Coppel Collection, México.
Fundación Marcelino Botín. Santander, España.                               Madrid.                                                           Bellas Artes. Buenos Aires, Argentina                       Centro Pompidou. Paris. France
Museum Ludwig, Colonia. Alemania.                                           «Talk». Stedelijk Museum Schiedam. Holanda.                       «Nuevas Historias-A New View of Spanish
MUSAC. León, España.                                                        «Imago Mundi». Deweer Art Gallery, Otegem, Bélgica.               Photography». The Stenersen Museum Oslo, Noruega




                                                                                                                                                                                                                                                                      107
Vik Muniz São Paulo, 1961                                             EXPOSICIONES INDIVIDUALES                                          Alcorcón City Council, Madrid, Spain                                       la boca, Salas Cajasol, Sevilla; ARCO’09, Stand Galería
Vive y trabaja en New York                                            2010   Laboratorios, Museo Guggenheim Bilbao, Spain                Córdoba City Council, Spain                                                Rafael Ortiz, Madrid.
                                                                      2009   Gap, Espacio latente, Patio Herreriano, Valladolid, Spain   Archivo Foral de Alava, Spain                                       2008   Hasta el infinito y más allá, Centro de las Artes de Sevilla,
Su gran éxito internacional se ha concretado en exposiciones                 Gap, Espacio latente, Koldo Mitxelena, San Sebastián,       Bilbao City Council, Spain                                                 Sevilla; ARCO’08, Stand Galería Rafael Ortiz, Madrid;
en solitario en el Nichido Contemporary de Tokio, en el Miami                Spain                                                       Oviedo City Council, Spain                                                 Foro Sur ’08, Stand Galería Rafael Ortiz, Cáceres; Inicial
Art Museum, en Museum of Contemporary Art de Montréal,                2008   Galería Senda, Barcelona, Spain                             Madrid City Council, Spain                                                 08, Espacio Iniciarte, Sevilla; Los Claveles, Fundación
en el Museum of Contemporary Art, San Diego, en el Centre             2006   A Subversión da realidade, Archivo del Reino de Galicia,    Banco Central Hispano, Spain                                               Chirivella-Soriano, Valencia; La hora sin sombra, Galería
National de la Photographie o en la Pinacoteca de Sau Paulo                  Spain                                                       Museo de la Universidad de Alicante, Spain                                 Tomás March, Valencia; ARTE=VIDA=ARTE. 26 artistas
entre otros, además de destacar su participación en la 49                    Muros de Luz, Museo ARTIUM, Vitoria, Spain                  Museo Municipal de Arte Contemporáneo, Madrid, Spain                       con Vostell, Museo Vostell Malpartida (Cáceres); Escala
edición de la Bienal de Venecia y en exposiciones colectivas en              Muros de Luz, Galería Max Estrella, Madrid, Spain           FCOFF, Fundació Centro Ordoñez-Falcón de Fotografía, Spain                 abierta, Espacio Escala, Sevilla.
el MOMA, en el Metropolitan Museum, en el Nacional Center for                                                                            Fundación Telefónica, Madrid, Spain                                 2007   Transatlántica 9669, Sala de Estar, Sevilla y Galería 713,
Contemporary Arts de Moscú o en la Fundación Daros. Cuentan           ÚLTIMAS EXPOSICIONES COLECTIVAS                                    Colección de Arte Contemporáneo Fundación La Caixa,                        Buenos Aires; ; Arte Santander ’07, Stand Galería Rafael
con su obra colecciones internacionales de prestigio, entre las       2010   Buildingrooms, Carlos Carvalho Arte Contemporanea,          Barcelona, Spain                                                           Ortiz, Santander; Valencia Art’07, Stand Galería Rafael
que podemos señalar el Metropolitan Museum y el MOMA de                      Lisboa, Portugal                                            MACUF, Museo de Arte Contemporáneo Unión FENOSA, La                        Ortiz, Valencia.
Nueva York, el Centre Georges Pompidou de París, el Museum                   Faraway… So close, Museo Nacional de Soares dos             Coruña, Spain                                                       2006   La estrategia del calcetín. Centro Cultural El Monte,
of Contemporary Art de Tokio y en España, el Artium, el CGAC,                Reis, Oporto, Portugal                                      Colección de Fotografía de la Comunidad de Madrid, Spain                   Sevilla; Art-Salamanca’06, Stand Galería Rafael Ortiz,
el Museo de Bellas Artes de Santander, la Fundación Telefónica        2009   Arte Lisboa’09, Carlos Carvalho Arte Contemporanea,         Fundación Sorigué, Lérida, Spain                                           Salamanca.
y el Museo Reina Sofía de Madrid. Recientemente ha sido comi-                Lisboa, Portugal                                            Gobierno de Cantabria, Spain                                        2005   Hacen lo que quieren, Fundación Aparejadores, Sevilla;
sario de la exposición Artist’s Choice en el MOMA de Nueva York              Colección Alcobendas, Siete décadas de creación             Museo Es Baluard, Palma de Mallorca, Spain                                 Medias y extremas razones, Sala Imagen. Obra Social de
     Vik Muniz desarrolla su trabajo en torno a dos ideas: el                fotográfica española, Centro Andaluz de la Fotografía,      Ministerio de Industria, Turismo y Comercio, Gobierno de                   Caja San Fernando, Sevilla; Todo Modo, Sala de eStar,
reconocimiento de imágenes fácilmente identificables que                     Almería, Spain                                              España, Spain                                                              Sevilla.
proceden de la historia del arte y de fuentes visuales históricas y          Paris Photo’09, Galería Max Estrella, Paris, France                                                                             2004   Mirabilia. Galería Birimbao, Sevilla.
documentales, y la innovación que supone el uso de materiales                MadridFoto ‘09, Galería Max Estrella, Madrid, Spain                                                                             2003   Figuraciones. Arte Civil/ Magicismos/ Espacios de
poco convencionales en el mundo del arte que acrecientan                     Art Brussels ‘09, Galería Max Estrella, Brussels, Belgium                                                                              Frontera, Espacio para el Arte, Obra Social de Caja
la atención del visitante. Con sentido del humor e inteligencia,             Arco ‘09, Galería Max Estrella, Madrid, Spain                                                                                          Madrid, Barcelona; Sala Santa Inés, Sevilla y Sala Alcalá
Muniz no sólo le muestra al espectador el producto creativo sino             Cige Art Fair, Beijing, China                               J. M. Pereñíguez Sevilla, 1977                                             30, Madrid; Los chicos del maíz, Galería Icaria, Alcalá
que lo desafía a participar en ese proceso creativo.                         A new view of Spanish Photography and Video Art,            Vive y trabaja en Sevilla                                                  de Guadaíra (Sevilla).
     Muniz disuelve las fronteras entre las técnicas y manipula              Kulturhuset, Stockholm, Sweden                                                                                                  2002   La parte chunga. El arte joven sevillano de finales del
hilo, alambre, azúcar o tinta con paciencia y minuciosidad. Su               A new view of Spanish Photography and Video Art,            Licenciado en Bellas Artes, Universidad de Sevilla (2000)                  siglo XX. Sala de eStar, Sevilla.
obra cuestiona nuestras ideas visuales preconcebidas y nos                   Stenersen Museum, Oslo, Norway                                                                                                  2001   Figuraciones de Sevilla. Horizonte 2000, Centro de Arte
obliga a plantearnos si la imagen que estamos contemplando es                                                                            EXPOSICIONES INDIVIDUALES                                                  Joven, Madrid y Sala Santa Inés, Sevilla.
en realidad pintura, fotografía de una pintura o reproducción de      COLECCIONES PÚBLICAS                                               2009   Años de peregrinaje, Sala Poste –Ite/ Galería Pedro
otra fotografía. Tal es el caso de la serie, Pictures of paper, que   MNCARS, Museo Nacional Centro de Arte Reina Sofía, Madrid,                Oliveira, Oporto; Presencia de ánimo, Galería Rafael         OBRAS EN COLECCIONES

toma como referente la fotografía clásica en blanco en negro          Spain                                                                     Ortiz, Sevilla.                                              Centro Andaluz de Arte Contemporáneo, Sevilla
donde realiza verdaderos collages previos, casi artesanales, con      Museo Patio Herreriano, Valladolid, Spain                          2007   La obra en negro, Galería Birimbao, Sevilla.                 Museo Patio Herreriano, Valladolid
pequeños fragmentos de papeles.                                       ARTIUM, Vitoria, Spain                                             2005   La leyenda frágil, Galería Deposito 14, Madrid; Brut         Fundación Coca Cola-Juan Manuel Saínz de Vicuña
                                                                      Fundación La Caixa, Colección Testimonio, Spain                           Nature, Galería Birimbao, Sevilla.                           Ministerio de Cultura, Madrid/ Fundación Cajasol, Sevilla
                                                                      CAB, Caja Burgos Collection, Spain                                 2004   La nueva música (con Miki Leal), Sala de eStar, Sevilla.     Obra Social Caja Madrid, Madrid
                                                                      Museo de Arte Moderno, Pamplona, Spain                             2002   Somos el fango (con Rubén Guerrero), Sala de eStar,          Consejería de Obras públicas y Transportes, Junta de Andalucía,
                                                                      IVAM, Valencia, Spain                                                     Sevilla.                                                     Sevilla
Aitor Ortiz Bilbao, 1971                                              AXXA Brussels, Belgium                                             2001   Comparemos mitologías, Showroom de The Richard               Instituto Andaluz de la Juventud, Málaga
Vive y trabaja en Bilbao                                              Guggenheim Museum, Bilbao, Spain                                          Channin Foundation, Sevilla                                  Colección Iniciarte
                                                                      Foto Colectania, Barcelona, Spain                                                                                                      Diputación de Sevilla
ÚLTIMOS PREMIOS                                                       International Museum of Electrography of Cuenca, Spain             EXPOSICIONES COLECTIVAS (SELECCIÓN)                                 Ayuntamiento de Utrera.
2006   Ciudad de Palma Arts Award, Spain                              Museo Etnográfico, Arqueológico e Histórico Vasco, Spain           2010   ARCO’10, Stand Galería Rafael Ortiz, Madrid; Nuevos
2003   Finalist of Europäischer Architekturfotografie-Preis           Ministry of Social Affairs (INJUVE), Spain                                pintores figurativos en las colecciones públicas de la
2002   ABC Photography, 1st Prize, Spain                              Diputación Foral de Bizkaia. Spain                                        provincia de Sevilla, Museo de la Ciudad, Alcalá de
2001   Biennial of Alexandria, Honor Prize, Egypt                     Diputación Foral de Gipuzkoa, Spain                                       Guadaíra (Sevilla).
2000   Honour Mention, Generación 2000 Caja Madrid, Spain             Rafael Tous Collection, Spain                                      2009   Aprendiendo a mirar. 25 años de la Galería Rafael Ortiz,
1999   Villa de Madrid, 1st Prize on Photography, Spain               Alcobendas City Council, Madrid, Spain                                    Centro de las Artes de Sevilla, Sevilla; El pensamiento en




108
Carlos Pérez Siquier Almería, 1930                                   ÚLTIMAS EXPOSICIONES COLECTIVAS                                    ÚLTIMAS EXPOSICIONES COLECTIVAS                                    en Las Palmas, Haus der kulturen der Welt y Sala del Senado
Vive y trabaja en Almería                                            2009   Centros para el Arte Contemporáneo Españoles: con-          2010   El angel exterminador,A room for a Spanish                  KunstBank en Berlín, Royal College of Art en Londres, Art
                                                                            tinente y contenido. Consulado General de España en                Contemporary Arts. Palais De Beaus Arts (Bozar).            in General en Nueva York, Centro cultural de España en
Es sin duda, uno de los pioneros de la vanguardia fotográfica en            Shanghai, China.                                                   Bruselas                                                    Miami, México D.F. y Montevideo, así como en la II Bienal de
España. Y si en 1956 fundó con José Mª Artero el Grupo AFAL y               Faraway… So Close. Museo Nacional de Soares dos                    Living Together. Reales Atarazanas. El Observatori.         Johannesburgo en Sudáfrica, Paris Photo, Instituto Cervantes en
la revista del mismo nombre, que sobrevivió hasta 1962, y que               Reis, Oporto (Portugal)                                            Valencia. Spain                                             Roma y en Pekín, y el Laboratorio de Arte Alameda en México
aglutinó a toda una generación, también en esa fecha realizó su             TORINOver 09 II Linguaggio genera mondi. Metro              2008   Paraísos Indómitos / Untamed Paradises, MARCO, Vigo         DF. Su obra está, entre otras, en las colecciones del Banco de
primera serie fotográfica en el barrio almeriense de La Chanca,             stationsCity of Torino, Italia.                                    Paraísos Indómitos / Untamed Paradises. Centro              España, MACBA, CAAC, Patio Herreriano, Fundación Marcelino
un documento humanista que retrata a la gente sencilla de                   Food. For de Brain. Roma Contemporary. Roma                        Andaluz Arte Contemporáneo. Sevilla                         Botín y Fundación Pilar Citoler.
la calle de una forma directa, convirtiéndose en un punto de                Escultura española actual. 2000-2010. Museo Esteban                Fotoencuentros, Fundación Cajamurcia, Centro Cultural
inflexión en la fotografía española. En sus obras posteriores la            Vicente, Segovia.                                                  Las Claras, Murcia, Spain
estética de Pérez Siquier cambió sustancialmente y sus imágenes,     2008   MicroNarratives. Musée d’Art Moderne. Saint-Etienne.               «Youniverse». BIACS-3. Sevilla,Spain (Catálogo)
ya en color no buscan al individuo, sino fragmentos, detalles, con          España1957-2007. Palazzo sant’Elia. Palermo.                       Kulturhuset, Stockholm. «Nuevas Historias». A new view
una ironía y una construcción interna en la que prima el estilo             O medio é o museo. MARCO. Vigo                                     of spanish photography                                      MP&MP Rosado San Fernando, Cádiz, 1971
pop. Su trabajo es un alegato subjetivo, muy moderno y personal             Bienal de Arte, Singapur                                           PhotoEspaña. Circo Price, Madrid, Spain                     Viven y trabajan en Sevilla
de sus vivencias y paisajes cotidianos. Está en posesión de la              BIACS 3, Sevilla                                                   «Puzzling Questions». Palacio Fonseca, Universidad de
Medalla de Andalucía; en el 2003 se le concedió por el Ministerio    2007   Speed. IVAM. Valencia                                              Salamanca, Salamanca, Spain                                 1989/94   Universidad de Sevilla. Facultad de Bellas Artes.
de Cultura el Premio Nacional de Fotografía, y en el 2005 el                Escenarios transitables. Museu d’art Girona. Girona.               «Puzling Question». Hospital de San Juan de Dios.           1994/95   School of Fine Arts, Atenas. Grecia
Pablo Ruiz Picasso de Artes Plásticas. Su obra está presente en             …And dreams are dreams. Istanbul Museum of Modern                  Almagro, Ciudad Real, Spain
importantes colecciones como en la colección permanente del                 Art. Estambul.                                              2007   Cuenca. Otra forma de mirar, Fundación Antonio Pérez,       ÚLTIMAS EXPOSICIONES INDIVIDUALES

Museo Reina Sofia de Madrid y en el IVAM en su colección que                Où? Scènes du sud: Espagne, Italie, Portugal. Carré                Sevilla, Spain                                              2010      CasalSolleric / Espai Quatre. Palma de Mallorca.
actualmente se exhibe en la Feria Mundial de Shanghai.                      d’Art. Nîmes.                                                      Geografías, Galería Miguel Marcos, Barcelona, Spain         2009/10   «Cuarto-Gabinete». Matadero-Madrid. Abierto × Obras.
                                                                            Video killed the painting star. DA2. Salamanca.                    Otras formas de paisaje, Fundación Metrópoli,                         Madrid.
Rosa Olivares / EXIT Publicaciones.                                         In situ. Le Quartier. Quimper                                      Alcobendas, Spain                                           2009      El retrato de Dorian Gray, de Oscar Wilde. Biblioteca
                                                                            Órbigo. MUSAC off. Velilla de la Reina, León                       Edit! Fotografia e Filme na Colecçao Ellipse, Centro de               Pública de zamora. zamora.
                                                                            Existencias. MUSAC. León                                           Artes Visuais, Coimbra, Portugal                                      «Ruines non romantiques». Galerie Olivier Houg. Lyon.
                                                                            Chacun à son goût. Guggenheim Bilbao                               Pepe Cobo y sus máquinas, Palacio de Sástago,                         «Como quien mueve las brasas y aspira a todo pulmón».
                                                                                                                                               Diputación provincial de zaragoza, zaragoza, Spain                    Museo de Cádiz. Organiza Obra Social Cajasol. Cádiz.
Sergio Prego San Sebastián,1969                                                                                                                «Existencias» Musac. Museo de Arte Contemporáneo de                   «Trasfábula». Universidad de Salamanca. Hospedería
Vive y trabaja en New York                                                                                                                     Castilla y León. Spain                                                de Fonseca. Curator: Alberto Martín.
                                                                                                                                                                                                                     «Cambio de aceite». Pepe Cobo & Cía. Madrid.
EXPOSICIONES INDIVIDUALES                                            Gonzalo Puch Sevilla, 1950                                                                                                            2008      Centro Cultural Fundación Círculo de Lectores en
2010   PRIMER PROFORMA, MUSAC, León, Spain                           Vive y trabaja en Madrid                                                                                                                        Barcelona. Galaxia Gutenberg/Círculo de Lectores.
2009   Galería Soledad Lorenzo, Madrid Spain                                                                                                                                                                         Ilustraciones originales para la edición «El retrato de
2007   Sergio Prego. Lehmann Maupin. New York. USA.                  EXPOSICIONES INDIVIDUALES (SELECCIÓN)                              Juan Carlos Robles Sevilla, 1962                                             Dorian Gray», de Oscar Wilde. Barcelona.
       Pan head. Buchmann Galerie. Berlín. Germany.                  2009   «Introducción a la meteorologia». Galería Helga de          Vive y trabaja en Sevilla                                                    «De profundis». Federico Luger Gallery, Milan. Italia.
       Sergio Prego. Alfonso Artiaco. Naples.                               Alvear. Madrid, Spain                                                                                                                    «Spleen». Galería Pepe Cobo, Madrid.
2006   En una era de belleza asequible, la fealdad tenía lago de            «Introducción a la meteorología». Fundación Garcia          Tras licenciarse en Bellas Artes en la Universidad de Barcelona,
       heráldico, Galería Soledad Lorenzo, Madrid.                          Jiménez, Murcia, Spain                                      recibió la beca de la Generalitat de Catalunya para ampliar        ÚLTIMAS EXPOSICIONES COLECTIVAS

       Tetsuo, bound to fail. Espacio 5. CAC Málaga.                 2008   Gonzalo Puch, Palacios de Cartón, Caja Sol Obra Social,     estudios en Berlín, ciudad en la que vivió de 1993 a 2001. Se      2010      ITINERARIOS 2009/10. XVI Convocatoria Becas Artes
2005   Sergio Prego: Caveau, Palazzo delle Papesse Centro Arte              Casa Pemán, Cádiz, Spain                                    licenció en la Escuela Superior de Arte, HDK, de Berlín y obtuvo             Plásticas Fundación Marcelino Botín (2008/2009).
       Contemporanea, Siena.                                                Otro orden de las cosas. Galería Art Nueve, Murcia, Spain   Meisterschuler con Prof. Katharina Sieverding y las becas de                 Fundación Marcelino Botín. Santander.
       Boom Tube. Galería Buchmann, Colonia.                         2007   Buscando en la zona (Incidentes, apariciones), Galería      postgraduación NaFöG y la del DAAD para trabajar en Nueva          2009      HUÉSPED. Colección MUSAC en Rosario. (Argentina).
2004   Anti-After T.B., Sala Rekalde, Bilbao.                               Pepe Cobo, Madrid, Spain                                    York con el soporte de Prof. Lothar Baumgarten. Allí obtuvo el               Huésped. Colección Musac en el MNBA-Museo
2003   Winter Star, Lombard-Freid Fine Arts, New York. USA.          2006   Gonzalo Puch, PhotoEspaña’06, Jardín Botánico,              Certificado en Tecnología de Vídeo en la New York University.                Nacional de Bellas Artes-MNBA, Buenos Aires.
2002   Galería Soledad Lorenzo, Madrid.                                     Madrid, Spain                                               Desde el 2000 trabaja con la Galería Oliva Arauna. Vive en                   Mi Vida. From Heaven to Hell. Life experiences in
2001   Yesland, I’m Here to Stay, Sala Montcada, Barcelona.          2005   Gonzalo Puch, Galería Pepe Cobo, Madrid, Spain              Sevilla y desde 2007 es profesor asociado en la universidad                  art from MUSAC Collection (Mi Vida. Del Paraíso al
       Tetsuo, Bound to Fail, Galería Antonio de Barnola,                   Incidentes, Julie Saul Gallery, New York, USA               de BBAA de Málaga. Ha expuesto entre otros lugares en el                     Infierno. Experiencias de vida en la Colección MUSAC).
       Barcelona.                                                    2004   Incidentes, Centro Andaluz de Arte Contemporáneo,           Reina Sofía de Madrid, Sala Montcada Fundació La Caixa, Arts                 Mucsarnok/Kunsthalle, Budapest. Curators: Agustin
1998   Tetsuo, Bound to Fail, Consonni, Bilbao.                              Sevilla, Spain                                             Sta Mònica y MACBA en Barcelona, CAAC en Sevilla, CAAM                       Pérez Rubio (MUSAC), Dr. zsolt Petrányi (Kunsthalle).




                                                                                                                                                                                                                                                                               109
El pensamiento en la boca. Sala Chicarreros. Cajasol.        Centro Andaluz de Arte Contemporáneo. Sevilla.                      actividades como: Coordinador del Área de Fotografía,                    contemporáneo de Castilla y León) León.
       Sevilla.                                                     Centre d’Art La Panera. Lleida.                                     Coordinador de la Fotografía en la «I Enciclopedia Electrónica           «AQUÍ-cuatro fotógrafos desde Madrid…». Sala de
2008   Doméstico 2008. Uno más uno multitud. Curator: Tania         Colección Bergé. Madrid                                             sobre Andalucía» (Medalla de Plata en el Certamen                        exposiciones del Canal de Isabel II. Madrid / Instituto
       Pardo. Madrid. España                                        Colección Caja Madrid. Madrid.                                      Internacional de Vídeo de Nueva York), Coordinador de un                 Cervantes. Milán.
       Interficie.Centre D’art La Panera. Curator: Gloria Picazo.   Colección de la Comunidad Autónoma de Madrid. CAM                   Archivo Fotográfico sobre Andalucía, Director y Profesor en              «Procesos del Paisaje» (comisariada por Paco del Río).
       Lérida. España                                               Colección El Monte, Caja de Ahorros de Huelva y Sevilla.            Cursos de Formación Fotográfica, Director de Exposiciones                Sala Cajasol. Jerez
       España. Arte Spagnola 1957-2007. Curator: Demetrio           Colección FIL, Lisboa. Portugal.                                    Fotográficas, Profesor de Cursos de Capacitación para                    X Mostra Internacional Unión Fenosa. MACUF. A Coruña.
       Paparoni                                                     Colección Montenmedio Arte Contemporáneo. Cádiz.                    la Producción Audiovisual y Realizador de Programas                      «Inicial/08» (comisariada por Óscar Alonso Molina)
       Palazzo Sant’Elia. Palermo. Italia. Organiza Instituto       Colección MP, Sevilla.                                              Audiovisuales (Multivisión).                                             Espacio Iniciarte. Sevilla
       Cervantes. España                                            Colección Testimoni. Barcelona.                                          Su obra fotográfica ha sido publicada y mostrada en                 «15 Años de Fotografía Española Contemporánea-
       Parangolé. Fragments from the 90’s: Brazil, Portugal,        Colección Unicaja. Málaga.                                          distintos foros nacionales e internacionales: Universidad de             Géneros y tendencias. Colección Alcobendas»
       Spain. Museo Patio Herreriano, Valladolid.                   Diputación Provincial de Cádiz.                                     Málaga, Sevilla, Menéndez Pelayo de Santander, Universidad               Alcobendas.
       Adquisiciones 2008. Colección de la Fundación Coca-          Diputación Provincial de Córdoba.                                   de Cantabria, Salamanca, Valencia, Utrera, Provence, Illinois     2007   «Planes Futuros» (comisariada por María de Corral y
       Cola. DA2, Domus Artium 2002, Salamanca.                     Diputación Provincial de Málaga.                                    University, Jardín Botánico de Madrid, Centro Cultural Conde             Lorena Martínez de Corral) Baluarte de Pamplona.
       Mixed Emotions. DA2, Domus Artium 2002, Salamanca.           Deutsche Bank, Londres.                                             Duque de Madrid, Nueva York, Museum of Documentary                       V Premio purificación García. Círculo de Bellas Artes.
       Comisario/curator: Javier Panera                             Ellipse Foundation. Cascais, Portugal.                              Photography de Chicago, Willians College Museum of Art de                Madrid
                                                                    Fundación Coca Cola.                                                Williamstown, Gray Gallery de Greenville, Southeast Museum of            Recorrido fotográfico «ARCO» (comisariado por Rafael
BECAS, AYUDAS, PREMIOS                                              Fundación Pilar y Joan Miró. Mallorca.                              Photography de Florida, Universidad internacional de Andalucía,          Doctor). Madrid
2010    7ª Becas Colección CAM de Artes Plásticas (2009/2010).      MUSAC. Museo de Arte Contemporáneo. Castilla y León.                Centro Andaluz de Arte Contemporáneo…                                    «Departures» Galería Luis Adelantado. Miami.
        Alicante                                                    Museo Patio Herreriano, Valladolid.                                      En 2002 obtuvo la I Beca a Proyectos Fotográficos de la
2009    XVI Becas Artes Plásticas Fundación Marcelino Botín         Domus Artium. DA2. Salamanca.                                       Caja San Fernando por su proyecto «Romper el Círculo».            PREMIOS Y BECAS (SELECCIÓN)

        (2008/2009). Santander.                                     Centro de Arte Dos de Mayo. Móstoles. Madrid. España.                    En los últimos años ha retomado las clases de Matemáticas    2010   Beca de residencia en Künstlerhaus Bethanien Gmbh.
        IV Premio Iniciarte 2009. Consejería de Cultura. Junta      Colección La Caixa. Barcelona.                                      en Secundaria, ha profundizado en la investigación y el uso              Programa Iniciarte. Junta de Andalucía.
        de Andalucía.                                               Fnac-Fond national d’art contemporain. Francia.                     profesional de las técnicas de captura, tratamiento e impresión   2008   Beca para proyectos artísticos «Generación 2008» de
2008    Beca Fundación Marcelino Botín. Proyecto «Melancolía        Fundación Marcelino Botín. Santander                                digital, ha ejercido como Director y Profesor sobre Fotografía           Caja Madrid
        II y III». Santander. España.                                                                                                   Digital en diversos Cursos de la Universidad Internacional de     2007   Primer premio V Concurso de fotografía «Purificación
        V Premio Arco 2008 Comunidad de Madrid para                                                                                     Andalucía y es socio colaborador del Laboratorio Digital de              García»
        Jóvenes Artistas. Arco 2008. Ifema. Madrid                                                                                      Photovision.                                                      2003   Primer Premio IV Concurso «ABC» de Fotografía
2006/07 International Studio & Curatorial Program. (ISCP).Nueva

        York. EEUU.                                                 Alejandro Sosa Suárez Coria del Río, Sevilla, 1951                                                                                    OBRA EN COLECCIONES PÚBLICAS (SELECCIÓN):

        Oficina de Creación Artística. Iniciarte. Junta de          Vive y trabaja en Coria del Río, Sevilla                                                                                              ABC-Vocento
        Andalucía.                                                                                                                                                                                        Obra social Caja Madrid
2002/03 Beca «The Pollock-Krasner Foundation», New York.            Maestro de Escuela y Profesor de Matemáticas en Enseñanza           Miguel Ángel Tornero Baeza, Jaén,1978                             Colección Purificación García
        U.S.A.                                                      Secundaria entró de niño en contacto con la imagen gracias a la     Vive y trabaja entre Madrid y Berlín                              Recorridos Fotográficos ARCO
2002    Premio Pilar Juncosa i Sotheby’s. Fundación Pilar i Joan    afición de su padre por construir y jugar con aparatos capaces      www.miguelangeltornero.net                                        Comunidad de Madrid
        Miró de Mallorca. Mención Especial.                         de captar, proyectar e imprimir estampas y fotografías.                                                                               Ayuntamiento de Pamplona
2000/1 Ayudas a la Creación Artística Contemporánea,                      El traslado práctico de estas experiencias al ámbito educa-   Licenciado en Bellas Artes por la Universidad de Granada.         Colección de fotografía pública de Alcobendas
        Consejería de Cultura, Junta de Andalucía, Nueva York,      tivo le llevaría a coordinar la puesta en marcha del Plan Andaluz                                                                     Cajasol
2000/1 Ayudas a la Producción. Nueva York, EEUU. Frontera           de Integración de las Nuevas Tecnologías de la Información y la     EXPOSICIONES INDIVIDUALES (SELECCIÓN)                             Colección de arte emergente. Junta de Andalucía
        Sur. Iconos. Diputación Provincial de Cádiz. Cádiz.         Comunicación en la Enseñanza, siendo miembro de la comisión         2009      «Catástrofes para bien». Galería Cubo Azul. León
1995/6 Beca Daniel Vázquez Díaz. Proyecto de Creación e             encargada de redactar el PLAN ANDALUz DE TECNOLOGÍAS                          «Por Ahora (todo va bien)» Galería Luis Adelantado.
        Investigación Diputación Prov. de Huelva.                   DE LA INFORMACIÓN Y LA COMUNICACIÓN PARA LA                                   Valencia
1994/5 Beca Erasmus Lingua-Accion II. School of Fine Arts,          EDUCACIÓN. Consejería de Educación. Junta de Andalucía.             2004      «Pretérito Imperfecto Compuesto» Galería Luis
        Athens. Grecia.                                                   En este sentido impartió cursos, ponencias y seminarios                 Adelantado. Valencia.
                                                                    sobre Fotografía y Educación, ejerciendo como guionista y                     «Conspiración» Sala Baja del Palacio de los Condes de
OBRA EN COLECCIONES                                                 asesor pedagógico en Programas de Televisión relativos a la                   Gabia. Centro José Guerrero. Granada
Ayuntamiento de Utrera. Sevilla.                                    Formación de Formadores. Programa EUROFORM. Comunidad
Ayuntamiento de Xàbia. Alicante.                                    Europea.                                                            ÚLTIMAS EXPOSICIONES COLECTIVAS (SELECCIÓN)

Ayuntamiento de San Fernando.                                             Entre 1990 y 2003 trabajó para el Centro de Tecnología        2009/09   «Un No por Respuesta» (comisariada por Tania
Caja San Fernando de Sevilla y Jerez.                               de la Imagen de la Universidad de Málaga desarrollando                        Pardo) Laboratorio 987. MUSAC (Museo de arte




110
English texts
Presentation / A context for AfterPost /
 What is a photographic image today?
Introduction
Paulino Plata Cánovas




As part of its commitment to contemporary art, the Andalusia Ministry of Culture presents
the exposition AfterPost [más allá de la fotografía] (beyond photography), organized by
Sema D’Acosta, from Seville, and held in the Iniciarte exhibition space.
   Over the years, the Iniciarte program has become known for its hard work to promote
those who take part in the creative activities that are most relevant to our times: artists,
critics, curators, students and those involved in other cultural activities.
   Perseverance is important if we are to advance towards this objective. The Iniciarte
Programme grant package is a sign of the Regional Ministry of Culture’s firm and decisive
support for contemporary art, covering all the different phases in the creation process:
research and training, project production and dissemination.
   Last year, in the Landscape: the Eternal Return exhibition, photographer José María
Mellado tried to show how modern man struggles to make a place for himself in History, and
this new initiative aims to reflect on the meaning of photographic images, contemplating
an open scenario where spectators can reach their own conclusions.
   The curator has selected the work of well-established artists, establishing a dialogue
with the production of new creators. We are sure that this suggestive combination will fulfil
the expectations of all the exhibition’s visitors.




                                                                                         115
A context for AfterPost                                                                            finally established itself as the most important artistic expression of our times. It seems to
Alberto Martín                                                                                     fulfil a dream that had been pursued for so long, (“photography has its own utopia, which
                                                                                                   is primarily established in art museums”, Boris Groys)3: photography as art, but now more
                                                                                                   than ever as a phantom. Yet, the phantom condition of electronic images is quite different:
                                                                                                  “Phantomization. For the most part, electronic images have the same quality as mental
                                                                                                   images, pure phantoms. They appear in places, and then immediately vanish. They are
In some sense we could say that this exhibition, eloquently entitled AfterPost. Más allá           spectres, mere spectres, far from any basis in reality” (Jose Luis Brea)4. It is a dematerial-
de la fotografía (beyond photography), is about the scarcity, and, at the same time, the           ized kind of photography that doesn’t need to be embodied in any object, or interact with
overabundance of photography. But, before getting into that, let’s start at the beginning.         any medium; its nature is of circulation and transmission; its natural state is of interaction,
The thesis of the project follows two distinct and well-defined paths: on one hand, the            manipulation and proliferation.
pervasive presence of photography in the art scene, a reality that is becoming more and               Just as with the phantom condition of photography, the two contexts mentioned above—
more evident; it has taken the porousness among different media to its most extreme                photography in the artistic sphere, and development of the digital image—also diverge in
possibilities, and, as a result, photographic media now appear to be in a kind of endless          terms of the setting in which they reside and act. Certainly, photography now proliferates
expansion. On the other hand, we see the development of the digital image, which may               in museums, and it does it right at the same time that the photographic medium, through
have upset the established order to the point, perhaps, of radically changing the nature of        digital technology, is not only reaching a state of total ubiquity and dematerialization, but
photography. It seems that every time these two elements, evident and omnipresent, are             also, in some sense, re-establishing ties with the social sphere. A paradox that is still relevant
mentioned together, the tendency is to define such confluence as a dual process of expan-          and even reinforces the tension between photography as a mundane, ever-expanding social
sion: the massive production and circulation of images spurred by the digital revolution,          practice and photography as part of museum collections5. Double the abundance, but of
along with photography’s widespread contamination of different types of media. Each of the         different natures: abundance in museums that contrasts with that of electronic images,
two contexts (that of photography’s presence in the art scene, and that of the development         which comes naturally and is based on the incessant circulation and proliferation with no
of the digital image) runs its own course, yet both are linked by overabundance, expan-            need to be materialized in any medium or even to be situated. If the place for photography
sion and fluidity. Still, the routes they take and the different stages they go through are        is the art museum, the place for the image is the digital realm, what is in reality a non-place.
largely divergent. We see this, for example, with the phantasmal character of photography          We might even say that photography, in its infiltration of the art scene, is now more than
and the image in one context or another. In, effect—and we have seen this largely in the           ever hipermaterialized, reinforcing the presence and the importance of physical media,
last decade—, photography has slipped into different creative practices like a phantom,            just as the digital revolution is making them vanish, making it unnecessary to house the
exploiting its capacity to combine with other media, and its condition of hyperfluidity. It is     image in an object6. The museum is lined up against the social practices associated with
an unstoppable process of irrigation, contamination, mutation and adaptation, which also           photography, which from a digital standpoint re-establish the relevant uses and functions
effects on photography, mostly in a progressive dissolution, or dispersion, of the specifically    of the activity. Like in other recent moments in the history of the relationship between
defined medium; this has happened to such an extent that, for some authors, like Paul              photography and art (for example, conceptual art), the anti-aesthetic movement that deals
Ardenne, photography is no longer art form, but rather it has taken on a new condition as          with the practical uses and function of the photographic medium enters into conflict with
a kind of vector of protean imagery1. Geoffrey Batchen expresses something similar in his          the notion of stylistic perfection and a whole field of stylistic considerations. In that sense,
simple, yet resounding analysis of the situation: photography appears everywhere, but not          we might remember how it has been clearly noted that digital developments in the area of
in any one particular place2. The conclusion seems simple and sound, photography has               art have mainly served to augment the porous relationship between photography and other



                                                                                                                                                                                                 117
media, to enhance hybridization, to increase the visual possibilities of that process and to      electronic technology as a way to pursue such questioning11. It is thus relevant to explore
unleash all of photography’s potential for manipulation . It was Geoffrey Batchen who wisely
                                                        7
                                                                                                  such transference in the specific context of AfterPost, an exposition that contains a good
noted that post-photography, arising in an environment of heightened porosity, might mark         number of works from around the world that could be said to involve such a process. There
the beginning of a new era which is after, though not completely beyond photography8. As          are numerous aspects that are involved in this particular type of “questioning”. Almost all
far as establishing a new way of viewing these works—a necessary condition for moving             of them seem to remind us of elements relating to the image, or vision, that “automatism”
beyond photography— it has still yet to happen. In the mean time it seems that the game           tends to obscure: the physical, temporal, and textural elements. They seem to remind us,
of aesthetic negotiation, as spurred by photography, is stronger than ever.                       as Paul Virilio did almost two decades ago12, that “devices for seeing dispense with the
      Up to this point we have spoken of abundance. Scarcity may be derived from the above        artist’s body in so far as it is light that actually makes the image”. It is evidence of manual
commentary about how today we see photography everywhere but cannot find it in any                and corporal involvement, the nature of which might acquire a totally opposite meaning in
one particular place. We might cite Jean-Luc Nancy as a way of determining if that place          today’s age of digital photography than it would have had, say, in the sixties, seventies and
exists, though remote or even hidden. Nancy asked himself:                                        eighties when the interactions between painting and photography were at their peak13. Back
  “What remains of art? Perhaps only a vestige. That at least is what we are hearing today,       then when the subjects of photography entered into the painting, the artists hand yielded
once again. By proposing “The Vestige of Art” as a title for this essay, I have in mind first     to the influence of the machine, and it was fundamental to give space to the indexical, or
of all, simply this: on the assumption that there remains in fact only a vestige of art—both      referential, nature of the photograph; nowadays the process has been almost completely
an evanescent trace and an almost ungraspable fragment—that itself could be just the              inversed, at least from the photographic standpoint. It’s not hard to see that a great many
thing to put us on the track of art itself, or at least of something that would be essential to   themes and considerations in painting have now entered the realm of photography or have
it, if one can entertain the hypothesis that what remains is also what resists the most. As       become the subject of photographs, or to see that it is precisely the involvement of the
a next step we will wonder if this something essential might not itself be on the order of a      machine that gives way to the artist’s hand. It does not appear to be of central concern to
vestige of itself, when, say, having retreated from the greatness of works that cause worlds      prove that photography is the medium that is changing our way of envisioning the world,
to come into being, art seems past, showing nothing more than its passage”9.                      nor to denaturalize the notion of photographic realism as the fundamental medium for
      We could now substitute art for photography in this long quote and find the vestige of      imagining the objective world. In the context of the digital image, it’s probably no longer
photography among the selection of works that form part of this exhibition, asking ourselves if   about photography and our way of seeing, but rather about images and the way they form
what remains is also what most resists. In fact, the sample serves two functions: to consider     part of our lives, their flow and proliferation. Moreover, the effort to denaturalize photographic
the massive infiltration of photography we already discussed and to observe the traces            realism, in a context in which mental images are already granted, or may be granted, a
left through the multiple processes of transformation permitted by the medium. It is in           nearly factual consideration, might as well surrender that point.
those particular traces, within the specific framework that only the photographic medium              For photography, manual involvement also recentralizes the notion of time, a notion
affords, in which we can finally find that vestige of photography. In some sense, it is like      that has been abolished in the constant quest for the instantaneous and exact. The traces
asking for the photographic soul (and adopting for the occasion the title of Richard Shiff’s      of process are in direct conflict with the independence and automatism of the machine.
interesting text10), and finding that what resists, that which is essential to the medium, is     Richard Shiff employs a certain image to describe this difference. In his analysis of Chuck
not exactly what is most evident, o most commonly instated. We may then have to look for          Closes’s piece, he speaks of corporal intimacy, an intimacy that is related to the process
that essence—as Richard Shiff suggests in the aforementioned essay, The Photographic              by which vision is materialized as the artist makes his passage through the image14. A
Soul—among those practices that seem to question what is most natural to the medium.              passage that involves a very close reading and extrapolation of visual data, synthesis of the
The same author considers manual reproduction of images produced by mechanical and                information contained in the image and a careful articulation of sensations and meanings.



118
They are constructive processes, elaborations that draw attention to some normally “minor”       1.   Paul Ardenne, “La fotografía en la era de la abolición del control”, in Cruce de caminos. Sobre el arte y la fotografía,

aspects, as considered from the photographic field. One such aspect is the attraction to              La Casa Encendida, Madrid, 2006, pp. 93-98.
                                                                                                 2.   Geoffrey Batchen, Burning with desire: the conception of photography, MIT Press, Cambridge, 1999, p. 216.
the surface of a photographic image, a particularly problematic and complex terrain, in
                                                                                                 3.   Boris Groys, “El lugar de la fotografía”, in Joan Fontcuberta (ed.), ¿Soñarán los androides con cámaras fotográficas?,
which space can be collapsed, compressed, disoriented, and reconstructed, where tex-
                                                                                                      Ministerio de Cultura, Madrid, 2008, p. 182.
ture and drawing interact, or where the materiality of the surface offers varying levels of      4.   José Luis Brea, Las tres eras de la imagen. Imagen-materia, film, e-image, Akal, Madrid, 2010, p. 67.
resistance against the image and the figurative experience15. As Geoffry Batchen points          5.   It’s interesting to observe, for example, how this tension comes up, indirectly, over and over again in the arguments

out, in a historical perspective, this kind of materiality “draws our attention to that aspect        developed by Boris Groys in the article cited in note 3.
                                                                                                 6.   José Luis Brea, Las tres eras de la imagen, op. cit.
of photography which is normally suppressed from our awareness of the photographs, their
                                                                                                 7.   For more on this topic, see: Paul Ardenne, “La fotografía en la era de la abolición del control”, op.cit. and Michaela
physical presence as things”16.
                                                                                                      Fiserova, Image photographique: de la critique de l’art plastique à la conversation visuelle, March 2 2006,
   One last element, which is more problematic and even arguable, is the way in which                 METAPHORES: http://www.sens-public.org/spip.php?article237.
the artist’s intentions are given precedence. Michael Fried lines up an interesting analysis     8.   Geoffrey Batchen, Burning with desire, op. cit., pp. 215 – 216.

of this element in his study of Roland Barthes’s punctum17, exploring both the connec-           9.   Jean-Luc Nancy, The Muses, Stanford University Press, 1996, p. 81.
                                                                                                 10. Richard Shiff, “Photographic Soul”, in David Green (ed.), Where is the photograph?, Photoworks, Brighton 2003,
tion and the separation between photographic artefact and intentionality. Referring to the
                                                                                                      pp. 95 – 111.
context of digital photography he affirms:                                                       11. Richard Shiff, “Photographic Soul”, op. cit., p. 111.
  “… Barthes’s hyperbolic desire to sever the (ideal) photograph from the intentions of its      12. Paul Virilio, The Vision Machine, Indiana University Press, Bloomington, 1994, p. 16.
maker subsequently found its mirror image in the increasing use of digital techniques by         13. For an interesting analysis of the implications of said interactions and said period, see, among other, the texts of

ambitious photographers in order to make photographic artefacts every bit of which may                Ralph Rugoff and Barry Schwabsky included in the book, The Painting of Modern Life, Hayward Publishing, London,
                                                                                                      2007.
be seen as potentially the manifestation of an artistic intention”18.
                                                                                                 14. Richard Shiff, “Photographic Soul”, op. cit., p. 97.
   Here, he emphasizes the role played by the degree of artistic control present in a pho-
                                                                                                 15. These aspects are addressed in a particularly relevant way in the essay of Richard Shiff, “Photographic Soul”, op.
tograph, and whether, in this day and age, photography “as art” could continue to leave in            cit.
the hands of a machine something that would escape the artist’s intentions.                      16. Geoffrey Batchen, “Fearful Ghost of Former Bloom’: What Photography is”, in David Green (ed.), Where is the

   On the other hand, the key now may be to show resistance to the mannerisms that could              Photograph?, Photoworks, Brighton, 2003, p. 26.
                                                                                                 17. Michael Fried, El Punctum de Roland Barthes, Cendeac, Murcia, 2008.
be derived from a renewed pre-eminence, or presence, of mechanics in the digital medium.
                                                                                                 18. Michael Fried, El Punctum de Roland Barthes, op. cit, p. 90, note 47.
Surely, those “vectors” of resistance might also be found—or might still be found—in the
vestiges of the photographic.




                                                                                                                                                                                                                        119
What is a photographic image today?                                                                    AfterPost. Más allá de la fotografía (beyond photography) considers the meaning of the
Sema D’Acosta                                                                                       photographic image in present-day society, providing an open setting in which the spectator
                                                                                                    can draw his or her own conclusions. In our times, a photograph is not just a reproducible
                                                                                                    and representative image, but has become an amassed assortment of ingredients, largely
                                                                                                    surpassing the testimonial or mnemonic functions that it traditionally held. The notion of
                                                                                                    photography, as understood today, encompasses ideas of inclusion, participation, fusion and
         “It all started with one essay about some of the                                           diversity—such ideas distinctly separate it from the chronic image that had defined the genre
           problems, aesthetic and moral, posed by                                                  since its beginning. In fact, very few photographers are still anchored to that domesticated
           the omnipresence of photographed images;                                                 sense of the term—quite the opposite. More and more artists turn to photography due to the
           but the more I thought about what photographs are,                                       vast array of possibilities it offers. Artists of many different creative fields use photography
           the more complex and suggestive they became”.1                                           as part of the creative process, as the end result, or as the starting point because it is a
                                                                                                    quick way to capture sensations, to create associations and to establish ideas.
           SUSAN SONTAG                                                                                Photography is now at a crucial and extremely complex juncture, in the first stages of
                                                                                                    a transition toward a new, still-undefined status. AfterPost portrays the new nature of the
                                                                                                    art form and traces the factors that have led to its current state; it explores the discourse
The art form which has entered the new century with most vitality is photography. With an           surrounding expressive forms which are rooted in fixed images and the derivations of such.
immense universe yet to unfold, and having surpassed the sine qua non condition (now                It is important to examine the boundaries of such expression in order to understand how
outdated) of being a documentary form, a world of new technology has opened the door to an          different creative outlets fall into place around an essentially photographic—or cinemato-
ever-growing discipline. The digital revolution has broadened the concept of photography to         graphic—epicentre; after all, an image in motion is only an extension of a still image. In a
such an extent that as it advances it encompasses almost every possibility—an uncontrollable        recent interview, German artist Thomas Demand stated: “I believe that photography has a
infinity that will absorb any other discipline or art form without establishing any boundaries.     fundamental role in modern society. Everybody has a camera on their mobile phone, millions
Photography in the twenty-first century has become something materially different from what it      of people use the internet to upload and distribute images. It’s clear that we all know how
was in the twentieth century. It does not appear in its pure state, but as a mixed media, hybrid-   to take a picture, and also how to understand one. This creates a very interesting context
ized with other fitting forms of expression, such as painting, drawing, videos and installation     for artists to work in, if we compare it, say, to the general knowledge that the public might
art. The era of post-photography urges us to move beyond the image as an indexical icon, and        have about other forms, like bronze casting”.2
promotes expansion into other areas, a phenomenon which has been studied in the last few               When it comes to interpreting an image, the essence no longer relies on what we have
decades by theorists from many different camps (theorists such as Roland Barthes, Rosalind          historically understood as the photographic condition. Yet that idea is ever-present no mat-
Krauss, Susan Sontag, Philippe Dubois, Geoffrey Batchen, Paul Ardenne, Vilém Flusser, Denis         ter what the actual format is, and we judge the image in one light or another depending
Roche, Peter Osborne, Boris Groys, Regis Durand, José Luis Brea, Víctor del Río, etc.) The          on the presentation and on our own values. Internet and the media have created parallel
artists themselves have also written about this phenomenon, trying to find the particular niche     universes that coexist indistinguishably, forming not one, but many similar and dissimilar
for their creative practices, and with an awareness that their work is greater in complexity        realities. Our collective imagination is fed by the images that we are continuously absorbing,
and depth than mere record or the expression of an instant (artists including Duane Michals,        not from true visions extracted from our experiences. In these times of constant virtuality,
Victor Burgin, Jeff Wall, Allan Sekula, Joan Fontcuberta, Jorge Ribalta, etc.).                     real-life experience is muddled with the imagination. We take in such imaginings and hold



                                                                                                                                                                                                121
them as true without differentiating the realistic from the real, two dimensions which are         and institutions. In fact, the crisis facing traditional art forms has invoked solutions that,
 becoming more and more intertwined. The digital image helps us comprehend—and                      through photography, would reawaken the iconic potential of images”.4
 apprehend—that new reality, a malleable, changeable, and extremely complex reality                    Without a doubt, photography appears before us as a new category, empowered by
 which doesn’t even need to materialize. It can be a volatile file that we alter to the point of    its unspecifiable nature. Photography’s intermediate position between art form and other
 being unreal, or that we send anywhere in the world in an instant. Now there’s no place            common uses has generated questions of sociological, philosophical and political impor-
 for unadulterated representations—they are a thing of the past. Now we live in the era of          tance, which go beyond normal aesthetic considerations. In her essay “Theorie des ecarts”
 post-photography.                                                                                  (theory of discrepancies/displacements), Rosalind Krauss is one of the first theorists to
                                                                                                    tackle the divergences of the contemporary image5. After her, literature on the subject
                                                                                                    flourished. It’s remarkable that this North-American art critic was also one of the first to
 THE CONTEXT OF POST-PHOTOGRAPHy                                                                    write about, in 1979, how the term sculpture was beginning to be used to refer to “things”
 Nowadays, photography is an inexhaustible idea with no exact notion; it has reached a status       that greatly deviated from the conventional statuary traditions6. “Categories like sculpture
 of such autonomy and osmosis that its condition goes beyond the iconic, syntactic and              and painting have been kneaded and stretched and twisted in an extraordinary demonstra-
 representative. “In the nineties, photography was omnipresent in galleries and museums,            tion of elasticity, a display of the way a cultural term can be extended to include just about
 in such a way that caused its identity to be dramatically reconfigured. Through its incor-         anything”7. According to her, sculpture was expanding toward architecture, landscapes,
 poration in a wide variety of artistic practices, photography was increasingly thought of in       constructions, and even the simple marking of sites. They were uncategorized works
 terms of its interrelation, on one hand to painting and sculpture media, and, on the other         that didn’t fit in with the pictorial tradition—they were constructed with space, materials,
 hand to the hybrid forms of installation and performance art. At the same time, the rapid          actions, movements, light or images, and they approached both the real and the non-
 development of ever-sophisticated digital and electronic technology has expanded the limits        existent, that which is lasting and that which is ephemeral. Such a denaturalization of the
 of what may be considered photography. The most evident consequence of this has been               term, which opens it to all kinds of possibilities (including, randomness, uncertainty and
 that it is now very hard to determine where and how we will draw the lines that separate           even immateriality), has not devalued the more traditional approaches, but it has changed
 photography from the cinema, or videos, or any other form dealing with iconic, graphic             the ways in which sculpture is considered, the light in which an object is judged, making
 or textual material, which nowadays we can gather and display on the computer screen.              the current sculpture scene heterogeneous, disperse and irreducible. We need only look
 Certainly, we can no longer assume that the stilled image processed on photographic paper          at the last edition of Sculpture Projects Muenster created in 2007 in the German city of
 is the archetypical form of the photograph, but rather one of many possible forms, coming          Münster –perhaps one of the most serious and solid projects in the world relating to this
 from an array of technological equipment and practices developed for visual production.            discipline— to discover that it included videos, performances, actions in nature and urban
Therefore, photography no long has any ontological stability (assuming that it ever did)”.3         exhibitions. What conclusions can we draw from the radical evolution in sculpture over
“Toward the end of the twentieth century it became evident that photographic media holds            the last forty years? It’s simple, the pigeonholes established for different art forms tend to
 an important place in art. Although the beginnings of such prominence could be seen                disappear, and it’s only a matter of waiting for the right conditions to stir things up.
 decades before, it was in the eighties and nineties that we see a clear discourse develop             This occurrence in one of the Fine Arts, which was a totally closed and absolutely
 regarding photographic media. The effects of photography having gained new importance              defined discipline, can be extrapolated to the new status of photography and its derivations.
 can be seen with the arrival of a new artistic genre (despite what is said in certain texts), as   The difference stems from the fact that transformations of the image happen so quickly,
 the discipline has definitively made its place among other more traditional art forms, and as      and depend to such an extent on developing technology, that we still don’t have enough
 it has secured institutional support through a network of specialized galleries, publications      perspective to clearly understand its new position. Truly understanding it is a question of



 122
historical context (we tend to reduce human reality to its historical condition, based on         photographic technique with an act of negation. Apparently, there is an underlying ironic
known and valued references), which due to lack of perspective we are not able to evalu-          take on pop culture, and also a reconstruction of photography as something other than
ate from our present. The progression of technology is passing through new stages with            what the genre had established in artistic terms. “The care with which the book is edited,
overwhelming speed, establishing with each new advance a modified model of operation,             even though the pictures are artistically bad, suggests that Ruscha is also playing with
which places photography at the mid point between the history of art and technological            the notion of banality, which doesn’t exclude the desire for his work to have an impact,
advances that emerge.                                                                             that is, for the work to be reproduced”.11 Ruscha’s work is part of a tendency that is very
   The art critic and theorist Jose Luis Brea has analyzed different aspects concerning           common in the second half of the twentieth century, a tendency that approaches culture
art and its relation to incipient technologies designed for communication through the             using art as a critical and liberating weapon, capable of breaking established formal limits.
internet, a new venue for creative activities which has upset all previous concepts. Brea         It is not so much about transgressing established genres, which would be more a type of
calls the present time we live in the Post-media Era, a domain in which public circula-           Avant-Garde movement, but rather relocating discourse12. One key element to consider
tion of information is not strictly subject to the hierarchical regulation characteristic of      is that photography has come into contact over the years with semiotics—it began to be
traditional media, structurally organized for production based on social consensus. In            interpreted, decoded, analyzed and reassembled not as an image but a text. Nowadays,
this new arena production is geared toward each individual user, in an independent and            many conceptual artists from North America use photography as a starting point, directing
detail-oriented fashion.8 Although the book explores questions relating to Net.art that stray     their work toward other areas that question what is and is not a work of art, taking certain
from the subject of photography, it does demonstrate a divide in the comprehension and            Duchampian premises to unthinkable extremes. Some creators moved toward performative
transmission of images. “The very concept of post-media prefigures the belief that we are         or linguistic aspects (such as Dan Graham, Joseph Kosuth, Lawrence Weiner, etc.), yet
now before a new historical context which affects the ways in which an image is received          for most of them photography played a vital testimonial role. They used to strengthen or
and circulated, and whose implications go beyond questions of constructing reality or the         cast doubt on their work, to separate it from one concept and associated it with another—
way we exchange information. Behind the present post-media condition is an underlying             always with the aim of questioning its essence. Since then, photography has been left in
crisis concerning representation.”9                                                               a gray area between society and culture, unable to escape. This tendency to expand has
   This new progression of photographic media, which has undermined the documentary               lasted up to now, taking on different perspectives decade after decade. “Toward the end
properties and expanded the field of action to other more intellectual areas, is the result of    of the seventies and into the eighties the interrelation between theory and practice was
a continual displacement occurring over the last century. It was in the seventies that previ-     manifested through artists who tried to re-examine photography’s place in the culture of
ous concepts began to crack, first questioned by conceptual artists and then by cinematic         image as a whole and as it corresponded to art’s function in mass media”13
structuralists. In 1962, Edward Ruscha produced a limited edition of photographic books by           Víctor del Río outlines two separate trajectories that may explain why photography
the name of Twentysix Gasoline Stations. The photos are aseptic, cold, and irrelevant—they        has become so important in the last few decades. “The first trajectory incorporates the
don’t stand out and don’t seem special in any way. They are produced without any technical        photographic medium through hybridization with other media. Photography is thus indi-
rigour and do not attempt to go beyond the initial claim. They are just like any other record.    rectly legitimated through a process that arises from other art forms being in crisis. It is a
The artist wasn’t trying to become a dominant figure in the field or define a certain style. It   process of hybridization that uses photography’s unspecified nature—a future not bound
strays from the technical values traditionally admired in the discipline, and the pieces are      by tradition—to enrich artistic content. The spaces used for such pieces and the scenic
even presented in the popular format, renouncing any kind of artistic distinction. Twentysix      potential of photography allow for both installation and pictorial solutions. Among the
Gasoline Stations is an object—no longer a simple image—which mixes high and low culture.         possible types of hybridization one of the most fruitful is the one established with painting.
As Jeff Wall suggests in “Marks of Indifference”10 Ruscha, with this series, is dismantling       The axis formed between Andy Warhol, Robert Rauschenberg, Christian Boltanski, Sigmar



                                                                                                                                                                                            123
Polke and Gerhard Richter suggests the range of possibilities that emerge, also involving       was no longer necessary to travel to the place where the work was housed in order to see
 the participation of many other artists. Artistic discourse becomes receptive to photography    it. It wasn’t even necessary for an image to be materialized for the viewer to enjoy it—these
 due to the way in which it begins to serve as a replacement of the painting. The intentional    concepts emerge with the arrival of photography, which became a new form of expression
 ambiguity employed by such artists suggests that the image has been elevated above its          that would be constantly evolving, apt for the masses and ragingly contemporary; a new
 technical origin, and thus above the adherence to any one particular form”.14                   kind of expression whose most consistent paradigm would be cinema.
      The second route considers the way in which photography is treated as tableau. Since          Photographic narratives—understood to be visual accounts of extraordinary situations
 the end of the eighties certain artists and theorists (one of the first to analyze this was     that were then expanded for graphic periodicals to tell about what was happening in the
 Regis Durand) start to judge photographic works as if they were paintings. That is, they        world, especially concerning political conflicts or military confrontations—are no longer of
 begin to grant photography the same value traditionally given to painting, just like that.      any use; They are iconic stories of the past that base their expressive power on composition
 I won’t go into any technical details here—they’re two different kinds of languages, but        and on the possibility of showing inaccessible places and unusual happenings. As those
 that’s not the question at hand; the important factor is the way photography is raised to a     possibilities were exhausted by globalization, technological potential and the overabun-
 dignified status by the end of the twentieth century, a consideration that arms it with the     dance of representations that overwhelm us on a daily basis, what those narratives could
 kind of historical respect and reverence granted to painting. Since then, and propelled by      offer now seems ordinary, common and untimely; they are images that we’ve already seen,
 newfound confidence, we see large format photography from artists like Jeff Wall, Jean          and whose syntax is all too familiar. The chronic image and the documentary image are
 Marc Bustamante, Thomas Struth, and prices are raised at dizzying speed, quickly reach-         now understood as perfectly harmless products of another era, which can no longer be
 ing the millions; galleries exhibit more and more photographs, and important collections        seen in the same way as when they were produced, the rules for re-interpreting an image
 from around the world start incorporating photographic acquisitions on a regular basis;         have changed and new fronts have been established. In his book, Camera Lucida, Roland
 a number of special festivals are held all over the globe, and photographs are hung in          Barthes declares the impossibility, from a semiotic standpoint, of analyzing an image
 museums as if they were paintings, to be viewed as if they were paintings.                      without addressing its informative facet.
      This elevated status ends with a historic debate that pits painting against photography,
 trying to weigh the artistic value of each form. As Matiza Walter Benjamin explains, “The
 dispute was in fact the symptom of a historical transformation, the universal impact of         bEyOND THE IMAGE (PHOTOGRAPHy AS ObJECT, ACT, IDEA, OR SOMETHING INEXPLICAbLE)

 which was not realized by either of the rivals. When the age of mechanical reproduction         For many theorists the true dilemma facing photography in our times is that of overcoming
 separated art from its basis in cult, the semblance of its autonomy disappeared forever.        the iconic and moving towards the object. Today the important thing is not particularly what
The resulting change in the function of art transcended the perspective of the nineteenth        an image contains but what it communicates, in what form and in what way. Photography
 century; for a long time it even escaped that of the twentieth century, which experienced the   has gone from being exteriorized by one technically reliable and unidirectional method,
 development of the film”. —An interesting posture, which is elucidated by the empathetic        to being a sort of “everything” which acts with endless shades of meaning of denotative
 concurrence that exists even seventy years after the German thinker had written the text,       value. It began a little less than two centuries ago, with the coincidence of some precise
“The Work of Art in the Age of Mechanical Reproduction”. He continues, “Earlier much             scientific parameters that were amazing in their capacity to surpass the agility of manual
 futile thought had been devoted to the question of whether photography is an art. The           movements. Now it is an omnipresent art form which has lost the alchemy of its beginnings.
 primary question—whether the very invention of photography had not transformed the              It is no longer necessary to control the take or the process; the surrounding gradations are
 entire nature of art—was not raised”.15 The perception of art after the birth of photography    more suggestive and allow for more complexity. “Post-photography is not then the result of
 took on a new character, detached from exclusivity and tied more closely to ubiquity. It        technological advances in image production and is not concerned with minor theoretical



124
dilemmas involving analogical or digital formats. The original composition of the images,           image outside of the act that makes it possible18. The photo is not just an image (the product
the fact that they have a chemical or numerical origin, is of no real consequence. It is with       of technique and action, the outcome of an event and some know-how, a figure on paper
the make-up of a photographic format that a set of functions can be established, through            to be seen in the limitations of the finite object); it is also begins as a truly iconic act—an
which the image truly becomes relevant in a way that goes beyond the photographic act               image, surely, yet also a work in action, something that could not be conceived outside
and transforms it into a work of art”.16                                                            the given circumstances, outside the game that urges it on, or without creating what is
    One example that will illustrate this point is the idea that Geoffrey Batchen develops after    literally proof; it is at once an image-act, yet, knowing that this “act” is not limited trivially
finding a photographic object in an antiques shop in New York. His argument questions               to the gesture of the production of the image (the gesture of the “shot”), but also includes
the traditional discourse of exclusion that decides what is or is not a photograph. Batchen         the act of reception and contemplation. As David Green and Joanna Lowry affirm, it was
found a large, glass picture frame with a few rosettes braided with hair, a vast adornment          C.S. Pierce who showed that the mark of the indexical photographic sign has less relation
of wax flowers in the shape of a crown, and a small image of a young woman. The whole               to the original causes than to the way in which we can elude the very fact of its creation.
scene, in all its languid sadness is an intimate monument to the absence of a loved one, “Photographs are not just indexical because light happened to be recorded in an instant
and goes beyond mere remembrance. The overall sensation that it transmits, emphasized               on a piece of photosensitive film, but because, first and foremost, they were taken”19. The
by the mode of presentation, goes far beyond that of simple photography, and it speaks              authors consider two deictic facets of any photo; the most obvious and most comprehen-
in some inexplicable way of things relating to death, respect, love and memory. “The                sible being that an image is the mark of an instant having occurred. The other facet, more
hybridity of this object also makes for a stronger portrait experience. By adding a sample          abstract but no less important, is that the act of taking a photograph is a performative event
of hair to the subject’s photograph, the indexical presence of that subject is reiterated           that points to a precise moment in time. Both are inherent in the capturing of the image.
and reinforced (…) It is a much more involving type of portrait experience than any single,         It’s remarkable that such a distinction was made not by theorists, but by conceptual artists
unadulterated photograph could provide. The object’s hybridity thereby helps bridge the             from the seventies, who with such notions attempted to question the documentary status
distance between the viewer and the person viewed and between likeness and subject                  of photography as an infallible means of proving the facts.
(between mere resemblance and that “something more”)”.17                                                Between the instant and the record of it, there exists an interdependence which goes
   Apart from being an image, a photograph is a physical entity which acquires connota-             beyond the representation of an instantaneous occurrence. Two comprehensible and
tions that are interpreted through appearance, association and presentation. An image is            illuminating examples would be: first, the photograph Authorization (1969) by Michael
representative, yet any kind of medium will endow it with important meanings for understand-        Snow which can be seen in the National Gallery of Canada (Ottawa). The image contains a
ing the work and the sensations it provokes. The way in which we receive the information            mirror and five Polaroid’s, stuck in a certain order on the mirror. While observing the cliché
relates that totality (image+objet+context) to our own culture, and to experiences fixed in         images carefully we discover that if read in a chronological order, they represent what is
the collective unconscious, which we understand and decipher. That said, such associa-              happening before the mirror, nothing more than a substantiation of the photographic act.
tions can also lead to errors—because an image is not always what it seems.                         The actions displayed are literally those that have constituted the work just as we see it.
   Another aspect, which is not commonly considered with photography, is the assess-                That is, they tell the story at the same time as it is created. They are simultaneously the act
ment of its nature as a performative act, a characteristic that enhances and conditions the         being carried out and the memory of it. Moreover, by the simple contemplation of these
visual information we are shown. Philippe Dubois has investigated this idea thoroughly in           instant photographs, the spectator can deconstruct their creation20. What the images
his book L’acte photographique (the photographic act). In the introduction to his study he          relate is just that, nothing more; Snow’s work is a metalinguistic reflection on the very act
points out that “If in photography there is a live and irresistible force, if there is any aspect   of producing a photograph. The second example is the series on inert gases created by
that I consider to be of absolute seriousness, it is that we are no longer able to think of the     Robert Barry, also in 1969, which is a set of images and attached texts that explain the



                                                                                                                                                                                                  125
act of releasing various invisible fluids in precise locations near Los Angeles. The artist     a stage that used to involve multiple steps, as well as plenty of time and dedication. With
released a liter of krypton in Beverly Hills, xenon in the mountains, argon on the beaches      the introduction if the first Kodak in 1888, a formula was established that had world-wide
and helium in the desert. The idea was to produce and act which was ephemeral, imma-            success and lasted for more than a century: the camera was loaded with a role of film, the
terial and imperceptible in plain sight. The photographs attempt to show these actions,         film was exposed and taken to a lab, and finally copies of the photos were printed. That
but, of course, we can only see the real places as empty: a part of the desert, an isolated     method meant a radical change in the way photographs were shared and appreciated,
beach, a silent park, and a rocky place. “Barry’s production of a photographic record of        since one only had to push the button, then go and pick up the results after turning in
these non-visible works of art might seem consciously futile and absurd, yet these images       the exposed roll of film. (“You press the button, we do the rest” was the famous slogan
may be significant for our understanding of the limitations of a particular form of indexical   for Eastman’s company toward the end of the nineteenth century). Since the process of
inscription. If at one level these images are displayed as documentary evidence denoting        developing photos was available to anyone for a modest price, it became a new form of
a state of affairs, what is also clear is that they are carefully designed to be at the limit   mass communication.
point of photography’s documentary capacity. While providing us with the indexical trace           Accustomed to the unconscious quickness of today, which doesn’t require any par-
of the moment of the gas’s release they also gesture towards the impossibility of recording     ticular ability, the other system seems obsolete and old-fashioned. If the method invented
it, and our attention shifts instead towards the act of photography itself as the moment        by Kodak is what made photography so popular by making it available to the public, the
of authentication. Thus the photograph is not intended so much to denote the inert gas          digital boom has vulgarized the act with its uncontrollable expansion, making it something
that cannot be seen as to point us towards it, and in that process of pointing to declare its   completely superficial. Now when we take a photo we don’t think about photography, not
existence”.21 In these images, Barry emphasizes a non-visual, imperceptible component           even a little. We don’t think about framing and we don’t need any special conditions, it is
for which he has created the photograph, and which must be confirmed by the artist, who         now utterly banal. This particular feature has created a new subgenre, emerging spontane-
serves to authenticate the actions—actions that are beyond the material reality and must        ously from low culture since the beginning of the twenty-first century. An especially insolent
be certified to be believed.                                                                    variety of portraits, which when can recognize by the captured image—inconsequential
      Compact digital cameras and mobile phones with built-in cameras have transformed          and amusing, by the undiscerning attitudes of the protagonists, the subjective angle of
the act of photography into something very different from what was traditionally under-         the camera, and the proximity of the subject and photographer, who share a moment of
stood. At any moment, in any way, and from any position a photo can be produced without         complicity which in normal conditions they wouldn’t be permitted. In any case, it is seldom
meaning or expressing anything special. In large gatherings of people photos are taken in       that the intimacy is aroused to such a point that the participants are driven to paroxysm
rapid succession with no particular aim. They are saved instantly and accumulated by the        or absurdity. In order for these instant photos (commonly seen on Facebook and Flickr
thousands—what used to be a distinguished moment, to be revealed and remembered                 or saved on a mobile phone) to reach any kind of artistic status, they need someone to
days later, is transformed into something ordinary, of no great import. The image is no         sift through and discover what sets them apart, a restructuring—as we clearly see in the
longer developed on paper as it was in years past, but rather the natural product is a file,    case of Juan Francisco Casas and his drawings done with a blue Bic pen. Casa’s works
formed of pixels, that we see on a screen and may choose to develop in a physical format.       never stop being photographs, even though they are manufactured and the final product
Moreover, we can take hundreds of photos without thinking twice—all we have to do is get        is created with an extremely precise, lifelike drawing; there is always an underlying notion
rid of the ones we don’t like. We don’t even have to wait to see how the image will come        that sustain them—the inexplicable idea of the photograph (inherent and inevitable) that
out because we can see it instantly. We’ve done away with developing and converting the         forms and characterizes the images. The well-known self-portrait of Chuck Close from 1968,
negatives, proving that the process is no longer necessary. The procedure is so condensed       in which he is seen with a slovenly attitude and smoking a cigarette, set a precedent that
that from the time we take the photo until we can see it only a few seconds have gone by,       resonated greatly with the work of Casas. Yet, what differentiates them is that the Close’s



126
piece is seen as an isolated work, classless, with certain pop undertones, and no direct rela-   technique is based on the use of graphite, we will find that both groups of works share
 tion to any photographic format of his time. “For Close, one medium (painting) became the        more similarities than differences. Despite their personal touches, the basic procedure is
 medium of another (photography). He reproduced by hand an image that had originated in           almost identical—the only difference is the final step. What brings them together is much
 a mechanism, one he himself operated. Although intimacy, accuracy, and the mechanics of          greater than what separates them. Rather than a taxonomical distinction which determines
 vision—human mechanics as well as machine mechanics—are among Close’s continuing                 that one is a drawing and the other a photograph, we should examine the nucleus that
 artistic interests, he has never sought to test technologies of representation against some      sustains, shapes and connects both groups. Each artist chooses to confront a separate set
 putative human standard. Pitting artist against machine hasn’t been his concern. Instead         of intellectual dilemmas: they each produce a representation of a representation developed
 he seems to test each of his two mediums, to see what each can do.”22 In judging Casa’s          with careful reflection and consideration. It’s like comparing a whale and an elephant.
 work, technical precision should not be the determining factor in inspiring, through his         Both are mammals that share similar physical structures, though it may not recognizable
 rigour, admiration. “The Ambassadors” (1533) painted by Hans Holbein the Younger or              in plain sight—they are warm-blooded, birth live offspring and breastfeed; yet, one of the
“La Condesa de Vilches” (1821) by Federico de Madrazo are very advanced in terms of               organisms has adapted to live in the sea and the other to live on land.
 correlation with reality, and even go beyond it many ways if we stop to examine the minute          Many artists have focused on constructing realities using small edifices, or scenes, and
 details and notice their precision. The works of the young Andalusian artist contain much        photographing models or spatial re-creations that are close to reality. The best example
 more than mere exactitude; one of the most interesting components is that the works emerge       might be that of the Thomas Demand, previously mentioned, and here things get truly
 from a popular subgenre of photography which is common today and easily recognizable,            complicated. The German artist selects an image published in a newspaper of magazine,
 only differentiated by the unique process of reproduction in pen, which in itself inspires       then uses paper and cardboard to build a model of the selected frame (sometimes to
 admiration, being such a simple, accessible and familiar medium. Depicting a landscape           scale), eliminating any superfluous details; after that, he takes a photo of the scene with
 or portrait with such hyperrealism doesn’t create much commotion because the public              normal, neutral lighting. Once the process is finished he destroys the prototype. The photos
 is familiar with that genre as part of the pictorial tradition, and the final product looking    contain the image of an image of an image, reverberations of some public event, moder-
 more or less like what we see first hand doesn’t seem strange, we’ve been used to it for         ated by an aseptic process, appearing before us in its most undramatic version. “In that
 centuries. Yet, to adopt a new kind of image—purely photographic—disrupts the scheme             way, the artist tests the viewer, who has been utterly saturated by the mass consumption
 of things and seems disconcerting to the observer, who is seduced by something so easily         of images produced by the media. Demand suggests that if the viewer is fooled by the
 recognizable—something that depicts, in all of its complexity, a simple process.                 images, it is not because they have the effect of presenting reality, but rather because of
    Regardless of the final reproduction—be it mechanical or manual, digital or chemical—we       the speed with which we must look at and perceive the world, especially representations
 have fully accepted the idea of photography in the same way that we have learned to              of the world”23. James Casebere also constructs his own models; with a very resourceful
 represent a three-dimensional space on a flat surface, both through conventions incor-           use of media, he tries to recreate centripetal structures that isolate the spectator’s view and
 porated into our culture. By way of the established associations for commonplace and             force it to center on contemplation. They are empty, isolated and mysterious spaces—just
 comprehensible images, we understand an image to be photographic just as we see the              like the works of Pereniguez. Ambiguous places presented as the setting of some event
 depth shown by vanishing lines. The fact that establishing such a convention corresponds         that has happened or will happen, but which we ignore; one instant among so many of an
 to the photograph’s traditional format will now seem more and more amusing. If we take           unknown narrative. The point of view has a cinematographic angle, and intrudes in the
 the concepts adopted by certain artists of international renown, such as Thomas Demand           scene like an omniscient eye—surpassing Dziga Vertov’s Kino-Pravda (film truth)—and,
 or James Casebere, who finish their works with the use of a camera, and we line them             keeping at an emotional distance from the events, observes them as a witness. Other art-
 up alongside the creative process of a young artist like José Miguel Pereñíguez, whose           ists like Oliver Boberg, Javier Vallhonrat or Jorge Ribalta, also create models to caution the



                                                                                                                                                                                             127
viewer about deceptive perceptions of reality. We mustn’t forget that every photograph is           is within a still image, a photographic fragment that opens up this “third meaning”, made
an artificial construction that evokes some other reality; it’s not reality, but rather a malle-    up of signifiers which resist signification”.26 The same Roland Barthes, in his book Camera
able representation of it.                                                                          Lucida, explains further “In the cinema, whose raw material is photographic, the image does
      If we have already considered the notion of photography as an object, as a performative       not, however, have this completeness (which is fortunate for the cinema). Why? Because
act or as an intrinsic idea—in this overview of those aspects that go beyond what is strictly       the photographic, taken in flux, is impelled, ceaselessly drawn towards other views; in the
considered photographic—then we must also examine the image as being somewhat                       cinema, no doubt, there is always a photographic referent, but this referent shifts, it does
enigmatic, connatural to some representations in action taken out of context; because of            not make a claim in favor of its reality.”27
the potential for suggestion and ambiguity, this trend is more and more common in the                   Since the Lumière brothers managed to project moving images in 1895, and even before,
art scene. In 1970, Roland Barthes published a text in Cahiers du Cinema entitled “The              the fluctuations between film and photography have oscillated back and forth, sharing
Third Meaning”24 which analyzed different frames taken from films by the Soviet director            some hazy boundaries that still seem unclear. The studies of Muybridge and Marey in the
Sergei M. Eisenstein as if they were photographs. They are stilled images suspended in              1880’s would play a decisive role in the creation of the cinema. Such new and dynamic
an undecipherable limbo, a series of isolated frames that lead him to propose a third inex-         images that flourish on the eve of the twentieth century are quintessential to the modern
plicable meaning that dominates our most obtuse senses, a kind of signifier and signified           spirit in one particular concept: movement; the idea would be fundamental for Futurism,
that are difficult to identify—without knowing the plot the iconic is null; it is found between     Cubism, or Marcel Duchamp (We go back to the piece Nude Descending a Staircase from
the image and its description, between definition and approximation, without being able to          1912). The instant, captured and suspended, is changing, now it is not one but many. It
place it in any exact position. An unnamed disturbance that the French writer would later           is fragmented or dissolved in between one moment and another. Nothing is condensed,
call punctum. The stilled images provide a broad reading and allow the observer to linger           or reflected; it doesn’t try to explain or teach anything. It shows only a trivial trance, one
on those elements that relate to his or her own experience. They are like sediments that            second of an elaborate situation. Such a fractal reality is not an ideal moment, but any
become solid when they are watched for a period of time; we are not able to capture the             moment. Once artists had come to the apex of documentary photography (Eugene Smith,
long, drawn out movements. These strange images caught in between the cinematographic               Robert Frank, Walker Evans or Cartier-Bresson), and classical cinema (Orson Welles,
and the photographic possess something indescribable that turns them into hidden carri-             Mankiewivz, Billy Wilder, John Ford, Frank Capra, George Cukor or Alfred Hitchkock),
ers of their own vestiges. “Other varieties like the video-image could seem confusing with          and with each discipline understood to be its own consolidated language, creators began
photography supposedly being in the foreground. However, despite some readings of the               to rebel against the established norms, and choose other roads less taken. From there
connections between photography, video and cinema, the iconic priority of the stilled image         we see the deviations that arise in the seventies. In cinema, we see the “Nouvelle Vague”
remains. We can already see this in the analysis of cinema in which Eisenstein Roland               and the postulates of structuralism introduced by Adams Sitney in 1969, which deviate
Barthes works with frames like isolated gems that transmit the obtuse meaning that related          toward the experimental. In photography we see the emergence of artists who decide to
to the whole story. Moreover, when pitted against the possible influence of the other media,        use images as if they were non-photographs.
what grants the stilled image the capacity of iconic crystallization is its sedimentary capacity       The eighties brought the emergence of artists like Sherrie Levine, who opt decisively
that allows it to act as “tableau.”25 Olivier Richon states that, “Barthes proposes to call those   for Appropriation Art, an intelligent means of questioning the conditions of an image’s
details to be found in the stilled image that resist communication and signification, the           reproducibility, challenging some of the considerations of traditional photography; this
filmic. The filmic is like a photograph, like a fragment or a fetish that freezes and subverts      movement was strongly countered by some theorists (such as Clement Greenberg, who
the diegesis of the film. It enables a vertical reading into the semiotics of arrested motion:      defends the separate cloistering of each specific media), with an extreme and absurd
details of faces, object…in short, an attention upon the make up of the image. The filmic           dedication to safeguarding the integrity of each genre. Dominique Barque suggests that



128
Sherrie Levine is the artist who went the farthest to radically negate the notions of author,      Bowery in Two Inadequate Descriptive Systems from the mid seventies is quite well-known),
 piece and originality, thus questioning the axioms of authorship and authenticity. If we           or Victor Burgin. The connections they make between different scenes that lack sufficient
 look to Walter Benjam’s proposed definition of authenticity, defined by the here and now           indications as to how they should be interpreted or placed, and the loose sentences that
 that mark the original28, Levine’s images fully comply with that proposition. They are exact       accompany those images, invite the viewer to infer new, not yet established meanings.
 photographs of other photographs, a mise en abîme, difficult to resolve. “Appropriation              “The problems in photography today are mostly derived from a sort of scattered confu-
 Art allowed Levine to explore a connection between the works and artists of her choosing,          sion in the area of theory. The series of debates that took place lead to the last set of artistic
 a connection that has sometimes been called Oedipal. For Levine, such a method has a               projects of the seventies, and gave rise to their semiotic, psychoanalytical, and post-structural
 magical quality: they are two superimposed images that aspire to establish an allegorical          arguments. The later response to some of these questions should also be explored, yet, it
 reading of the work. The viewer must then reconstruct the meaning that these photographs           comes in a completely different environment from that in which the discourse originally
 have for the artist, and the connection they may have to her. (…) By marking the images as         arose; so, in a sense, we find ourselves amid a strange kind of anachronism”32, affirms del
“stolen” she gives them authenticity, re-establishing that aura that they would have lost if they   Rio affirms with great precision, with an understanding that many of the trials and tribula-
 were simple reproductions, and granting them the status of unique works, as well as goods.         tions present in photography today were generated many decades ago, and that they are
 Her intention is not to deny such concepts, but to underline that dialectic nature”.29             to be resolved in completely unknown and unforeseen circumstances, in a new global
     In that same vain, we can turn to the Brazilian artist Vik Muniz, who is established in        setting that has arisen with the aid of new technological advances and the development
 New York and creates a very unique kind of Appropriation Art. He takes famous icons from           of the internet. This immaterial revolution, characterized by ubiquity and virtuality, has
 the collective imagination, widely reproduced all over the world, and creates a personal           great repercussions for the art world, particularly susceptible to transformation due to its
 reproduction of the famous image, transforming it into something new, related to the               experimental essence. “One important element for young artists, those born in the seventies
 original representation, but substantially different. In many cases the reproduction is a          and the beginning of the eighties, is that they are facing the urgent call for innovation from
 documentation of the process of creating the image, a kind of performance art that usually         the international art community, facing rather tricky challenges like changing the models
 involves odd, perishable materials, like chocolate, syrup or sugar… “Muniz manages to              and systems of traditional art forms: the model of painting, sculpture and architecture.
 activate our memories using unconscious images that form part of out cultural baggage,             System-wide changes of this scope—that will affect the structural principals of the “classic”
 and his photographs serve both as a catalyst for memory and an element of disruption and           visual and spatial disciplines, (…) mean that these structural innovations are that much
 contrast, given that the deception is revealed at first glance”.30 “His works speak of the         more exciting. On one hand, they respond to a need to reconfigure the sensibilities of the
 permeability of meanings in the world of images, where things are not always what they             modern-day viewer, who demand images that correspond to the current visual systems
 seem. For that reason he often thinks of Goddard’s saying “Ce n’est pas du sange, c’est            (graphics, publicity, photojournalism, cinema, videos, and the web…); and on the other
 du rouge” [this isn’t blood, it’s only red paint]. As we have seen with cinema and television,     hand, the more serious art being produced in the last 10 years is also intimately tied to
 often the real objects are not very convincing when they are shown and don’t seem as they          the new technologies that feed into our present imagination”.33
 really are. At the same time, there are some very versatile materials that can be used to
 represent something they’re not, and may even be more believable than the real material
 they represent”.31 Other categories that have diverged from photography in the last half
 century include works that combine text and image in conceptual projects of greater scope
 than mere memory or record. I’m referring to some outstanding examples—without going
 into too much detail, such as the works of Sophie Calle, Martha Rosler (her piece The



                                                                                                                                                                                                  129
1.    Sontag, S. “On Photography.” P. 9.
2.    EL CULTURAL, May 5 2008. Interview with Thomas Demand conducted by Javier Hontoria.
3.    Lowry, J., Green, D., Campany, D. Foreword. “Where is the photograph?” Photoworks. Brighton, 2003.
4.    Del Río, V. “Fotografía Objeto”. P. 75.
5.    Krauss, R. “Lo fotográfico. Por una teoría de los desplazamientos” (“Theorie des ecarts”). Editorial Gustavo Gili.
      Barcelona, 2004.
6.    Krauss, R. “Sculpture in the expanded field” is a well-known essay, first published in the spring edition of “OCTOBER”.
      MIT Press, 1979.
7.    Krauss, R. “Sculpture in the expanded field”. P. 30. MIT Press, 1979.
8.    Brea, J. L. “La era Postmedia”. Editorial Centro de Arte Salamanca, 2002.
9.    Del Río. op. cit. P. 145.
10. Wall J. Señales de indiferencia. (“Marks of indifference”) “Indiferencia y singularidad. La fotografía en el pensamiento
      artístico contemporáneo”. P. 246-247..MACBA. Barcelona, 1997.
11. Del Río. op. cit. P. 100.
12. Ibid. P. 98.
13. Lowry, J., Green, D., Campany, D. op. cit.
14. Del Río. op. cit. P. 80.
15. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. (“The Work of Art in the Age of Mechanical
      Reproduction”) “Sobre la fotografía”. P. 108. Pre.Textos. Valencia, 2008.
16. Del Río. op. cit. P. 107.
17. 2: Batchen, G. Fearful Ghost of Former Bloom. “Where is the photograph? P. 21. Photoworks. Brighton, 2003.
18. Dubois, P. Introduction. “El acto fotográfico” (“L’Acte Photographique”). P.11. Paidós. Barcelona, 1986.
19. Lowry, J., Green, D. From presence to the performative: rethinking photographic indexicality. “Where is the photo-
      graph?”, p. 48. Photoworks. Brighton, 2003.
20. Dubois, P. op. cit. P. 14-15.
21. Lowry, J., Green, D. op. cit. P. 48.
22. Shiff, R. Photographic Soul “Where is the photograph?”. P. 98. Photoworks. Brighton, 2003.
23. Gómez Isla, J. “Fotografía de creación”. Editorial Nerea. San Sebastián, 2005.
24. Barthes, R. “Lo obvio y lo obtuso”. Paidós, 2009.
25. Del Río. op. cit. P. 77.
26. Richon, O. Thinking Things. “Where is the photograph?”. p. 78. Photoworks. Brighton, 2003.
27. Barthes, R. “La Cámara lúcida” (“Camera Lucida”) P. 156. Paidós, Barcelona, 1989.
28. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. (“The Work of Art in the Age of Mechanical
      Reproduction”) Sobre la fotografía. Pre.Textos. Valencia, 2008.
29. S. R. Taken from the critical commentary of the piece “Interieurs Parisiens: 1-60 After Atget”, (1997) which belongs
    to the collection of Fundación Telefónica. www.fundacion.telefonica.com
30. Gómez Isla, J. op, cit. P. 35.
31. C. D.. Taken from the critical commentary of the piece “Chocolate Disaster,” (1999) which belongs to the collection
    of Fundación Telefónica. www.fundacion.telefonica.com
32. Del Río. op. cit. P. 12.
33. Marín-Medina, J. Wilhelm Sasnal, iconos de lo cotidiano. EL CULTURAL, December 4, 2009.




130
Afterpost
Afterpost
Afterpost
Afterpost
Afterpost
Afterpost

Afterpost

  • 1.
    AfterPost  [más alláde la fotografía]
  • 5.
    AfterPost  [más alláde la fotografía] Un proyecto comisariado por Sema D’Acosta para Espacio Iniciarte Sevilla 27.05 / 27.07 2010
  • 6.
    JUNTA DE ANDALUCÍA AGRADECIMIENTOS Pamela Hernández Consejero de Cultura Paulino Plata Cánovas Alberto de Juan Pilar Citoler Viceconsejera de Cultura Dolores Carmen Fernández Carmona Alfonso de la Torre Pilar Linares Secretario General de Políticas Culturales Bartolomé Ruiz González Alfredo Viñas Rafael Ortiz Directora General de Museos y Promoción del Arte Inmaculada López Calahorro Álvaro Alcázar Rocío Calvo Director Gerente del Instituto de las Artes y las Letras Luis Miguel Jiménez Gómez Beatriz Pastrana Rosa Juanes Carles Taché Rosalía Benítez Clara Arnuncio Rosalía Ortiz EXPOSICIÓN Concha de Aizpuru Soledad Lorenzo Comisario Sema D’Acosta Dan Benveniste Tania Iglesias Asistencia comisariado Marta del Corral Diego Ruiz Alcubilla Vicente Rabasco Producción Instituto Andaluz de las Artes y las Letras Eduardo D’Acosta Yolanda Rodríguez Diseño de comunicación underbau [Juanjo Justicia+Joaquín Labayen] Elba Benítez Colección fotografía Universidad de Salamanca Montaje Gonzalo Posada y Grupo 956 S.L. Enrique Tejerizo Colección Circa XX-Pilar Citoler Carpintería Lioch Carpinteros S.L. Fernando Pradilla Fundación Cajasol, Sevilla Francisco del Río Fundación Rafael Botí, Córdoba Helga de Alvear Fundación Telefónica, Madrid CATÁLOGO Ignacio Tovar Galería Alfredo Viñas, Málaga Instituto Andaluz de las Artes y las Letras Israel Caballero Galería Álvaro Alcázar, Madrid Joaquín García Martín Galería Benveniste Contemporary, Madrid Edita JUNTA DE ANDALUCÍA. Consejería de Cultura Jorge Rigol Galería Carles Taché, Barcelona Juan María Vélez Galería Cubo Azul, León Textos Alberto Martín, Sema D’Acosta y Óscar Fernández Juana de Aizpuru Galería Elba Benítez, Madrid Traducción Anna Rose Thomas Laura Fernández Orgaz Galería Fernando Pradilla, Madrid Diseño editorial underbau [Juanjo Justicia+Joaquín Labayen] Laura Ramón Galería Fúcares; Madrid Producción Instituto Andaluz de las Artes y las Letras Margarita González Galería Helga de Alvear, Madrid Impresión TecnoGraphic María Montero Sierra Galería Juana de Aizpuru, Madrid María Platero Galería Max Estrella, Madrid © de los textos: sus autores Marta Puerta Galería Oliva Arauna, Madrid © de las fotografías: sus autores Matías González Andrieu Galería Rafael Ortiz, Sevilla © de la edición: JUNTA DE ANDALUCÍA. Consejería de Cultura Myriam Castro Galería Sandunga, Granada © Vik Muniz, Daniel Canogar, Luis Gordillo, JJunco, VEGAP, Sevilla, 2010 Norberto Dotor Museo Patio Herreriano, Valladolid Oliva Arauna ISBN: 978-84-8266-999-1 Óscar Romero Bar El Pelícano, Sevilla DL: SE-6682-2010 Pablo Suárez Hotel Plaza Santa Lucía, Sevilla
  • 7.
    Presentación Paulino Plata Un contexto para AfterPost Alberto Martín ¿Qué es una imagen fotográfica hoy? Sema D’Acosta Obras Eugenio Ampudia / Dionisio González / Vik Muniz / Sherrie Levine / Jacobo Castellano / James Casebere / José Miguel Pereñíguez / Juan Francisco Casas / Juan Carlos Robles / Daniel Canogar / Pierre Gonnord / Gabriella Gerosa / Miguel Ángel Tornero / Carlos Aires / Germán Gómez / MP&MP Rosado / Aitor Ortiz / Helena Almeida / Luis Gordillo / Carlos Pérez Siquier / John Baldessari / Juan Francisco Isidro / Gregory Crewdson / Cristina Lucas / Sergio Prego / Alejandro Sosa / Lucas Gómez / Gonzalo Puch / Juan del Junco / Manolo Bautista / Miki Leal / Rogelio López Cuenca / Juan Carlos Bracho TEXTOS: ÓSCAR FERNÁNDEz / SEMA D’ACOSTA Autores Biografías resumidas English texts Presentation / A context for AfterPost / What is a photographic image today?
  • 9.
    Presentación Paulino Plata
  • 11.
    Presentación del Consejero de Cultura Paulino Plata Cánovas Fiela su compromiso de apoyo al arte contemporáneo, la Consejería de Cultura de la Junta de Andalucía presenta en Sevilla la muestra AfterPost. Más allá de la fotografía, un proyecto del comisario hispalense Sema D’Acosta. A lo largo de estos cinco años, el programa Iniciarte se ha distinguido por una intensa labor dirigida a promocionar a todos los que integran el sector de la creación más directa- mente conectada con nuestro tiempo: artistas, críticos, comisarios, estudiantes e industrias culturales. Es importante seguir trabajando con constancia para avanzar en ese objetivo. La línea de Ayudas del Programa Iniciarte constituye una apuesta firme y decidida de la Consejería de Cultura por el arte contemporáneo que abarca de todas las fases de la creación: inves- tigación y formación, producción y difusión de proyectos. Si el año pasado en la exposición Landscape: the eternal return el fotógrafo José María Mellado trataba de poner de manifiesto cómo el hombre moderno se afana por lograr un lugar en la Historia, la intención de esta nueva iniciativa es reflexionar sobre el significado de la imagen fotográfica, para lo cual se plantea un escenario abierto donde el espectador pueda extraer sus propias conclusiones. El comisario ha seleccionado trabajos de artistas consagrados que dialogan con obras de artistas noveles. Estamos convencidos de que esta sugestiva combinación cumplirá las expectativas de todos aquellos que visiten la exposición. 7
  • 13.
  • 15.
    Un contexto para AfterPost parece sencilla y plenamente asentada, la fotografía se ha establecido por fin como la Alberto Martín expresión artística más destacada de nuestro tiempo. Parece haberse cumplido el sueño perseguido durante tanto tiempo («la fotografía tiene su propia utopía, que se manifiesta particularmente en el museo de arte», Boris Groys)3: la fotografía como arte, pero ahora más que nunca como un fantasma. Ahora bien, la condición fantasmal de las imágenes electrónicas es muy diferente: «Fantasmización. En buena medida, las [imágenes] electró- En cierta manera se podría decir de esta exposición, titulada de manera elocuente AfterPost. nicas poseen la cualidad de las imágenes mentales, puro fantasma. Aparecen en lugares Más allá de la fotografía, que trata a un mismo tiempo de la escasez y de la sobreabundan- –de los que inmediatamente se esfuman–. Son espectros, puros espectros, ajenos a todo cia de la fotografía. Pero antes de entrar en ello, empecemos por el principio. La tesis del principio de realidad.» (José Luis Brea)4. Es una fotografía desmaterializada que no necesita proyecto recorre dos caminos bien delimitados: por una parte la presencia generalizada ya encarnarse en un objeto ni dialogar con el soporte, su naturaleza es la circulación y la de la fotografía en la escena artística, una realidad cada vez más acentuada que ha llevado difusión, y su estado natural es la interacción, la manipulación y la proliferación. hasta sus últimas consecuencias la porosidad entre los diferentes medios, y ha dado como Al igual que ocurre con su condición fantasmal, también es diferente el lugar en el que resultado que lo fotográfico aparezca como un medio en permanente expansión. Por otra, residen y acontecen los dos contextos antes aludidos: la fotografía en la esfera artística y el el desarrollo de la imagen digital que vendría a perturbar el estatuto de la fotografía hasta desarrollo de la imagen digital. Ciertamente, la fotografía ahora prolifera en los museos, y el punto, ¿tal vez?, de modificar radicalmente su naturaleza. En cierta manera, cada vez lo hace precisamente en el momento en que el medio fotográfico, a través de la tecnología que aparecen mencionados estos dos elementos, evidentes y omnipresentes, se tiende digital, no sólo alcanza un estado de plena ubicuidad y desmaterialización, sino que en a plantear su confluencia en un panorama cuya definición más clara sería la de un doble cierta manera también reencuentra sus vínculos con la esfera social. Una paradoja que proceso de expansión: la masiva generación y circulación de imágenes provocada por la no deja de hacer visible e incluso refuerza la tensión entre la fotografía como práctica revolución digital y la difusa y generalizada contaminación de los diferentes medios por social cotidiana y expandida y su entrada en el museo5. Doble abundancia de diferente la fotografía. Ambos contextos, el de la fotografía en la esfera artística y el del desarrollo signo: abundancia en el museo que entra en contraste con aquella que caracteriza a las de la imagen digital, terminan así por hablarnos, aunque por diferentes caminos, de la imágenes electrónicas y que deriva de un lugar natural asentado en la circulación y la sobreabundancia, la expansión o la fluidez. Pero sus itinerarios y sus etapas son en buena proliferación incesante sin necesidad de llegar a materializarse en un soporte o localizarse. medida divergentes. Lo es por ejemplo el carácter fantasmal de la fotografía o de la imagen Si el lugar de la fotografía en arte es el museo, el lugar de la imagen en la esfera digital es en uno y otro contexto. En efecto, y lo hemos visto especialmente a lo largo de la última en realidad un no-lugar. Podría decirse también que la fotografía ahora más que nunca, década, la fotografía se ha colado como un fantasma en la práctica artística explotando su en su infiltración por la esfera del arte, se hipermaterializa, reforzando la presencia y capacidad combinatoria y su condición de medio hiperfluido. Un proceso imparable de la importancia de los soportes, justamente ahora que la revolución digital provoca un irrigación y contaminación, mutación y adaptación, que ha generado también sus propias desvanecimiento de los mismos, haciendo innecesaria la encarnación en un objeto6. Se consecuencias sobre la fotografía, especialmente una progresiva disolución o dispersión contraponen el museo y las prácticas sociales asociadas a la fotografía que ahora, desde de su especificidad como medio, hasta el punto de que para algunos autores, como por lo digital, devuelven a lo fotográfico su estrecha conexión con los usos y las funciones. De ejemplo Paul Ardenne, ya no existiría un medio artístico que sería la fotografía, sino que ésta nuevo entran en tensión, como en otros momentos recientes de la historia de la relación habría accedido a una nueva condición como vector de una imaginería proteiforme1. Algo entre fotografía y arte (por ejemplo, el conceptual), la pulsión antiestética que dialoga con similar expresa Geoffrey Batchen en un contundente y simple resumen de dicha situación: los usos y funciones del medio fotográfico, con la perfección estilística que abre un campo lo fotográfico aparece en todas partes pero en ningún lugar determinado2. La conclusión de negociación estética. En este sentido, puede recordarse cómo se ha señalado con 11
  • 16.
    claridad que losavances digitales desde el campo del arte han servido fundamentalmente o más comúnmente instituido. Quizás haya que buscarlo, por el contrario, como apunta para facilitar la porosidad de la fotografía con otros medios, para acentuar la hibridación, Richard Shiff en el mencionado artículo El alma fotográfica, en prácticas que ponen a profundizar en las capacidades plásticas de dicho proceso y desplegar todo su potencial prueba todo lo que parece natural al medio. Este mismo autor señala la reproducción de manipulación7. Con razón Geoffrey Batchen decía que la posfotografía, encarnada en manual de imágenes producidas con tecnologías mecánicas y electrónicas como una de este acentuado nivel de porosidad, podía suponer la entrada en una era posterior, aunque esas posibles pruebas11. Es oportuno explorar dicha transferencia en el contexto concreto no totalmente más allá de la fotografía.8 La inscripción de otro modo de ver, condición de AfterPost, propuesta expositiva que contiene un buen número de obras que global- necesaria para un más allá de la fotografía, parece que aún está por llegar. De momento mente podrían incluirse en tal procedimiento. Son numerosos los aspectos que aparecen lo que si parece es que el juego de la negociación estética a partir de la fotografía está implicados en este tipo de «prueba». Casi todos ellos parecen recordarnos elementos más animado que nunca. implicados en la imagen o la visión que el «automatismo» tiende a oscurecer. La corpo- Hasta aquí la abundancia. La escasez por su parte podría derivar del comentario reidad, la temporalidad, la superficie. Parecen recordarnos, como ya hacía Paul Virilio citado más arriba acerca de que hoy encontramos lo fotográfico en todas partes pero en hace más de dos décadas12, que «los materiales de visión pasan por el cuerpo del artista ningún lugar determinado. Podemos parafrasear a Jean-Luc Nancy para preguntarnos si en la misma medida en que la luz es la que fabrica la imagen». Un rastro de manualidad, existe ese lugar, aunque sea remoto o permanezca escondido. Se preguntaba por su parte de corporeidad, cuya naturaleza hoy, en el nuevo contexto de la fotografía digital, quizás Nancy: «¿Que queda del arte? Acaso sólo un vestigio. Eso es, al menos, lo que se dice en adquiera un sentido inverso al que pudo tener, por ejemplo, en la época de plenitud del nuestros días, una vez más. Al proponer como título de esta conferencia «El vestigio del diálogo entre pintura y fotografía de los años 60 a 8013. Si entonces los temas de la foto- arte», simplemente tengo en vista lo siguiente: de suponer que, en efecto, no queda más grafía entraron en la pintura, la huella de la mano del artista cedía el paso a la huella del que un vestigio –a la vez una huella evanescente y un fragmento casi inasible–, esto mismo aparato, y se consideraba central construir una distancia respecto al carácter indicial o podría ser apto para ponernos sobre la pista del propio arte o, cuando menos, de algo que referencial de lo fotográfico, hoy las cosas suceden, al menos visto desde la fotografía, de le fuera esencial, si podemos plantear la hipótesis de que lo que queda es también lo que un modo casi inverso. No es difícil observar cómo en gran medida los temas de la pintura más resiste. A continuación, tendremos que preguntarnos si ese algo esencial no será o sus preocupaciones han entrado en la fotografía o se han convertido en tema para ella; también del orden del vestigio, y si el arte en su totalidad no manifiesta mejor su naturaleza o cómo es precisamente la huella del aparato la que cede el paso a la huella del artista. o su meta cuando se convierte en vestigio de sí mismo: cuando apartado de la grandeza Igualmente, hoy no parece que el asunto central sea tratar de poner de relieve que la de las obras que crean mundos, parece pasado y ya no muestra más que su pasaje».9 fotografía es el medio que altera nuestro modo de ver o tratar de desnaturalizar el realismo Podríamos ahora sustituir arte por fotografía en esta larga cita y buscar el vestigio de fotográfico como medio fundamental de imaginar el mundo objetivo. En el contexto de la fotografía entre la selección de obras que forman esta exposición, preguntarnos si real- la imagen digital, probablemente ya no se trate de la fotografía y nuestro modo de ver, mente lo que queda es también lo que más resiste. De hecho, esta muestra permite una sino de la imagen y nuestro modo de vivir con ella, el flujo y la proliferación. Asimismo, el doble mirada, evidentemente repasar la masiva infiltración de la fotografía ya aludida, pero intento de desnaturalizar el realismo fotográfico, en un contexto en el que las imágenes también observar el rastro que va dejando entre los múltiples procesos de transfiguración mentales ya adquieren o pueden adquirir un carácter prácticamente factual, bien podría que permite el medio. Es en estos rastros concretos, en estas marcas específicas que dejar el paso a una rendición frente a esa pretensión. aporta singularmente lo fotográfico, donde podemos encontrar finalmente ese vestigio Para la fotografía esa «manualidad» devuelve también un sitio central a la temporalidad, de la fotografía. En cierta medida, sería como preguntarse (retomando para la ocasión el una temporalidad abolida en la perseverante búsqueda de la instantaneidad y la fidelidad. título de un interesante texto de Richard Shiff) por el alma de la fotografía10, y encontrar La huella del proceso se enfrenta abiertamente a la independencia y el automatismo que lo que resiste, aquello que esencializa el medio, no es precisamente lo más evidente del aparato. El mencionado Richard Shiff utiliza una precisa imagen para describir esta 12
  • 17.
    diferencia. Analizando, ensu caso, el proceso de trabajo de Chuck Close, habla de intimidad 1. Paul Ardenne, «La fotografía en la era de la abolición del control», en Cruce de caminos. Sobre el arte y la fotografía, corporal, una intimidad que tiene que ver con el proceso a través del cual la visión se va La Casa Encendida, Madrid, 2006, pp. 93-98. 2. Geoffrey Batchen, Arder en deseos. La concepción de la fotografía, Gustavo Gili, Barcelona, 2004, p. 215. materializando a medida que el artista se abre paso a través de la imagen14. Un abrirse 3. Boris Groys, «El lugar de la fotografía», en Joan Fontcuberta (ed.), ¿Soñarán los androides con cámaras fotográficas?, paso que supone una precisa lectura y extrapolación de datos visuales, una sintetización Ministerio de Cultura, Madrid, 2008, p. 182. de la información contenida en la imagen y una cuidadosa articulación de sensaciones y 4. José Luis Brea, Las tres eras de la imagen. Imagen-materia, film, e-image, Akal, Madrid, 2010, p. 67. significados. Procesos constructivos, elaboraciones, que desplazan la atención hacia algunos 5. Es interesante observar, por ejemplo, cómo esta tensión asoma indirectamente una y otra vez a lo largo de la aspectos generalmente «menores» si se consideran desde el campo fotográfico. Uno de argumentación desarrollada por Boris Groys en su artículo mencionado en la nota 3. 6. José Luis Brea, Las tres eras de la imagen, op. cit. ellos es la atracción hacia la superficie de la imagen fotográfica, territorio particularmente 7. Para este aspecto puede verse: Paul Ardenne, La fotografía en la era de la abolición del control, op.cit. y Michaela conflictivo y complejo, donde el espacio puede ser colapsado, comprimido, desorientado Fiserova, Image photographique: de la critique de l’art plastique à la conversation visuelle, 2 marzo 2006, o reconstruido, donde trama y dibujo dialogan, o donde la materialidad de la superficie METAPHORES: http://www.sens-public.org/spip.php?article237. puede ofrecer diversos niveles de resistencia frente a la imagen y la experiencia figura- 8. Geoffrey Batchen, Arder en deseos, op. cit., pp. 214-215. tiva15. Una materialidad que como bien señala Geoffrey Batchen, desde una perspectiva 9. Jean-Luc Nancy, Las Musas, Amorrortu, Buenos Aires, 2008, p. 113. 10. Richard Shiff, «El alma fotográfica», en David Green (ed.), ¿Qué ha sido de la fotografía?, Gustavo Gili, Barcelona, histórica, «llama la atención hacia ese aspecto de las fotografías habitualmente reprimido 2007, pp. 102-123. en la conciencia que tenemos de ellas, su presencia física como cosas»16. 11. Richard Shiff, El alma fotográfica, op. cit., p. 123. Un último elemento, más problemático, e incluso discutible, sería el modo en que se 12. Paul Virilio, La máquina de visión, Cátedra, Madrid, 1989, p. 29. ponen en primer plano las intenciones del autor. Michael Fried abre una vía interesante 13. Para un interesante análisis de las implicaciones de dicho diálogo y de dicho periodo se pueden consultar, entre de análisis en este sentido, en su estudio acerca del punctum de Roland Barthes17, al otros, los textos de Ralph Rugoff y Barry Schwabsky incluidos en el libro The Painting of Modern Life, Hayward Publishing, Londres, 2007. profundizar en la conexión y separación entre artefacto fotográfico e intencionalidad. 14. Richard Shiff, El alma fotográfica, op. cit., p. 104. Situándonos en el contexto de la fotografía digital afirma: 15. Estos aspectos son abordados de un modo especialmente relevante por Richard Shiff, El alma fotográfica, op. cit. «… el deseo hiperbólico de Barthes de separar la fotografía (ideal) de las intenciones de 16. Geoffrey Batchen, «Aterrador fantasma de antiguo esplendor»: Qué es la fotografía», en David Green (ed.), ¿Qué su autor encontraría su contrapartida en el creciente uso de técnicas digitales por parte de ha sido de la fotografía?, Gustavo Gili, Barcelona, 2007, p. 26. fotógrafos con ambición, con el fin de crear artefactos fotográficos cada parte de los cuales 17. Michael Fried, El Punctum de Roland Barthes, Cendeac, Murcia, 2008. 18. Michael Fried, El Punctum de Roland Barthes, op. cit, p. 90, nota 47. podía ser vista como la manifestación en potencia de una intención artística»18. Se pone en primer plano aquí, evidentemente, el papel que juega el nivel de control artístico en una fotografía, y si hoy la fotografía «como arte» puede seguir dejando en manos del aparato algo que se escape a la intencionalidad del artista. En contraste, quizás lo que está en juego ahora es cómo ofrecer resistencia al amane- ramiento que pueda derivarse de una renovada preeminencia o presencia de lo mecánico en el medio digital. Probablemente esos «vectores» de resistencia puedan encontrarse también, o todavía, en los «vestigios» de lo fotográfico. 13
  • 19.
  • 21.
    ¿Qué es una imagen fotográfica hoy? AfterPost. Más allá de la fotografía reflexiona en torno a lo que significa una imagen Sema D’Acosta fotográfica actualmente, esbozando un escenario abierto donde el espectador pueda sacar sus propias conclusiones. Evidentemente la idea de los límites de la fotografía no es algo nuevo, ya se planteó a finales de los años sesenta cuando algunos artistas conceptuales empiezan a utilizarla la cámara con fines no fotográficos. De hecho, es un cuestionamiento consustancial a la postmodernidad y sus derivaciones. Lo que sí es novedoso dentro de «Todo empezó con un ensayo sobre algunos de los este proyecto es que esa frontera se convierta en el argumento de una exposición, ya problemas estéticos y morales planteados que todas las obras seleccionadas trascienden los confines de lo fotográfico y se sirven por la omnipresencia de las imágenes fotográficas; de la imagen como herramienta, un instrumento que pone en entredicho coordenadas pero cuanto más pensaba en lo que son las fotografías, fundamentales que definen el hecho fotográfico tradicional (tiempo, espacio, instantanei- más complejas y sugestivas las encontraba.»1 dad, reproductibilidad…) No se pretende cuestionar aquí esas fronteras para marcar un borde inclusivo y otro exclusivo, no; la fotografía como lenguaje es muy sólido y no da pie SUSAN SONTAG a equivocaciones. Ahora bien, como género es un medio muy permeable que facilita una ósmosis continuada. Por su capacidad de adaptación y porosidad se adapta a cualquier formato y disciplina con facilidad. Lo fotográfico es un concepto que hoy lo impregna casi El arte que más vivo ha entrado en el nuevo siglo es la fotografía. Con un inmenso universo todo. ¿Hasta dónde llega? ¿Qué abarca? Hay una zona intermedia, ambigua y mudable, por delante y una vez superada su documental (y obsolescente) condición sine qua non, que participa de lo fotográfico sin ser necesariamente una fotografía, un terreno envolvente el feraz desarrollo tecnológico de los últimos lustros ha abierto las puertas a una disciplina y expansivo que rodea a lo fotográfico sin depender de los condicionantes técnicos que que crece y se expande de manera logarítmica. La revolución digital ha permitido un lo constituyen. Es ahí, en ese intersticio desubicado, donde se sitúan la mayoría de los ensanche tan amplio de sus fundamentos, que en su enriquecimiento caben casi todas las trabajos presentes en esta colectiva. posibilidades, incontrolable infinitud que acapara cualquier disciplina artística sin establecer En nuestros días, una fotografía no es sólo una imagen arquetípica reproducible; se fronteras previas. En el siglo XXI la fotografía se ha convertido en algo sustancialmente ha transformado en un conglomerado complejo de ingredientes que supera en mucho diferente de lo que fue en el siglo XX. No aparece en su estado puro, sino que se mezcla la función mnemotécnica que había ostentado tradicionalmente. La noción tal como se e hibrida con otros planteamientos expresivos convenidos, ya sea pintura, dibujo, vídeo o entiende hoy, se aproxima más a un concepto inclusivo, participado, mestizo y heterogéneo instalación. La era de la posfotografía propugna la superación de la imagen como icono que nada tiene que ver con la «imagen-crónica» que había definido el género desde sus indicial y su dilatación hacia otros campos, una circunstancia que ha sido estudiada en las inicios. De hecho, pocos son los fotógrafos que perviven atrincherados en ese sentido últimas décadas desde muchos flancos por diferentes teóricos (Roland Barthes, Rosalind domesticado del término. Todo lo contrario. Cada vez son más los autores que recurren a Krauss, Susang Sontag, Philippe Dubois, Geoffrey Batchen, Paul Ardenne, Vilém Flusser, la fotografía por el acopio de posibilidades que permite. Los creadores de cualquier rama Denis Roche, Peter Osborne, Boris Groys, Regis Durand, José Luis Brea, Víctor del Río, la aprovechan como procedimiento, fin o punto de arranque porque es un mecanismo etc.) También los artistas han escrito al respecto preocupados por la exacta ubicación de rápido para captar sensaciones, crear asociaciones y establecer ideas. sus prácticas, conscientes de que sus trabajos superaban en complejidad y profundidad Nuestra generación está viviendo un momento crucial y extremadamente complejo, un el mero registro o la instantaneidad (Duane Michals, Victor Burgin, Jeff Wall, Allan Sekula, estado liminar hacia un estatus fotográfico nuevo todavía, no definido. AfterPost atestigua Joan Fontcuberta, Jorge Ribalta, etc.) esa tesitura explorando los discursos actuales que fluctúan en torno a la imagen fija y/o 17
  • 22.
    sus derivaciones. Esnecesario indagar esos límites para investigar cómo se calan los mismo tiempo, el rápido desarrollo de las eternamente sofisticadas tecnologías digitales y medios creativos en torno a un epicentro que sustancialmente siempre es fotográfico. O electrónicas ha expandido los límites de lo propiamente fotográfico. La consecuencia más fílmico. La imagen en movimiento no es más que una extensión de la imagen fija. El artista evidente ha sido que ahora resulta muy difícil decir con exactitud dónde y cómo vamos a alemán Thomas Demand comentaba en una entrevista reciente: «Considero fundamental trazar las fronteras que separan la fotografía del cine o el vídeo o, incluso, de cualquiera el papel de la fotografía en la sociedad actual. Todo el mundo tiene una cámara en su móvil, de las otras formas de material icónico, gráfico o textual que hoy día podemos reunir y millones de personas utilizan la red para subir y distribuir imágenes. Hoy todos sabemos, mostrar en la pantalla del ordenador. Definitivamente ya no podemos suponer que la en definitiva, cómo hacer una foto pero también cómo leerla. Esto, para los artistas, crea imagen fija impresa fotográficamente es la forma arquetípica de la fotografía, sino una un contexto muy interesante desde el que trabajar si lo comparamos con el conocimiento de las muchas realizaciones posibles de una serie de aparatos tecnológicos y prácticas que tiene el público en general sobre, por ejemplo, los vaciados de bronce.»2 configuradas alrededor de la producción del campo visual. La fotografía, por lo tanto, ya A la hora de interpretar una imagen, lo esencial ya no resulta lo que históricamente no tiene (si es que alguna vez la tuvo) ninguna estabilidad ontológica.»3 «A finales del hemos asimilado de la condición fotográfica. Esa premisa permanece intacta sea cual sea siglo XX la importancia del medio fotográfico en el arte ha llegado a ser evidente. Aunque el medio y toma un valor u otro dependiendo de su presentación o nuestros propios juicios. las raíces de este protagonismo podrían encontrarse en décadas anteriores, es entre los Internet y los medios de comunicación conciben universos equivalentes que conviven ochenta y noventa cuando se consolida un discurso claro en torno al medio fotográfico. indistintos para crear no una sola realidad, sino muchas paralelas y diferentes. Nuestro Ese protagonismo no se traduce sólo en la aparición de un nuevo género artístico (en imaginario colectivo está sustentado en imágenes que absorbemos continuamente, no contra de lo que dicen sus textos programáticos) que se hace un hueco definitivo entre en visiones reales extraídas de la experiencia. En estos tiempos de continuada virtualidad, otros de mayor tradición, sino también en la consolidación de un marco estable basado la vivencia se confunde con la imaginación. Asimilamos figuraciones ya hechas que en un circuito especializado de galerías, publicaciones e instituciones. Y es precisamente asumimos como verdaderas sin deslindar lo verosímil de lo real, dos dimensiones que de la crisis de los géneros artísticos tradicionales de donde parecen surgir soluciones para cada vez aparecen más acopladas. La imagen digital ayuda a aprender (y aprehender) rehabilitar las potencialidades icónicas de la imagen a través de la fotografía.»4 esa realidad nueva, un suceso manipulable, cambiable y harto enrevesado que ni siquiera Es innegable que la fotografía comparece ante nosotros ahora como una nueva categoría necesita materializarse. Puede ser un archivo volátil que retocamos hasta la inverosimilitud habilitada por su situación de inespecificidad. Su condición intermedia entre la práctica o comunicamos de manera instantánea. Los signos descontaminados ya no tienen cabida, artística y otras variantes compartidas genera debates de calado sociológico, filosófico y son consideraciones del pasado. Ahora habitamos la era de la posfotografía. político que superan las consideraciones estéticas habituales. En su ensayo Teoría de los desplazamientos5, Rosalind Krauss es una de las que inicialmente aborda estas divergen- cias de la imagen contemporánea, convirtiéndose en pionera de una abundante literatura EL CONTEXTO DE LA POSFOTOGRAFÍA sobre el asunto. Curiosamente, esta misma crítica de arte norteamericana fue también de Hoy por hoy la fotografía es una idea inagotable sin una noción exacta. Ha alcanzado un las primeras en advertir en 19796 cómo se estaba empezando a utilizar el término escul- estatus de tal autonomía y ósmosis, que su condición supera lo icónico, lo sintáctico y lo tura para referirse a «cosas» bastante diferentes de la tradición estatuaria convencional. representativo. «En los años noventa la fotografía fue omnipresente en galerías y museos «Categorías como la escultura o la pintura han sido amasadas, extendidas y retorcidas en pero en maneras en las que su identidad se vio radicalmente reconfigurada. Mediante su una demostración extraordinaria de elasticidad, una exhibición de la manera en que un incorporación a una amplia gama de prácticas artísticas, la fotografía fue progresivamente término cultural puede alargarse para incluir casi cualquier cosa»7. Según sus palabras, la pensada en términos de su interrelación, por una parte, con los medios de la pintura y escultura rompía sus fronteras con la arquitectura, el paisaje, las construcciones o la mera la escultura y, por otra, con las formas híbridas de la instalación y la performance. Al señalización de lugares. Se trataba de trabajos desubicados que no podían encajarse en 18
  • 23.
    lo pictórico yque se construían con espacio, materia, acción, movimiento, luz, o incluso alejan de lo fotográfico, sí evidencia un cisma entre la comprensión y comunicación de la imágenes, en un cerco que abarcaba cuatro vectores marcados por lo conocido, lo inexis- imagen. «El concepto mismo [postmedia] prefigura la creencia de que nos encontramos tente, lo perdurable y lo efímero. Esta desnaturalización del término (que lo abre a la alea- ante una nueva situación histórica que afecta a las formas de recepción y circulación de toriedad o la incertidumbre y que incluye hasta la inmaterialidad), no ha desmerecido los la imagen, y cuyas implicaciones van más allá de lo meramente visual para constituirse en caminos más tradicionales, pero sí ha variado la consideración de la expresión escultórica una problemática que afecta a la construcción de la realidad y a los modos de intercambio y la valoración del objeto, convirtiendo el panorama actual en un horizonte heterogéneo informacional. A la actualidad de la condición postmedia subyace una crisis larvada de y disperso. Basta repasar la última edición del Sculpture Projects Muenster desarrollada la representación.»9 en 2007 en la ciudad alemana de Münster –quizás uno de los proyectos más serios y Esta nueva instauración de lo fotográfico que ha depreciado su estimación documental sólidos de Europa en relación con esta disciplina–, para descubrir que en él se incluían y ha expandido su ámbito de acción hacia otros terrenos más intelectuales, es el resultado vídeos, performances, acciones en la naturaleza o intervenciones urbanas. ¿Qué podemos de una progresiva dislocación acaecida en el último medio siglo. Será a partir de los años inferir de esta imprevisible evolución sufrida por la escultura en los últimos cuarenta años? sesenta cuando el concepto empiece a resquebrajarse, puesto en tela de juicio primero Sencillo, los encasillamientos en las disciplinas artísticas tienden a desaparecer, sólo es por los artistas conceptuales y luego por los cineastas estructuralistas. En 1962 Edward cuestión de esperar las circunstancias adecuadas que los desajusten. Ruscha produce una edición limitada de libros de fotografías bajo el nombre de Veintiséis La fotografía ha experimentado un proceso análogo al de la escultura, en el sentido Gasolineras. Las fotos son asépticas, frías, irrelevantes; no destacan por nada ni tienen de que también en ella han comenzado a desdibujarse los límites que la enmarcaban y especial interés. Están realizadas sin cuidado técnico y no pretenden ir más allá de lo definían. Sabemos que su ubicación ha cambiado, pero aún nos falta perspectiva histórica enunciativo, son sólo un registro elemental. El autor no procura acaparar protagonismo ni para comprender dónde se encuentran ahora esos límites, pues el imparable desarrollo definir un estilo; se desprende del género en su valoración tradicional e incluso presenta el tecnológico de los últimos años ha hecho del cambio, hábito. Estamos, de algún modo, trabajo en un formato popular renunciando a su diferenciación artística. Twemtysix Gasoline ante una nueva «tradición de la ruptura», como explicara Octavio Paz en relación con la Station es un objeto (ya no una simple imagen) que mezcla baja y alta cultura. Como medita literatura. Realmente su reconocimiento es un problema historicista (tendemos a reducir la Jeff Wall en «Señales de indiferencia»10 Ruscha está desmontando con esta serie la técnica realidad humana a su condición histórica apoyándose en referentes conocidos y valorados) fotográfica en un ejercicio de negación. Evidentemente subyace en toda la idea un guiño que por falta de perspectiva no es evaluable desde nuestro presente. La progresión técnica pop irónico, pero también una reconsideración de lo fotográfico como algo diferenciado va solapando etapas con suma celeridad, estableciendo en cada progreso un marco de de lo que abarcaba el género hasta entonces en su relación con lo artístico. «El cuidado acción alterado que sitúa a la fotografía a mitad de camino entre la historia del arte y las con el que se edita el libro, incluso si las fotografías son técnicamente malas, apunta a variantes tecnológicas que se van produciendo. que Ruscha está jugando también en el terreno de una estatización de lo banal que no El critico de arte y pensador José Luis Brea ha analizado la repercusión en el arte de los excluye el interés por la confección efectista del soporte, es decir, por la manufactura de nuevos escenarios creativos proporcionados por el uso de Internet, un escenario inédito sus obras»11 La obra de Ruscha se inscribe en una tendencia muy común en la segunda para la acción creadora que trastoca todos los conceptos anteriores. Brea denomina al mitad del siglo XX, que se acerca a lo cultural utilizando el arte como arma crítica liberadora momento actual que vivimos «era Postmedia», un dominio donde la circulación pública capaz de romper los límites formales establecidos. No se trata de transgredir los géneros, de la información ya no está exhaustivamente sometida a la regulación jerarquizada algo que sería más bien una forma de vanguardismo, sino de reubicar el discurso12. característica de los tradicionales mass-media (estructuralmente orientados a la produc- Un elemento clave también a tener en cuenta es que la fotografía tomó contacto en ción social del consenso), sino que se adapta a cada usuario de manera pormenorizada e estos años con la semiótica, empezando a ser interpretada, decodificada, analizada y independiente.8 Aunque el libro ahonda en cuestiones relacionadas con el Net.art que se reensamblada no como una imagen, sino como un texto. Muchos artistas conceptuales 19
  • 24.
    norteamericanos parten delo fotográfico y derivan su trabajo hacia otros territorios que del siglo XX, una consideración que la equipara con el respeto histórico y la reverencia que cuestionan qué es y qué no es una obra de arte, llevando hasta márgenes impensados había recibido la pintura. A partir de entonces e insuflados por esta confianza, comienzan ciertas premisas duchampianas. Algunos creadores discurrieron por aspectos performativos a aparecer grandes formatos (Jeff Wall, Jean Marc Bustamante, Hannah Collins, Günther y otros lingüísticos (Dan Graham, Joseph Kosuth, Lawrence Weiner); pero en la mayoría Förg, Cindy Sherman, Thomas Struth), suben vertiginosamente los precios hasta alcanzar de sus experiencias, la fotografía jugaba un papel destacado como valor testimonial. Se en poco tiempo cotas millonarias, en las galerías se exhiben cada vez más fotografías, las servían de ella para patentizar sus obras o ponerlas en entredicho, la desvinculaban de grandes colecciones empiezan a incorporarlas con normalidad, se crean festivales específicos una idea o la asociaban a otra, pero siempre buscando cuestionar su esencia. A partir de en los cinco continentes y se cuelgan fotografías en los museos como si fuesen cuadros entonces, la fotografía quedó emplazada en un territorio mixto entre lo social y lo cultural, para ser contempladas como se mira un lienzo, superponiendo dos idiomas diferenciados imposible de abandonar. Esta tendencia expansiva ha perdurado hasta hoy superpo- que comienzan a compartir terrenos y a cobrar la misma relevancia niendo perspectivas década tras década. «A finales de los años setenta y en los ochenta La exposición «Los géneros de la pintura», organizada por Rosa Olivares a mediados la interrelación entre la teoría y la práctica se manifestó a través de la obra de artistas que de los años noventa en Gran Canaria, Madrid y Sevilla, precisamente abordaba esta trataron de reexaminar el lugar de la fotografía en la cultura de la imagen en su conjunto relación simbiótica entre pintura y fotografía, explicando cómo el bodegón, el paisaje y de acuerdo con la función del arte ante los medios de masas»13. y el retrato acostumbrados, estaban siendo retomados por la fotografía con absoluta Víctor del Río propone un doble enfoque para entender por qué la fotografía ha tomado vigencia cuando ya habían sido abandonados por la pintura al considerarlos modos de tanto protagonismo en las últimas décadas. «El primer itinerario incorpora el medio fotográ- representación pertenecientes a épocas pasadas. «Es así como la fotografía desarrolla fico mediante híbridos con otros soportes. La fotografía aparece entonces indirectamente la existencia de los géneros clásicos de una manera libre y sin prejuicios, respetando y legitimada por un proceso que parte de la crisis de otros géneros artísticos. Un proceso utilizando una tradición estética y usando una iconología aceptada popularmente, pero de hibridación que aprovecha precisamente la inespecificidad de lo fotográfico, su devenir sin el peso con que esta tradición lastra a la pintura. De una manera renovada y limpia, no asociado a una tradición, para enriquecer los contenidos artísticos. Los espacios de las como si se empezase a reescribir la historia del arte desde el principio pero sin tener que instalaciones y el potencial escenográfico de la fotografía dan lugar a soluciones instalativas recalar en cada etapa histórica, repitiendo y utilizando solamente lo que se quiere, un y pictóricas. De estas hibridaciones posibles, la que se establece con la pintura sería una método totalmente postmoderno en el que todo vale y en el que, una vez más, el fin justi- de las más fructíferas. El eje entre Andy Warhol, Robert Rauschenberg, Christian Boltanski, fica cualquier medio y en el que se pueden mezclar influencias, gustos, todo sin temor al Sigmar Polke o Gerhard Richter sugiere el espectro de posibilidades que se presenta y crítico, sin temor al historiador. Es un juego sin castigo. Los elementos que en la pintura del que participan otros muchos artistas. El discurso artístico se abre así a la imagen son considerados excesivamente tradicionales y poco renovadores, en la fotografía son los fotográfica por una vía de suplantación de lo pictórico. La ambigüedad intencionada con puntos clave de su desarrollo y aceptación como un lenguaje inmerso en la más radical la que trabajan estos artistas apunta a un primado de la imagen por encima de su origen de las modernidades.»15 técnico y, por ende, de su adscripción a un género concreto» . 14 Esta nivelación entre pintura y fotografía (una vinculación sobre el «inconsciente pic- La segunda ruta considera el tratamiento que recibe la fotografía como tableau. Desde tórico» sobre la que ahonda F. Javier Panera en algunos de sus ensayos) acaba con un finales de los años ochenta, determinados artistas y teóricos (entre los primeros, Regis debate histórico en cuanto al valor artístico de sus respectivos productos. Matiza Walter Durand) empiezan a estimar la obra fotográfica como si fuesen cuadros. Es decir, comienzan Benjamin: «De hecho, esta disputa era la expresión de un vuelco en la historia universal del a valorarla al mismo nivel que tradicionalmente había recibido la pintura, sin ningún tipo que no se daban cuenta ninguno de los dos contendientes. La época de la reproductibilidad de complejo. Sin entrar en asuntos estilísticos, son dos lenguajes diferenciados y ésa no técnica desligó el arte de su fundamento cultural, extinguiendo para siempre el brillo de es la cuestión, lo esencial es la dignificación que alcanza la obra fotográfica a la conclusión su autonomía. Ello trajo consigo un cambio en la función del arte que no fue planteado ni 20
  • 25.
    estudiado durante elsiglo XIX, e incluso se le ha escapado durante largo tiempo al siglo XX, uno a su manera, pero siempre anteponiendo rigor y conceptualismo. Candida Höfer, Andreas que es el que ha vivido el desarrollo del cine» Un planteamiento interesante, que se dilucida Gursky, Thomas Ruff, Axel Hütte y Thomas Struth forman parte de ese grupo inicial de discí- por asimilación empática y sin entrar en ningún tipo de conflictos, sesenta años después pulos, un quinteto colocado hoy entre los mejores fotógrafos de la actualidad. De la segunda que el pensador alemán escribiera «La obra de arte en la época de su reproductibilidad promoción, Elger Esser y Simone Nieweg, son dos de los pupilos más aventajados. técnica». Continúa Benjamin: «en un primer momento se malgastó mucha agudeza en Vancouver, en la costa pacífica de Canadá, está considerada una de las ciudades con decidir si la fotografía era o no un arte, sin haberse planteado previamente si la invención mayor calidad de vida del planeta. Es el tercer centro de producción cinematográfica y de la fotografía no había cambiado el carácter global del arte.»16 televisiva de Norteamérica después de Los Ángeles y Nueva York. Será aquí a partir del La percepción del arte después del nacimiento de la fotografía adquirió un valor dife- trabajo de Jeff Wall y su fotografía escenificada, cuando germine un tipo de imagen de gran rente desligado de la exclusividad y vinculado con la ubicuidad. Ya no era necesario viajar formato muy vinculada con lo fílmico, un instante suspendido de una historia sin resolver al lugar donde se hallaba la obra para poder verla, ni siquiera era necesario concretar una que encuentra su continuidad en obras como las de Gregory Crewdson o Erwin Olaf. imagen para que fuera disfrutada por el espectador; estos conceptos se trastocan con la La Escuela de Boston caracteriza sus fotografías no por manifestar el mundo, sino por llegada de la fotografía, que se convierte en una expresión nueva en constante evolución constatarlo a través de experiencias propias. Es lo real según unos rasgos antisociales, apta para todas las masas y rabiosamente contemporánea. Una expresión nueva cuyo e incluso distópicos, de los diversos estilos de vida alternativos. En la obra de autores paradigma más consistente será el cine. como Nan Goldin, Jack Pierson, Corinne Day, Jurgen Teller, David Armstrong o Wolfgang Las narraciones fotográficas, entendiendo como tales los relatos visuales de situaciones Tillmans, lo mundano se reelabora a través de una iconografía de la miseria y los detritus extraordinarias expandidos por el periodismo gráfico para dar conocimiento de qué ocurría de la existencia contemporánea vivida en un estado de descontento social y psíquico. 17 en lugares inaccesibles (especialmente conflictos políticos o confrontaciones bélicas), ya En España, podríamos situar a Alberto García-Alix en esta misma línea. Son trabajos mal no sirven. Son historias icónicas del pasado que fundamentaban su fuerza expresiva en la encuadrados, borrosos y de una estudiada informalidad, donde lo importante no es la mirada, composición y en la posibilidad de mostrar escenas inauditas. Agotados sus recursos por la sino la vivencia que se comunica través de una subjetivización extrema (en las antípodas sobreabundancia de representaciones que nos asaltan a diario, lo que ofrecen ahora nos de la Nueva Objetividad alemana, escrupulosamente neutra), un modo de manifestar la parece ordinario, común, extemporáneo. Son imágenes que ya conocemos cuya sintaxis presencia corporal del fotógrafo en un campo afectivo compartido. En muchos casos, la nos resulta consabida. La imagen-crónica o la imagen-documento aparecen ahora como intimidad queda registrada de manera diarística como recuerdo de una autobiografía salvoconductos de otro tiempo que no pueden ser vistos del mismo modo que cuando salpicada de momentos de gran carga emotiva. Quizás la pieza más emblemática de esta fueron generadas, se han modificado las reglas de re-interpretación de una imagen y se tendencia sea el diaporama con banda sonora de The Ballad of Sexual Dependency de han abierto diferentes frentes. En su libro «La cámara lúcida» Roland Barthes declara la Nan Goldin, que figura en colecciones como la de la Tate Modern o la del MOMA, una imposibilidad desde el punto de vista de la semiótica de analizar una imagen circunscri- sucesión de instantes vividos con más de setecientas imágenes. biéndonos, sólo, a su nivel informativo. El último núcleo y por ahora el de menor recorrido, lo hemos situado en Helsinki por ser Comoquiera que sea valorado, en la complexión de la fotografía reciente podemos dife- el centro más establecido, aunque podríamos extenderlo a todos los países escandinavos renciar varios focos fundamentales que han marcado, y marcan, algunas de las tendencias porque en la mayoría surgen prácticas similares. Los fotógrafos de la Helsinki School prac- de más calado y profusión del panorama. Una suerte de puntos cardinales que podríamos tican una particular poética del paisaje y establecen unos vínculos muy especiales con la ubicar en cuatro ciudades diferentes: Düsseldorf, Vancouver, Boston y Helsinki. Cuando Naturaleza; correspondencias entre el entorno y los seres humanos que implican respeto Bernd & Hilla Becher empezaron a dar clases en los años setenta en la Academia de Arte de e integración. Son artistas que también abordan de un modo personal los sentimientos Düsseldorf, rápidamente una primera generación de alumnos absorbe sus enseñanzas. Cada personales (los recuerdos, las ensoñaciones, los deseos), impresiones que exteriorizan a 21
  • 26.
    veces de manerainquietante y otras de manera misteriosa. Destacan Elina Broterus, Aino indicial de ese sujeto queda reiterada y reforzada (…) Es un tipo de experimentación del Kannisto y Roni Horn, que aunque nació en Nueva York, mantiene un nexo especial con retrato mucho más apasionante que la que puede ofrecer cualquier fotografía única y Islandia, país al que se siente emocionalmente vinculada. sin manipular. La hibridez del objeto ayuda a salvar la distancia entre quien observa y es observado, entre el parecido y el sujeto (entre la simple semejanza y «algo más»).19 Una fotografía además de imagen, es un ente físico que adquiere unas connotaciones MÁS ALLÁ DE LA IMAGEN (LA FOTOGRAFÍA COMO ObJETO, ACTO, IDEA… O ALGO INEXPLICAbLE) interpretables en función de su apariencia, relación y presentación. Una imagen repre- Para muchos teóricos, el verdadero dilema de lo fotográfico en nuestro tiempo es la supe- senta, sin duda, pero nunca puede desprenderse del soporte, que aporta significados ración de la iconicidad hacia lo objetual. Lo preponderante hoy no es, particularmente, fundamentales para la lectura y sentido de esa obra. Su condición de objeto lo deter- qué contiene una imagen sino cómo se comunica, de qué forma y manera. La fotografía mina y configura. La manera en la que recibimos la información, relaciona esa totalidad ha pasado de exteriorizarse por un método técnico fiable y unidireccional, a ser un «todo» (imagen+objeto+contexto) con nuestra cultura, además de con experiencias fijadas en que comporta infinidad de matices significantes con valores denotativos. Empezó hace el inconsciente colectivo, que entendemos y desciframos. Ahora bien, esas asociaciones algo menos de dos siglos por la coincidencia de unos parámetros científicos exactos, que pueden llevar a error, porque una imagen no es siempre lo que parece. maravillaron por su capacidad para superar en presteza la habilidad manual. Ahora es una Otro aspecto poco usual a considerar de la fotografía, es valorar su naturaleza como forma artística omnipresente cuya alquimia ha desaparecido. Ya no es relevante controlar ni acto performativo, una circunstancia que acrecienta y condiciona la información visual que la toma ni el proceso, las gradaciones de alrededor son más sugerentes y acarrean mayor nos muestra y que ha investigado con profundidad Philippe Dubois en su libro «El acto complejidad. «La posfotografía no es, por tanto, el resultado de un cambio en la tecnología de fotográfico.» Aclara en la introducción de su estudio: «si hay en la fotografía una fuerza producción de la imagen, y no responde a los endebles dilemas teóricos entre lo analógico viva irresistible, si hay en ella algo que me parece de una gravedad absoluta es que, con la y lo digital. La composición originaria de las imágenes, el hecho de que tengan un origen fotografía, ya no nos resulta posible pensar la imagen fuera del acto que la hace posible.» químico o numérico resulta en la mayor parte de los casos anecdótico. Es la constitución de La foto no es sólo una imagen (el producto de una técnica y una acción, el resultado de un un soporte fotográfico donde se describe una serie de pragmáticas con las que la imagen hacer y de un saber-hacer, una figura de papel que se mira simplemente en su delimitación cobra relevancia más allá del acto fotográfico para constituirse como obra.»18 de objeto cerrado), es también, de entrada, un verdadero acto icónico; una imagen, si se Un ejemplo que puede ilustrar esta idea, es la reflexión que desarrolla Geoffrey Batchen quiere, pero como trabajo en acción, algo que no se puede concebir fuera de sus circuns- tras encontrar un objeto fotográfico en una tienda de antigüedades de Nueva York. Su tancias, fuera del juego que la anima, sin hacer literalmente la prueba: algo que es a la vez argumentación cuestiona el excluyente discurso tradicional que decide, en relación con y por tanto una imagen-acto, pero sabiendo que este «acto» no se limita trivialmente al unos criterios puristas ya superados, qué es y que no es fotografía. Batchen halló un gran gesto de la producción propiamente dicha de la imagen (el gesto de la «toma») sino que vidrio de marco grueso con unos rosetones tejidos con cabello, un amplio adorno de flores incluye también el acto de su recepción y de su contemplación.»20 Como refieren David de cera en forma de corona y una pequeña imagen de una mujer joven en el centro. El Green y Joanna Lowry con acierto, fue C. S. Pierce quien demostró que el signo indicial conjunto, en toda su lánguida tristeza, es un monumento intimista a la ausencia de un ser fotográfico guarda menos relación con sus orígenes causales que con el modo de aludir querido que va más allá del mero recordatorio. Las sensaciones globales que transmite, al hecho de su propia inscripción. «Las fotografías no son indiciales sólo porque la luz se potenciadas por el modo de presentación, superan en mucho las de una simple fotografía registre en un instante en una porción de película fotosensible sino, primero y ante todo, y nos hacen entender de alguna manera no explicable, asuntos que tienen que ver con porque se hicieron»21. Los autores diferencian dos ejemplos deícticos. El más evidente y la muerte, el respeto, el amor y la memoria. «La hibridez de este objeto también ofrece entendible: una imagen es la huella de un instante sucedido. El otro, más abstracto pero una experiencia del retrato más intensa. Al añadir una muestra de cabello, la presencia no menos importante, el acto de fotografiar es un hecho performativo que apunta hacia un 22
  • 27.
    momento preciso enel tiempo. Ambos son consustanciales a la captación de una imagen. existencia»23. En estas imágenes de Barry destaca un componente no visual imperceptible Es curioso como esta distinción no fue precisada por teóricos sino evidenciada por artistas para el que observa la fotografía, que debe ser acreditado por el artista como notario de conceptuales de los años setenta que intentaban cuestionar con sus propuestas el estatus unos hechos que superan lo material y por tanto deben certificarse para ser creíbles. documental de una fotografía como salvaguarda probatoria de los hechos. Las cámaras digitales compactas y los móviles con cámara incorporada, han convertido Existe una interdependencia entre un instante y su registro que es mucho más que la la acción fotográfica en algo distinto a lo que entendíamos tradicionalmente. En cualquier representación de un incidente momentáneo. Dos ejemplos comprensibles y clarificadores momento, de cualquier manera y desde cualquier posición puede surgir una foto sin que serían: el primero la fotografía Authorization (1969) de Michael Snow que puede verse en eso signifique ni conlleve nada especial. En las convocatorias donde coinciden personas se la Galería Nacional de Canadá (Ottawa). La imagen contiene un espejo y cinco polaroids disparan tomas de manera ordinaria sin una intención concreta. Las instantáneas quedan ordenadas pegadas sobre él. Al observar los clichés con atención descubrimos que leídos registradas hasta acumular miles, metamorfoseando lo que antes era un momento diferen- en progresión cronológica representan lo que está aconteciendo delante del espejo, que ciado cuyo recuerdo se desvelaba días después, en algo cotidiano sin mayor trascendencia. no es más que la constatación del hecho fotográfico. Los acontecimientos expuestos son No se concreta la imagen sobre papel como ocurría antaño, sino que de forma natural los que, literalmente, han constituido la obra tal como la vemos. Es decir, narran su historia disponemos de un archivo en píxeles que visionamos en una pantalla u opcionalmente al mismo tiempo que la crean. Son a la vez el acto de realización y su memoria. Además a materializamos en un formato físico. Además, se pueden hacer cientos de fotos sin per- través de la simple contemplación de esas instantáneas el espectador puede desmontar juicio, basta con desechar las que no nos convencen. Ni siquiera hace falta esperar para su fabricación22. Lo que cuentan las imágenes es sólo eso, no hay más, la obra de Snow saber cómo será la imagen porque al instante podemos verla. Suprimimos el revelado y es una reflexión metalingüística en torno al acto mismo de hacer una fotografía. el positivado, evidenciando que el procesado ya no es necesario. Se comprime tanto el El segundo sería la serie sobre gases inertes realizada por Robert Barry también en procedimiento, que desde que hacemos la foto hasta que la visionamos pasan apenas 1969, un conjunto de imágenes y textos adjuntos que explican la acción de liberar varios segundos, un lapso que antes necesitaba varias fases, dedicación y mucho tiempo. Cuando fluidos invisibles en localizaciones concretas próximas a Los Ángeles. El artista soltó a la aparece la primera cámara Kodak en 1888, se afianza una fórmula que ha perdurado más atmósfera un litro de criptón sobre Beverly Hills, xenón en las montañas, argón en las playas de un siglo con éxito mundial: se cargaba la cámara con un rollo, se exponía la película, se y helio en el desierto. Su idea era generar un acto efímero, inmaterial e imperceptible a llevaba a un laboratorio y finalmente se imprimían las copias. El método supuso un cambio la vista. Las fotografías pretenden mostrar esas acciones pero, por supuesto, no puede radical en la difusión y apreciación de fotografía, ya que sólo había que pulsar el disparador verse nada más que lugares reales vacíos: una porción de desierto, una playa aislada, un e ir a recoger los resultados una vez entregado el rollo expuesto («Usted apriete el botón parque silencioso y un paraje rocoso. «El registro fotográfico que hizo Barry de esas obras y nosotros haremos el resto» fue el famoso eslogan de la compañía de George Eastman a no-visibles puede parecer conscientemente inútil y absurdo, sin embargo, esas imágenes finales del siglo XIX). Al estar el revelado al alcance de cualquiera a módicos precios, su pueden ser relevantes para que comprendamos las limitaciones de una forma de escritura utilización se convirtió en una nueva forma de comunicación masiva. indicial concreta. Si a cierto nivel esas imágenes se muestran como una prueba documental Acostumbrados a la celeridad inconsciente de hoy, que no requiere ningún tipo de que da fe de un estado de cosas, también queda claro que están claramente pensadas destreza, este sistema nos parece obsoleto y caduco. Si el método inventado por Kodak para llegar al límite del potencial documental de la fotografía. A la vez que nos ofrecen el popularizó la fotografía al convertirla en un lujo alcanzable por el pueblo, la eclosión digi- rastro indicial del momento de la liberación del gas, también muestran la imposibilidad tal en su dispersión incontrolada la ha vulgarizado al transformarla en algo sumamente de registrarlo, y nuestra atención, en cambio, se desplaza al acto mismo de fotografiar superficial. Cuando ahora hacemos una foto ya no pensamos en la fotografía, ni siquiera como momento de autentificación. Así, no se pretende que la fotografía represente el gas la tenemos en cuenta. No consideramos la selección del encuadre ni necesitamos un inerte invisible sino que nos dirija hacia él y, mediante la acción de señalar, establezca su acondicionamiento adecuado, la banalización es absoluta. Esta particularidad ha dado 23
  • 28.
    lugar a unnuevo subgénero específicamente fotográfico nacido espontáneamente de la se diferencia sólo por su original factura, una consecución con bolígrafo que asimismo baja cultura a principios del siglo XXI. Una variedad especialmente procaz en lo retratístico, despierta admiración por ser un medio sencillo, accesible y familiar. que reconocemos más que por la imagen registrada –intrascendente y anecdótica– por Se puede conseguir hacer de manera hiperrealista un paisaje o un retrato sin que la actitud desprejuiciada de los protagonistas, el ángulo subjetivado de la cámara y por la apenas llamen la atención porque el público entiende ese género como propio de la cercanía entre retratado y retratista, que comparten un momento de complicidad que en tradición pictórica y su finalización, sea más o menos parecida con lo que ven nuestros otras condiciones estaría vedado. En cualquier caso, pocas veces se solivianta la intimidad de ojos, no nos extraña, la hemos asimilado durante centurias. Pero optar por una variedad alguno de ellos y ambos se dejan llevar por el contexto hasta el paroxismo o el absurdo. de imagen nueva puramente fotográfica, descuadra esquemas y desconcierta al espec- Para que estas instantáneas (habituales en Facebook, Twitter, Flickr o registradas tador, que se ve seducido por algo que reconoce con facilidad y que muestra, en toda en el móvil) alcancen un estatus de artístico, necesitan un lixiviado que las singularice, su complejidad, una sencilla ejecución. reconversión que en el caso de los dibujos realizados con bolígrafo Bic azul de Juan Independientemente de su plasmación final –bien sea mecánica o manual, digital o Francisco Casas es más que evidente. Las obras de Casas no dejan de ser fotografías química–, hemos asimilado cierta idea de lo fotográfico igual que hemos aprendido a repre- nunca, aunque su terminación sea manufacturada y su finalización técnica se corresponda sentar un espacio tridimensional sobre una superficie plana, por medio de convenciones con un dibujo en extremo fidedigno, en ellas subyace siempre un componente que la incorporadas culturalmente. A través de asociaciones que establecemos con imágenes sustancia: cierta idea inexplicable de lo fotográfico (inherente, inevitable) que las constituye comunes interpretables, entendemos una imagen como fotográfica igual que las líneas y caracteriza. El conocido autorretrato de Chuck Close de 1968 en el que aparece con de fuga las leemos como profundidad. El hecho de que su concreción sea análoga con el actitud desaliñada fumando un pitillo, es un precedente que mantiene enormes conco- formato tradicional de presentación de lo fotográfico, cada vez resultará más anecdótico. mitancias con la obra de Casas. Empero, el hecho que los diferencia es que el lienzo del Parangonando el concepto de trabajo de autores consagrados a nivel internacional como norteamericano se muestra como una obra aislada, desclasada y dentro del Pop Art, sin Thomas Demand o James Casebere, que concluyen sus obras recurriendo a una cámara relación directa con ningún formato fotográfico de su tiempo. «Para Close, un medio (la fotográfica, con el procesamiento de un joven artista como José Miguel Pereñíguez, cuya pintura) se convirtió en el medio de otro (la fotografía) y reprodujo a mano una imagen técnica se basa en el uso del grafito, podemos inferir que ambos grupos de piezas son que se había originado en un mecanismo que operaba él mismo. Aunque la intimidad, el más semejantes que disímiles. Con matices personales, el fundamento procesual es casi rigor y los mecanismos de la visión –la mecánica humana al igual que la mecánica de la el mismo, lo único que las diferencia es su terminación. Es mucho más lo que las acerca máquina– se encuentren entre las motivaciones artísticas permanentes de Close, nunca que aquello que las distancia. Más que una distinción taxonómica que decida que uno es ha pretendido poner a prueba las tecnologías de la representación contra ningún supuesto un dibujo y otro una fotografía, deberíamos acudir al núcleo que las sustenta, fundamenta estándar humano. Su interés no residía en retar en duelo al artista contra la máquina; en y conecta. Sendos trabajos optan por disyuntivas parejas de índole intelectual: son una cambio sí parece poner a prueba ambos medios para conocer sus respectivos límites.»24 representación de una representación desarrollada con calma después de una reflexión Al valorar el trabajo de Casas, la precisión técnica no debería ser el factor determinante profunda. Es como comparar una ballena y un elefante. Ambos son mamíferos y com- que despertara, por su rigor, admiración. «Los Embajadores» (1533) pintados por Hans parten semejanzas estructurales que no son reconocibles a simple vista (son de sangre Holbein el Joven o «La Condesa de Vilches» (1821) de Federico de Madrazo van muy por caliente, paren crías vivas que amamantan…) pero uno ha adaptado su organismo a la delante en correlación con la realidad y lo superan también en mucho si nos detenemos a vida marina y otro a la vida terrestre. examinar los pormenores y atendemos a la precisión de los detalles. Las obras del andaluz Un buen número de autores se ha centrado en la construcción de realidades a partir de suman más componentes que la mera exactitud, y uno de los más interesantes es que pequeñas arquitecturas o escenografías, fotografiando maquetas o recreaciones espaciales participa de un subgénero fotográfico actual popular y fácilmente reconocible, del que que asemejan ser la realidad. Quizás el ejemplo más conocido sea el citado Thomas Demand 24
  • 29.
    y es dondela idea riza más el bucle. El artista alemán selecciona una imagen publicada vez superados su nivel informativo y simbólico, una tercera vía inexplicable que denomina en un diario o revista, construye un modelo (en ocasiones a escala real) de ese encuadre sentido obtuso, una especie de significante sin significado que resulta difícil nombrar (sin con papel y cartón eliminando los detalles superfluos, y luego fotografía la escena con una conocer la trama lo icónico queda mudo) que se halla entre la imagen y su descripción, entre luz general neutra. Una vez terminado el proceso, destruye el prototipo. Sus fotos son la la definición y la aproximación sin poder situarse en un lugar concreto. Una perturbación imagen de una imagen de una imagen, reverberaciones de un suceso público aplacado innominada que más tarde el ensayista francés acabará llamando punctum. por la asepsia, que comparece ante nosotros en su versión más desdramatizada. «De esta Las imágenes fijas propician una lectura extensa y permiten al observador detenerse forma este autor pone a prueba la mirada del espectador, que se encuentra notablemente en aquellos elementos que relaciona con su experiencia. Son como estratos sedimentados saturada por el consumo masivo de imágenes de la comunicación mediática. Demand que adquieren solidez cuando se miran con detenimiento, ya que no permiten apreciar su sugiere que si ante sus imágenes la mirada es engañada, no es tanto por un efecto de prolijidad en movimiento. Estas extrañas imágenes a medio camino entre lo cinematográfico realidad que no poseen, sino por la rapidez con la que estamos obligados a mirar y percibir y lo fotográfico, poseen algo indescriptible que las convierte en recónditas portadoras de el mundo y, sobre todo, sus representaciones.»25 James Casebere también fabrica sus huellas propias. «Otras variantes como la imagen-vídeo podrían confundir acerca de este propias maquetas, pero utilizando la máxima economía de medios e intentando recrear supuesto protagonismo de lo fotográfico. Sin embargo, y a pesar de algunas lecturas de las arquitecturas centrípetas que aíslen la visión del espectador y le fuercen a centrarse en relaciones entre fotografía, vídeo y cine, esa prioridad icónica de la imagen fija se mantiene. la contemplación. Son espacios vacíos, aislados, misteriosos. Ya en los análisis sobre el cine de Eisenstein Roland Barthes se trabaja sobre fotogramas Exactamente igual que los trabajos de Pereñíguez. Lugares ambiguos presentados como mónadas aisladas portadoras de aquel sentido obtuso que afectaba a todo el relato. como escenarios de un suceso que ha acontecido o está por acontecer, pero que igno- Pero, además, frente a la pretendida influencia de esos otros medios, es la capacidad ramos; un instante entre tantos de una narración desconocida. El punto de vista posee sedimentadora de la imagen fija como «cuadro» la que posibilita una nueva cristalización un ángulo muy cinematográfico y se inmiscuye en la escena como un ojo omnisciente icónica.»27 Precisa Olivier Richon al respecto: «Barthes proponía llamar lo fílmico a esos (superando el Cine-Verdad de Dziga Vertov) que, manteniendo una posición distanciada detalles que se encuentran en las imágenes fijas que se resisten a la comunicación y a emocionalmente de los hechos, los atestigua de manera notarial. Otros autores como Oliver la significación. Lo fílmico es como una fotografía, como un fragmento o un fetiche que Boberg, Javier Vallhonrat o Jorge Ribalta, también confeccionan maquetas para advertir congela y subvierte la diégesis de la película. Permite una lectura vertical en la semiótica al observador de la engañosa percepción de la realidad. No olvidemos que toda fotografía del movimiento detenido: detalles del rostro, el objeto… en resumen, una atención a es una construcción artificial que evoca otra realidad; no es la realidad misma, sino una la elaboración de la imagen. En una imagen fija, lo fílmico es un fragmento fotográfico representación manipulable. que nos abre a ese «tercer sentido», compuesto de significadores que se resisten a la Si ya hemos comentado la fotografía como objeto, acto performativo o idea intrínseca, en significación.»28 El propio Roland Barthes aclara en su libro «La cámara lúcida»: «en el este repaso de algunos aspectos que van más allá de lo considerado estrictamente fotográfico, cine, cuyo material es fotográfico, la foto, sin embargo no posee esta completud (y es una es también interesante inspeccionar la imagen como un pellizco enigmático connatural a suerte para él) ¿Por qué? Porque, presa en un fluir, la foto es empujada, estirada sin cesar algunas representaciones en movimiento sacadas de contexto, planos que cada vez son hacia otras vistas; sin duda hay siempre en el cine un referente fotográfico, pero dicho más comunes dentro del panorama artístico por su potencial sugestivo y ambigüedad. En referente se escurre, no reivindica su realidad.»29 1970 se publica en Cahiers du Cinema un texto de Roland Barthes titulado El tercer sen- Desde que en 1895 los hermanos Lumière lograran proyectar imágenes en movimiento tido26, que analizaba varios fotogramas obtenidos de películas del director soviético Sergei M. e incluso antes, las fluctuaciones entre lo fílmico y lo fotográfico han oscilado en un viaje Eisenstein como si fuesen fotografías. Son imágenes detenidas que permanecen suspendidas de ida y vuelta, compartiendo unos confines neblinosos que aun todavía permanecen poco en un limbo indescifrable, una serie de encuadres aislados que le llevan a proponer, una nítidos. Los estudios de Muybridge y Marey en la década de 1880 van a ser determinantes 25
  • 30.
    para el nacimientodel cine. Esas imágenes nuevas y dinámicas que se prodigan en establecer, además, su propio vínculo con ellas.(…) Firmando estas imágenes «robadas» los albores del siglo XX, quintaesencian el espíritu de la modernidad en un concepto: les da autenticidad, devolviéndoles el aura que habrían perdido si fueran simples reproduc- movimiento; una idea que va a ser determinante para el Futurismo, el Cubismo o Marcel ciones, y les confiere tanto el estatus de obra única como el de mercancía. Su intención Duchamp (recordemos su cuadro Desnudo bajando una escalera de 1912). El instante no es negar estos conceptos, sino establecer su naturaleza dialéctica.»31 capturado y detenido varía, ya no es uno solo, son muchos. Se fragmenta o diluye a mitad En esta misma línea el brasileño Vik Muniz, afincado en Nueva York, genera un tipo de camino entre dos momentos. No condensa nada, no refleja nada, no pretende explicar de apropiación muy singular. Elige iconos famosos extraídos del imaginario colectivo y ni enseñar nada. Muestra un trance trivial, un segundo de una situación desarrollada. Esa ampliamente reproducidos a nivel mundial, para hacer una reinterpretación personal de una realidad fractal no es un momento ideal, sino un instante cualquiera. imagen célebre que transforma en algo nuevo, vinculado con la representación matriz pero Una vez alcanzadas las cotas más altas de la fotografía documental –Eugene Smith, sustancialmente diferente. En muchos casos la copia que se obtiene es la documentación Robert Frank, Walker Evans o Cartier-Bresson– y el cine clásico –Orson Welles, Mankiewivz, del proceso de elaboración de esa imagen, una especie de performance que en la mayoría Billy Wilder, John Ford, Frank Capra, George Cukor o Alfred Hitchkock– entendidas ambas de los casos se realiza con materiales inusuales y perecederos (chocolate, sirope, azúcar…). disciplinas como un lenguaje propio consolidado, los creadores se rebelan contra esa «Muniz consigue activar nuestra memoria visual a través de las imágenes inconscientes estabilidad y escogen otros derroteros menos transitados. De ahí las desviaciones que que forman parte de nuestro bagaje cultural, y sus fotografías sirven al mismo tiempo surgen a partir de los años sesenta. En cine con la «Nouvelle Vague» y los postulados del como catalizador del recuerdo y como elemento de choque y contraste, ya que el engaño estructuralismo introducidos por Adams Sitney en 1969, que derivan hacia lo experimen- es detectado al primer golpe de vista.»32 «Sus obras nos hablan de la permeabilidad de tal. En fotografía con la aparición de artistas que deciden usar imágenes como si fuesen significados en el mundo de la imagen, donde las cosas no siempre son lo que parecen. no-fotografías. Por eso le gusta recordar la frase de Godard: «Ce n’est pas du sang, c’est du rouge» [esto En los años ochenta emergen creadoras como Sherrie Levine, que optan de manera no es sangre, es sólo pintura roja]. Como nos ha demostrado el cine y la televisión, muchas perspicaz por el apropiacionismo, un modo inteligente de cuestionar la condición de repro- veces los objetos reales son poco persuasivos a la hora de ser representados y no parecen ductibilidad de la imagen y poner en evidencia algunas consideraciones de la fotografía lo que son. De igual manera, hay materiales que dada su versatilidad pueden representar tradicional, excesivamente obstruida por algunos teóricos (caso de Clement Greenberg, lo que no son siendo incluso más creíbles que el material al que representan».33 Otros que defendía la parcelación de cada medio específico de manera independiente) en un territorios interesantes divergidos a partir de lo fotográfico en el último medio siglo, son los empeño tan extremista como absurdo por resguardar su integridad. Dominique Barqué que articulan texto e imagen en proyectos conceptuales de mayor calado que el simple señala que es la artista que más lejos ha llegado en la negación radical de las nociones registro memorístico o documental. Refiero algunos ejemplos sobresalientes sin entrar en autor, obra y originalidad, dejando en entredicho axiomas hasta entonces incuestionables precisiones, como pueden ser los trabajos de Sophie Calle, Martha Rosler (su pieza «The como autoría y autenticidad. Si nos atenemos a la definición de Walter Benjamin sobre Bowery en dos sistemas descriptivos inadecuados» de mediados de los años setenta es autenticidad definida por un aquí y ahora que marca el original30, las imágenes de Levine muy conocida) o Victor Burgin. Las vinculaciones que se establecen entre escenarios que cumplen a rajatabla esa proposición. Son fotografías exactas de otra fotografía, un mise carecen de indicios para ser interpretados/ubicados y las frases sueltas que acompañan en abîme complejo de solucionar. «El apropiacionismo le sirve a Levine para explorar su a esas imágenes, invitan al espectador a colegir significados abiertos no fijados. relación con las obras y los autores que elige, una vinculación que, en ocasiones, ha defi- «Los problemas derivados de la fotografía son hoy en gran medida una especie de per- nido como edípica. Para Levine este método tiene una cualidad mágica: son dos imágenes plejidad autoportante en el ámbito de la teoría. La serie de debates a los que ha dado lugar superpuestas que aspiran a establecer una lectura alegórica del trabajo. Es el espectador constituyen la deriva última de los proyectos artísticos de los setenta y de sus comentarios el que se ve obligado a reconstruir el significado que para ella tienen estas fotografías y a semióticos, psicoanalíticos o posestructurales. La réplica dilatada en el tiempo de algunas de 26
  • 31.
    esas cuestiones debeverificarse, sin embargo, en un entorno completamente diferente al que 9. Del Río. op. cit. P. 145. 10. Wall J. Señales de indiferencia. «Indiferencia y singularidad. La fotografía en el pensamiento artístico contemporáneo». sirvió de origen al discurso, de modo que nos encontramos con un extraño anacronismo»34, P. 246-247. MACBA. Barcelona, 1997. apunta con acierto del Río entendiendo que muchos dilemas en torno a lo fotográfico gene- 11. Del Río. op. cit. P. 100. rados hace varias décadas, deben resolverse ahora en un contexto nuevo determinado por 12. Ibídem. P. 98. circunstancias inéditas, coyuntura imprevista marcada por la supremacía de los adelantos 13. Lowry, J., Green, D., Campany, D. op. cit. P. 7. tecnológicos y la ubicuidad de Internet. Obligatoriamente, esta revolución inmaterial afecta 14. Del Río. op. cit. P. 80. 15. Olivares, R. El último cuadro. Catálogo «Los géneros de la pintura». P. 18. Madrid. 1994. en mucho al mundo artístico, harto poroso a las mutaciones por su esencia experimental. 16. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. Sobre la fotografía. P. 108. Pre.Textos. «Una parte importante de los artistas jóvenes –nacidos en los años setenta y comien- Valencia, 2008. zos de los ochenta– que afrontan las urgencias innovadoras de la comunidad artística 17. Lowry, J., Green, D. De lo presencial a lo performativo: nueva revisión de la indicialidad fotográfica. «¿Qué fue de internacional, está trabajando sobre una cuestión tan peliaguda como la de cambiar el la fotografía?», p. 62. Editorial Gustavo Gili. Barcelona 2007. modelo o sistema de los géneros tradicionales: el modelo de pintura, el de escultura y el 18. Del Río. op. cit. P. 107. 19. 2: Batchen, G. Aterrador fantasma de antiguo esplendor. «¿Qué fue de la fotografía?». P. 21. Editorial Gustavo Gili. de arquitectura. Un cambio de sistema de este calado –que afecta a los principios estruc- Barcelona 2007. turales de nuestras disciplinas visuales y espaciales “más clásicas”– (…) contribuye a 20. Dubois, P. Introducción. «El acto fotográfico». P.11. Paidós. Barcelona, 1986. que las prácticas innovadoras de la estructura o modelo resulten apasionantes. Por una 21. Lowry, J., Green, D op. cit. P. 50. parte, porque responden a la necesidad de configurar la sensibilidad de la mirada actual 22. Dubois, P. op. cit. P. 14-15. que piden las imágenes de los sistemas visuales vigentes (la gráfica, la publicidad, el 23. Lowry, J., Green, D. op. cit. P. 50. 24. Shiff, R. El alma fotográfica. «¿Qué fue de la fotografía?». P. 105. Editorial Gustavo Gili. Barcelona 2007. fotoperiodismo, el cine, el vídeo, la web…); y, por otra parte, porque el arte más crítico 25. Gómez Isla, J. «Fotografía de creación». Editorial Nerea. San Sebastián, 2005. de los últimos diez años se produce íntimamente vinculado con las nuevas técnicas que 26. Barthes, R. «Lo obvio y lo obtuso». Paidós, 2009. provocan el imaginario del presente».35 27. Del Río. op. cit. P. 77. 28. Richon, O. Pensando las cosas. «¿Qué fue de la fotografía?», p. 78. Editorial Gustavo Gili. Barcelona 2007. 1. Sontag, S. «Sobre la fotografía.» P. 9. 29. Barthes, R. «La cámara lúcida» P. 156. Paidós, Barcelona, 1989. 2. EL CULTURAL, 5 de mayo de 2008. Entrevista a Thomas Demand realizada por Javier Hontoria 30. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. Sobre la fotografía. Pre.Textos. Valencia, 3. Lowry, J., Green, D., Campany, D. Prefacio. «¿Qué fue de la fotografía?». P. 8. Editorial Gustavo Gili. Barcelona 2008. 2007. 31. S. R. Extraído del comentario crítico sobre la obra «Interieurs Parisiens: 1-60 After Atget», (1997) que pertenece 4. Del Río, V. «Fotografía Objeto». P. 75. a la Colección Fundación Telefónica. www.fundacion.telefonica.com 5. Krauss, R. «Lo fotográfico. Por una teoría de los desplazamientos». Editorial Gustavo Gili. Barcelona 2004. 32. Gómez Isla, J. op, cit. P. 35. 6. Krauss, R. «La escultura en el campo expandido» es un conocido ensayo publicado por primera vez en la revista 33. C. D. Extraído del comentario crítico sobre la obra «Chocolate Disaster,» (1999) que pertenece a la Colección «OCTOBER» en la primavera de 1979. Fundación Telefónica. www.fundacion.telefonica.com 7. Krauss, R. «La escultura en el campo expandido». P. 60 Editorial Kairós 1985. 34. Del Río. op. cit. P. 12. 8. Brea, J. L. «La era Postmedia». Editorial Centro de Arte Salamanca 2002. 35. Marín-Medina, J. Wilhelm Sasnal, iconos de lo cotidiano. EL CULTURAL, 4 de diciembre de 2009. 27
  • 33.
    Obras Eugenio Ampudia / Dionisio González / Vik Muniz / Sherrie Levine / Jacobo Castellano / James Casebere / José Miguel Pereñíguez / Juan Francisco Casas / Juan Carlos Robles / Daniel Canogar / Pierre Gonnord / Gabriella Gerosa / Miguel Ángel Tornero / Carlos Aires / Germán Gómez / MP&MP Rosado / Aitor Ortiz / Helena Almeida / Luis Gordillo / Carlos Pérez Siquier / John Baldessari / Juan Francisco Isidro / Gregory Crewdson / Cristina Lucas / Sergio Prego / Alejandro Sosa / Lucas Gómez / Gonzalo Puch / Juan del Junco / Manolo Bautista / Miki Leal / Rogelio López Cuenca / Juan Carlos Bracho TEXTOS: ÓSCAR FERNÁNDEz / SEMA D’ACOSTA
  • 34.
    Eugenio Ampudia Fuego frío II2010 (site specific) Vídeo instalación. Proyección de DVD sobre librería Medidas variables. Estantería: 221 × 150 × 30 cm Eugenio Ampudia utiliza las nuevas tecnologías para invitar al espectador a reflexionar sobre el estatus de la cultura. Utiliza para ello una serie de recursos como la ironía o el humor, que se ponen en circulación a través de un lenguaje visual que replica la apariencia directa e inmediata de los medios de comunicación. La instalación Fuego Frío con la que participa en AfterPost, constituye uno de sus ejercicios más simbólicos. Sobre una estantería repleta de libros que tratan temas relacionados con lo fotográfico, se proyectan imágenes de llamas para simular un fuego figurado. La multitud de lecturas que esta pieza porta se incrementa aún más si la leemos en el contexto global de la muestra. Y es que al instalarse al inicio de la exposición, casi como preámbulo de la misma, se conforma como una invitación a repensar, incluso a destruir, algunos de nuestros conceptos heredados sobre qué es la fotografía. 30 / 31
  • 36.
    Dionisio González Comercial Santo Amaro2007 Fotografía color, diasec + vídeo 180 × 400 cm En el debate en torno a los límites de la imagen digital brotan las panorámicas de Dionisio González. Las suyas ya no son meras fotografías intervenidas. Como tampoco su cometido se ciñe a una labor de retoque o énfasis del material original. Aun cuando sus paisajes urbanos toman como punto de partida escenarios marginales reales a los que el artista, no sin riesgo, se desplaza para fotografiar- los, las imágenes de González se posicionan más allá del documento, sus preocupaciones tienen más que ver con el espacio y la arquitectura que con el registro. Su trabajo describe un territorio visual nuevo donde la coexisten- cia de la imagen original y del postizo digital es total. Sin embargo, esta coexistencia dista mucho de ser pacífica. De hecho, lo más inquietante de su trabajo es el modo como, a pesar de manejar con soltura sus herramientas, niega el tono celebratorio de lo digital, en tanto universo indiferente frente a lo real. González invierte esta tendencia y se propone aproximar lo digital al orden de lo concreto, a lugares reales donde el conflicto social y la desigualdad no han sido desdibujados. 32 / 33
  • 38.
    Vik Muniz bread line duringthe Louisville flood, Kentucky, 1937, after Margaret bourke-White 2008 Pictures of Paper. Fotografía b/n al bromuro de plata 155 × 127 cm Ed. 6/10 El brasileño Vik Muniz genera un tipo de apropiación muy singular. Elige iconos famosos extraídos de nuestro bagaje cultural, para reinterpretar a su manera una imagen célebre. En muchos casos la copia que se obtiene es la documen- tación del proceso de elaboración de ese sucedáneo, una especie de performance que en la mayoría de los casos realiza con materiales inusuales y perecederos (chocolate, sirope, azúcar, etc.), consiguiendo activar de este original modo nuestra memoria visual. Sus fotografías sirven al mismo tiempo como catalizador del recuerdo y como ele- mento de choque y contraste, ya que el engaño es detec- tado al primer golpe de vista. Sus obras nos hablan de la permeabilidad de significados en el mundo de la imagen, donde las cosas no siempre son lo que parecen. Lo que percibimos es una imagen inspirada en otra imagen, una composición volumétrica fotografiada en ceni- tal. Las conocidas recreaciones del artista provocan en un principio sorpresa para a continuación hacernos reflexionar sobre el poder evocador de las imágenes. Muniz se define a sí mismo como escultor, fotógrafo, diseñador y pintor; incluso ha utilizado la cámara para registrar sus obras de Land Art. 34 / 35
  • 40.
    Sherrie Levine Interieurs Parisiens: AfterAtget 1997 Fotografía blanco y negro, serie de 50 fotografías 23,2 × 18,4 cm c/u Ed. 4/5 Colección Fundación Telefónica El adverbio inglés after que acompaña el título de muchas obras de Sherrie Levine, describe la esencia de su proyecto artístico. Con él la artista nos informa de la operación que nos presenta, consistente, grosso modo, en volver a retratar obras maestras de la fotografía clásica occidental. Con su acción Levine pretende apropiarse de la historia dominante de la fotografía con la intención de introducir en ella un discurso crítico que, en algunos casos, puede llegar a afectar al estatuto mismo de la imagen. Eugene Atget es uno de los maestros que contribuyeron a fijar ese canon de la fotografía moderna al que Levine pretende cuestionar. En AfterPost se presenta un conjunto dedicado a los interiores parisinos del fotógrafo francés. Una serie que, tras pasar por el proceso de revisión de Levine, es desposeída del aura inquebrantable de lo moderno. Así se convierte en un material desauratizado que engrosa ese ingente repertorio de imágenes del pasado que el arte de nuestro tiempo post- histórico emplea de manera desacomplejada En los años ochenta creadoras como Sherrie Levine optan de manera perspicaz por el apropiacionismo, un modo inteligente de cuestionar la condición de reproductibilidad de la imagen y poner en evidencia algunas consideraciones de la fotografía tradicional. Dominique Barqué señala que es la artista que más lejos ha llegado en la negación radi- cal de las nociones autor, obra y originalidad, dejando en entredicho axiomas hasta entonces incuestionables como autoría y autenticidad. 36 / 37
  • 42.
    Jacobo Castellano Sin público 2009 Madera,cristal, metal y tela 215 × 420 × 79 cm C.A.C. ACS, S.A. Museo Patio Herreriano, Valladolid El espacio doméstico es para Jacobo Castellano el punto de partida a partir del cual construye su obra. Una obra que se sirve de lo cotidiano de una forma realmente singular y que haya en él ese desorden metafísico que tan bien plasmaron Perec o Blanchot en sus novelas. Lo cierto es que si algo caracteriza al trabajo del artista de Jaén es su extrema habilidad para extraer de ese caos íntimo un nuevo orden donde las texturas y superficies convencionales se tornan otra cosa. Gravedad, escala y espacialidad, soportan un proyecto cuya apariencia entrópica no oculta un soberbio rigor interno. La instalación es uno de los medios a través de los que Castellano obtiene resultados más sugerentes. Por esta vía reúne varios lenguajes expresivos, como la fotografía, el collage o la escultura, sin que se pierda nunca la coherencia interna de su trabajo. Sin Público es una pieza silenciosa, a medio camino entre lo escultórico y lo fotográfico, que desglosa un itine- rario de huellas propias a través de evocaciones personales, recuerdos vinculados con lugares familiares borrosos, caso por ejemplo de un cine rural que regentaba el abuelo del artista en Porcuna o la casa donde vivió durante un tiempo con sus padres. Esta proyección de imágenes posee una contenida percusión dramática. 38 / 39
  • 44.
    James Casebere Nineveh Horizontal 2004 Impresióndigital cromogénica sobre papel sobre metacrilato 182 × 238 cm Ed. 4/5 + 2 P.A. Colección Circa XX-Pilar Citoler Fotografía: Luis Toloba Fotógrafos La arquitectura es el arte de modelar la luz y el espacio. Tal vez sea esa la razón por la que sirva tan bien a los intereses de James Casebere, para quien la fotografía constituye, por encima de todo, un lenguaje autónomo que se expresa precisamente en términos de luz, espacio, perspectiva, etc. Para subrayar esta condición autorreferencial de la imagen fotográfica el artista elude la localización real de su trabajo para confinarla en un estudio. De esa manera, es la arquitectura, en forma de maqueta, la que se aproxima al fotógrafo, y no al revés. La inversión que de aquí resulta obtiene unos frutos realmente misteriosos en tanto que demuestra la capacidad de la fotografía para recrear un ambiente monumental o para transmitir las sensaciones más intensas por sí misma, independientemente de la verosimilitud del motivo retratado. De algún modo, nos encontramos ante un trabajo que se apoya en el simulacro de la arquitectura para poner de manifiesto, paradójica- mente, la capacidad de la fotografía de sustentarse a sí misma y transmitir su propia realidad. 40 / 41
  • 46.
    José Miguel Pereñíguez La vía media2009 Carbón y lápiz conté sobre cartón 120 × 90 cm La otra vía 2009 Tiza, carbón y lápiz conté sobre cartón 105 × 75 cm Independientemente de su plasmación final –bien sea de piezas son más semejantes que disímiles. Con matices mecánica o manual, digital o química–, hemos asimilado personales, el fundamento procesual es casi el mismo, lo cierta idea de lo fotográfico igual que hemos aprendido a único que las diferencia es su terminación. El uno y el otro representar un espacio tridimensional sobre una super- optan por disyuntivas parejas de índole intelectual: son ficie plana, por medio de convenciones incorporadas una representación de una representación desarrollada culturalmente. A través de asociaciones inconscientes, después de una reflexión profunda. entendemos una imagen como fotográfica igual que las Un buen número de artistas actuales se ha centrado líneas de fuga las leemos como profundidad. El hecho de en la construcción de realidades a partir de pequeñas que su concreción sea análoga con el formato tradicional arquitecturas o escenografías, fotografiando maquetas o de presentación de lo fotográfico, cada vez resultará más recreaciones que asemejan ser la realidad. El resultado anecdótico. Parangonando el concepto de trabajo de autores son espacios vacíos, aislados, misteriosos. Exactamente consagrados a nivel internacional como Thomas Demand igual que los trabajos de Pereñíguez. Lugares ambiguos o James Casebere, que concluyen sus obras recurriendo a presentados como escenarios de un suceso desconocido una cámara fotográfica, con el procesamiento de un joven que ha acontecido o está por acontecer. Un instante entre artista como José Miguel Pereñíguez, cuya técnica se basa tantos de una narración ignorada que adquiere visos en el uso del grafito, podemos inferir que ambos grupos cinematográficos. 42 / 43
  • 48.
    Juan Francisco Casas Fuckartloveartistclick nº1 |nº2 | nº3 | nº4 2009 Rotulador y bolígrafo bic negro sobre papel nº1, nº2 y nº4 26 × 41 cm nº3 26 × 40 cm En el último lustro, la eclosión descontrolada de cámaras digitales ha vulgarizado la toma fotográfica hasta niveles insospechadamente banales. Esta particular devaluación ha dado lugar a un nuevo subgénero específicamente fotográfico nacido espontáneamente de la baja cultura de principios del siglo XXI. Variedad especialmente procaz en lo retratístico (habitual en Facebook, Tuenti, Twitter, Flickr o nuestro propio móvil) que para alcanzar estatus artístico necesita un lixiviado que la singularice; reconversión que en el caso de los dibujos realizados con boli Bic azul de Juan Francisco Casas es más que evidente. Las obras de Casas no quedan desposeídas de su componente fotográ- fico nunca, aunque su terminación sea manufacturada y su finalización técnica se corresponda con una imagen en extremo fidedigna, en ellas subyace siempre algo que las sustancia: cierta idea inexplicable de lo fotográfico (inhe- rente, inevitable) que las constituye y caracteriza. Al valorar el trabajo de Casas, la precisión técnica no debería ser el factor determinante que despertara, por su rigor, admiración. Las obras del andaluz suman más componentes que la mera exactitud, y uno de los más interesantes es que participa de un subgénero fotográfico actual popular y fácilmente reconocible, del que se dife- rencia sólo por su original factura, una consecución con bolígrafo que asimismo despierta admiración por ser un medio sencillo, accesible y familiar. 44 / 45
  • 50.
    Juan Carlos Robles Amor de Dios2007 | Sala X puerta trasera, 2007 | Sala X 2007 Fotografías color con marco de madera 120 × 150 cm 190 × 164 cm Juan Carlos Robles une en una misma imagen dos con- ceptos de significado opuesto que mezclados originan uno nuevo más irónico e inesperado. La llamativa entrada de un cine porno en una casa sevillana de estilo regionalista, es un oxímoron visual que produce extrañeza y nos lleva a considerar la escena con atención. Con esta antítesis el artista recurre a la paradoja para repensar esquemas arquitectónicos decimonónicos asociados a la identidad hispalense. Valores autóctonos apegados a este tipo de construcciones neomudéjares cuyo uso supera en mucho la artificiosidad que manifiesta. Una simple fachada, pura apariencia, antesala de un mundo oculto de perversiones y deseo. Las fotografías muestran el haz y el envés de una misma realidad, representación que puede servir de metáfora para ilustrar la parte más oscura de un sector determinado de la sociedad, que vive cara a los demás pendiente de su aspecto externo, mientras que a escondidas y en lugares inconfesables se deja llevar por sus instintos más sórdidos. Las imágenes horizontales, paralelas formalmente, refuerzan el sentido fingido de lo arabesco. 46 / 47
  • 52.
    Daniel Canogar Pneuma III 2009 Proyector,cables de teléfono, disco duro multimedia, ventiladores y estructura de madera 56 × 12 × 40 cm Ed. 7 Podría afimarse que Daniel Canogar lleva tiempo desa- rrollando para la imagen aquél concepto expansivo que Rosalind Krauss aplicó a la escultura en 1978. De hecho el artista se refiere a la serie Pneuma, a la que pertenece la pieza con que participa en AfterPost, como una instalación escultórica. Las razones de este devenir instalación del trabajo de Canogar pueden rastrearse en múltiples fuentes, si bien hay dos claves que parecen imponerse a las demás. Una de ella vendría definida por su consideración de la imagen como un ente dinámico, no estático. La otra, se manifiesta en su inclinación hacia el análisis tecnológico de la representación, lo que le lleva cada vez con más intensidad a descomponer sus procesos y a aproximarse a ella más como un dispositivo de visión que como una herramienta para narrar. De todo ello resulta un trabajo complejo y técnicamente elaborado que se ocupa, sin embargo, de aspectos elementales como la luz (materia prima de la fotografía) o la energía. 48 / 49
  • 54.
    Pierre Gonnord Senén 2009 Fotografía colorsiliconada sobre dibond, enmarcada 165 × 125 cm Ed. 2/5 + 1 P.A. Lo más importante en la obra de Pierre Gonnord es la vivencia, por eso su trabajo es consecuencia de una expe- riencia existencial enriquecedora. El artista entiende que la fotografía sólo puede cristalizar cuando las relaciones que se crean con el entorno son verdaderamente sinceras. Todos sus proyectos tienen como nexo de unión la hones- tidad ante la cámara, la conquista de un territorio ignoto que le hace conocer más y mejor la naturaleza humana. Para Pierre Gonnord es fundamental, por encima de la imagen final que se obtiene, los vínculos que establecen con las personas que va encontrando en el camino, un modo de enriquecerse con los mundos que descubre a través de los demás. Ser fotógrafo para Pierre Gonnord significa escuchar y comunicar, entender y comprender, empatizar y dignificar. En sus retratos, la composición, el uso de las luces y la pose de los personajes pertenecen a la tradición pictórica más convencional, un modo de representación de épocas pasadas inadmisible en otros formatos, que con la fotografía toma un sentido moderno alentado por el eclecticismo que sostiene la posmodernidad. Se reinterpreta así un género nuevo con un lenguaje consabido. 50 / 51
  • 56.
    Gabriella Gerosa Portrait of ayoung woman 2009 Vídeo enmarcado 57 × 47 × 14 cm Ed. 5 La obra de Gabriella Gerosa funciona como un trampantojo contemporáneo. Lo que vemos no es lo que parece, y su trabajo nos confunde doblemente. Al observar este retrato, lo primero que pensamos es que nos hallamos ante un cuadro. El marco, el tamaño y la pose del personaje cumplen el estándar compositivo de una pintura académica. Creemos resolver el engaño al descubrir que es una representación actual, pero todavía nos sorprendemos más al comprobar que no estamos ante una imagen fija, sino contemplando la emisión de un vídeo. Gerosa introduce el factor tiempo en sus piezas –eliminando por completo elementos narra- tivos o contextualizadores– para constituir un artificio que desestabiliza esquemas prefijados en torno a una imagen artística tradicional. La reinvención de los géneros clásicos de la pintura a través de la fotografía es una de las primeras vertientes que toma este medio en el siglo XIX. Hoy, casi dos siglos después, esta reinterpretación de la historia del arte ya no se hace de manera continuista ni de modo inocente, sino que acude a las nuevas tecnologías para cuestionar la solidez de los cánones y la permeabilidad de los formatos. 52 / 53
  • 58.
    Miguel Ángel Tornero Sin título (taparalgunos huecos) 2010 Vinilo adhesivo sobre fotografía 140 × 100 cm Hasta 2007, la obra de Miguel Ángel Tornero se ha centrado en la construcción de collages digitales que funcionaban como escenarios descontextualizados. Como él mismo describe, eran ejercicios de «épica cotidiana» en el que las personas se convertían en personajes, los lugares en decorados y los objetos en improvisado atrezo. En los últi- mos años han pasado de recortar las imágenes con un programa informático, a hacerlo directamente con tijeras y sus propias manos, un proceso experimental que lo aleja de la ortodoxia del medio, a la par que distancia sus fotografías de los acabados usuales y de la estandarización. El resultado final se convierte así en un objeto único, irreproducible, que se desprende de su parte narrativa y supera la mera iconicidad, adquiriendo nuevos valores plásticos derivados de las texturas del papel fotográfico, que pasa de ser un simple soporte a parte esencial del trabajo. En la pieza que aquí vemos el vinilo se pega desde detrás de manera imperfecta, produciendo arrugas y puntos de tensión. Lo que queda a la vista es la parte adhesiva, de manera que, con el tiempo, la superficie irá ensuciándose y acumulando motas de polvo y demás partículas que floten en la atmósfera. 54 / 55
  • 60.
    Carlos Aires Love is inthe air (inox edition) 2007 Instalación Cuchillo grabado láser, fotografía enmarcada Medidas variables Todas las imágenes fueron encontradas en la colección del Museo de la Fotografía en Amberes. Todas estas fotografías están archivadas como «catástrofes». La representación de la violencia constituye uno de los argumentos dominantes del arte contemporáneo. Este es también uno de los temas fetiche de Carlos Aires, quien se aproxima a él desde una posición crítica que no elude las contradicciones que el tema suscita. De hecho, la obra de Aires enfrenta constantemente la naturaleza provocadora de las representaciones de la violencia. Lo hace, no tanto para neutralizarla a través de su estatización, sino para mantener, incluso agudizar, su carácter punzante. El arte de Aires es, pues, pretendidamente afilado y juega siempre en el límite de lo polémico. Este coqueteo con la controversia se produce, sin embargo, desde un juego retórico complejo que no se detiene en el ejercicio fácil de la provocación. Es este planteamiento el que anima también la obra que presenta en AfterPost. En ella el artista despieza las imágenes de conflicto de las que parte y las descontextualiza para justificarlas dentro de una instalación que no sólo no las desactiva sino que, a través de un juego de espejos muy atinado, hace al espectador más consciente de la grave- dad de las mismas. Primero observamos siluetas aisladas impresas sobre cuchillos, soporte que conlleva implícito una importante dosis de violencia. Después descubrimos las fotografías que contienen a los personajes, rescatados de un momento en extremo cruel, y nos damos cuenta que esas figuras neutras nacen de hechos atroces. 56 / 57
  • 62.
    Germán Gómez Claudio Guillermo AntonioJosé 2004 C-print e hilo 198,7 × 67,5 cm La primera referencia que nos asalta frente a la obra de Germán Gómez es la del hombre hecho a partir de muchos hombres descrito por la escritora Mary Shelley. Desde luego no faltan nexos entre este artista y una de las novelas que inauguran la conciencia moderna del sujeto, ya que es la versión actual de este sujeto fragmentario prefigurado en Frankenstein la que Gómez se ha propuesto retratar. Para ello ha dispuesto una manera muy particular de componer la figura que hace coexistir, como en Shelley, lo artesanal con lo tecnológico, lo mecánico con la carne. El resul- tado son retratos llenos de conexiones con los modelos de representación clásicos, incluido Miguel Ángel, pero que introducen una mirada radicalmente nueva sobre éstos. Es a través de la técnica fotográfica y de la sutura manual como logra ese sorprendente giro en el género del retrato que define a buena parte de su obra. 58 / 59
  • 64.
    MP&MP Rosado  Sin título (laintimidad) 2002 Terracota, pigmento, cera y pintura sobre papel fotográfico. 200 × 300 × 60 cm En un mundo donde todo es mezcla parece que la condi- ción mestiza del arte ya no tuviera interés intrínseco si no es a partir de los efectos locales que desencadena. Para el caso de los hermanos MP&MP Rosado Garcés esta consideración parece realmente oportuna, ya que el modo como combinan recursos heterogéneos aspira no tanto al mero efectismo de la mezcla sino a mantener el pulso de una investigación sobre el sujeto, la identidad, el proceso creativo, etc., que les acompaña desde su irrupción en la escena artística. No es de extrañar, por esta razón, que en su obra La intimidad la superposición de lenguajes (fotográfico, escultórico y de instalación, en este caso) o la coexistencia de planos y ejes distintos obedezcan a una búsqueda mucho más profunda. Esa búsqueda, a pesar de lo aparatoso de su formalización, se acomoda finalmente en el orden de lo íntimo o de la poesía; en definitiva, en los recodos más inaccesibles del sujeto. 60 / 61
  • 66.
    Aitor Ortiz Amorfosis 001 ConfiguraciónIII 2009 Tubos de aluminio impresos 250 × 40 × 24 cm Ed. 5 Desde los años noventa del pasado siglo la fotografía de arquitectura se ha convertido en un tema realmente pro- lífico. Sin duda, ha sido éste un matrimonio fructífero que nos ha ayudado a interpretar la convulsa evolución de lo urbana y el nuevo paisaje global así como a investigar los límites mismos de lo fotográfico. Aitor Ortiz es un buen ejemplo de aplicación de esta pareja de intereses en un proyecto que se caracteriza, entre otras cosas, por saber equilibrar las fuerzas de ambos. Esto se logra a partir de una consideración muy generosa del hecho fotográfico que permite al artista deshacerse de su planitud convencional y traspasarlo a la tercera dimensión ocupando a modo de escultura o instalación la sala de exposiciones. Toda la obra de Ortiz podría definirse por su capacidad para hacer convivir la fotografía con esa nueva condición física que le imprime sin incurrir en un barroquismo vacío, sino transfiriendo cualidades realmente arquitectónicas (trans- parencia, solidez, organización del espacio) a las imágenes. Desde lo fotográfico, ha sabido llegar a lo escultórico de manera natural. 62 / 63
  • 68.
    Helena Almeida O Abraço (díptico)2007 2 fotografías B/N C print 280 × 130 cm Colección Fundación Telefónica Se podría afirmar que el cuerpo es uno de los grandes temas de la fotografía del siglo XX. Al menos a la suma de este asunto, tan antiguo como el arte mismo, con la tecnología –ya no tan nueva– de la fotografía, debemos buena parte de los grandes hallazgos estéticos del siglo anterior. Quizá sea el caso de Helena Almeida uno de los que mejor representa la herencia de esta tradición en el arte actual. Su obra, como la de muchos otros nacidos durante la emergencia de los nuevos comportamientos artísticos, ha brotado del encuentro entre cuerpo-fotografía- pintura con un cuarto elemento, la performance. De todo ello afloran imágenes llenas de una gran contundencia y plasticidad en las que el cuerpo ya no es un ente estático ni una materia inerte, sino que responde a coreografías y gestos netamente marcados. Así, las fronteras entre artista y obra aparecen difusas y adquieren un estatus intercam- biable. Habitualmente la propia Almeida es protagonista de sus piezas de modo autorreferencial. De esta manera, la portuguesa se desvincula de la fotografía retratística, basada en la búsqueda de lo singular, para adentrarse en el territorio de lo simbólico y en la investigación sobre las emociones humanas. En el díptico que aquí vemos, la artista aparece abrazada a su marido, el arquitecto Artur Rosa, un pilar básico tanto en su vida como en su trabajo. El matrimonio renuncia a su propio ser individual para convertirse en un único sujeto indiferenciado, acoplamiento que puede interpre- tarse como un gesto mayúsculo de amor, entendimiento y compenetración. 64 / 65
  • 70.
    Luis Gordillo Extensa biografía larga(proceso y derivaciones) 2010 Serigrafía, e impresión digital sobre lona con impresión digital. Conjunto de 3 fotografías 255 × 500 cm. 100 × 35 cm c/u Otros títulos alternativos: Darwin’s biographie / Espirales contenidas en sí mismas / Darwin delantero centro / Darwin delantero goleador / Darwin era atrevido / Espiraloides espiralados / Entidades darwinianas La obra de Luis Gordillo es circular y anticipa una noción tan asumida hoy como la del trabajo del arte como pro- ceso. No cabe duda que la paternidad que el arte español reciente le atribuye está ganada a pulso. Y es que en su obra las actitudes actuales, expresadas sobre todo en el concepto abierto, en el trabajo en serie o en la interfe- rencia de disciplinas artísticas, están presentes desde hace décadas. Así queda de manifiesto también en la serie de imágenes que presenta aquí. Se trata de pinturas fotografiadas e intervenidas componiendo una cadena de retroalimentación que condensa en un mismo soporte la supuesta unidad de lo pictórico y la reproductibilidad de lo fotográfico. Como se puede sospechar en este ejercicio de condensación, los dos lenguajes salen mal parados. Sendas variantes llegan a disolverse en una experiencia diferente que niega los clichés sintácticos que la componen y que se propone como alternativa, tan herética como cautivadora, al encorsetamiento de ambos. Desde sus inicios, Gordillo ha utilizado la fotografía como una herramienta útil para fragmentar y descomponer la realidad, un hecho que las inagotables contingencias derivadas de las nuevas tecnologías ha acentuado. Cada vez es mayor su inclinación a la hibridación, la disolución de fronteras y la combinación de trabajos analógicos y digitales. Esta secuencia de imágenes que ahora vemos nace a partir de la serie «Charles Darwin evoluciona», un motivo inicial que ha cambiado significativamente. 66 / 67
  • 72.
    Carlos Pérez Siquier Sevilla 2006 |Sevilla 2000 | Cabo de Gata 1996 Fotografía color 50 × 50 cm | 100 × 100 cm Colección Fundación Rafael Botí Carlos Pérez Siquier se adelantó a la mirada fotográfica de su tiempo. Sus instantáneas parecen formar parte de la era digital tanto por su ejecución como por su temática. El artista renuncia voluntariamente a la concepción figurativa de la imagen y centra su interés en una suma de sensaciones complejas derivada de las posibilidades compositivas del color. Muchas de sus fotos son casi planas y retratan inten- cionadamente muros o paredes, superficies que al carecer de profundidad, anulan la perspectiva para convertirse en una mezcla pura de formas, líneas y tonos. Con el paso de los años, su obra cada vez se ha vuelto más conceptual. Ha derivado progresivamente de una evidente influencia Pop hasta la síntesis minimalista que vemos hoy, represen- taciones que en muchos casos están más cercanas a la pintura abstracta que a la propia fotografía. El trabajo de Pérez Siquier es eminentemente intuitivo. Posee una amplia gama cromática que reproduce la diver- sidad de matices que encontramos en las playas de su Almería natal. Su obra refleja como ninguna otra el cambio radical que supuso para España pasar de la difícil época de la autarquía, gris y cerrada, al posterior periodo aperturista que significó la llegada masiva de turistas extranjeros. 68 / 69
  • 74.
    John Baldessari blasted Allegories (ColorfulEquation/Sentence): Stage Line; Semi-Colon Shelf Life-Evaluative 1978 Fotografía color sobre tabla 39,6 × 100,6 cm blasted Allegories (b.W. Sentence): Fondle Facts 1978 Fotografía color sobre tabla 63,6 × 53,6 cm Colección Fundación Telefónica John Baldessari es uno de los protagonistas del arte con- ceptual. Tal etiqueta alude a un conjunto dispar de prácticas artísticas que se reunieron en torno a la crítica del estatuto de la obra de arte, de su mercado y de los códigos que éste legitimaba. De manera que el trabajo producido a la sombra de esta corriente, que nunca fue un movimiento como tal, reformulaba todas las ideas adquiridas sobre lo que era pertinente o no al arte. Baldessari constituye un referente en esta línea ya que su trabajo tensiona de un modo sorprendente los límites del arte hasta llevarlo al absurdo o a la tautología. En su obra circulan con idéntico rango la imagen, la pintura y el texto para construir un universo esquivo y lleno de conflictos que el artista deja sin resolver de forma premeditada. En su obra lo previsible no tiene lugar, y es de los desencuentros y de los accidentes que se producen entre los diferentes lenguajes que maneja de donde se nutre. Con este trabajo el artista cuestiona el sentido tradicional de la alegoría, presentando unos montajes fotográficos donde cada imagen-texto, dada su ambivalencia, adquiere varios significados. 70 / 71
  • 76.
    Juan Francisco Isidro Restauración 1989 Dos fotografíasmanipuladas 18 × 32 cm On-Off 1988 Montaje con dos fotografías 20 × 33 cm Sin título (fundas de cámara) 1989 Montaje con dos fotografías 20 × 32 cm El uno doble 1988 Montaje con dos fotografías 20 × 32 cm Por desgracia, el artista sevillano Juan Francisco Isidro falle- ció en 1993 a la corta edad de 32 años. En su breve pero prolífica carrera, fue uno de los creadores más sensibles y prometedores de su época. Aunque sus fotografías se hicie- ron hace más de veinte años, no han perdido un ápice de vigencia. En dos décadas el panorama ha cambiado mucho y sin embargo, su discurso intimista al margen de modas o espectacularidades sigue sorprendiéndonos. Extraídas de reflexiones cotidianas que huyen de lo grandilocuente, sus secuencias consiguen crear determinado clímax poético inexplicable, un ritmo frágil y delicado acompasado por detalles inadvertidos de la vida diaria. Su trabajo conjuga planteamientos conceptuales con un proceso lento y metódico. Los objetos que utiliza para conse- guir estas alegorías visuales son extremadamente sencillos y no están exentos ni de humor ni de ironía. Replantea desde diferentes posiciones la mirada del espectador e incluso compagina texto e imagen. Juan Francisco Isidro trabajó tanto el papel como el lienzo, la madera o la fotografía, un medio en el que hubiese avanzado hasta niveles insospecha- dos por su inusual capacidad para imaginar y descubrir. 72 / 73
  • 78.
    Gregory Crewdson Sin título 2002 SerieTwilight C-print 125 × 150 cm Colección de fotografía de la Universidad de Salamanca En esencia, cualquier historia no es más que la incorpo- ración de infinitesimales momentos que se suceden. La concatenación de situaciones y escenarios hace que una narración exista, dando lugar a un relato-crónica. Si aislamos uno de esos fotogramas, lo diseccionamos y observamos con detenimiento, descubrimos que ese instante congelado es capaz de desvelar muchas claves de la secuencia de la que forma parte. Las imágenes escenificadas de Gregory Crewdson tienen esa capacidad evocadora de lo fílmico, son capítulos abiertos de una historia oculta que el observador debe completar en su cabeza atendiendo a los indicios que halla. En sus trabajos, la puesta en escena, la técnica utilizada, el ángulo de cámara elegido y la logística empleada son eminentemente cinematográficos; pero la morfología y el sentido de la obra final siempre es fotográfico. El artista estadounidense recrea en sus obras escenas misteriosas que mantienen en vilo al espectador, inquie- tantes fabulaciones que transcurren en barrios residen- ciales típicamente norteamericanos. El tiempo detenido y la densidad narrativa de sus piezas, podemos relacionarlo con la extrañeza de los cuentos de Raymond Carver o los cuadros de Edward Hopper. En muchos aspectos, el trabajo de Crewdson está más cercano a la dirección artística que a la propia fotografía. 74 / 75
  • 80.
    Cristina Lucas Las fascistas 2004 SerieEl viejo Orden Fotografía color siliconada bajo metacrilato, enmarcada 110 × 140 cm Ed. 3/3 + 1 P.A. Una de las características fundamentales de la obra de Cristina Lucas, es que pretende revelar con su trabajo cómo en una sociedad eminentemente patriarcal como la nuestra, la mujer ha sufrido durante siglos una consentida desigualdad con respecto al hombre. Desde las estructuras de poder, las autoridades e intelectuales han potenciado una diferenciación negativa, jerarquización discriminatoria alimentada por símbolos culturales que favorecen la exclu- sión social. En un primer momento de su trayectoria, Lucas se interesó por las acciones, pero pronto pasó a utilizar otros medios de expresión como la fotografía, el video, el dibujo o la instalación. Tanto sus imágenes fijas como en movimiento, poseen una estudiada teatralidad que requiere una cuidadosa preparación previa. En Las Fascistas, la artista recurre a la ironía para representar un grupo de radicales amas de casa –pertenecientes a tres generaciones distintas de mujeres– concentradas en sus menesteres domésticos. Una fotografía escenificada, de cariz fílmico, que muestra un momento habitual en la vida de una buena y abnegada esposa. Aunque en una primera impresión sus trabajos pueden parecer ingenuos, revisados en profundidad poseen una importante carga crítica. 76 / 77
  • 82.
    Sergio Prego black Monday 2006 VídeoDVD 3’ 33’’ Ed. 5/8 Sergio Prego, que forma parte del grupo denominado Nueva Escultura Vasca, utiliza los avances digitales como un ins- trumento más para reflexionar sobre nuestra percepción del espacio. Black Monday es una secuencia de vídeo montada a partir de cientos de fotos tomadas por cuarenta cámaras en un mismo instante. De las diferentes explosiones que efectuó en una fábrica de Bilbao, obtiene esta corpórea nube de humo danzante, materia inasible que aquí se convierte en un objeto sólido (escultórico) que vemos en tres dimensiones desde distintos puntos de vista. Salvando las distancias, la técnica es muy parecida a la que usó Muybridge. Lo que ocurre es que las fotos decimo- nónicas eran series temporales y aquí vemos un conjunto de imágenes, de un momento específico, captadas desde diferentes perspectivas. Es la tecnología lo que nos hace ver el tiempo y el espacio de una forma distinta. Prego cosifica un accidente y recurre a la linealidad para convertir un instante en un relato, alterando las coordenadas espacio- temporales que constituyen esa fracción de segundo para llevar al límite de lo verosímil la propia realidad. 78 / 79
  • 84.
    Alejandro Sosa Suárez El trabajo de Alejandro Sosa se sustenta en una para- de plano fijo son utópicas y parciales. Sus fotografías doja imposible que se sitúa al espectador frente a una transforman lo circular en lineal en un esfuerzo por 21/2000 2000 visión frontal de 360º. Retrata toda la circunferencia entender la arquitectura que nos rodea e intentar cap- Serie Romper el Círculo que envuelve a un lugar fijo facilitándole una visión turar la infinidad de matices que contienen los lugares panorámica de su alrededor. De este modo crea una que habitamos. Gelatinobromuro de plata nueva percepción de la realidad que no impone un Estos bucles visuales convierten un espacio tridi- 60 × 320 cm único punto de vista, sino más bien al contrario: ofrece mensional en otro bidimensional, superando así la falsa Colección Cajasol campo abierto al observador para que reflexione sobre profundidad que representa una fotografía. Es inevitable las posibilidades del espacio, la forma de mirar y el recordar, al mirar sus extensas imágenes horizontales, modo en que percibimos la realidad. El ser humano se movimientos de cámara en cine como el paneo o el mueve de manera indeterminada y participa de múltiples travelling, desplazamientos que sitúan la escena y facilita perspectivas, por lo tanto las imágenes convencionales la máxima información del lugar de los hechos. 80 / 81
  • 86.
    Lucas Gómez Las imágenes de Lucas Gómez son siempre fruto de la La influencia del cine y el conocimiento del montaje como un instante, sino como una suma de momentos y espontaneidad. En ningún caso se originan tras una reflexión son tan evidentes en el trabajo de Gómez, que casi podría sensaciones. Patio de colegio 2010 previa. Son fragmentos de vida diaria que no ha elegido, decirse que lo que nos muestra está más cerca de lo video- Si Alejandro Sosa cuestiona el punto de vista espacial, Fotografía color momentos cazados al azar que no sobresalen por nada gráfico que de lo fotográfico. La obra seleccionada para Lucas Gómez evidencia la temporalidad de una imagen. Si 18 × 100 cm especial, forman parte de la cotidianeidad. Sus fotografías AfterPost es el lapso de tiempo que dura un recreo infantil nos detenemos a reflexionar el trabajo de ambos, podemos hablan de él, de sus encuentros y circunstancias, de sus (varios minutos condensados en una única imagen), un llegar a la conclusión que las premisas espacio-temporales viajes y pensamientos. Reflejan lo cambiante y poliédrica periodo que se convierte en una incorporación de tiem- inherentes a lo que tradicionalmente entendemos por foto- que pueden resultar las casualidades que nos rodean. pos que se superponen. Sus fotos hablan del presente no grafía, también son discutibles. 82 / 83
  • 88.
    Gonzalo Puch Sin título 2010 Impresiónpor plotter e instalación 149 × 300 cm La noción de imagen que maneja Gonzalo Puch ya no posee ese carácter unívoco de antaño, lo que la convierte en un dispositivo mucho más complejo donde las ideas y los conceptos rigen. En paralelo a esta certeza, el artista atiende a una serie de intereses como el medio ambiente, el caos o la meteorología, que se reúnen en torno a una preocupación vertebral: su condición artificiosa y de puesta en escena. Todo ello deriva en un proyecto tan ambicioso como apasionante: subrayar el potencial escenificado del saber y dejar en evidencia los desajustes del hombre ante la Naturaleza. Puch adopta para ello un discurso igualmente ficcional donde el campo de la imagen se llena de elementos preñados de significado y cuidadosamente organizados. La idea misma de instantánea abandona su ser, y detrás de ella también la condición bidimensional y enmarcada de la imagen se erosiona. Quiere ello decir que el sentido escénico, multifocal que rige su trabajo no sólo se expresa en el contenido de sus imágenes sino en el display donde las presenta. De manera que su trabajo conquista el espacio, incorpora el audiovisual y la arquitectura efímera hasta componer una especie de doble escenario complementario: la fotográfico y lo instalativo. En la instalación que ha preparado para AfterPost reflexiona en torno a la degradación de los entornos natu- rales por la intervención humana. 84 / 85
  • 90.
    Juan del Junco breve epílogo ornitológicosobre qué es antes, el artista o el ornitólogo 2010 Lightjet print Medidas variables Con la colaboración de la Estación Biológica de Doñana / CSIC y la Casa de Velázquez Hay en la fotografía de Juan del Junco un tratamiento de la naturaleza realmente singular. El sentido de puesta en escena que tiene todo su trabajo redunda de un modo directo en la desnaturalización de sus imágenes. Éstas, a su vez, toman como motivo en muchas ocasiones for- mas animales o vegetales que aparecen como presencias inanimadas y, usualmente, fuera de su entorno. Todo ello desemboca en una imaginería de la naturaleza, próxima a la taxonomía, que constituye el verdadero hallazgo de este artista. En ocasiones, su trabajo ha coqueteado con otros recursos como la narración suspendida, la introducción de elementos inquietantes en una escena o la superposición de códigos de lectura. De modo que lo previsible nunca ha tenido lugar en su trabajo. Pero es en trabajos de corte taxonómico como la serie Huevos, que presenta en AfterPost, donde sus imágenes rozan lo extraordinario. 86 / 87
  • 92.
    Manolo Bautista Snooker Hotshots 2007 VídeoPAL sonoro 8’ 15” loop El cordobés Manolo Bautista utiliza como armas la ironía y la paradoja para llevar la realidad al paroxismo de la verosimilitud. Exprimiendo las posibilidades de una imagen digital construye, con la escrupulosa paciencia de un ciru- jano experto en nuevas tecnologías, universos imposibles cargados de sugerencias. Sus trabajos están manipulados con tanta destreza que confunden al espectador hasta el punto de no saber distinguir con certeza dónde acaba la realidad y comienza la ficción, un terreno ambiguo e impreciso en el que nada es lo que parece. Su obra, que oscila de lo fotográfico a lo videográfico, inventa una suerte de universos extraños que desconciertan tanto como atrapan, elaborando situaciones singulares que logran llevarnos a la reflexión por el camino de las ilusiones creíbles. Colocar Snooker Hotshots en un bar como si fuese una emisión extemporánea de un canal deportivo extranjero, acerca esta pieza artística a un público desacostumbrado que puede verse sorprendido de manera inesperada por una retransmisión desconcertante. 88 / 89
  • 94.
    Miki Leal Serie The End2009 Photo gravure a partir de fotolito directo 12 Estampas Papel Hahnemühle, 350 g. blanco 41 × 58 cm c/u Ed. 11 En el trabajo de Miki Leal, la fotografía funciona como motor de arranque para la pintura. Cualquier manifestación popular que cae en sus manos es susceptible de ser reinterpretada por su peculiar estilo, que se apropia de esas imágenes para concebir representaciones personales modificadas con libertad. El cine, el jazz o la literatura son motivos ins- piradores de su obra, una combinación reconducida hasta el lenguaje pictórico que mezcla baja y alta cultura. La serie The End aglutina varios niveles a tener en cuenta: la palabra, el cine y la pintura. Evidentemente nos encon- tramos ante el fotograma final de una película, una imagen fija que nos esclarece el momento de la historia en el que nos hallamos. El relato ha concluido pero apenas atisba- mos detalles. Las palabras que aparecen en las estampas están sacadas de nuestro imaginario cinematográfico, y aun estando escritas en un idioma que no conocemos, resultan determinantes para ubicarnos con exactitud. El lenguaje son símbolos que actúan de una u otra manera en función del contexto, signos que interpretamos del mismo modo en una fotografía o en un dibujo. Al ver estas piezas, es inevitable recordar las pinturas escuetas y limpias de Ed Ruscha. 90 / 91
  • 96.
    Rogelio López Cuenca Le partage 12007 Vídeo monocanal de alta definición, fundido encadenado 6’ loop Ed. 1/5 + 1 P.A. Rogelio López Cuenca interpreta la imagen como un texto. Un texto visual, claro, cuyo código de lectura hegemónico dista mucho de ser neutral o transparente. De manera que su tarea consiste, grosso modo, en interrumpir el flujo habitual de circulación de esas imágenes, interrumpir su pulso «natural», para desvelar la condición contingente y premeditada de ese código. A través de la mediación del artista, distintas representaciones asociadas al mundo árabe –que de otro modo jamás se contagiarían– son reconectadas en un territorio común, el de su propio trabajo. Esta con- dición excepcional de lo artístico, permite a López Cuenca poner de manifiesto esas fricciones y conflictos que emergen del encuentro de dos imaginarios, uno autorizado y el otro no, nacidos del mismo lugar pero portadores de valores asociados radicalmente distintos. En la serie Le Partage el artista fusiona lo fotográfico y lo videográfico, generando una imagen ambigua que no es ni una cosa ni la otra. 92 / 93
  • 98.
    Juan Carlos Bracho Todos nos sentimosmejor en la oscuridad 2009 Print 173 × 238 cm Desde la era de los conceptualismos, existe una extraña circularidad entre la acción artística y los mecanismos para su documentación y transmisión. Desde ejercicios semi- nales como los de Dennis Oppenheim en torno al dibujo y al vídeo, se han desarrollado numerosos episodios de esta tendencia que algunos denominan ahora dibujo expandido. En ella se inscribe también la obra de Juan Carlos Bracho. Su trabajo pretende incidir en ese mismo carácter circular del proceso de creación y exposición en el que el dibujo, como materia prima o punto de origen, sufre una serie de desarrollos diferidos a través de su documentación mediante fotografías o vídeos. Esta segunda vida de la obra, en soporte digital, funciona, a un primer vistazo, como testimonio de un proceso. Algo a lo que colabora la idea de secuencia que siempre tienen estas imágenes. Pero, dentro del discurso de Bracho, como de los pioneros como Oppenheim, esta documentación no es un simple apéndice o residuo, sino que conforma la obra en sí. Y es que su propósito, por encima de todo, es dilatar el estatuto de pertinencia del dibujo más allá de la inmediatez y la gestualidad que lo ha caracterizado desde antiguo. 94 / 95
  • 101.
  • 103.
    Carlos Aires Ronda,Málaga, 1974 1939-1960, Universidad de zaragoza; Poéticas del siglo XX, La artista y su cuerpo son siempre los protagonistas: sus Trabajó con ellas creando una especie de diccionario de Vive y trabaja en Amberes y Madrid Museo Regional de Arte Moderno, Cartagena; la muestra El formas, sus posturas y su relación con los objetos de su estudio imágenes, es decir, un lenguaje para hacer frases y párrafos. De Sur de nuevo, programada en el MNCARS, Madrid; Conductus son las principales categorías de interacción empleadas -O ahí nació esta serie, como fruto de todas las imágenes violentas Ha realizado estudios de Bellas Artes en Granada, Holanda Vocis, una acción urbana en el acueducto de Segovia, Festival Atelier, 1983. Esta auto-representación a través del lenguaje que pudo rescatar de las fotos cinematográficas. Este tipo de (Tilburg), Estados Unidos (Columbus y Nueva York) y Amberes Oxigenarte; Some politics of appropiation, Laznia Centre for fotográfico tiene como objetivo último indagar en los límites material es uno de los preferidos de Baldessari, y lo ha usado (Bélgica). Ha obtenido ayudas como la beca Manuel Rivera, Contemporary Art, Gdansk, Polonia; CIGE Feria de Arte de de la representación –no hay que olvidar que sus orígenes frecuentemente en sus obras hasta los años noventa. Iniciarte, Fontys, Edith Fergus Gilmore o Fulbright. También fue Pekin, China; Comunicacionismos, 10ª Bienal de la Habana, coinciden con el apogeo de la performance y el debate surgido Otra de las obras paradigmáticas de Baldessari es el vídeo galardonado con importantes premios entre los que destacan: Cuba; Banquete, Nodos y Redes en el zKM de Karlsruhe alrededor del arte conceptual. Folding Hat (1970). La cinta muestra una secuencia de media De Pont Award (Holanda), Art Premier (Holanda), 2º premio Prix (Alemania); Intemperies, Bienal del Fin del Mundo en el Mientras Helena Almeida se introduce en el cuadro, los hora del artista en primer plano sosteniendo un sombrero que de la Jeune Peinture Belga (Bélgica) o 1er premio Generación Goethe Institut de Sao Paulo (Brasil); PLAY, en la capilla del procedimientos de la pintura se sitúan en el exterior de la estruja y aplasta, como si fuese un juguete. Aunque a primera 2008 (Caja Madrid). En su trayectoria artística ha participado MPH de Valladolid; H2O, en el Kursaal de San Sebastian; imagen, sobre la fotografía en blanco y negro. En ocasiones la vista no lo parezca, éste es un trabajo ligado intrínsecamente a en muchas exposiciones, tanto nacionales como internacio- Momentos-New Perspectives on Spanish Contemporary artista deviene una gran mancha negra –Espaço espesso, 1982; este medio, ya que son acciones que se desarrollan mediante la nales: How innocent is that? (Pavilion Unicredi, Bucarest) Photography (Estocolmo); BIACS, Bienal Internacional de Arte Negro Agudo, 1983– otras, su cuerpo se deja contaminar por interacción entre el artista y la cámara de vídeo. Danzad, danzad malditos (galería ADN, Barcelona), Rock my Contemporáneo de Sevilla, Sevilla y Granada. brochazos de color que ensucian sus formas –Perdão, 1993. Cuando Baldessari empieza a usar las imágenes de la Religion (Museo Domus Artium, Salamanca) Psychic Realities Actualmente muestra su trabajo en Tempestade, Centro Sus imágenes nacen pues de la pintura, disciplina en la que televisión y el vídeo, contribuye de una manera clara a desdi- (Itinerante. Austria), Leere & Vision (MARTA-museum, Herford, Cultural Solar Barao, Museo da Gravura, Cidades de Curitiva, experimentó durante la década de los setenta para concluir bujar los límites entre baja y alta cultura. El interés por hacer Alemania), EuroPART/25peaces (MOMENTUM Museum, Brasil. identificando el cuadro-objeto con el propio autor en obras llegar sus obras al público no especializado le hace crear obras Viena), A day without sunshine is like night (Aeroplastic como Desenho Habitado o Pintura Habitada, ambas de 1975. como Stream of violence: From Front to Torrent (The begin- Contemporary, Bruselas) IX Bienal de Jóvenes Creadores Pese a su más que evidente relación con la performance y nings) (1996). Formada por cinco paneles de gran tamaño con Europeos y Países del Mediterráneo(Roma). Su obra forma el body art, la artista somete todo su proceso creativo a una fotografías en blanco y negro serigrafiadas por encima con una parte de colecciones como Artium (Vitoria), CAC (Málaga), imagen preconcebida, realizando minuciosos bocetos hasta banda roja, que se colgaron en la fachada de un edificio en Los Caja Madrid, National Belgium Bank, MAK (Viena), Junta de Helena Almeida Lisboa (Portugal), 1934 encontrar la representación deseada. Lo que contemplamos es Ángeles. Andalucía o Caja Sol. Vive y trabaja en Lisboa sólo el resto de una acción compleja que puede implicar una El carácter postmoderno y didáctico que inunda muchas de Para información más detallada visite su página web: www. larga y cuidadosa elaboración. sus obras tienen como claro ejemplo la Serie Goya (1997), en la carlosiares.com Licenciada en pintura por la Escola Superior de Belas-Artes que repite la estructura de obras míticas de la historia del arte de Lisboa, Helena Almeida es hija del escultor Leopoldo de con sus ya conocidos recortes en blanco y negro. Almeida, madre de la artista Joana Rosa, y esposa de Artur Sus obras se encuentran en los mejores museos del mundo Rosa, arquitecto y escultor que también realiza sus fotografías. y sus trabajos han tenido una gran influencia en artistas de Durante más de treinta años, el trabajo artístico de esta por- John badessari National City, California (USA), 1931 generaciones posteriores, como en los neoconceptuales de Eugenio Ampudia Melgar, Valladolid, 1958 tuguesa se ha afirmado como portador de un lenguaje expresivo Vive y trabaja en Los Ángeles los ochenta y en otros fotógrafos «apropiacionistas». Su labor Vive y trabaja en Madrid en el que confluyen diversas disciplinas y actitudes. Aunque como profesor, comenzada en los setenta y que llega hasta la www.eugenioampudia.net generalmente aparece representada en los manuales como Desde que quemó sus obras pictóricas a finales de los sesenta actualidad, ha sido muy importante y reconocida, tanto por los fotógrafa, su obra se encuentra íntimamente relacionada con en un acto ritual de renuncia al formalismo y la autoexpresión críticos como por sus propios alumnos, a los que hizo escribir En la actualidad uno de los videoartistas españoles más recono- otras artes plásticas, como la pintura y la escultura, debido al que habían caracterizado el período posterior a la guerra, sobre más de cien veces: «No haré más arte aburrido, no haré más cidos. Su trabajo multidisciplinar recibió en 2008 la beca The minucioso proceso de elaboración de las imágenes, y al empleo todo al expresionismo abstracto, el nombre de John Baldessari arte aburrido…» Delfina Foundation (Londres) y el Premio AECA al mejor artista de pigmentos y materiales complementarios en la realización se ha relacionado con el arte conceptual. español vivo representado en ARCO08. de las fotografías. A partir de ese momento empezó a interesarse por las Su trabajo indaga, bajo una actitud crítica con el sistema Su discurso creativo encuentra su base en la auto- interconexiones entre la imagen, siempre fotográfica, y la establecido del Arte, en la idea misma de proceso artístico, representación. No se trata meramente de autorretratos, la palabra. Sus primeros trabajos al respecto fueron Pure Beauty tanto del significado de la obra en sí como de los mecanismos artista aparece siempre como modelo, escenificando distintas (1966-1968) y An Artist (1966-1968), una serie alegórica de Manolo bautista Lucena, Córdoba, 1974 tradicionales de promoción, contemplación e interpretación facetas: como autora, como mujer, planteando sus dudas fotografías tomadas de manera casual sobre las que escribió Vive y trabaja en Sevilla y Berlín de ésta. Su tarea pues, se centra en el cuestionamiento per- personales ante la vida. Sus composiciones suelen presentarse textos referidos a la historia del arte. www.manolobautista.com manente del proceso creativo como medio de transmisión como escenografías secuenciadas a la manera cinematográfica, Después abandonó los presupuestos estrictamente concep- de ideas y del artista como gestor de éstas y sus sistemas de instaurando espacios donde Almeida consigue emplazar su tuales dedicándose de lleno a la imagen. Su interés por las que RESIDENCIAS comunicación. subjetividad. proporcionaban la televisión y el cine le convierten en uno de Künstlerhaus Bethanien GmbH. Berlin 2009 Entre sus últimas exposiciones están: ¡Grande hazaña! Con Pese a convertir su cuerpo –y la experiencia personal del los pioneros del «apropiacionismo de la imagen». Una de sus 12 meses. muertos, Sala Puerta Nueva, Córdoba; Aprendiendo a mirar. mismo– en el objeto fundamental de su trabajo, en las obras de primeras series y de las más celebradas es The violent space 25años de Rafael Ortiz, Espacio San Clemente, Sevilla; Almeida no hay lugar para el relato autobiográfico, mostrándo- (1975-1976) que realizó a partir del descubrimiento de las fotos EXPOSICIONES INDIVIDUALES En juego en el Centro de Documentación de La Panera, nos su fisonomía como único soporte y ve-hículo de comunica- fijas de escenas de cine, utilizándolas con la intención de no «Gemstones». Espacio Iniciarte. Córdoba. 2010 Lleida; Después de la alambrada. El arte español en el exilio. ción -Ouve-me, 1979. crear nada artístico. «Simulator» Künstlerhaus Bethanien GmbH. Berlin. 2009 99
  • 104.
    «On translation». GaleríaT20. Murcia. 2008 Colección Iniciarte. Junta de Andalucía. Sevilla. PREMIOS Y BECAS (SELECCIÓN) Permanent photographic wall on footbridge, Parque Río «Segundo asalto». Galería Rafael Ortiz. Sevilla.2007 Fundación Coca-Cola. Madrid. Beca Hangar/CALQ-Quebec. Manzanares, Madrid, Spain «Salvaje». Sala Capitulares. Córdoba.2006 Colección Arte Contemporáneo. Museo Patio Herreriano. Valladolid. III Concurso de Fotografía Purificación García. Primer premio Daniel Canogar & Stephen Dean: Process in dialogue, «The New Era». Galería Siboney. Santander. 2006 C.A.A.C. Centro Andaluz de Arte Contemporáneo. Sevilla. Generación 2005. Caja Madrid. Primer premio Koldo Mitxelena, San Sebastián, Spain. Curated by Galería Pedro Oliveira. Oporto. 2005 Fundación Montenmedio.Vejer de la Frontera, Cádiz. VIII Premio de Fotografía y Pintura ABC. Primer accésit Cecilia Andersson «Artificios».Galería Rafael Ortiz. Sevilla 2004 Premio a la actividad artística. Junta de Andalucía Work for «The Brain», Museum of Natural History of Sala de Star. Sevilla 2004 New York, New York, USA Sala de Arte UNICEF. Sevilla.2002 COLECCIONES (SELECCIÓN) 2009 Pneuma, Galerie Guy Bärtschi, Geneve, Switzerland Juan Carlos bracho La Línea de la Concepción, Cádiz, 1970 Fundación La Caixa Jerusalem Lights Festival, Jerusalem, Israel EXPOSICIONES COLECTIVAS (SELECCIÓN) Vive y trabaja en Barcelona CGAC. Centro Gallego de arte contemporáneo Lumen, Projection on the Arcos de Lapa, Río de Janeiro, 2010 European Night. Beijing. China Comunidad de Madrid Brasil. Curated by Paulo Reis Instituto Cervantes. Shangay. China 1993/97 Facultad de Bellas Artes de Cuenca. Universidad de Centro de Arte la Panera Nodi, Mimmo Scognamiglio Artecontemporanea, Napoli, 2009 El sur de nuevo. MNCARS, Museo Nacional Centro de Castilla-La Mancha Ministerio de Asuntos Sociales. Injuve Italy Arte Reina Sofía. Madrid. 2000/03 Artista residente. Hangar. Barcelona Colección Cajasol Daniel Canogar, Galería Juan Silió, Santander, Spain Open Studios. Künstlerhaus Bethanien GmbH. Berlin. 2006 Artista residente. Axeneo7. Gatineau. Canadá Caja Madrid Fuegos Fatuos, Abierto × obras, Matadero, Madrid, Auto. sueño y materia. Centro LABoral. Comisariado por Colección Circa XX Spain Alberto Martín. Gijón EXPOSICIONES (SELECCIÓN) Colección de Fotografía Purificación García Tangle, Mimmo Scognamiglio Artecontemporanea, 2008 Nuit Blanche. Paris. Francia 2010 Arco 10. Galería Carles Taché. Barcelona Fundación Rafael Botí Milán, Italy Bienal Internacional de Arte Contemporáneo de Sevilla. Diez+: Arte contemporáneo en los premios ABC. Colección ABC Enredos, Galería Max Estrella, Madrid, Spain YOUniverse. Sevilla. Instituto Cervantes. Varsovia Daniel Canogar, Guy Bärtschi Gallery, Geneve, Reacción en cadena. Galería Rafael Ortiz. Sevilla. AfterPost. Espacio Iniciarte. Sevilla Switzerland Colección Iniciarte. Espacio Iniciarte. Sevilla 2009 Félix y su amiga F.2003-2009 (individual) Espacio Solo Project, Caprice Horn Gallery, Berlin, Germany PHE08. Colección Caja Burgos. Madrid Iniciarte. Sevilla 2007 Other Bioligies, Sala Parpalló, Valencia, Spain Arte-Vida-Arte. Museo Vostell Malpartida. Cáceres. Magnificent obsessión (individual) Galería Carles Taché. Daniel Canogar Madrid, 1964 Daniel Canogar, Galería Maior, Pollença, Mallorca, Spain The Rencontres d’Arles 2008. Arles, Francia. Barcelona Vive y trabaja en Madrid Daniel Canogar, CAC Málaga, Spain Balelatina. Basel, Suiza. Colección I. Centro de arte dos de Mayo. Madrid Clandestinos, Notte en Bianco, Public projection on San «Migrations». Paris. Francia Light, camera, action. Arte Lisboa. Lisboa ESTUDIOS Pietro in Montorio, Rome, Italy «Confabulaciones». Sala Puertanueva. Córdoba 2008 Experiencia2. Museo de Bellas Artes de Santander 1990 M.A. with studies in photography, New York University/ «Retando al vídeo». Centro Cultural de España, Lima. Perú. I Premio Internacional de Pintura Guasch Coranty. Tecla International Center of Photography, New York, USA ÚLTIMAS EXPOSICIONES COLECTIVAS Sala. Barcelona 1987 B.A., Visual Communications, Complutense University of 2010 Fiax Lux, MACUF, Museo de Arte Contemporáneo Unión PREMIOS Y BECAS Andalucía-Tokio-Andalucía. Instituto Cervantes. Tokio Madrid, Spain Fenosa, A Coruña, Spain. Curated by Paulo Reis Beca de estancia en Künstlerhaus Bethanien. Berlín 2007 Un Hecho real (instalación). O debuxo por diante. CGAC. Atopía, CCCB, Centro de Cultura Contemporánea de Premio Real Academia de Bellas Artes Santa Isabel de Hungría Santiago de Compostela BECAS Y PREMIOS Barcelona, Barcelona, Spain. Curated by Iván de la Primer premio Pepe Espaliú. Córdoba. Poni Aloha (intervención). Aquí y ahora. Tiempo y espa- 1997 Pilar and Joan Miró grant for art project developing, Nuez Beca de Artes Plásticas Rafael Botí. 2003 cio. Sala de exposiciones Alcalá 31. Madrid Spain 25 obras, 17 artistas, 4 relatos, Centro de Arte La Adquisición Bienal de artes plásticas Rafael Botí. Córdoba. Video killed the painting star. Domus Artium. Salamanca Ojo Crítico Art Award by RNE (National Spanish Radio) Panera, Lérida, Spain Beca de Artes Plásticas Junta de Andalucía. I Have a drean (instalación). Fundación ABC. La noche 1996 Pepiniers grant, Instituto de la Juventud Europea, Madrid Timeless Territorios, Art Algarve, Salt Mines, Algarve, Generación 2006 Cajamadrid en blanco. Madrid Subsidy from the Canadian Ministry of Culture for Sous Portugal. Curated by María and Lorena Corral Ayudas a la creación artística INICIARTE. La ilimitada energía del paisaje. Monasterio de San Juan la Surface Project, Quebec, Canada Bienal de Cerveira, Cerveira, Portugal. Curated by María de la Peña. Huesca 1995 Banff Centre for the Arts art residence, Banff, Alberta, Fátima Lambert OBRAS EN COLECCIONES PÚBLICAS 2006 XVI Proyectos de Arte Español (instalación). Arco’06. Canada The End, Andy Warhol Museum, Pittsburgh, USA. Fundación Cajamadrid Madrid 1992 Budapest Academy of Arts art residence, Germinaciones Curated by Eric Shiner Instituto Andaluz de la Juventud. Le dessin comme expérience (instalación). Studio project, Young European Artists Biennial, Hungary Banquete, Nodos y Redes, zKM, Center for Art Fundación El Monte. Sevilla. Daïmon. Axeneo7. Gatineau. Canadá 1987/89 Hispanic-US Joint Committee Scholarship to undertake and Media, Karlsruhe, Germany. Curated by Karin Instituto Andaluz de la Juventud. Donner c’est aimer, aimer c’est partager (individual). a Masters of Art in New York, USA Ohlenschlager Fundación Pepe Espaliú Galería Carmen de la Calle. Madrid 2008 Inner and Outer Space, Mattress Factory Museum, Fundación Rafael Botí. Córdoba. The celestial ómnibus (intervención). Palacio de Caja ÚLTIMAS EXPOSICIONES INDIVIDUALES Pittsburgh, USA Fundación Bancaxa. Valencia. Cantabria. Santillana del Mar 2010 Light installation made for the atrium of the European The discreet charm of technology, zKM, Center for Art Centro de Arte Caja de Burgos. Burgos. The sock strategy. Fundación El Monte. Sevilla Union Council for Spain’s Presidency of the European and Media, Karlsruhe, Germany. Curated by Claudia Ayuntamiento de Alcobendas. Madrid. XVLIII Muestra Caja San Fernando (instalación). Sevilla Union, Brussels, Belgium Gianetti and Antonio Franco 100
  • 105.
    Momentos-New perspectivs onSpanish Contemporary Granada y Premio Nacional de Fin de Carrera del Colección del Ministerio de Asuntos Exteriores. Second International Biennial of Contemporary Art of Photography, Kulturhuset, Stockholm, Sweden. Curated Ministerio de Educación y Ciencia. Colección de la Real Academia de España en Roma. Seville, Seville, Spain. by Thimothy Persons 2000 Certificado de Docencia del Tercer Ciclo de Estudios Colección del Instituto de la Juventud, INJUVE, Madrid. Before the Camera, Norton Museum of Art, West Palm España, Arte Español 1957-2007. De Picasso, Miró, Dalí, Universitarios de la Universidad de Granada. Colección de Arte de la Junta de Andalucía. Beach, FL. Tápies hasta nuestros días, Palazzo Sant’Elia, Palermo, 2002 Diploma de Suficiencia Investigadora del Tercer Ciclo de Colección de Arte Caja Granada. Helga de Alvear – Concepts for A Collection, Exhibition Italy. Curated by Demetrtio Paparoni Estudios Universitarios de la Universidad de Granada. Colección Diputación Provincial de Cádiz. Centre of Centro Cultural de Belém, Brazil. El discreto encanto de la tecnología, Museo Extremeño Doctorado en la Facultad de Bellas Artes de la Colecciones privadas en Francia, Alemania, los Países Bajos, New York, New York: Fifty Years of Art, Architecture, e Iberoamericano de Arte Contemporáneo (MEIAC), Universidad de Granada. Gran Bretaña, EE.UU., México, Colombia y España. Photography, Film and Video, Grimaldi Forum, Monaco. Badajoz, Spain. Curated by Claudia Giannetti Sublime Embrace: Experiencing Consciousness in Máquinas y Almas, Museo Nacional Centro de Arte EXPOSICIONES INDIVIDUALES (SELECCIÓN) Contemporary Art, Art Gallery of Hamilton, Hamilton, Reina Sofía (MNCARS), Madrid, Spain. Curated by 2010 Foreignaffairs. Galería Fernando Pradilla. Madrid. España Ontario. Montxo Algora 2008 Bare(y)there. Galería Fernando Pradilla. Madrid. España Suspension, Dunn and Brown Contemporary, Dallas, Light messages, Museo Es Baluard, Palma de Mallorca, Scope Basel 2008. Basilea, Suiza. James Casebere Lansing (USA), 1953 Texas. Spain. Curated by Marie Claire Uberquoi Real Academia de España en Roma. Italia Vive y trabaja en Nueva York. 2007 Mis(s)behave(again). Sala Manolo Alés. La Línea, Cadiz. COLECCIONES PÚBLICAS Y PRIVADAS COLECCIONES PÚBLICAS MyLovingNation. Galería Ferrán Cano. Palma de FORMACIÓN A.T.&T., South Plainfield, NJ. Museo Patio Herreriano, Valladolid, Spain Mallorca. España. 1979 M.F.A., California Institute of Arts, CA. Addison Gallery of American Art, Phillips Academy, Andover, Coca Cola Foundation 2006 Sacrebleu! Galería Sandunga. Granada. España. 1977 Whitney Independent Study Program, New York, NY. MA. MUSAC, León, Spain Mis(s)behave. Sala Rivadavia. Diputación Provincial de 1976 B.F.A., Minneapolis College of Art and Design, MN. Albright-Knox Museum, Buffalo, NY. ARTIUM, Vitoria, Spain Cádiz. Cádiz. España. 1971/73 Michigan State University, MI. Peter Alger Collection, New York, NY. Museé du Art Contemporain, Lyon 2005 Saturdaynighthbathroom. Galería Fernando Pradilla. Allen Memorial Art Museum, Oberlin, OH. Fundación Unión Fenosa, La Coruña, Spain Madrid. PREMIOS American Patrons of Tate, New York, NY. MNCARS, Museo Nacional Centro de Arte Reina Sofía, Madrid. 1999 [PI]. Centro de Lenguas Modernas. Universidad de Granada. 1999 Shortlisted for the Citibank Private Bank Photography Baltimore Museum of Art, Baltimore, MD. IMAC, Reus, Tarragona, Spain 1998 Haikús. Casa de Jaén. Granada. Prize. Big Flower Press, New York, NY. MEIAC, Museo Extremeño e Iberoamericano de Arte 1995 John Simon Guggenheim Memorial Foundation Grant. Birmingham Museum of Art, Birmingham, AL. Contemporáneo, Badajoz, Spain EXPOSICIONES COLECTIVAS (SELECCIÓN) 1994 New York Foundation for the Arts Fellowship. Brooklyn Museum of Art, Brooklyn, NY. Salamanca University Collection, Salamanca, Spain 2009 Diez +: Arte contemporáneo español en los premios 1990 National Endowment for the Arts, Visual Arts Fellowship. Carnegie Museum of Art, Pittsburgh, PA. Helga de Alvear Collection, Madrid, Spain ABC. Instituto Cervantes de Moscú. 1989 New York Foundation for the Arts Fellowship. Capital Group, Los Angeles, CA. CAM, Caja de Ahorros del Mediterráneo, Alicante, Spain El arte de la semejanza. Centro Cultural CAIXANOVA. 1986 National Endowment for the Arts, Visual Arts Fellowship. Centro Galego Arte Contemporanea, Santiago de Compostella, Ayuntamiento de Lleida, Spain Vigo, España 1985 New York Foundation for the Arts Fellowship. Spain. FRAC Midi-Pyrenées, Toulousse, France SCOPE BASEL. Basilea. Suiza. 1982 National Endowment for the Arts, Visual Arts Fellowship. Chase Manhattan Bank, New York, NY. FNAC, Fonds National d’Árt Contemporain, Paris, France Arte Americas. Miami. EE.UU. 1983 New York State Council on the Arts: Visual Artists Contemporary Art Museum, University of South Florida, Tampa, Art and Technology Foundation, Madrid, Spain SCOPE NY. New York. EE.UU. Sponsored ProjectGrant. FL. Instituto de la Juventud, Ministerio de Asuntos Sociales, Madrid. 2008 Inventio Roma. Real Academia de San Fernando. Madrid Dallas Museum of Art, Dallas, TX. Rafael Tous Foundation for Contemporary Art, Barcelona, Spain Inventio Roma. Real Academia de España en Roma. ÚLTIMAS EXPOSICIONES INDIVIDUALES (SELECCIÓN) Davis Museum and Cultural Center, Wellesley, MA. Fons d’Art Contemporani, Universidad Politécnica de Valencia. Roma, Italia 2008 James Casebere, Andrew Jensen Gallery, Auckland, Nz. Disney Collection, New York, NY. Museum of Fine Arts of Álava, Vitoria, Spain KIAF, Feria Internacional de Arte en Corea. Seúl, Corea James Casebere, Daniel Templon Gallery, Paris, France. Emily Fisher Landau Collection, New York, NY. Collectión of the City of Alcobendas, Madrid, Spain Scope Hantomps’08. New York, EE.UU. James Casebere, Galleria Marabini, Bologna, Italy Fogg Museum, Harvard University, Cambridge, MA. C.O.S.I., Columbus, Ohio, USA Scope London’08, Londres, Reino Unido 2007 James Casebere; The Levant, Galeria Marabini, Bologna, Fondazione Sandretto Rebaudengo per l’arte, Turin, Italy. Musseum of Santander, Santander, Spain 2007 ARCO. Feria Internacional de Arte Contemporáneo. Italy Fonds National d’Art Contemporain, Paris, France. Museo Alejandro Otero, Caracas, Venezuela Stand Junta de Andalucía y Stand Galería Sandunga de James Casebere: The Levant, Sean Kelly Gallery, New General Mills Collection, Minneapolis, MN. Granada. IFEMA, Madrid. España. York Goetz Collection, Munich, Germany. Arteaméricas. Feria Internacional de Arte Goldman Sachs, New York, NY. Contemporáneo Latinoamericano. Stand Galería ÚLTIMAS EXPOSICIONES COLECTIVAS (SELECCIÓN) Solomon R. Guggenheim Museum, New York, NY. Fernando Pradilla de Madrid y Stand de Galería El 2008 Galería Helga de Alvear, Madrid, Spain Hallmark Collection, Kansas City, MO. Juan Francisco Casas Ruiz La Carolina, Jaén, 1976 Museo de Bogotá. Miami, Florida, EE.UU. 2007 Façade, Architecture, Space, Cook Fine Art, New York, High Museum of Art, Atlanta, GA. Vive y trabaja en Madrid y en La Carolina, Jaén NY. Hughes and Luce, L.L.P. Collection, Dallas, TX. OBRA EN MUSEOS Y COLECCIONES: Imagination becomes Reality, Goetz Collection, Munich Jewish Museum, New York, NY. ESTUDIOS REALIZADOS Museo ARTIUM, Museo Vasco de Arte Contemporáneo, Vitoria. 2006 Extra-Ordinary: The Everyday Object in American Art, Johnson & Johnson, New Brunswick, NJ. 1999 Licenciado en Bellas Artes por la Universidad de Colección ABC, Madrid. Frist Center for the Visual Arts, Nashville, TN. Los Angeles County Museum of Art, Los Angeles, CA. 101
  • 106.
    Metropolitan Museum ofArt, New York. ÚLTIMAS EXPOSICIONES INDIVIDUALES Colección del Consejo Superior de Deportes. España Spaces,» Bureau for Open Culture, Columbus College of Mukha Museum, Antwerp, Belgium. 2009 Jacobo Castellano. The solo Project. Basel, Suiza. Hospital de San Juan de Dios. Espacio de Arte Contemporáneo. Art & Design, Columbus, OH (catalogue) «Bad Habits,» Museum of Fine Arts, Boston, MA. Sin Público. Galería Fúcares_Madrid, España. Almagro (Ciudad Real). España Albright-Knox Art Gallery, Buffalo, NY Museum of Fine Arts, Houston, TX. Cuadrilátero. La casa Encendida. Madrid, España. Colección Olor Visual. Barcelona. España 2008 «A Show of Hands: Photographs and Sculpture from Museum of Modern Art, New York, NY. 2008 Às Apalpadelas Galería Pedro Oliveira. Porto, Portugal. Colección Pilar Citolar. Madrid. España the Henry Buhl Collection,» January 12 to March Museum of Modern Art, San Francisco, CA. Puzzling question! (con Gonzalo Puch, comisario Alberto Colección Prosegur. España 25, 2008, The Norton Museum of Art, West Palm National Gallery of Art, Washington, DC Martín) Sala Hospedería Fonseca. Salamanca – Hospital Diputación Provincial de Granada. España Beach, FL «Beyond the Backyard,» June 20 – August National Gallery of Canada, Ottawa, Ontario, Canada. de San Juan de Dios. Espacio de Arte Contemporáneo, Fundación Sorigué, Lerida. España 23, Museum of Contemporary Photography, Chicago. Neuberger Berman LLC, New York, NY. Almagro (Ciudad Real). España. Fundación Televisa. Méjico «Diana und Actaeon – Der Verbotene Blick Auf Die Neuberger Museum, State University of New York at Purchase, 2007 Podium. Galería Fúcares_Almagro, España. Universidad de Granada. España Nacktheit,» Museum Kunst Palast, Düsseldorf, Germany Purchase, NY. 2006 16 Proyectos de Arte Español. Proyect Room, galería Fundación Montenmedio Arte Contemporáneo. España (catalogue) «Invisible Rays: The Surrealism Legacy,» Neue Galerie der Stadt Linz, Linz, Austria. Fúcares. ARCO’06 (Comisariado: María de Corral). Fundación Provincial de Artes Plásticas Rafael Botí. España Sept 25-Dec 14, Rose Art Museum, Waltham, MA New Orleans Museum of Art, New Orleans, LA. Madrid. «Invitational Exhibition of Visual Arts,» March 12 – April New School for Social Research, New York, NY. 5, The American Academy of Arts and Letters, New Pacific Bell Collection, Los Angeles, CA. ÚLTIMAS EXPOSICIONES COLECTIVAS York «Las Implicaciones de la Imagen,» Universidad Pepsico Collection, Purchase, NY. 2010 «Itinerarios 0809». Fundación Marcelino Botín. Nacional Autónoma de México, Museo Universitario de Progressive Corporation, Cleveland, OH. Santander, España. Gregory Crewdson Brooklyn, NY, 1962 Ciencias y Arte, Mexico City (catalogue) «Oh L’Amour: Prudential, Newark, NJ. 2009 El tiempo que venga. La colección IX. Comisariada por Vive y trabaja New York Contemporary Photography from The Stéphane Janssen Rose Art Museum, Waltham, MA. Daniel Castillejo. Artium. Centro Museo Vasco de Arte Collection,» The Center for Creative Photography, Revco Corporation, New York, NY. Contemporáneo. Vitoria-Gasteiz, España FORMACIÓN Tuscan, Az. «Reality Check: Truth and Illusion in San Diego Museum of Contemporary Art, San Diego, CA. Off Street. A Foundation (comisaria Blanca de la Torre y 1988 Yale School of Art, Yale University, New Haven, CT, Contemporary Photography,» The Metropolitan Museum St. Louis Art Museum, St. Louis, MO. Mark Waugh). Londres, Reino Unido. M.F.A. of Art, New York. «Sheldon Survey: An Invitational,» Tampa Museum of Art, Tampa, FL. Expanded Drawing. Comisariada por Pilar Ribal DNA 1985 SUNY Purchase, NY, B.A. Sheldon Memorial Art Gallery, University of Nebraska, Tate Modern, London, UK. Galerie. Berlín, Alemania. Lincoln, NB. «to: Night, Contemporary Representations United Yarn Corporation, Wayne, NJ. 2008 Uno + Uno, Multitud. Doméstico 08. (Comisariada por PREMIOS of the Night,» September 25 – December 6, 2008, The University Art Museum, University of New Mexico, Albuquerque. Tania Pardo). Madrid, España. 2004 Skowhegan Medal for Photography, Skowhegan School Bertha and Karl Leubsdorf Art Gallery, The Hunter University of Iowa Museum of Art, Iowa City, IA. A limerence reaction. Galería Benveniste. Madrid, of Painting and Sculpture College Art Galleries, New York, NY; September 25 – Victoria and Albert Museum, London, England. España. November 15, 2008, Times Square Gallery, The Hunter Walker Art Center, Minneapolis, MN. Condiciones de trabajo. Viajeros. Museo Provincial de ÚLTIMAS EXPOSICIONES INDIVIDUALES College Art Galleries, New York, NY (catalogue) «Untitled Whitney Museum of American Art, New York, NY. Cádiz, Cadiz y Sala Caja Sol. (Comisariada por Francisco 2009 La Fábrica Galería, Madrid. «Beneath the Roses,» (Vicarious),» Gagosian, New York «World’s Away: New Williams College Museum of Art, Williamstown, MA. del Río). Sevilla, España. Galerie Daniel Templon, Paris Suburban Landscapes,» Walker Art Center, traveling to España. Arte español 1957.2007. Palazzo Sant’Elia. 2008 «Dream House,» Photology, Milan, Italy «Beneath the Carnegie Museum, February 15, 2008 to May 18, 2008. (Comisariada por Demetrio Paparoni). Palermo, Italia. Roses,» Luhring Augustine, New York «Beneath the Condiciones de Trabajo, Viajeros, con Chema Roses,» White Cube, London «Beneath the Roses,» COLECCIONES Alvargonzález y Jesús Palomino. Museo de Cádiz. Cádiz, Gagosian, Los Angeles «Gregory Crewdson: 1985– Indianapolis Museum of Art, Indianapolis, IN Guggenheim Jacobo Castellano Jaén, 1976 España. 2005,» Galerie Rudolfinum, Prague. Museum, New York, NY The Herbert F. Johnson Museum of Vive y trabaja en Madrid «Inicial/08». Espacio Iniciarte. (Comisariada por Oscar 2007 «Drawing on Hopper: Gregory Crewdson/Edward Art, Ithaca, New York The Broad Art Foundation, Santa Monica, Alonso Molina). Sevilla, España. Hopper,» Williams College Museum of Art, Williamstown, CA The Berkshire Museum, Pittsfield, MA The Contemporary Licenciado en Bellas Artes. Universidad de Granada, 2000. 2007 De Granada a Gasteiz. Centro Museo Vasco de Arte MA «Gregory Crewdson: 1985–2005,» DA2. Domus Museum, Honolulu, Hawaii The Malba-Collection, Buenos Contemporáneo. Artium. Vitoria, España. Artium 2002, Salamanca; Hasselblad Center, Göteborg, Aires, Argentina The Museum of Contemporary Art, Los Angeles, BECAS Y PREMIOS Open Studios. International Studio and Curatorial Sweden; 2007/2008: Palazzo delle esposizioni, Rome CA The American Contemporary Art from Misumi Collection, 2008/09 Premio Iniciarte a la Actividad Artística del 2008. Sevilla, Program (ISCP). Nueva York, Estados Unidos. 2006 «Gregory Crewdson: Fotografien 1985-2005,» Museum of Contemporary Art, Tokyo, Japan The Art Institute España. Mapas, Cosmogonías y Puntos de Referencia. Centro Fotomuseum Winterthur, Winterthur, Switzerland; of Chicago, Chicago, IL The Rose Art Museum, Brandeis Beca Fundación Marcelino Botín. International Studio Gallego de Arte Contemporáneo. CGAC. Santiago de Museen Haus Lange/ Haus Esters Krefeld, Krefeld, University, Waltham, MA Brooklyn Museum of Art, Brooklyn, and Curatorial Program (ISCP). Nueva York, EE.UU. Compostela, España. Germany; Fotomuseum Den Haag, Holland. «Fireflies,» NY Los Angeles County Museum of Art, Los Angeles, CA Lowe 2006 Beca Manuel Rivera (Diputación Provincial de Granada. Skarstedt Fine Art, New York, NY. (exhibition catalogue) Art Museum, The University of Miami, Coral Gables, FL John D. International Studio and Curatorial Program (ISCP). COLECCIONES and Catherine T. Macarthur Foundation, Chicago Metropolitan Nueva York, Estados Unidos. ARTIUM. Centro-Museo Vasco de Arte Contemporáneo. España ÚLTIMAS EXPOSICIONES COLECTIVAS Museum of Art, New York The Montclair Art Museum, Montclair, 1997 Beca Erasmus. Accademia di Belle Arti di Firenze. Ayuntamiento de Granada. España 2009 «Invitational Exhibition of Visual Arts,» American NJ Milwaukee Art Museum, Milwaukee, WI Musee des Beaux Florencia, Italia. CGAC. Centro Gallego de Arte Contemporáneo. España Academy of Arts and Letters, New York, NY «Of Other Arts de Montreal, Montreal, Canada Museo Nacional Centro 102
  • 107.
    de Arte Reina,Madrid,Spain Museum of Contemporary Art, 2002 Video speaking pictures, Catalogue, Kunstraum Riehen, BECAS Y PREMIOS Scope London. Galería Fernando Pradilla. Inglaterra. U.K. Chicago, IL Museum of Fine Arts, Boston Museum of Modern Riehen/Basel, Switzerland 2008 Fotógrafo Revelación PhotoEspaña’08 II Bienal de Arte Contemporáneo. Fundación Once. Art, New York Norton Museum of Art, West Palm Beach, FL 1996 Das Paar in der Kunst, Catalogue of exhibition, IX Premio ABC de Pintura y Fotografía. Primer Accésit. Madrid. España. Orlando Museum of Art, Orlando, FL Philadelphia Museum Helmhaus zürich, Switzerland 2007 Beca de la Real Academia de España en Roma. Museo de Bellas Artes de Santiago de Chile. of Art, Philadelphia, PA Princeton University Art Museum, Fundación Alexander Clavel Awards, Riehen/Basilea, Artista Español en la XXIV Bienal de Alejandría. Egipto. Real Academia de España en Roma. Italia. Princeton, NJ Progressive Corporation, Mayfield Village, OH Switzerland 2006 Seleccionado. I Premio Internacional de Fotografía Pilar ARCO ’08. ABC. Madrid. España. Saint Louis Art Museum, Saint Louis, MO San Francisco 1994 Hauttief, Catalogue of exhibition, Helmhaus zürich, Citoler. Universidad de Córdoba. Museo de Arte de San Paulo. Brasil. Museum of Modern Art, San Francisco, CA Whitney Museum of Switzerland Seleccionado. Premio de Fotografía Ciudad de Palma American Art, New York National Gallery of Victoria, Melbourne, 2006. Casal Solleric. Palma de Mallorca. Australia Yale University Art Gallery, New Haven, CT PREMIOS Y BECAS 2001 1º Premio Nacional de Fotografía Injuve 2001. 2008 Förderbeitrag des Fachausschuss für Film, Foto und 2º Premio VI Edición Concurso «Todos Somos Video, Basel-Stadt und Baselland Diferentes» Fundación de Derechos Civiles. Lucas Gómez Fernández San Sebastián, 1971 2006 Förderbeitrag des Fachausschuss für Film, Foto und Vive y trabaja en Sevilla y Málaga. Video, Basel-Stadt und Baselland EXPOSICIONES INDIVIDUALES (SELECCIÓN) Gabriella Gerosa 1964 2005 Beca Kunstkredit Basel 2010 Moradores del Alma. MAMBA. Museo de Arte Moderno Licenciado en Bellas Artes Granada, 1996. Vive y trabaja en Basilea 2003 zONTA Regio Kulturpreis de Barranquilla. Colombia 2002 Förderbeitrag des Fachausschuss für Film, Foto und De Padres y de Hijos. Galería Fernando Pradilla. Madrid. EXPOSICIONES RECIENTES SELECCIÓN DE EXPOSICIONES Video, Basel-Stadt und Baselland 2009 PhotoEspaña’09. Room Mate Óscar. Madrid 2010 Espacio Emergente Málaga. Individual. 2010 ART MASTERS ST.MORITz, Switzerland 2001 Swiss Art Award, Eidgenössischer Preis für Kunst Basler Galería El Museo. Bogotá, Colombia 2009 Sala A4 Almería al desnudo. Colectiva. ARCO’10, Galería Max Estrella, Madrid, Spain Künstlerstipendium Paisaje español. Galería Carlos Word. Guatemala 2008 Palacio del Obispo Retrospectiva premios Unicaja. 2009 Staatliche Kunstsammlungen Dresden, Schloss Pillnitz, 1996 Kulturförderpreis der Alexander Clavel Stiftung, Riehen/ Peregrinatio. Sagunto, Valencia Colectiva. Germany Basel, Switzerland Förderbeitrag des Fachausschusses Espai Quatre. Casal Solleric. Palma de Mallorca. España. 2007 Sala invisible Málaga, Paisaje Desnudo. Individual. ART Basel, Galerie Tony Wüthrich, Basel, Switzerland für Film, Foto und Video, Basel-Stadt und Baselland 2008 Galería Bertin-Toublanc. Miami. USA Certamen de Artes Plásticas Málaga (obra adquirida) Paris Photo’09, Galería Max Estrella, Paris, France Swiss Art Award, Eidgenössischer Preis für Kunst Basler Festival YES zagreb. Croacia. Colectiva. 2008 ART Basel, Galerie Tony Wüthrich, Basel, Switzerland Künstlerstipendium Museo de Arte Moderno de Guatemala Expo. Premio Unicaja Fotografia (itinerante Andalucia) Laboratorio Kunsthalle Lugano, Switzerland 1993 Swiss Art Award, Beca Kiefer Hablitzel Condenados. Photoespaña. Galería Fernando Pradilla. 2006 Bienal de Almería exposición ABIAC Colectiva. 2006 REGIONALE 7, Kunsthalle Basel, Switzerland Madrid. MálagaCrea CAC, Málaga Colectiva. 2005 Blumenmythos, Fondation Beyeler, Riehen /Basel, OBRAS EN COLECCIONES PÚBLICAS Fichados-Tatuados. Galería Fernando Pradilla. Espacio 2005 Arte Efímero en el Ateneo de Málaga. Colectiva. Switzerland Kunstmuseum Basel, Kupferstichkabinett, Basel, Switzerland Proyectos. Madrid. España. 2004 Sala San Telmo Málaga, Viajes. Individual. Swiss Miss, Kunstmuseum Schwerin, Alemania Oeffentliche Kunstsammlung der Stadt, Basel, Switzerland MIART. Galería Fernando Pradilla. Milán. Italia. 2003 Exposición itinerante de Unicaja. (Sevilla, Málaga, 2003 Centre culturel Suisse, Paris, France Oeffentliche Kunstsammlung des Kanton, Basel, Switzerland 2007 Pabellón de España en la XXIV Bienal de Alejandría. Almería ) Colectiva REGIONALE 4, Kunsthalle Basel, Switzerland Oeffentliche Sammlung der Stadt zürich, zürich, Switzerland Egipto. zum Fest, Kunstraum Aarau, Switzerland Baden Württembergische Landesbank, Stuttgart, Germany Galería El Museo. Bogotá. Colombia. BECAS Y PREMIOS 2002 VIDEO SPEAKING PICTURES, Kunstraum Riehen, Royal Caribbean International, Miami, USA Galería Full Art. Sevilla. España. 2006 Premio major guión y dirección. Festival Nacional de Switzerland National Versicherung, Basel, Switzerland Scope’07. Galería Fernando Pradilla. Basilea. Suiza. Soria. 2000 Stillleben, Kaskadenkondensator, Basel, Switzerland ROCHE, Basel, Switzerland ARCO ’07. Project Room. Galería Fernando Pradilla. Premio a la mejor videocreación de ficción en el 9º 1996 Das Paar in der Kunst, Museum Helmhaus, zürich, Madrid. España. Festival de Cine Español de Málaga por el cortometraje Switzerland «S/T» Akkumulator» FILIALE, Basel, Switzerland EXPOSICIONES COLECTIVAS (SELECCIÓN) Premio RTVA al mejor vídeo andaluz en el Festival 1994 Hauttief, Museum Helmhaus, zürich, Switzerland 2010 Cazadores de Sombras. Casa de España en México Almería en Corto 06 por el cortometraje «S/T» In Vitro, Kunst im öffentlichen Raum, Genf, Switzerland Germán Gómez Gijón, 1972 2009 Kuntsi Museum of Modern Art, Vaasa, Finland. Primer premio en el certamen Málaga Crea, modalidad Bad zur Sonne, Steirischer Herbst, Graz, Austria Vive y trabaja en Madrid SCOPE Basel. Galería Fernando Pradilla, Basilea, Suiza de Artes Plásticas. MadridFoto. Galería Fernando Pradilla. Madrid, España 2004 Premio al mejor guión Andaluz en el Certamen de PUBLICACIONES ESTUDIOS REALIZADOS Stenersen Museum. Oslo. Noruega. cortometrajes andaluces 04. 2009 Still Life, Catalogue, Colección de Arte Estatal de Dresde. 2001 Diploma de Estudios Avanzados en Bellas Artes. 2008 Museo de Arte Contemporáneo, Panamá. Premio a la mejor producción almeriense en el Festival Schloss Pillnitz, Dresde, Germany Universidad Complutense de Madrid. Kulturhuset. Stockholm. Suecia. Internacional de Corto por «Dos». 2007 Publikation anlässlich der Dauerausstellung im Kulm 1998 Licenciado en Bellas Artes Universidad Complutense de Photo Miami. Galería Fernando Pradilla. Florida. EEUU. 2003 Primer premio Unicaja de Fotografía 03 Hotel, St.Moritz,Switzerland Madrid. Nuit Blanche Paris. (European Night). Paris. Francia. Primer premio del 6º Festival de Cine español de Málaga, 2005 Blumenmythos, Catalogue Fondation Beyeler, Riehen/ 1993 Diplomado en Magisterio. Universidad Complutense de Academia de San Fernando. «Inventio Roma». Madrid. sección audiovisuales ficción 03 por el cortometraje Basel, Switzerland Madrid. España. «Dos» 103
  • 108.
    Primer premio festivalCortomanía de Córdoba por «Dos» del Águila y la Parra de Santillana del Mar, Santander, Maison Europeènne de la Photographie. París. Creación Artística Contemporánea grant, Consejería de Primer premio Baumann de videocreación por «Dos» España. Centre Nacional des Arts Plasttiques (CNAP), París. Cultura Junta de Andalucía, Spain Primer premio festival de Moncofa por «Dos»Premio al «Colección de Pilar Citoler». Fundación Caixa Galicia. Colección de la Comunidad de Madrid. 2003 Artes Plásticas Daniel Vázquez Díaz grant, Diputación de mejor cortometraje andaluz en el 8º Festival de Cabra Pontevedra, España. Fundación de Fútbol Profesional. Madrid. Huelva, Spain por «Dos» «Cuestión Generacional», CGAC Centro Galego de Arte Museo de Bellas Artes de Álava. Vitoria, España. Unicaja VII award, Certamen de Artes Plásticas, Málaga, 2002 Premio al mejor guión en el festival de audiovisuales de Contemporánea, Santiago de Compostela, España. Colección UNED, Universidad Nacional de Educación a Spain Cabra 02 2008 ARCO’08. Stand Galería Juana de Aizpuru. Madrid. Distancia. Madrid. 2001 Pilar Juncosa and Sotheby’s. Fundació Pilar i Joan Miró Primer premio del jurado y premio del público, sección «Atemporalidad. Colección Pecar». Museo de Bellas Gobierno de Cantabria, Santander, España. award, Mallorca, Spain audiovisuales, en el 5º Festival de cine español de Artes de Santander. Santander, España. Encuentros de Fotografía de Coimbra, Portugal. 2000 Gijón City Council grant for digital art production, Spain Málaga por el cortometraje «Uno». «De lo humano». Centro Andaluz de Arte Celebrity Cruises Art Collection, USA. Unicaja VI award, Certamen de Artes Plásticas, Málaga, Contemporáneo. Sevilla, España. Fonds Nacional d’Art Contemporain, Francia. Spain «Portrait & Paisaje du XXIe siècle», Espace Culturel ING. 21C MUSEUM Louisville, KY, USA. Ayuda a la Creación Artística Contemporánea, Bruselas. Museum of Contemporary Art, Chicago, ILL, USA. Consejería de Cultura Junta de Andalucía, Spain «25 Fotografos Españoles» Intinirante desde Kiulur Colección de Fotografía Antonio Pérez Martín. Pierre Gonnord Cholet (Francia), 1963 huset, Estocolmo. Diputación Provincial de Cádiz. España. ÚLTIMAS EXPOSICIONES INDIVIDUALES Vive y trabaja en Madrid 2009 «FRAC Auvergne’s Collection in 2008 and 2009» FRAC Museo de Arte Contemporáneo de Murcia, España. 2010 Busan Biennale. Proyecto de Arte Público para la ciudad Auvergne. Francia Ayuntamiento de Alcorcón, Madrid. de Busan, Corea ÚLTIMAS EXPOSICIONES INDIVIDUALES ARCO’09. Stand de la Galería Juana de Aizpuru. Madrid. Colección de la Fundación El Monte. Sevilla, España. Ensayos para un descampado, DA2, Domus Artium, 2007 «Paris-Sevilla». Galería Juana de Aizpuru. Madrid. «25 Fotógrafos Españoles» Itinerancia al Sternersen Colección Fundación Telefónica, Madrid. Salamanca, Spain «El puente de la visión 2007». Museo de Bellas Artes de Museum, Oslo. Colección Ordóñez-Falcón de Fotografía, San Sebastián, Conflict in paradise, The Columns Art Center for Visual Santander. Santander, España. «Prohibido el cante. Flamenco y Fotografía» Centro España. and Performing Arts, Seul, South Corea 2008 «Testigos». Universidad de Salamanca, España. Andaluz de Arte Contemporáneo. Sevilla,España. Colección Banco Espíritu Santo, Lisboa. Organogramas, Novalis Fine Arts Gallery, Turín, Italy «Sous la peau», Atelier des Forges, Les Rencontres «Pequeña historia da fotografía». Fondos de la Colección Colección L’OREAL, España. 2009 Transfigured Schönberg, Museo Patio Herreriano, d’Arles, Arles, Francia. del CGAC. Santiago de Compostela. España. Museo de Arte Contemporáneo de Castilla y León (MUSAC). Valladolid, Spain «La interpretación muda», Dentro des Festival la Mar de BASEL’09. Stand de la Galeria Juana de Aizpuru. Madrid. Castilla y León, España. Postopias, Fiedler Taubert Contemporary, Berlin, Musicas, Palacio Molina, Cartagena, España. Frieze. Stand Galería Juana de Aizpuru. Londres, Reino Colección de Arte Museo Patio Herreriano, Valladolid, España. Germany «Pierre Gonnord A l’épreuve du portrait.» 20e Festival Unido. ARTIUM. Museo de Arte Contemporáneo de Álava, Vitoria, 2008 Elegía 1938, Solo Project, Arco ‘08, Galería Max Estrella, internatinal du photojournalisme de Perpignan, Eglise Paris Photo. Stand Galería Juana de Aizpuru. Paris, España. Madrid, Spain des Dominicains. Perpignan, Francia. Francia Colección Gobierno de Cantabria. Santander, España. This it’s true, The Columns Art Center for Visual and «Pierre Gonnord» FRAC Auvergne – Ecuries de Chazerat. «Paisatges creuats». Colección Es Baluard. Palma de Universidad de Salamanca, España. Performing Art’s, Seoul, Korea Clermont Ferrand. Francia. Mallorca. Colección Metrònom Rafael Tous, Barcelona. «Utopicos» Festival Fotografico de Helsinki Helsinki City 2010 «No singing Allowed Flamenco & Photography». Amster Colección de Pilar Citoler, Madrid. ÚLTIMAS EXPOSICIONES COLECTIVAS Art Museum, Oslo. Yard Gallery, Instituto Cervantes New York, New York. Colección de la Comunidad Autónoma de la Región de Murcia. 2010 10ª Bienal Martínez Guerricabeitia, Valencia, Spain «Bienal de Fotografía de Córdoba (Mapas del Sujeto)». Itinerancia de la exposición en el Centro Andaluz de Arte Museo de Bellas Artes de Santander, España. Pulse New York, Ftc. Contemporary,New York, USA Córdoba Contemporáneo. Fundación Alorda-Derksen, Barcelona, España. Arte Fiera Bologna, Novalis Fine Arts Gallery, y 2009 «Pierre Gonnord». Frac de Auverge, Clemont Ferrand, ARCO’10. Stand Galeria Juana de Aizpuru, stand Museo d’art modern i contemporani Es Baluard, Palma de PROJECTB Art Conntemporary, Bolonia, Italy Francia. Comunidad de Madrid. Madrid Mallorca Art Brussels’10, PROJECTB. Brussels, Belgium «Testimoni». Dentro del proyecto Made in Mad de Ministerio de Industria Turismo y Comercio, Madrid, España. Espacio Atlántico’10, Galería Max Estrella, Vigo, Spain la Comunidad de Madrid. Centro Internazionale di PREMIOS, BECAS Y OTROS PROYECTOS: ASIMTRYA FESTIVAL.Peru Fotografía. Milán (Italia) 2003 Beca del Programa «Villa Kujoyama» (Kioto/Japón). Faraway so close, Museo Nacional Soares Dos Reis, «Terre de Personne». Sala Alcalá, 31. Madrid AFAA/Asociación Française d’Action Artistique. Oporto Portugal 2010 «Terre de Personne». Xacobeo 2010. Santiago de Ministerio de Asuntos Exteriores Francés. Utopia? L’Art amb els drets humans, Museo de Arte Compostela Premio L’Oreal de Fotografía. Madrid. Dionisio González Gijón, 1965 Contemporaneo, Mallorca, Spain 2004 Premio Purificación García, 3º puesto. Círculo de Bellas Vive y trabaja en Sevilla Paitsages creuats, ES Baluard, Mallorca, Spain ÚLTIMAS EXPOSICIONES COLECTIVAS: Artes. Madrid. 2009 Cazadores de Sombras, Centro Cultural de España en 2007 ARCO’07. Stand Galería Juana de Aizpuru. Madrid. 2005/06 «Cité Internacional des Arts». Paris. Francia ÚLTIMAS BECAS Y PREMIOS México, México DF, Mexico «En quête d’identité». Centre Photographique d’Ile 2008 Premio de la Fotografía de la Comunidad de Madrid 2007 Ayudas Iniciarte, Consejería de Cultura Junta de Paris Photo ‘09, Galería Max Estrella, Renos Xippas, Paris de France, Francia. Obras procedentes de los Fonds Andalucía, Spain El Dorado. On the promise of Human Rights, Kuntshalle National d’Art Contemporain, Paris. OBRAS COLECCIONES PUBLICAS Y PRIVADAS Ayuda a la Creación Visual, Fundación Arte y Derecho, Nürnberg, Germany «Colección Norte de Arte Contemporáneo». Casas Museo Nacional Centro de Arte Reina Sofía. Madrid. Spain Scad, Red Gallery, Atlanta, USA 104
  • 109.
    Usazur Nachahmung Empfohlen,The Uferhallen, Berlin, Fonds National d’Art Contemporain, Paris, France estilo propio que, de un modo u otro, ha influido en el trabajo Sus obras se encuentran en importantes colecciones Germany The Margolies Collection, Miami, USA de muchos de los artistas pertenecientes a generaciones públicas: Museo Nacional Centro de Arte Reina Sofía Home less home, Museum on the Seam, Socio-Political Caldic Collection. Rotterdam, Netherlands posteriores. (Madrid, España), Museo de Bellas Artes de Bilbao, IVAM Contemporary Art Museum, Jerusalem, Israel Centro de Fotografía, Universidad de Salamanca, Spain Tras pasar por la Facultad de Derecho, comenzó su forma- (Valencia, España), Fundación La Caixa (Barcelona, España), El Ángel Exterminador, El Bozar, Palais des Beaux Arts, ARTIUM, Álava, Spain ción artística en la Escuela de Bellas Artes de Sevilla. Durante Patio Herreriano (Valladolid, España), MACBA (Barcelona, Brussels, Belgium Neuflize Vie Collection, Paris, France el desarrollo de su carrera, va asimilando de un modo personal España), ARTIUM (Vitoria, España), Fundación Juan March Big Up, Centro de Arte Les Abattoirs, Pau, France Song Eun Art Foundation, Seoul, Korea los nuevos lenguajes creativos de las últimas cinco décadas. Así (Madrid, España), la Fundación AENA, CAAC (Sevilla, España), Cazadores de Sombras, Museo Nacional de Bellas Artes University of California Contemporary Art Collection, USA en 1958, tras vivir en París varios años, entra en contacto con Caja Madrid (Madrid, España), Caja Sol (Sevilla, España), de La Habana, Cuba MACUF, Museo Unión Fenosa, Spain el Informalismo. Con posterioridad conoce el Pop Art, el cual le ICO(Madrid), Museum Folkwang (Essen, Alemania), entre otros. Insiders le Floklore qui Vient, Musée d’Art Contemporain, Centro Andaluz de Arte Contemporáneo, Spain ofrece nuevos e importantes medios plásticos de expresión. A la Bordeaux, France Comunidad de Madrid, Spain configuración de una estética propia le acompaña, de manera Atopia, CCCB, Centre de Cultura Contemporania de Madrid City Council, Spain paralela, su interés por plantear nuevos discursos desde el Barcelona, Spain Alcobendas City Council, Spain conocimiento e interés por el psicoanálisis, el cine y la música. The inaugural opening, The Incheon Art Center and Caja San Fernando, Sevilla, Spain Su trayectoria, siempre marcada por la experimentación Juan Francisco Isidro Lora del Río, Sevilla, 1961-Sevilla, 1993 Platform, Incheon, Korea CAM, Caja de Ahorros del Mediterráneo, Alicante, Spain continua así como por el cambio de registros en su producción, KIAF Art Fair, Korea Fundació Pilar i Joan Miró, Mallorca, Spain ha sido enmarcada dentro de la abstracción, una definición Realiza estudios de Arquitectura en la E.T.S.A. de Sevilla. New Perspectives on Spanish Contemporary Fundación Centro Ordóñez Falcón de Fotografía, San Sebastián, que encorseta un trabajo que va más allá, en un afán de descu- Photography, Finland Spain brimiento de nuevos horizontes plásticos. El uso de diferentes 1990 Premio L’Oréal. VI Edición. Confines, IVAM, Valencia, Spain DA 2, Domus Artium, Salamanca, Spain medios le ha llevado a desarrollar un universo paralelo donde, 1992 Beca Banesto. There Goes the Neighbourhood, Museum of IVAM, Colección de Arte Contemporáneo, Valencia, Spain superando la abstracción, conviven en el mismo plano refe- Contemporary Art, Cleveland, USA Diputación de Cádiz, Spain rencias a la realidad, o a partes de la misma, con elementos EXPOSICIONES INDIVIDUALES Scope Basel, Fiedler Taubert Contemporary, Basel, Diputación de Málaga, Spain imaginados, plenamente abstractos, simbólicos o narrativos. En 1987 Sala de Exposiciones de la Casa de la Cultura. Málaga. Switzerland Museo Casa Natal de Jovellanos, Ayuntamiento de Gijón, Spain definitiva un lenguaje propio, rico y complejo, donde plasma 1988 Galería Rafael Ortiz. Sevilla. In the Photographic Image. The Columns Gallery, Seoul, Instituto de la Juventud, Consejería de Asuntos Sociales, Junta sus obsesiones e incertidumbres repetidamente, a modo de 1990 Galería Ángel Romero. Madrid. Korea de Andalucía, Spain cartografía mental. 1991 Galería Rafael Ortiz. Sevilla. Pulse Miami, FTC Berlin, Miami, USA Palacio de Congresos, Sevilla, Spain Muestra de la importancia de su trabajo son los premios 1992 Galería Elba Benítez. Madrid. Great Expectations. Contemporary Photography Colección Unicaja, Málaga, Spain recibidos a lo largo de todos los años de trayectoria profesional. Galería Trazos Tres. Santander. Looks at Today’s Bitter Years, Le Casino; Forum d’Art Colección Fundación Monte de Piedad, Sevilla, Spain Entre estos múltiples premios cabe destacar por su notoriedad y 1994 ABIERTO. BIENAL ‘94. Sala del Colegio Oficial de Contemporain, Luxembourg Colección Prosegur, Spain trascendencia el Premio Nacional de Artes Plásticas (1981) y el Arquitectos de Almería. Big up 3, La Maison, Boucau, Bayonne, France Colección Purificación García, Spain reciente Premio Velázquez a las Artes Plásticas (2007). 1996 En la Torre Juan Francisco Isidro. Torre de los Extreme Frontiers, Urban Frontiers, IVAM, Valencia, Spain Fundación Vázquez Díaz, Huelva, Spain Remarcable también, su nombramiento como Doctor Guzmanes. La Algaba, Sevilla. Sur, Museo Nacional Centro de Arte Reina Sofía CAB, Centro de Arte Caja Burgos, Spain Honoris Causa por la Facultad de Bellas Artes de Cuenca 2006 Laboratorio de silencios. Galería Rafael Ortiz. Sevilla. (MNCARS), Madrid, Spain Ayuntamiento de Pamplona, Spain (2008), la Medalla de Oro del Circulo de Bellas Artes de Madrid Feedforward-the Angel of History, LABoral Centro de Societé Générale. Paris, France (2004), el Premio Aragón-Goya de Pintura (2003), el Premi ULTIMAS EXPOSICIONES COLECTIVAS Arte y Creación Industrial, Gijón, Spain West Collection, Oaks, USA Ciutat de Barcelona d’Arts Plastiques (2000),el Premio Tomás 2003 Colección L’Oréal de Arte Contemporáneo. Sala de Paitsatges creuats, Es Baluard Museu d’Art Modern i Rubel Collection, Beverly Hills, USA Francisco Prieto de la Casa de la Moneda (1999), la Medalla Armas de la Ciudadela. Pamplona. Contemporani, Palma de Mallorca, Spain Tom Fenner Collection, Düsseldorf, Germany del Honor al Mérito en las Bellas Artes (1996), El Premio CEOE La distancia y otros mundos. Galería Rafael Ortiz. Sevilla. Utopía, Alaró, Palma de Mallorca, Spain Fundación Coca-Cola, Spain a las Artes Plásticas (1992), El Premio Andalucía de las Artes Colección L’Oéeal de Arte Contemporáneo. Casal Solleric. Loop ‘09, Barcelona, Spain Museo Patio Herreriano, Valladolid, Spain Plásticas (1991). Asimismo ha sido distinguido con la orden de Palma de Mallorca. Vienna Art ‘09, Galeria Ulrich Fiedler, Vienna Private Collections Caballero de las Artes y de las Letras por el ministerio de Cultura 2004 El papel, ese soporte. Galería Edurne. Madrid. Pulse New York, Ulrich Fiedler Gallery, New York, USA Collection BES Art francés (2007). 2006 FORO SUR ‘06. Feria Iberoamericana de Arte Videntes, CAB, Sala Amós Salvador, Logroño, Spain Su trabajo se ha mostrado internacionalmente de forma Contemporáneo. Stand Galería Rafael Ortiz. Cáceres. Arco ‘09, Galería Max Estrella, Madrid, Spain individual tanto en Museos y Centros como en Galería de Arte ARTE SANTANDER ‘06. Feria de Arte Contemporáneo. MadridFoto, Galería Max Estrella, Madrid, Spain Contemporáneo de España, Alemania, México, Francia, Brasil Stand Galería Rafael Ortiz. Santander. Art Brussels ‘09, Galería Max Estrella, Brussels, Belgium y Estados Unidos. Entre sus innumerables muestra cabe VALENCIA ART ’06 Feria de Arte Contemporáneo. Stand Luis Gordillo Sevilla, 1934 destacar «Iceberg Tropical» en el MNCARS (Madrid, España) y Galería Rafael Ortiz. Valencia. COLECCIONES PÚBLICAS Vive y trabaja en Madrid en el Kunst Museum (Bonn, Alemania), la mayor retrospectiva Colección 2006. Centro Andaluz de Arte MNCARS, Museo Nacional Centro de Arte Reina Sofía, Madrid realizada hasta el momento de su obra junto con una magnífica Contemporáneo. Sevilla. ING Collection, Amsterdam, Netherlands Luis Gordillo se ha convertido en el artista referente de la crea- publicación que recoge un recorrido analizado personalmente 2009 Aprendiendo a mirar. 25 años de la Galería Rafael Ortiz. Museum of Contemporary Photography, Chicago, USA ción pictórica española de las últimas décadas, marcando un por el propio artista (2007-2008). Centro de las Artes de Sevilla, caS. Sevilla. 105
  • 110.
    OBRAS EN MUSEOSY COLECCIONES PÚBLICAS Miki Leal Sevilla, 1974 Colección Arte Cotemporáneo, Patio Herreriano. Valladolid. Levine resignifica la obra de grandes maestros del arte –siempre Colección Banco de España. Madrid. Vive y trabaja en Madrid Colección Artium. Vitoria hombres– y niega las nociones tradicionales de originalidad y Colección L’Oréal. Madrid. Colección Caja Madrid. Madrid autoría, que han sido paradigmáticas del concepto patriarcal Colección Telefónica. Madrid. Licenciado en Bellas Artes, Universidad de Sevilla Colección del Excmo. Ayuntamiento de Utrera. Sevilla. de vanguardia. Al mismo tiempo se interroga sobre la idea de Colección Testimoni. Fundación Caja de Pensiones. La Caixa. Colección Fundación Tio Pepe. Jerez de la Frontera propiedad y el proceso de fetichización que sufre toda obra de Barcelona. ÚLTIMAS EXPOSICIONES INDIVIDUALES Colección RED BULL, hangar 7, Salzburg arte por el mero hecho de llevar inscrita una firma. Comunidad Autónoma de Extremadura. 2009 «Mikithology». Galería Fúcares. Almagro (Ciudad Real), Comunidad de Madrid Comunidad Autónoma de La Rioja. España. Diputación de Cádiz Comunidad Autónoma de Murcia. «Trasfábula» (Con Abraham Lacalle y Mp y MP Rosado). Diputación de Málaga Fundación Coca-Cola de España. Sala de exposiciones Hospedería Fonseca. Universidad Fundación Coca Cola. Madrid Diputación Provincial de Sevilla. de Salamanca. Salamanca, España. Fundación de la Caja de Badajoz. Sede Central de Badajoz. Rogelio López Cuenca Nerja, Málaga, 1959 Centro Andaluz de Arte Contemporáneo. Sevilla. «The end». Benveniste Contemporary. Madrid, España. Fundación El Monte. Sevilla Vive y trabaja en Málaga Museo José María Moreno Galván. Puebla de Cazalla. Sevilla. 2008 «Ieri, oggi, domani». Galería Alessandro Seno. Milán, Fundación Focus Abengoa. Sevilla Museo Nacional Centro de Arte Reina Sofía. Madrid. Italia. Fundación Unicaja. Málaga Licenciado en Filosofía y Letras «Con el viento de cara». Galería Rafael Ortiz. Sevilla, Instituto Andaluz de la Juventud. Sevilla España. Junta de Andalucía. Sevilla ÚLTIMAS EXPOSICIONES INDIVIDUALES «Frenhofer y La Laguna». Galería Maribel López. Berlín, MUSAC. Museo de Arte Contemporáneo de Castilla y León. 2007 «Málaga 1937». Sala Alameda, Diputación Provincial. Alemania. León Málaga, España.* Juan del Junco Jerez de la Fra, 1972 2007 «Balada Heavy» Galería Magda Bellotti. Madrid, España. Museo de BBAA de Santander 2008 «Hojas de Ruta». Museo Patio Herreriano. Valladolid, Vive y trabaja en Sevilla Galería Milagros Delicado. Cádiz, España. Museo Nacional Centro de Arte Reina Sofía. Madrid España. Universidad de Sevilla. Sevilla «Le Partage». Galería Juana de Aizpuru. Madrid. Artista visual que utiliza la fotografía, es miembro fundador de ÚLTIMAS EXPOSICIONES COLECTIVAS «Relecturas. Herramientos del Arte». Sala Parpalló, The Richard Channin Foundation, colectivo artístico formado a 2010 «La Cabaña» / «De la Costa Azul a la Selva Negra». Valencia, España. final de los 90 en Sevilla. Becas de Artes Visuales Cajasol 2010. Centro Cultural «Avenida Ixtapaluca» Galeria Juana de Aizpuru. Madrid. Entre sus exposiciones individuales cabe destacar El Cajasol, Espacio Escala y Sala Imagen. Sevilla, España. 2009 «La Comunidad Desobrada». La ciudadela, Pamplona, sueño del ornitólogo II (del Philloscopus sibilatrix a la Oxyura 2009 El tiempo que venga. La colección IX. Comisariada por Sherrie Levine Hazleton, Pennsylvania (USA), 1947 España. jamaicensis) un proyecto específico para el Centro Andaluz Daniel Castillejo. Artium. Centro Museo Vasco de Arte Vive y trabaja en New York «Gitanos de Papel (con Elo Vega)». Sal a Cajasol. Jerez de Arte Cotemporáneo, Sevilla ; Lejos del paraíso en el Patio Contemporáneo. Vitoria-Gasteiz, España. de la Frontera, España. de Escuelas de la Universidad de Salamanca; o el Naturalista AUTO. SUEÑO Y MATERIA. «La cultura del automóvil Sherrie Levine es una de los principales miembros de una gene- Galería Pedro Olveira. Oporto. Portugal y lo habitado: trazas, huellas y el artificio del artista en la sala como territorio crítico y creativo». Comisariada por ración de artistas que, huyendo de la nueva tendencia pictórica «Bienal Ventosul». Curitiba, Brasil Cajasol de Sevilla. Ha participado dos veces en el festival Off de Alberto Martín. LABoral Centro de Arte y Creación neoexpresionista que dominaba el arte de los últimos setenta y «Yo uso perfume para ocupar más espacio». Museo Photoespaña y trabaja con las galerías Alfredo Viñas en Málaga Industrial. Gijón, España. CA2M Centro de Arte Dos de primeros años ochenta, comienza a explorar asuntos como los Carrillo Gil. y magda Belloti en Madrid Mayo. Mostoles, España. de la originalidad, autenticidad y autoría, característicos de lo «La mirada del otro» Universidad Nacional de Bogotá. Es ganador del IV Premio Internacional de fotografía con- 2008 Imágenes latentes. Comisariada por Alberto Martín. que más tarde ha venido a llamarse neoconceptualismo. Colombia. temporánea Pilar Citoler y ha disfrutado de numerosas becas Galería Fúcares_Madrid, España. Su primera obra destacada fue Shoe Sale (1977) y ese «Camuflajes» Casa Encendida. Madrid entre las que citamos la de la Casa Velázquez y la Beca para mismo año terminó una serie de dibujos, Sons and Lovers, que «Rogelio López Cuenca» Festival: Mar de Músicas. Sala proyectos de fotografía Cajasol. BECAS Y PREMIOS parecen anunciar sus obras posteriores. En ellos enfrenta la Muralla Bizantina. Cartagena. España Actualmente investiga sobre la relación entre fotografía y 2009 Beca Cajasol. silueta reconocible de un presidente americano con la de una ciencia, más específicamente entre el lenguaje fotográfico y la 2007 Premio Altadis de pintura 2006. figura femenina anónima; estos dibujos logran, a través de la ÚLTIMAS EXPOSICIONES COLECTIVAS ornitología, ciencia social que practica desde su más temprana 2006 Beca caja Madrid Proyecto BBC. repetición y de la variación, que el espectador sea el que genere 2007 «Geografías del Desorden». Centro de Historia, zaragoza, infancia. Vive y trabaja en Andalucía 2004 Beca, Ayudas a la Creación Artística Contemporánea de la historia que los une completando el significado de la obra. España. la Consejería de Cultura de la Junta de Andalucía. En 1979 Levine realizó ocho collages a partir de obras de «Existencias» MUSAC. León 2002 1º Premio. Certamen Nacional de Arte Joven (I.A.J.) Leonard Feininger, fue la primera vez que se apropió de las «Ciutats Platja» Asociación para las Artes Málaga. fotografías de otro artista. Ese mismo año refotografió seis de Contemporáneas. Vic. Cataluña. 1998 1º Premio para Artistas Jóvenes de la Fundación El los desnudos masculinos de Edward Weston, así como algunos «Mediterraneo» Centre D’Art La Panera. LLeida Monte. Sevilla. de los paisajes de Eliot Porter. Dos años después, su exposición «La Palabra Imaginada» Museo Esteban Vicente. individual en la galería Metro Pictures provocó, por la novedad Segovia OBRA EN COLECCIONES de su propuesta, el debate en el medio artístico neoyorquino. En 2008 IX Bienal de Guerricabeitia. Valencia, España. Centro Andaluz de Arte Contemporáneo CAAC. Sevilla ella presentó sus reproducciones de la serie fotográfica W.P.A. ARCO’08. Stand Galería Juana de Aizpuru. Madrid. Colección Altadis. Madrid Depression Series de Walker Evans. Con sus apropiaciones, Festival de Videoclip «Videolife». MUSAC, León, España. 106
  • 111.
    «Arte=Vida=Arte» Museo Vostel,Malpartida. Cáceres. Diputación de Málaga. Málaga, España. 2009 «Light Years. Cristina Lucas» Centro de Arte Dos de 2010 «Dominó Caníbal». Proyecto de Arte Contemporáneo «Retorno a Anísala» MUSAC. León. Colección Caja Sol, Sevilla, España. Mayo. Móstoles, Madrid. Murcia. Sala Verónicas. Murcia 2009 «XIX Bienal de la Fotografía Internacional de Córdoba». Colección Caja Burgos. Burgos. 2010 «Letargo Revolucionario». Espacio Iniciarte. Sevilla «La rama dorada». MARCO Vigo, España y Frac Lorraine Córdoba, España. Museo Patio Herreriano. Valladolid Francia «Retrono a Anísala». MUSAC, León, España. MEIAC. Badajoz ÚLTIMAS EXPOSICIONES COLECTIVAS «Crisisss. América Latina: arte y confrontación. 1910- «Heroirik ez Gehiago / No más Héroes». Artium, Victoria, 2007 ARCO’07. Stand Galería Juana de Aizpuru. Madrid. 2010». Museo Del Palacio de Bellas Artes de la Ciudad España. BECAS Y PREMIOS Botánico. Comisariada por: Maria Azcoitia, Oliva María de México «Lecturas Transversales». Colección Fundación 1991 III Beca Pablo Ruiz Picasso. Málaga, España. Rubio, Blanca de la Torre. Madrid. «Despalzamientos». Cent4 de París, Francia Marcelino Botin, Santander 1992 Premio Andalucía de Artes Plásticas. Junta de III Bienal Internacional de Valencia. Valencia, España. ARCO’10. Stand galeria Juana de Aizpuru. Madrid ARCO’09. Stand de la Galería Juana de Aizpuru. Madrid. Andalucía, España. «Historias Animadas» La Caixa. Mallorca, España. «LIF:Libertad, Igualdad,.Fraternidad». CAAM. Canarias. «Bienal Ventosul». Curitiba, Brasil Premio El Ojo Crítico-Artes Plásticas. Radio Nacional de «Encuentro Internacional Medellin’07-Prácticas artís- «Miradas singulares voces plurales». Palacio provincial, «Camuflajes» Casa Encendida. Madrid. Itinerancia España. ticas Contemporáneas». Bienal de Medellín. Espacios Cádiz. en Sala de exposiciones de zaragoza. Museo del 1995/96 Beca del Ministerio de Asuntos Exteriores. Madrid. de Hospitalidad. Medellín, Colombia. Patrimonio Municipal de Málaga. Barcelona Academia Española de Bellas Artes en Roma. «Mujer, Arte y Género». Filmoteca de Andalucía. BECAS Y CONFERENCIAS «¡Grande Hazaña! Con muertos. Sala Puertanueva. 1999/00 Beca Fundación Marcelino Botín de Artes Plásticas. Córdoba. 2002 Beca Fundación Marcelino Botín Córdoba Santander, España. «Aquí y Ahora». Sala Alcalá 31. Madrid. «Itinerarios 2002-2003». X Becas de Artes Plásticas. 2010 «Camuflajes» Itinerancia de la exposición de la Casa 2001 Premio El Público Canal Sur Radio, España. «Je est il, Je sont ils?» Centre d’art Contemporain Sala de Exposiciones de la Fundación Marcelino Botín. Encendida, Madrid. Espacio para el Arte Caja Madrid, 2002 Premio Francisco de Goya. Ayuntamiento de Madrid. Maymac, Francia. Santander, España. zaragoza. Museo del Patrimonio Municipal de Málaga. «Jelly Border». Bienal de Estambul. Estambul. 2006/07 Beca Rijksakademie, Amsterdam. Barcelona. 2008 «Las implicaciones de la imagen». MUCA Museo 2009 Beca «Cité Internacional des Arts» del Gobierno Francés. ARCO’10. Stand galeria Juana de Aizpuru, stand galeria Universitario de Ciencias y Artes. Ciudad México. Paris. Francia. Palma Dotze. Madrid ARCO’08. Stand Galería Juana de Aizpuru. Madrid. 2010 Conferencia «Light years» en Centre Pompidou, Francia, Cristina Lucas Jaén, España, 1973 Bienal de Estambul 2008. dentro del programa Video et apres organizado por OBRA EN MUSEOS Y COLECCIONES PUBLICAS Vive y trabaja entre Madrid y Ámsterdam «En vivo encuentro». 28 Bienal de Sao Paulo, Brasil Christine Van Assche. Museo de Arte Contemporáneo de Barcelona. «Nuevas historias». Kulturus. Estocolmo, Suecia Museo Nacional Centro de Arte Reina Sofía. Madrid. Licenciada en Bellas Artes por la Universidad Complutense. «Tina b: Alternative Revolutions». Praga Contemporary OBRAS EN MUSEOS Y COLECCIÓNES Museo de San Telmo. San Sebastián, España. Madrid. 93/98 Art Festival. República Checa INJUVE, Instituto de la Juventud, Ministerios de Asuntos Museo de Bellas Artes de Álava. Vitoria, España. MFA (Master on Fine Arts) University of California Irvine. «One way one ticket». Instituto Valenciano de Arte Sociales. Madrid. Academia Española de Bellas Artes. Roma. Estudiante de intercambio 99/00 Moderno, Valencia Ayuntamiento de Alcorcón, España. Museo Nacional de Bellas Artes. La Habana. Coordinadora Jefe del Canal de Arte de Kataweb (España), por- «The Gates of the Mediterráneo». Palazzo Piozzo. Comunidad de Madrid. Fundación Ludwig de Cuba. La Habana. tal perteneciente al grupo editorial El Expreso de Italia. (00/01) Rivoli, Italia. MUSAC. Museo de Arte Contemporáneo de Castilla. León, Centro Andaluz de Arte Contemporáneo. Sevilla, España. Programa de formación y gestión cultural en Casa de América, «Geopolítica de la Animación». MARCO, Vigo España. Colección Banco de España. Madrid. dirigido por Rafael Doctor (02) Frieze. Stand Galería Juana de Aizpuru. Londres IVAM Institut Valencià d’Art Modern, España. Colección de la Biblioteca Nacional. Madrid. ISCP International Studio and Curatorial Program. New York. Paris Photo. Stand Galería Juana de Aizpuru. París ARTIUM. Museo de Arte Moderno de Vitoria, España. Colección Fundación La Caixa. Barcelona. USA (2003) Art Basel Miami Beach. Stand Galería Juana de FNAF Fondo Nacional de Arte de Francia. Colección Fundación ICO. Madrid. Rijksakademie Ámsterdam. 2006-2007 Aizpuru. Miami. Colección ALTADIS Francia-España. Colección Martínez Guerricabeitia. Universidad de Valencia, 2009 Integration and resistente in the global era. X Bienal de Obra Social Caja Madrid. Madrid. España. ÚLTIMAS EXPOSICIONES INDIVIDUALES La Habana, Cuba. Fundación Marcelino Botín. Santander, España. Colección Ministerio de Asuntos Exteriores. Madrid. 2005 «Cristina Lucas, más Luz». Centro Cultural de España en Dojima River Biennale 2009-Reflections: The World L’Oreal España Colección Fundación Coca Cola. Madrid. República Dominicana / Centro Cultural Español, Miami, Through Art-Dojima River Biennale, Osaka, Japón Fundación NMAC, Montenmedio, Vejer, Cadiz, España. Asociación Colección de Arte Contemporáneo. Madrid. USA. ARCO’09. Stand de la Galería Juana de Aizpuru. Museo de Bellas Artes de Santander. España. Collection Fondation Colás. París. «Nunca verás mi Rostro». Centro Municipal de las Artes Madrid. Fundación Coca-Cola. España. Colección de la Diputación de la Rioja. Logroño, España. Buero Vallejo. Alcorcón, Madrid. Art Basel ’09. Stand de la galería Juana de Aizpuru. Diputación de Málaga. España. Collection Fonds Nationals d’Art Contemporain. Paris. «El Eje Del Mal» Agencia Española de Cooperación Basel. The Centre National d’Art et de Culture Georges Pompidou, Colección Caja de Asturias. Oviedo, España. Internacional. Miami, USA. «El Patio de mi Casa». (Casa de las Campanas), varias Paris. Colección UNED. Madrid. «Under The Gloss» Galería Valle Ortí. Valencia, España. sedes. Córdoba Colección de la Comunidad de Madrid. IVAM. Valencia, España. 2008 «Caín y las hijas de Eva». Galería Juana de Aizpuru. «Huésped». Colección MUSAC. Museo Nacional de Isabel y Agustín Coppel Collection, México. Fundación Marcelino Botín. Santander, España. Madrid. Bellas Artes. Buenos Aires, Argentina Centro Pompidou. Paris. France Museum Ludwig, Colonia. Alemania. «Talk». Stedelijk Museum Schiedam. Holanda. «Nuevas Historias-A New View of Spanish MUSAC. León, España. «Imago Mundi». Deweer Art Gallery, Otegem, Bélgica. Photography». The Stenersen Museum Oslo, Noruega 107
  • 112.
    Vik Muniz SãoPaulo, 1961 EXPOSICIONES INDIVIDUALES Alcorcón City Council, Madrid, Spain la boca, Salas Cajasol, Sevilla; ARCO’09, Stand Galería Vive y trabaja en New York 2010 Laboratorios, Museo Guggenheim Bilbao, Spain Córdoba City Council, Spain Rafael Ortiz, Madrid. 2009 Gap, Espacio latente, Patio Herreriano, Valladolid, Spain Archivo Foral de Alava, Spain 2008 Hasta el infinito y más allá, Centro de las Artes de Sevilla, Su gran éxito internacional se ha concretado en exposiciones Gap, Espacio latente, Koldo Mitxelena, San Sebastián, Bilbao City Council, Spain Sevilla; ARCO’08, Stand Galería Rafael Ortiz, Madrid; en solitario en el Nichido Contemporary de Tokio, en el Miami Spain Oviedo City Council, Spain Foro Sur ’08, Stand Galería Rafael Ortiz, Cáceres; Inicial Art Museum, en Museum of Contemporary Art de Montréal, 2008 Galería Senda, Barcelona, Spain Madrid City Council, Spain 08, Espacio Iniciarte, Sevilla; Los Claveles, Fundación en el Museum of Contemporary Art, San Diego, en el Centre 2006 A Subversión da realidade, Archivo del Reino de Galicia, Banco Central Hispano, Spain Chirivella-Soriano, Valencia; La hora sin sombra, Galería National de la Photographie o en la Pinacoteca de Sau Paulo Spain Museo de la Universidad de Alicante, Spain Tomás March, Valencia; ARTE=VIDA=ARTE. 26 artistas entre otros, además de destacar su participación en la 49 Muros de Luz, Museo ARTIUM, Vitoria, Spain Museo Municipal de Arte Contemporáneo, Madrid, Spain con Vostell, Museo Vostell Malpartida (Cáceres); Escala edición de la Bienal de Venecia y en exposiciones colectivas en Muros de Luz, Galería Max Estrella, Madrid, Spain FCOFF, Fundació Centro Ordoñez-Falcón de Fotografía, Spain abierta, Espacio Escala, Sevilla. el MOMA, en el Metropolitan Museum, en el Nacional Center for Fundación Telefónica, Madrid, Spain 2007 Transatlántica 9669, Sala de Estar, Sevilla y Galería 713, Contemporary Arts de Moscú o en la Fundación Daros. Cuentan ÚLTIMAS EXPOSICIONES COLECTIVAS Colección de Arte Contemporáneo Fundación La Caixa, Buenos Aires; ; Arte Santander ’07, Stand Galería Rafael con su obra colecciones internacionales de prestigio, entre las 2010 Buildingrooms, Carlos Carvalho Arte Contemporanea, Barcelona, Spain Ortiz, Santander; Valencia Art’07, Stand Galería Rafael que podemos señalar el Metropolitan Museum y el MOMA de Lisboa, Portugal MACUF, Museo de Arte Contemporáneo Unión FENOSA, La Ortiz, Valencia. Nueva York, el Centre Georges Pompidou de París, el Museum Faraway… So close, Museo Nacional de Soares dos Coruña, Spain 2006 La estrategia del calcetín. Centro Cultural El Monte, of Contemporary Art de Tokio y en España, el Artium, el CGAC, Reis, Oporto, Portugal Colección de Fotografía de la Comunidad de Madrid, Spain Sevilla; Art-Salamanca’06, Stand Galería Rafael Ortiz, el Museo de Bellas Artes de Santander, la Fundación Telefónica 2009 Arte Lisboa’09, Carlos Carvalho Arte Contemporanea, Fundación Sorigué, Lérida, Spain Salamanca. y el Museo Reina Sofía de Madrid. Recientemente ha sido comi- Lisboa, Portugal Gobierno de Cantabria, Spain 2005 Hacen lo que quieren, Fundación Aparejadores, Sevilla; sario de la exposición Artist’s Choice en el MOMA de Nueva York Colección Alcobendas, Siete décadas de creación Museo Es Baluard, Palma de Mallorca, Spain Medias y extremas razones, Sala Imagen. Obra Social de Vik Muniz desarrolla su trabajo en torno a dos ideas: el fotográfica española, Centro Andaluz de la Fotografía, Ministerio de Industria, Turismo y Comercio, Gobierno de Caja San Fernando, Sevilla; Todo Modo, Sala de eStar, reconocimiento de imágenes fácilmente identificables que Almería, Spain España, Spain Sevilla. proceden de la historia del arte y de fuentes visuales históricas y Paris Photo’09, Galería Max Estrella, Paris, France 2004 Mirabilia. Galería Birimbao, Sevilla. documentales, y la innovación que supone el uso de materiales MadridFoto ‘09, Galería Max Estrella, Madrid, Spain 2003 Figuraciones. Arte Civil/ Magicismos/ Espacios de poco convencionales en el mundo del arte que acrecientan Art Brussels ‘09, Galería Max Estrella, Brussels, Belgium Frontera, Espacio para el Arte, Obra Social de Caja la atención del visitante. Con sentido del humor e inteligencia, Arco ‘09, Galería Max Estrella, Madrid, Spain Madrid, Barcelona; Sala Santa Inés, Sevilla y Sala Alcalá Muniz no sólo le muestra al espectador el producto creativo sino Cige Art Fair, Beijing, China J. M. Pereñíguez Sevilla, 1977 30, Madrid; Los chicos del maíz, Galería Icaria, Alcalá que lo desafía a participar en ese proceso creativo. A new view of Spanish Photography and Video Art, Vive y trabaja en Sevilla de Guadaíra (Sevilla). Muniz disuelve las fronteras entre las técnicas y manipula Kulturhuset, Stockholm, Sweden 2002 La parte chunga. El arte joven sevillano de finales del hilo, alambre, azúcar o tinta con paciencia y minuciosidad. Su A new view of Spanish Photography and Video Art, Licenciado en Bellas Artes, Universidad de Sevilla (2000) siglo XX. Sala de eStar, Sevilla. obra cuestiona nuestras ideas visuales preconcebidas y nos Stenersen Museum, Oslo, Norway 2001 Figuraciones de Sevilla. Horizonte 2000, Centro de Arte obliga a plantearnos si la imagen que estamos contemplando es EXPOSICIONES INDIVIDUALES Joven, Madrid y Sala Santa Inés, Sevilla. en realidad pintura, fotografía de una pintura o reproducción de COLECCIONES PÚBLICAS 2009 Años de peregrinaje, Sala Poste –Ite/ Galería Pedro otra fotografía. Tal es el caso de la serie, Pictures of paper, que MNCARS, Museo Nacional Centro de Arte Reina Sofía, Madrid, Oliveira, Oporto; Presencia de ánimo, Galería Rafael OBRAS EN COLECCIONES toma como referente la fotografía clásica en blanco en negro Spain Ortiz, Sevilla. Centro Andaluz de Arte Contemporáneo, Sevilla donde realiza verdaderos collages previos, casi artesanales, con Museo Patio Herreriano, Valladolid, Spain 2007 La obra en negro, Galería Birimbao, Sevilla. Museo Patio Herreriano, Valladolid pequeños fragmentos de papeles. ARTIUM, Vitoria, Spain 2005 La leyenda frágil, Galería Deposito 14, Madrid; Brut Fundación Coca Cola-Juan Manuel Saínz de Vicuña Fundación La Caixa, Colección Testimonio, Spain Nature, Galería Birimbao, Sevilla. Ministerio de Cultura, Madrid/ Fundación Cajasol, Sevilla CAB, Caja Burgos Collection, Spain 2004 La nueva música (con Miki Leal), Sala de eStar, Sevilla. Obra Social Caja Madrid, Madrid Museo de Arte Moderno, Pamplona, Spain 2002 Somos el fango (con Rubén Guerrero), Sala de eStar, Consejería de Obras públicas y Transportes, Junta de Andalucía, IVAM, Valencia, Spain Sevilla. Sevilla Aitor Ortiz Bilbao, 1971 AXXA Brussels, Belgium 2001 Comparemos mitologías, Showroom de The Richard Instituto Andaluz de la Juventud, Málaga Vive y trabaja en Bilbao Guggenheim Museum, Bilbao, Spain Channin Foundation, Sevilla Colección Iniciarte Foto Colectania, Barcelona, Spain Diputación de Sevilla ÚLTIMOS PREMIOS International Museum of Electrography of Cuenca, Spain EXPOSICIONES COLECTIVAS (SELECCIÓN) Ayuntamiento de Utrera. 2006 Ciudad de Palma Arts Award, Spain Museo Etnográfico, Arqueológico e Histórico Vasco, Spain 2010 ARCO’10, Stand Galería Rafael Ortiz, Madrid; Nuevos 2003 Finalist of Europäischer Architekturfotografie-Preis Ministry of Social Affairs (INJUVE), Spain pintores figurativos en las colecciones públicas de la 2002 ABC Photography, 1st Prize, Spain Diputación Foral de Bizkaia. Spain provincia de Sevilla, Museo de la Ciudad, Alcalá de 2001 Biennial of Alexandria, Honor Prize, Egypt Diputación Foral de Gipuzkoa, Spain Guadaíra (Sevilla). 2000 Honour Mention, Generación 2000 Caja Madrid, Spain Rafael Tous Collection, Spain 2009 Aprendiendo a mirar. 25 años de la Galería Rafael Ortiz, 1999 Villa de Madrid, 1st Prize on Photography, Spain Alcobendas City Council, Madrid, Spain Centro de las Artes de Sevilla, Sevilla; El pensamiento en 108
  • 113.
    Carlos Pérez SiquierAlmería, 1930 ÚLTIMAS EXPOSICIONES COLECTIVAS ÚLTIMAS EXPOSICIONES COLECTIVAS en Las Palmas, Haus der kulturen der Welt y Sala del Senado Vive y trabaja en Almería 2009 Centros para el Arte Contemporáneo Españoles: con- 2010 El angel exterminador,A room for a Spanish KunstBank en Berlín, Royal College of Art en Londres, Art tinente y contenido. Consulado General de España en Contemporary Arts. Palais De Beaus Arts (Bozar). in General en Nueva York, Centro cultural de España en Es sin duda, uno de los pioneros de la vanguardia fotográfica en Shanghai, China. Bruselas Miami, México D.F. y Montevideo, así como en la II Bienal de España. Y si en 1956 fundó con José Mª Artero el Grupo AFAL y Faraway… So Close. Museo Nacional de Soares dos Living Together. Reales Atarazanas. El Observatori. Johannesburgo en Sudáfrica, Paris Photo, Instituto Cervantes en la revista del mismo nombre, que sobrevivió hasta 1962, y que Reis, Oporto (Portugal) Valencia. Spain Roma y en Pekín, y el Laboratorio de Arte Alameda en México aglutinó a toda una generación, también en esa fecha realizó su TORINOver 09 II Linguaggio genera mondi. Metro 2008 Paraísos Indómitos / Untamed Paradises, MARCO, Vigo DF. Su obra está, entre otras, en las colecciones del Banco de primera serie fotográfica en el barrio almeriense de La Chanca, stationsCity of Torino, Italia. Paraísos Indómitos / Untamed Paradises. Centro España, MACBA, CAAC, Patio Herreriano, Fundación Marcelino un documento humanista que retrata a la gente sencilla de Food. For de Brain. Roma Contemporary. Roma Andaluz Arte Contemporáneo. Sevilla Botín y Fundación Pilar Citoler. la calle de una forma directa, convirtiéndose en un punto de Escultura española actual. 2000-2010. Museo Esteban Fotoencuentros, Fundación Cajamurcia, Centro Cultural inflexión en la fotografía española. En sus obras posteriores la Vicente, Segovia. Las Claras, Murcia, Spain estética de Pérez Siquier cambió sustancialmente y sus imágenes, 2008 MicroNarratives. Musée d’Art Moderne. Saint-Etienne. «Youniverse». BIACS-3. Sevilla,Spain (Catálogo) ya en color no buscan al individuo, sino fragmentos, detalles, con España1957-2007. Palazzo sant’Elia. Palermo. Kulturhuset, Stockholm. «Nuevas Historias». A new view una ironía y una construcción interna en la que prima el estilo O medio é o museo. MARCO. Vigo of spanish photography MP&MP Rosado San Fernando, Cádiz, 1971 pop. Su trabajo es un alegato subjetivo, muy moderno y personal Bienal de Arte, Singapur PhotoEspaña. Circo Price, Madrid, Spain Viven y trabajan en Sevilla de sus vivencias y paisajes cotidianos. Está en posesión de la BIACS 3, Sevilla «Puzzling Questions». Palacio Fonseca, Universidad de Medalla de Andalucía; en el 2003 se le concedió por el Ministerio 2007 Speed. IVAM. Valencia Salamanca, Salamanca, Spain 1989/94 Universidad de Sevilla. Facultad de Bellas Artes. de Cultura el Premio Nacional de Fotografía, y en el 2005 el Escenarios transitables. Museu d’art Girona. Girona. «Puzling Question». Hospital de San Juan de Dios. 1994/95 School of Fine Arts, Atenas. Grecia Pablo Ruiz Picasso de Artes Plásticas. Su obra está presente en …And dreams are dreams. Istanbul Museum of Modern Almagro, Ciudad Real, Spain importantes colecciones como en la colección permanente del Art. Estambul. 2007 Cuenca. Otra forma de mirar, Fundación Antonio Pérez, ÚLTIMAS EXPOSICIONES INDIVIDUALES Museo Reina Sofia de Madrid y en el IVAM en su colección que Où? Scènes du sud: Espagne, Italie, Portugal. Carré Sevilla, Spain 2010 CasalSolleric / Espai Quatre. Palma de Mallorca. actualmente se exhibe en la Feria Mundial de Shanghai. d’Art. Nîmes. Geografías, Galería Miguel Marcos, Barcelona, Spain 2009/10 «Cuarto-Gabinete». Matadero-Madrid. Abierto × Obras. Video killed the painting star. DA2. Salamanca. Otras formas de paisaje, Fundación Metrópoli, Madrid. Rosa Olivares / EXIT Publicaciones. In situ. Le Quartier. Quimper Alcobendas, Spain 2009 El retrato de Dorian Gray, de Oscar Wilde. Biblioteca Órbigo. MUSAC off. Velilla de la Reina, León Edit! Fotografia e Filme na Colecçao Ellipse, Centro de Pública de zamora. zamora. Existencias. MUSAC. León Artes Visuais, Coimbra, Portugal «Ruines non romantiques». Galerie Olivier Houg. Lyon. Chacun à son goût. Guggenheim Bilbao Pepe Cobo y sus máquinas, Palacio de Sástago, «Como quien mueve las brasas y aspira a todo pulmón». Diputación provincial de zaragoza, zaragoza, Spain Museo de Cádiz. Organiza Obra Social Cajasol. Cádiz. Sergio Prego San Sebastián,1969 «Existencias» Musac. Museo de Arte Contemporáneo de «Trasfábula». Universidad de Salamanca. Hospedería Vive y trabaja en New York Castilla y León. Spain de Fonseca. Curator: Alberto Martín. «Cambio de aceite». Pepe Cobo & Cía. Madrid. EXPOSICIONES INDIVIDUALES Gonzalo Puch Sevilla, 1950 2008 Centro Cultural Fundación Círculo de Lectores en 2010 PRIMER PROFORMA, MUSAC, León, Spain Vive y trabaja en Madrid Barcelona. Galaxia Gutenberg/Círculo de Lectores. 2009 Galería Soledad Lorenzo, Madrid Spain Ilustraciones originales para la edición «El retrato de 2007 Sergio Prego. Lehmann Maupin. New York. USA. EXPOSICIONES INDIVIDUALES (SELECCIÓN) Juan Carlos Robles Sevilla, 1962 Dorian Gray», de Oscar Wilde. Barcelona. Pan head. Buchmann Galerie. Berlín. Germany. 2009 «Introducción a la meteorologia». Galería Helga de Vive y trabaja en Sevilla «De profundis». Federico Luger Gallery, Milan. Italia. Sergio Prego. Alfonso Artiaco. Naples. Alvear. Madrid, Spain «Spleen». Galería Pepe Cobo, Madrid. 2006 En una era de belleza asequible, la fealdad tenía lago de «Introducción a la meteorología». Fundación Garcia Tras licenciarse en Bellas Artes en la Universidad de Barcelona, heráldico, Galería Soledad Lorenzo, Madrid. Jiménez, Murcia, Spain recibió la beca de la Generalitat de Catalunya para ampliar ÚLTIMAS EXPOSICIONES COLECTIVAS Tetsuo, bound to fail. Espacio 5. CAC Málaga. 2008 Gonzalo Puch, Palacios de Cartón, Caja Sol Obra Social, estudios en Berlín, ciudad en la que vivió de 1993 a 2001. Se 2010 ITINERARIOS 2009/10. XVI Convocatoria Becas Artes 2005 Sergio Prego: Caveau, Palazzo delle Papesse Centro Arte Casa Pemán, Cádiz, Spain licenció en la Escuela Superior de Arte, HDK, de Berlín y obtuvo Plásticas Fundación Marcelino Botín (2008/2009). Contemporanea, Siena. Otro orden de las cosas. Galería Art Nueve, Murcia, Spain Meisterschuler con Prof. Katharina Sieverding y las becas de Fundación Marcelino Botín. Santander. Boom Tube. Galería Buchmann, Colonia. 2007 Buscando en la zona (Incidentes, apariciones), Galería postgraduación NaFöG y la del DAAD para trabajar en Nueva 2009 HUÉSPED. Colección MUSAC en Rosario. (Argentina). 2004 Anti-After T.B., Sala Rekalde, Bilbao. Pepe Cobo, Madrid, Spain York con el soporte de Prof. Lothar Baumgarten. Allí obtuvo el Huésped. Colección Musac en el MNBA-Museo 2003 Winter Star, Lombard-Freid Fine Arts, New York. USA. 2006 Gonzalo Puch, PhotoEspaña’06, Jardín Botánico, Certificado en Tecnología de Vídeo en la New York University. Nacional de Bellas Artes-MNBA, Buenos Aires. 2002 Galería Soledad Lorenzo, Madrid. Madrid, Spain Desde el 2000 trabaja con la Galería Oliva Arauna. Vive en Mi Vida. From Heaven to Hell. Life experiences in 2001 Yesland, I’m Here to Stay, Sala Montcada, Barcelona. 2005 Gonzalo Puch, Galería Pepe Cobo, Madrid, Spain Sevilla y desde 2007 es profesor asociado en la universidad art from MUSAC Collection (Mi Vida. Del Paraíso al Tetsuo, Bound to Fail, Galería Antonio de Barnola, Incidentes, Julie Saul Gallery, New York, USA de BBAA de Málaga. Ha expuesto entre otros lugares en el Infierno. Experiencias de vida en la Colección MUSAC). Barcelona. 2004 Incidentes, Centro Andaluz de Arte Contemporáneo, Reina Sofía de Madrid, Sala Montcada Fundació La Caixa, Arts Mucsarnok/Kunsthalle, Budapest. Curators: Agustin 1998 Tetsuo, Bound to Fail, Consonni, Bilbao. Sevilla, Spain Sta Mònica y MACBA en Barcelona, CAAC en Sevilla, CAAM Pérez Rubio (MUSAC), Dr. zsolt Petrányi (Kunsthalle). 109
  • 114.
    El pensamiento enla boca. Sala Chicarreros. Cajasol. Centro Andaluz de Arte Contemporáneo. Sevilla. actividades como: Coordinador del Área de Fotografía, contemporáneo de Castilla y León) León. Sevilla. Centre d’Art La Panera. Lleida. Coordinador de la Fotografía en la «I Enciclopedia Electrónica «AQUÍ-cuatro fotógrafos desde Madrid…». Sala de 2008 Doméstico 2008. Uno más uno multitud. Curator: Tania Colección Bergé. Madrid sobre Andalucía» (Medalla de Plata en el Certamen exposiciones del Canal de Isabel II. Madrid / Instituto Pardo. Madrid. España Colección Caja Madrid. Madrid. Internacional de Vídeo de Nueva York), Coordinador de un Cervantes. Milán. Interficie.Centre D’art La Panera. Curator: Gloria Picazo. Colección de la Comunidad Autónoma de Madrid. CAM Archivo Fotográfico sobre Andalucía, Director y Profesor en «Procesos del Paisaje» (comisariada por Paco del Río). Lérida. España Colección El Monte, Caja de Ahorros de Huelva y Sevilla. Cursos de Formación Fotográfica, Director de Exposiciones Sala Cajasol. Jerez España. Arte Spagnola 1957-2007. Curator: Demetrio Colección FIL, Lisboa. Portugal. Fotográficas, Profesor de Cursos de Capacitación para X Mostra Internacional Unión Fenosa. MACUF. A Coruña. Paparoni Colección Montenmedio Arte Contemporáneo. Cádiz. la Producción Audiovisual y Realizador de Programas «Inicial/08» (comisariada por Óscar Alonso Molina) Palazzo Sant’Elia. Palermo. Italia. Organiza Instituto Colección MP, Sevilla. Audiovisuales (Multivisión). Espacio Iniciarte. Sevilla Cervantes. España Colección Testimoni. Barcelona. Su obra fotográfica ha sido publicada y mostrada en «15 Años de Fotografía Española Contemporánea- Parangolé. Fragments from the 90’s: Brazil, Portugal, Colección Unicaja. Málaga. distintos foros nacionales e internacionales: Universidad de Géneros y tendencias. Colección Alcobendas» Spain. Museo Patio Herreriano, Valladolid. Diputación Provincial de Cádiz. Málaga, Sevilla, Menéndez Pelayo de Santander, Universidad Alcobendas. Adquisiciones 2008. Colección de la Fundación Coca- Diputación Provincial de Córdoba. de Cantabria, Salamanca, Valencia, Utrera, Provence, Illinois 2007 «Planes Futuros» (comisariada por María de Corral y Cola. DA2, Domus Artium 2002, Salamanca. Diputación Provincial de Málaga. University, Jardín Botánico de Madrid, Centro Cultural Conde Lorena Martínez de Corral) Baluarte de Pamplona. Mixed Emotions. DA2, Domus Artium 2002, Salamanca. Deutsche Bank, Londres. Duque de Madrid, Nueva York, Museum of Documentary V Premio purificación García. Círculo de Bellas Artes. Comisario/curator: Javier Panera Ellipse Foundation. Cascais, Portugal. Photography de Chicago, Willians College Museum of Art de Madrid Fundación Coca Cola. Williamstown, Gray Gallery de Greenville, Southeast Museum of Recorrido fotográfico «ARCO» (comisariado por Rafael BECAS, AYUDAS, PREMIOS Fundación Pilar y Joan Miró. Mallorca. Photography de Florida, Universidad internacional de Andalucía, Doctor). Madrid 2010 7ª Becas Colección CAM de Artes Plásticas (2009/2010). MUSAC. Museo de Arte Contemporáneo. Castilla y León. Centro Andaluz de Arte Contemporáneo… «Departures» Galería Luis Adelantado. Miami. Alicante Museo Patio Herreriano, Valladolid. En 2002 obtuvo la I Beca a Proyectos Fotográficos de la 2009 XVI Becas Artes Plásticas Fundación Marcelino Botín Domus Artium. DA2. Salamanca. Caja San Fernando por su proyecto «Romper el Círculo». PREMIOS Y BECAS (SELECCIÓN) (2008/2009). Santander. Centro de Arte Dos de Mayo. Móstoles. Madrid. España. En los últimos años ha retomado las clases de Matemáticas 2010 Beca de residencia en Künstlerhaus Bethanien Gmbh. IV Premio Iniciarte 2009. Consejería de Cultura. Junta Colección La Caixa. Barcelona. en Secundaria, ha profundizado en la investigación y el uso Programa Iniciarte. Junta de Andalucía. de Andalucía. Fnac-Fond national d’art contemporain. Francia. profesional de las técnicas de captura, tratamiento e impresión 2008 Beca para proyectos artísticos «Generación 2008» de 2008 Beca Fundación Marcelino Botín. Proyecto «Melancolía Fundación Marcelino Botín. Santander digital, ha ejercido como Director y Profesor sobre Fotografía Caja Madrid II y III». Santander. España. Digital en diversos Cursos de la Universidad Internacional de 2007 Primer premio V Concurso de fotografía «Purificación V Premio Arco 2008 Comunidad de Madrid para Andalucía y es socio colaborador del Laboratorio Digital de García» Jóvenes Artistas. Arco 2008. Ifema. Madrid Photovision. 2003 Primer Premio IV Concurso «ABC» de Fotografía 2006/07 International Studio & Curatorial Program. (ISCP).Nueva York. EEUU. Alejandro Sosa Suárez Coria del Río, Sevilla, 1951 OBRA EN COLECCIONES PÚBLICAS (SELECCIÓN): Oficina de Creación Artística. Iniciarte. Junta de Vive y trabaja en Coria del Río, Sevilla ABC-Vocento Andalucía. Obra social Caja Madrid 2002/03 Beca «The Pollock-Krasner Foundation», New York. Maestro de Escuela y Profesor de Matemáticas en Enseñanza Miguel Ángel Tornero Baeza, Jaén,1978 Colección Purificación García U.S.A. Secundaria entró de niño en contacto con la imagen gracias a la Vive y trabaja entre Madrid y Berlín Recorridos Fotográficos ARCO 2002 Premio Pilar Juncosa i Sotheby’s. Fundación Pilar i Joan afición de su padre por construir y jugar con aparatos capaces www.miguelangeltornero.net Comunidad de Madrid Miró de Mallorca. Mención Especial. de captar, proyectar e imprimir estampas y fotografías. Ayuntamiento de Pamplona 2000/1 Ayudas a la Creación Artística Contemporánea, El traslado práctico de estas experiencias al ámbito educa- Licenciado en Bellas Artes por la Universidad de Granada. Colección de fotografía pública de Alcobendas Consejería de Cultura, Junta de Andalucía, Nueva York, tivo le llevaría a coordinar la puesta en marcha del Plan Andaluz Cajasol 2000/1 Ayudas a la Producción. Nueva York, EEUU. Frontera de Integración de las Nuevas Tecnologías de la Información y la EXPOSICIONES INDIVIDUALES (SELECCIÓN) Colección de arte emergente. Junta de Andalucía Sur. Iconos. Diputación Provincial de Cádiz. Cádiz. Comunicación en la Enseñanza, siendo miembro de la comisión 2009 «Catástrofes para bien». Galería Cubo Azul. León 1995/6 Beca Daniel Vázquez Díaz. Proyecto de Creación e encargada de redactar el PLAN ANDALUz DE TECNOLOGÍAS «Por Ahora (todo va bien)» Galería Luis Adelantado. Investigación Diputación Prov. de Huelva. DE LA INFORMACIÓN Y LA COMUNICACIÓN PARA LA Valencia 1994/5 Beca Erasmus Lingua-Accion II. School of Fine Arts, EDUCACIÓN. Consejería de Educación. Junta de Andalucía. 2004 «Pretérito Imperfecto Compuesto» Galería Luis Athens. Grecia. En este sentido impartió cursos, ponencias y seminarios Adelantado. Valencia. sobre Fotografía y Educación, ejerciendo como guionista y «Conspiración» Sala Baja del Palacio de los Condes de OBRA EN COLECCIONES asesor pedagógico en Programas de Televisión relativos a la Gabia. Centro José Guerrero. Granada Ayuntamiento de Utrera. Sevilla. Formación de Formadores. Programa EUROFORM. Comunidad Ayuntamiento de Xàbia. Alicante. Europea. ÚLTIMAS EXPOSICIONES COLECTIVAS (SELECCIÓN) Ayuntamiento de San Fernando. Entre 1990 y 2003 trabajó para el Centro de Tecnología 2009/09 «Un No por Respuesta» (comisariada por Tania Caja San Fernando de Sevilla y Jerez. de la Imagen de la Universidad de Málaga desarrollando Pardo) Laboratorio 987. MUSAC (Museo de arte 110
  • 117.
    English texts Presentation / Acontext for AfterPost / What is a photographic image today?
  • 119.
    Introduction Paulino Plata Cánovas Aspart of its commitment to contemporary art, the Andalusia Ministry of Culture presents the exposition AfterPost [más allá de la fotografía] (beyond photography), organized by Sema D’Acosta, from Seville, and held in the Iniciarte exhibition space. Over the years, the Iniciarte program has become known for its hard work to promote those who take part in the creative activities that are most relevant to our times: artists, critics, curators, students and those involved in other cultural activities. Perseverance is important if we are to advance towards this objective. The Iniciarte Programme grant package is a sign of the Regional Ministry of Culture’s firm and decisive support for contemporary art, covering all the different phases in the creation process: research and training, project production and dissemination. Last year, in the Landscape: the Eternal Return exhibition, photographer José María Mellado tried to show how modern man struggles to make a place for himself in History, and this new initiative aims to reflect on the meaning of photographic images, contemplating an open scenario where spectators can reach their own conclusions. The curator has selected the work of well-established artists, establishing a dialogue with the production of new creators. We are sure that this suggestive combination will fulfil the expectations of all the exhibition’s visitors. 115
  • 121.
    A context for AfterPost finally established itself as the most important artistic expression of our times. It seems to Alberto Martín fulfil a dream that had been pursued for so long, (“photography has its own utopia, which is primarily established in art museums”, Boris Groys)3: photography as art, but now more than ever as a phantom. Yet, the phantom condition of electronic images is quite different: “Phantomization. For the most part, electronic images have the same quality as mental images, pure phantoms. They appear in places, and then immediately vanish. They are In some sense we could say that this exhibition, eloquently entitled AfterPost. Más allá spectres, mere spectres, far from any basis in reality” (Jose Luis Brea)4. It is a dematerial- de la fotografía (beyond photography), is about the scarcity, and, at the same time, the ized kind of photography that doesn’t need to be embodied in any object, or interact with overabundance of photography. But, before getting into that, let’s start at the beginning. any medium; its nature is of circulation and transmission; its natural state is of interaction, The thesis of the project follows two distinct and well-defined paths: on one hand, the manipulation and proliferation. pervasive presence of photography in the art scene, a reality that is becoming more and Just as with the phantom condition of photography, the two contexts mentioned above— more evident; it has taken the porousness among different media to its most extreme photography in the artistic sphere, and development of the digital image—also diverge in possibilities, and, as a result, photographic media now appear to be in a kind of endless terms of the setting in which they reside and act. Certainly, photography now proliferates expansion. On the other hand, we see the development of the digital image, which may in museums, and it does it right at the same time that the photographic medium, through have upset the established order to the point, perhaps, of radically changing the nature of digital technology, is not only reaching a state of total ubiquity and dematerialization, but photography. It seems that every time these two elements, evident and omnipresent, are also, in some sense, re-establishing ties with the social sphere. A paradox that is still relevant mentioned together, the tendency is to define such confluence as a dual process of expan- and even reinforces the tension between photography as a mundane, ever-expanding social sion: the massive production and circulation of images spurred by the digital revolution, practice and photography as part of museum collections5. Double the abundance, but of along with photography’s widespread contamination of different types of media. Each of the different natures: abundance in museums that contrasts with that of electronic images, two contexts (that of photography’s presence in the art scene, and that of the development which comes naturally and is based on the incessant circulation and proliferation with no of the digital image) runs its own course, yet both are linked by overabundance, expan- need to be materialized in any medium or even to be situated. If the place for photography sion and fluidity. Still, the routes they take and the different stages they go through are is the art museum, the place for the image is the digital realm, what is in reality a non-place. largely divergent. We see this, for example, with the phantasmal character of photography We might even say that photography, in its infiltration of the art scene, is now more than and the image in one context or another. In, effect—and we have seen this largely in the ever hipermaterialized, reinforcing the presence and the importance of physical media, last decade—, photography has slipped into different creative practices like a phantom, just as the digital revolution is making them vanish, making it unnecessary to house the exploiting its capacity to combine with other media, and its condition of hyperfluidity. It is image in an object6. The museum is lined up against the social practices associated with an unstoppable process of irrigation, contamination, mutation and adaptation, which also photography, which from a digital standpoint re-establish the relevant uses and functions effects on photography, mostly in a progressive dissolution, or dispersion, of the specifically of the activity. Like in other recent moments in the history of the relationship between defined medium; this has happened to such an extent that, for some authors, like Paul photography and art (for example, conceptual art), the anti-aesthetic movement that deals Ardenne, photography is no longer art form, but rather it has taken on a new condition as with the practical uses and function of the photographic medium enters into conflict with a kind of vector of protean imagery1. Geoffrey Batchen expresses something similar in his the notion of stylistic perfection and a whole field of stylistic considerations. In that sense, simple, yet resounding analysis of the situation: photography appears everywhere, but not we might remember how it has been clearly noted that digital developments in the area of in any one particular place2. The conclusion seems simple and sound, photography has art have mainly served to augment the porous relationship between photography and other 117
  • 122.
    media, to enhancehybridization, to increase the visual possibilities of that process and to electronic technology as a way to pursue such questioning11. It is thus relevant to explore unleash all of photography’s potential for manipulation . It was Geoffrey Batchen who wisely 7 such transference in the specific context of AfterPost, an exposition that contains a good noted that post-photography, arising in an environment of heightened porosity, might mark number of works from around the world that could be said to involve such a process. There the beginning of a new era which is after, though not completely beyond photography8. As are numerous aspects that are involved in this particular type of “questioning”. Almost all far as establishing a new way of viewing these works—a necessary condition for moving of them seem to remind us of elements relating to the image, or vision, that “automatism” beyond photography— it has still yet to happen. In the mean time it seems that the game tends to obscure: the physical, temporal, and textural elements. They seem to remind us, of aesthetic negotiation, as spurred by photography, is stronger than ever. as Paul Virilio did almost two decades ago12, that “devices for seeing dispense with the Up to this point we have spoken of abundance. Scarcity may be derived from the above artist’s body in so far as it is light that actually makes the image”. It is evidence of manual commentary about how today we see photography everywhere but cannot find it in any and corporal involvement, the nature of which might acquire a totally opposite meaning in one particular place. We might cite Jean-Luc Nancy as a way of determining if that place today’s age of digital photography than it would have had, say, in the sixties, seventies and exists, though remote or even hidden. Nancy asked himself: eighties when the interactions between painting and photography were at their peak13. Back “What remains of art? Perhaps only a vestige. That at least is what we are hearing today, then when the subjects of photography entered into the painting, the artists hand yielded once again. By proposing “The Vestige of Art” as a title for this essay, I have in mind first to the influence of the machine, and it was fundamental to give space to the indexical, or of all, simply this: on the assumption that there remains in fact only a vestige of art—both referential, nature of the photograph; nowadays the process has been almost completely an evanescent trace and an almost ungraspable fragment—that itself could be just the inversed, at least from the photographic standpoint. It’s not hard to see that a great many thing to put us on the track of art itself, or at least of something that would be essential to themes and considerations in painting have now entered the realm of photography or have it, if one can entertain the hypothesis that what remains is also what resists the most. As become the subject of photographs, or to see that it is precisely the involvement of the a next step we will wonder if this something essential might not itself be on the order of a machine that gives way to the artist’s hand. It does not appear to be of central concern to vestige of itself, when, say, having retreated from the greatness of works that cause worlds prove that photography is the medium that is changing our way of envisioning the world, to come into being, art seems past, showing nothing more than its passage”9. nor to denaturalize the notion of photographic realism as the fundamental medium for We could now substitute art for photography in this long quote and find the vestige of imagining the objective world. In the context of the digital image, it’s probably no longer photography among the selection of works that form part of this exhibition, asking ourselves if about photography and our way of seeing, but rather about images and the way they form what remains is also what most resists. In fact, the sample serves two functions: to consider part of our lives, their flow and proliferation. Moreover, the effort to denaturalize photographic the massive infiltration of photography we already discussed and to observe the traces realism, in a context in which mental images are already granted, or may be granted, a left through the multiple processes of transformation permitted by the medium. It is in nearly factual consideration, might as well surrender that point. those particular traces, within the specific framework that only the photographic medium For photography, manual involvement also recentralizes the notion of time, a notion affords, in which we can finally find that vestige of photography. In some sense, it is like that has been abolished in the constant quest for the instantaneous and exact. The traces asking for the photographic soul (and adopting for the occasion the title of Richard Shiff’s of process are in direct conflict with the independence and automatism of the machine. interesting text10), and finding that what resists, that which is essential to the medium, is Richard Shiff employs a certain image to describe this difference. In his analysis of Chuck not exactly what is most evident, o most commonly instated. We may then have to look for Closes’s piece, he speaks of corporal intimacy, an intimacy that is related to the process that essence—as Richard Shiff suggests in the aforementioned essay, The Photographic by which vision is materialized as the artist makes his passage through the image14. A Soul—among those practices that seem to question what is most natural to the medium. passage that involves a very close reading and extrapolation of visual data, synthesis of the The same author considers manual reproduction of images produced by mechanical and information contained in the image and a careful articulation of sensations and meanings. 118
  • 123.
    They are constructiveprocesses, elaborations that draw attention to some normally “minor” 1. Paul Ardenne, “La fotografía en la era de la abolición del control”, in Cruce de caminos. Sobre el arte y la fotografía, aspects, as considered from the photographic field. One such aspect is the attraction to La Casa Encendida, Madrid, 2006, pp. 93-98. 2. Geoffrey Batchen, Burning with desire: the conception of photography, MIT Press, Cambridge, 1999, p. 216. the surface of a photographic image, a particularly problematic and complex terrain, in 3. Boris Groys, “El lugar de la fotografía”, in Joan Fontcuberta (ed.), ¿Soñarán los androides con cámaras fotográficas?, which space can be collapsed, compressed, disoriented, and reconstructed, where tex- Ministerio de Cultura, Madrid, 2008, p. 182. ture and drawing interact, or where the materiality of the surface offers varying levels of 4. José Luis Brea, Las tres eras de la imagen. Imagen-materia, film, e-image, Akal, Madrid, 2010, p. 67. resistance against the image and the figurative experience15. As Geoffry Batchen points 5. It’s interesting to observe, for example, how this tension comes up, indirectly, over and over again in the arguments out, in a historical perspective, this kind of materiality “draws our attention to that aspect developed by Boris Groys in the article cited in note 3. 6. José Luis Brea, Las tres eras de la imagen, op. cit. of photography which is normally suppressed from our awareness of the photographs, their 7. For more on this topic, see: Paul Ardenne, “La fotografía en la era de la abolición del control”, op.cit. and Michaela physical presence as things”16. Fiserova, Image photographique: de la critique de l’art plastique à la conversation visuelle, March 2 2006, One last element, which is more problematic and even arguable, is the way in which METAPHORES: http://www.sens-public.org/spip.php?article237. the artist’s intentions are given precedence. Michael Fried lines up an interesting analysis 8. Geoffrey Batchen, Burning with desire, op. cit., pp. 215 – 216. of this element in his study of Roland Barthes’s punctum17, exploring both the connec- 9. Jean-Luc Nancy, The Muses, Stanford University Press, 1996, p. 81. 10. Richard Shiff, “Photographic Soul”, in David Green (ed.), Where is the photograph?, Photoworks, Brighton 2003, tion and the separation between photographic artefact and intentionality. Referring to the pp. 95 – 111. context of digital photography he affirms: 11. Richard Shiff, “Photographic Soul”, op. cit., p. 111. “… Barthes’s hyperbolic desire to sever the (ideal) photograph from the intentions of its 12. Paul Virilio, The Vision Machine, Indiana University Press, Bloomington, 1994, p. 16. maker subsequently found its mirror image in the increasing use of digital techniques by 13. For an interesting analysis of the implications of said interactions and said period, see, among other, the texts of ambitious photographers in order to make photographic artefacts every bit of which may Ralph Rugoff and Barry Schwabsky included in the book, The Painting of Modern Life, Hayward Publishing, London, 2007. be seen as potentially the manifestation of an artistic intention”18. 14. Richard Shiff, “Photographic Soul”, op. cit., p. 97. Here, he emphasizes the role played by the degree of artistic control present in a pho- 15. These aspects are addressed in a particularly relevant way in the essay of Richard Shiff, “Photographic Soul”, op. tograph, and whether, in this day and age, photography “as art” could continue to leave in cit. the hands of a machine something that would escape the artist’s intentions. 16. Geoffrey Batchen, “Fearful Ghost of Former Bloom’: What Photography is”, in David Green (ed.), Where is the On the other hand, the key now may be to show resistance to the mannerisms that could Photograph?, Photoworks, Brighton, 2003, p. 26. 17. Michael Fried, El Punctum de Roland Barthes, Cendeac, Murcia, 2008. be derived from a renewed pre-eminence, or presence, of mechanics in the digital medium. 18. Michael Fried, El Punctum de Roland Barthes, op. cit, p. 90, note 47. Surely, those “vectors” of resistance might also be found—or might still be found—in the vestiges of the photographic. 119
  • 125.
    What is a photographic image today? AfterPost. Más allá de la fotografía (beyond photography) considers the meaning of the Sema D’Acosta photographic image in present-day society, providing an open setting in which the spectator can draw his or her own conclusions. In our times, a photograph is not just a reproducible and representative image, but has become an amassed assortment of ingredients, largely surpassing the testimonial or mnemonic functions that it traditionally held. The notion of photography, as understood today, encompasses ideas of inclusion, participation, fusion and “It all started with one essay about some of the diversity—such ideas distinctly separate it from the chronic image that had defined the genre problems, aesthetic and moral, posed by since its beginning. In fact, very few photographers are still anchored to that domesticated the omnipresence of photographed images; sense of the term—quite the opposite. More and more artists turn to photography due to the but the more I thought about what photographs are, vast array of possibilities it offers. Artists of many different creative fields use photography the more complex and suggestive they became”.1 as part of the creative process, as the end result, or as the starting point because it is a quick way to capture sensations, to create associations and to establish ideas. SUSAN SONTAG Photography is now at a crucial and extremely complex juncture, in the first stages of a transition toward a new, still-undefined status. AfterPost portrays the new nature of the art form and traces the factors that have led to its current state; it explores the discourse The art form which has entered the new century with most vitality is photography. With an surrounding expressive forms which are rooted in fixed images and the derivations of such. immense universe yet to unfold, and having surpassed the sine qua non condition (now It is important to examine the boundaries of such expression in order to understand how outdated) of being a documentary form, a world of new technology has opened the door to an different creative outlets fall into place around an essentially photographic—or cinemato- ever-growing discipline. The digital revolution has broadened the concept of photography to graphic—epicentre; after all, an image in motion is only an extension of a still image. In a such an extent that as it advances it encompasses almost every possibility—an uncontrollable recent interview, German artist Thomas Demand stated: “I believe that photography has a infinity that will absorb any other discipline or art form without establishing any boundaries. fundamental role in modern society. Everybody has a camera on their mobile phone, millions Photography in the twenty-first century has become something materially different from what it of people use the internet to upload and distribute images. It’s clear that we all know how was in the twentieth century. It does not appear in its pure state, but as a mixed media, hybrid- to take a picture, and also how to understand one. This creates a very interesting context ized with other fitting forms of expression, such as painting, drawing, videos and installation for artists to work in, if we compare it, say, to the general knowledge that the public might art. The era of post-photography urges us to move beyond the image as an indexical icon, and have about other forms, like bronze casting”.2 promotes expansion into other areas, a phenomenon which has been studied in the last few When it comes to interpreting an image, the essence no longer relies on what we have decades by theorists from many different camps (theorists such as Roland Barthes, Rosalind historically understood as the photographic condition. Yet that idea is ever-present no mat- Krauss, Susan Sontag, Philippe Dubois, Geoffrey Batchen, Paul Ardenne, Vilém Flusser, Denis ter what the actual format is, and we judge the image in one light or another depending Roche, Peter Osborne, Boris Groys, Regis Durand, José Luis Brea, Víctor del Río, etc.) The on the presentation and on our own values. Internet and the media have created parallel artists themselves have also written about this phenomenon, trying to find the particular niche universes that coexist indistinguishably, forming not one, but many similar and dissimilar for their creative practices, and with an awareness that their work is greater in complexity realities. Our collective imagination is fed by the images that we are continuously absorbing, and depth than mere record or the expression of an instant (artists including Duane Michals, not from true visions extracted from our experiences. In these times of constant virtuality, Victor Burgin, Jeff Wall, Allan Sekula, Joan Fontcuberta, Jorge Ribalta, etc.). real-life experience is muddled with the imagination. We take in such imaginings and hold 121
  • 126.
    them as truewithout differentiating the realistic from the real, two dimensions which are and institutions. In fact, the crisis facing traditional art forms has invoked solutions that, becoming more and more intertwined. The digital image helps us comprehend—and through photography, would reawaken the iconic potential of images”.4 apprehend—that new reality, a malleable, changeable, and extremely complex reality Without a doubt, photography appears before us as a new category, empowered by which doesn’t even need to materialize. It can be a volatile file that we alter to the point of its unspecifiable nature. Photography’s intermediate position between art form and other being unreal, or that we send anywhere in the world in an instant. Now there’s no place common uses has generated questions of sociological, philosophical and political impor- for unadulterated representations—they are a thing of the past. Now we live in the era of tance, which go beyond normal aesthetic considerations. In her essay “Theorie des ecarts” post-photography. (theory of discrepancies/displacements), Rosalind Krauss is one of the first theorists to tackle the divergences of the contemporary image5. After her, literature on the subject flourished. It’s remarkable that this North-American art critic was also one of the first to THE CONTEXT OF POST-PHOTOGRAPHy write about, in 1979, how the term sculpture was beginning to be used to refer to “things” Nowadays, photography is an inexhaustible idea with no exact notion; it has reached a status that greatly deviated from the conventional statuary traditions6. “Categories like sculpture of such autonomy and osmosis that its condition goes beyond the iconic, syntactic and and painting have been kneaded and stretched and twisted in an extraordinary demonstra- representative. “In the nineties, photography was omnipresent in galleries and museums, tion of elasticity, a display of the way a cultural term can be extended to include just about in such a way that caused its identity to be dramatically reconfigured. Through its incor- anything”7. According to her, sculpture was expanding toward architecture, landscapes, poration in a wide variety of artistic practices, photography was increasingly thought of in constructions, and even the simple marking of sites. They were uncategorized works terms of its interrelation, on one hand to painting and sculpture media, and, on the other that didn’t fit in with the pictorial tradition—they were constructed with space, materials, hand to the hybrid forms of installation and performance art. At the same time, the rapid actions, movements, light or images, and they approached both the real and the non- development of ever-sophisticated digital and electronic technology has expanded the limits existent, that which is lasting and that which is ephemeral. Such a denaturalization of the of what may be considered photography. The most evident consequence of this has been term, which opens it to all kinds of possibilities (including, randomness, uncertainty and that it is now very hard to determine where and how we will draw the lines that separate even immateriality), has not devalued the more traditional approaches, but it has changed photography from the cinema, or videos, or any other form dealing with iconic, graphic the ways in which sculpture is considered, the light in which an object is judged, making or textual material, which nowadays we can gather and display on the computer screen. the current sculpture scene heterogeneous, disperse and irreducible. We need only look Certainly, we can no longer assume that the stilled image processed on photographic paper at the last edition of Sculpture Projects Muenster created in 2007 in the German city of is the archetypical form of the photograph, but rather one of many possible forms, coming Münster –perhaps one of the most serious and solid projects in the world relating to this from an array of technological equipment and practices developed for visual production. discipline— to discover that it included videos, performances, actions in nature and urban Therefore, photography no long has any ontological stability (assuming that it ever did)”.3 exhibitions. What conclusions can we draw from the radical evolution in sculpture over “Toward the end of the twentieth century it became evident that photographic media holds the last forty years? It’s simple, the pigeonholes established for different art forms tend to an important place in art. Although the beginnings of such prominence could be seen disappear, and it’s only a matter of waiting for the right conditions to stir things up. decades before, it was in the eighties and nineties that we see a clear discourse develop This occurrence in one of the Fine Arts, which was a totally closed and absolutely regarding photographic media. The effects of photography having gained new importance defined discipline, can be extrapolated to the new status of photography and its derivations. can be seen with the arrival of a new artistic genre (despite what is said in certain texts), as The difference stems from the fact that transformations of the image happen so quickly, the discipline has definitively made its place among other more traditional art forms, and as and depend to such an extent on developing technology, that we still don’t have enough it has secured institutional support through a network of specialized galleries, publications perspective to clearly understand its new position. Truly understanding it is a question of 122
  • 127.
    historical context (wetend to reduce human reality to its historical condition, based on photographic technique with an act of negation. Apparently, there is an underlying ironic known and valued references), which due to lack of perspective we are not able to evalu- take on pop culture, and also a reconstruction of photography as something other than ate from our present. The progression of technology is passing through new stages with what the genre had established in artistic terms. “The care with which the book is edited, overwhelming speed, establishing with each new advance a modified model of operation, even though the pictures are artistically bad, suggests that Ruscha is also playing with which places photography at the mid point between the history of art and technological the notion of banality, which doesn’t exclude the desire for his work to have an impact, advances that emerge. that is, for the work to be reproduced”.11 Ruscha’s work is part of a tendency that is very The art critic and theorist Jose Luis Brea has analyzed different aspects concerning common in the second half of the twentieth century, a tendency that approaches culture art and its relation to incipient technologies designed for communication through the using art as a critical and liberating weapon, capable of breaking established formal limits. internet, a new venue for creative activities which has upset all previous concepts. Brea It is not so much about transgressing established genres, which would be more a type of calls the present time we live in the Post-media Era, a domain in which public circula- Avant-Garde movement, but rather relocating discourse12. One key element to consider tion of information is not strictly subject to the hierarchical regulation characteristic of is that photography has come into contact over the years with semiotics—it began to be traditional media, structurally organized for production based on social consensus. In interpreted, decoded, analyzed and reassembled not as an image but a text. Nowadays, this new arena production is geared toward each individual user, in an independent and many conceptual artists from North America use photography as a starting point, directing detail-oriented fashion.8 Although the book explores questions relating to Net.art that stray their work toward other areas that question what is and is not a work of art, taking certain from the subject of photography, it does demonstrate a divide in the comprehension and Duchampian premises to unthinkable extremes. Some creators moved toward performative transmission of images. “The very concept of post-media prefigures the belief that we are or linguistic aspects (such as Dan Graham, Joseph Kosuth, Lawrence Weiner, etc.), yet now before a new historical context which affects the ways in which an image is received for most of them photography played a vital testimonial role. They used to strengthen or and circulated, and whose implications go beyond questions of constructing reality or the cast doubt on their work, to separate it from one concept and associated it with another— way we exchange information. Behind the present post-media condition is an underlying always with the aim of questioning its essence. Since then, photography has been left in crisis concerning representation.”9 a gray area between society and culture, unable to escape. This tendency to expand has This new progression of photographic media, which has undermined the documentary lasted up to now, taking on different perspectives decade after decade. “Toward the end properties and expanded the field of action to other more intellectual areas, is the result of of the seventies and into the eighties the interrelation between theory and practice was a continual displacement occurring over the last century. It was in the seventies that previ- manifested through artists who tried to re-examine photography’s place in the culture of ous concepts began to crack, first questioned by conceptual artists and then by cinematic image as a whole and as it corresponded to art’s function in mass media”13 structuralists. In 1962, Edward Ruscha produced a limited edition of photographic books by Víctor del Río outlines two separate trajectories that may explain why photography the name of Twentysix Gasoline Stations. The photos are aseptic, cold, and irrelevant—they has become so important in the last few decades. “The first trajectory incorporates the don’t stand out and don’t seem special in any way. They are produced without any technical photographic medium through hybridization with other media. Photography is thus indi- rigour and do not attempt to go beyond the initial claim. They are just like any other record. rectly legitimated through a process that arises from other art forms being in crisis. It is a The artist wasn’t trying to become a dominant figure in the field or define a certain style. It process of hybridization that uses photography’s unspecified nature—a future not bound strays from the technical values traditionally admired in the discipline, and the pieces are by tradition—to enrich artistic content. The spaces used for such pieces and the scenic even presented in the popular format, renouncing any kind of artistic distinction. Twentysix potential of photography allow for both installation and pictorial solutions. Among the Gasoline Stations is an object—no longer a simple image—which mixes high and low culture. possible types of hybridization one of the most fruitful is the one established with painting. As Jeff Wall suggests in “Marks of Indifference”10 Ruscha, with this series, is dismantling The axis formed between Andy Warhol, Robert Rauschenberg, Christian Boltanski, Sigmar 123
  • 128.
    Polke and GerhardRichter suggests the range of possibilities that emerge, also involving was no longer necessary to travel to the place where the work was housed in order to see the participation of many other artists. Artistic discourse becomes receptive to photography it. It wasn’t even necessary for an image to be materialized for the viewer to enjoy it—these due to the way in which it begins to serve as a replacement of the painting. The intentional concepts emerge with the arrival of photography, which became a new form of expression ambiguity employed by such artists suggests that the image has been elevated above its that would be constantly evolving, apt for the masses and ragingly contemporary; a new technical origin, and thus above the adherence to any one particular form”.14 kind of expression whose most consistent paradigm would be cinema. The second route considers the way in which photography is treated as tableau. Since Photographic narratives—understood to be visual accounts of extraordinary situations the end of the eighties certain artists and theorists (one of the first to analyze this was that were then expanded for graphic periodicals to tell about what was happening in the Regis Durand) start to judge photographic works as if they were paintings. That is, they world, especially concerning political conflicts or military confrontations—are no longer of begin to grant photography the same value traditionally given to painting, just like that. any use; They are iconic stories of the past that base their expressive power on composition I won’t go into any technical details here—they’re two different kinds of languages, but and on the possibility of showing inaccessible places and unusual happenings. As those that’s not the question at hand; the important factor is the way photography is raised to a possibilities were exhausted by globalization, technological potential and the overabun- dignified status by the end of the twentieth century, a consideration that arms it with the dance of representations that overwhelm us on a daily basis, what those narratives could kind of historical respect and reverence granted to painting. Since then, and propelled by offer now seems ordinary, common and untimely; they are images that we’ve already seen, newfound confidence, we see large format photography from artists like Jeff Wall, Jean and whose syntax is all too familiar. The chronic image and the documentary image are Marc Bustamante, Thomas Struth, and prices are raised at dizzying speed, quickly reach- now understood as perfectly harmless products of another era, which can no longer be ing the millions; galleries exhibit more and more photographs, and important collections seen in the same way as when they were produced, the rules for re-interpreting an image from around the world start incorporating photographic acquisitions on a regular basis; have changed and new fronts have been established. In his book, Camera Lucida, Roland a number of special festivals are held all over the globe, and photographs are hung in Barthes declares the impossibility, from a semiotic standpoint, of analyzing an image museums as if they were paintings, to be viewed as if they were paintings. without addressing its informative facet. This elevated status ends with a historic debate that pits painting against photography, trying to weigh the artistic value of each form. As Matiza Walter Benjamin explains, “The dispute was in fact the symptom of a historical transformation, the universal impact of bEyOND THE IMAGE (PHOTOGRAPHy AS ObJECT, ACT, IDEA, OR SOMETHING INEXPLICAbLE) which was not realized by either of the rivals. When the age of mechanical reproduction For many theorists the true dilemma facing photography in our times is that of overcoming separated art from its basis in cult, the semblance of its autonomy disappeared forever. the iconic and moving towards the object. Today the important thing is not particularly what The resulting change in the function of art transcended the perspective of the nineteenth an image contains but what it communicates, in what form and in what way. Photography century; for a long time it even escaped that of the twentieth century, which experienced the has gone from being exteriorized by one technically reliable and unidirectional method, development of the film”. —An interesting posture, which is elucidated by the empathetic to being a sort of “everything” which acts with endless shades of meaning of denotative concurrence that exists even seventy years after the German thinker had written the text, value. It began a little less than two centuries ago, with the coincidence of some precise “The Work of Art in the Age of Mechanical Reproduction”. He continues, “Earlier much scientific parameters that were amazing in their capacity to surpass the agility of manual futile thought had been devoted to the question of whether photography is an art. The movements. Now it is an omnipresent art form which has lost the alchemy of its beginnings. primary question—whether the very invention of photography had not transformed the It is no longer necessary to control the take or the process; the surrounding gradations are entire nature of art—was not raised”.15 The perception of art after the birth of photography more suggestive and allow for more complexity. “Post-photography is not then the result of took on a new character, detached from exclusivity and tied more closely to ubiquity. It technological advances in image production and is not concerned with minor theoretical 124
  • 129.
    dilemmas involving analogicalor digital formats. The original composition of the images, image outside of the act that makes it possible18. The photo is not just an image (the product the fact that they have a chemical or numerical origin, is of no real consequence. It is with of technique and action, the outcome of an event and some know-how, a figure on paper the make-up of a photographic format that a set of functions can be established, through to be seen in the limitations of the finite object); it is also begins as a truly iconic act—an which the image truly becomes relevant in a way that goes beyond the photographic act image, surely, yet also a work in action, something that could not be conceived outside and transforms it into a work of art”.16 the given circumstances, outside the game that urges it on, or without creating what is One example that will illustrate this point is the idea that Geoffrey Batchen develops after literally proof; it is at once an image-act, yet, knowing that this “act” is not limited trivially finding a photographic object in an antiques shop in New York. His argument questions to the gesture of the production of the image (the gesture of the “shot”), but also includes the traditional discourse of exclusion that decides what is or is not a photograph. Batchen the act of reception and contemplation. As David Green and Joanna Lowry affirm, it was found a large, glass picture frame with a few rosettes braided with hair, a vast adornment C.S. Pierce who showed that the mark of the indexical photographic sign has less relation of wax flowers in the shape of a crown, and a small image of a young woman. The whole to the original causes than to the way in which we can elude the very fact of its creation. scene, in all its languid sadness is an intimate monument to the absence of a loved one, “Photographs are not just indexical because light happened to be recorded in an instant and goes beyond mere remembrance. The overall sensation that it transmits, emphasized on a piece of photosensitive film, but because, first and foremost, they were taken”19. The by the mode of presentation, goes far beyond that of simple photography, and it speaks authors consider two deictic facets of any photo; the most obvious and most comprehen- in some inexplicable way of things relating to death, respect, love and memory. “The sible being that an image is the mark of an instant having occurred. The other facet, more hybridity of this object also makes for a stronger portrait experience. By adding a sample abstract but no less important, is that the act of taking a photograph is a performative event of hair to the subject’s photograph, the indexical presence of that subject is reiterated that points to a precise moment in time. Both are inherent in the capturing of the image. and reinforced (…) It is a much more involving type of portrait experience than any single, It’s remarkable that such a distinction was made not by theorists, but by conceptual artists unadulterated photograph could provide. The object’s hybridity thereby helps bridge the from the seventies, who with such notions attempted to question the documentary status distance between the viewer and the person viewed and between likeness and subject of photography as an infallible means of proving the facts. (between mere resemblance and that “something more”)”.17 Between the instant and the record of it, there exists an interdependence which goes Apart from being an image, a photograph is a physical entity which acquires connota- beyond the representation of an instantaneous occurrence. Two comprehensible and tions that are interpreted through appearance, association and presentation. An image is illuminating examples would be: first, the photograph Authorization (1969) by Michael representative, yet any kind of medium will endow it with important meanings for understand- Snow which can be seen in the National Gallery of Canada (Ottawa). The image contains a ing the work and the sensations it provokes. The way in which we receive the information mirror and five Polaroid’s, stuck in a certain order on the mirror. While observing the cliché relates that totality (image+objet+context) to our own culture, and to experiences fixed in images carefully we discover that if read in a chronological order, they represent what is the collective unconscious, which we understand and decipher. That said, such associa- happening before the mirror, nothing more than a substantiation of the photographic act. tions can also lead to errors—because an image is not always what it seems. The actions displayed are literally those that have constituted the work just as we see it. Another aspect, which is not commonly considered with photography, is the assess- That is, they tell the story at the same time as it is created. They are simultaneously the act ment of its nature as a performative act, a characteristic that enhances and conditions the being carried out and the memory of it. Moreover, by the simple contemplation of these visual information we are shown. Philippe Dubois has investigated this idea thoroughly in instant photographs, the spectator can deconstruct their creation20. What the images his book L’acte photographique (the photographic act). In the introduction to his study he relate is just that, nothing more; Snow’s work is a metalinguistic reflection on the very act points out that “If in photography there is a live and irresistible force, if there is any aspect of producing a photograph. The second example is the series on inert gases created by that I consider to be of absolute seriousness, it is that we are no longer able to think of the Robert Barry, also in 1969, which is a set of images and attached texts that explain the 125
  • 130.
    act of releasingvarious invisible fluids in precise locations near Los Angeles. The artist a stage that used to involve multiple steps, as well as plenty of time and dedication. With released a liter of krypton in Beverly Hills, xenon in the mountains, argon on the beaches the introduction if the first Kodak in 1888, a formula was established that had world-wide and helium in the desert. The idea was to produce and act which was ephemeral, imma- success and lasted for more than a century: the camera was loaded with a role of film, the terial and imperceptible in plain sight. The photographs attempt to show these actions, film was exposed and taken to a lab, and finally copies of the photos were printed. That but, of course, we can only see the real places as empty: a part of the desert, an isolated method meant a radical change in the way photographs were shared and appreciated, beach, a silent park, and a rocky place. “Barry’s production of a photographic record of since one only had to push the button, then go and pick up the results after turning in these non-visible works of art might seem consciously futile and absurd, yet these images the exposed roll of film. (“You press the button, we do the rest” was the famous slogan may be significant for our understanding of the limitations of a particular form of indexical for Eastman’s company toward the end of the nineteenth century). Since the process of inscription. If at one level these images are displayed as documentary evidence denoting developing photos was available to anyone for a modest price, it became a new form of a state of affairs, what is also clear is that they are carefully designed to be at the limit mass communication. point of photography’s documentary capacity. While providing us with the indexical trace Accustomed to the unconscious quickness of today, which doesn’t require any par- of the moment of the gas’s release they also gesture towards the impossibility of recording ticular ability, the other system seems obsolete and old-fashioned. If the method invented it, and our attention shifts instead towards the act of photography itself as the moment by Kodak is what made photography so popular by making it available to the public, the of authentication. Thus the photograph is not intended so much to denote the inert gas digital boom has vulgarized the act with its uncontrollable expansion, making it something that cannot be seen as to point us towards it, and in that process of pointing to declare its completely superficial. Now when we take a photo we don’t think about photography, not existence”.21 In these images, Barry emphasizes a non-visual, imperceptible component even a little. We don’t think about framing and we don’t need any special conditions, it is for which he has created the photograph, and which must be confirmed by the artist, who now utterly banal. This particular feature has created a new subgenre, emerging spontane- serves to authenticate the actions—actions that are beyond the material reality and must ously from low culture since the beginning of the twenty-first century. An especially insolent be certified to be believed. variety of portraits, which when can recognize by the captured image—inconsequential Compact digital cameras and mobile phones with built-in cameras have transformed and amusing, by the undiscerning attitudes of the protagonists, the subjective angle of the act of photography into something very different from what was traditionally under- the camera, and the proximity of the subject and photographer, who share a moment of stood. At any moment, in any way, and from any position a photo can be produced without complicity which in normal conditions they wouldn’t be permitted. In any case, it is seldom meaning or expressing anything special. In large gatherings of people photos are taken in that the intimacy is aroused to such a point that the participants are driven to paroxysm rapid succession with no particular aim. They are saved instantly and accumulated by the or absurdity. In order for these instant photos (commonly seen on Facebook and Flickr thousands—what used to be a distinguished moment, to be revealed and remembered or saved on a mobile phone) to reach any kind of artistic status, they need someone to days later, is transformed into something ordinary, of no great import. The image is no sift through and discover what sets them apart, a restructuring—as we clearly see in the longer developed on paper as it was in years past, but rather the natural product is a file, case of Juan Francisco Casas and his drawings done with a blue Bic pen. Casa’s works formed of pixels, that we see on a screen and may choose to develop in a physical format. never stop being photographs, even though they are manufactured and the final product Moreover, we can take hundreds of photos without thinking twice—all we have to do is get is created with an extremely precise, lifelike drawing; there is always an underlying notion rid of the ones we don’t like. We don’t even have to wait to see how the image will come that sustain them—the inexplicable idea of the photograph (inherent and inevitable) that out because we can see it instantly. We’ve done away with developing and converting the forms and characterizes the images. The well-known self-portrait of Chuck Close from 1968, negatives, proving that the process is no longer necessary. The procedure is so condensed in which he is seen with a slovenly attitude and smoking a cigarette, set a precedent that that from the time we take the photo until we can see it only a few seconds have gone by, resonated greatly with the work of Casas. Yet, what differentiates them is that the Close’s 126
  • 131.
    piece is seenas an isolated work, classless, with certain pop undertones, and no direct rela- technique is based on the use of graphite, we will find that both groups of works share tion to any photographic format of his time. “For Close, one medium (painting) became the more similarities than differences. Despite their personal touches, the basic procedure is medium of another (photography). He reproduced by hand an image that had originated in almost identical—the only difference is the final step. What brings them together is much a mechanism, one he himself operated. Although intimacy, accuracy, and the mechanics of greater than what separates them. Rather than a taxonomical distinction which determines vision—human mechanics as well as machine mechanics—are among Close’s continuing that one is a drawing and the other a photograph, we should examine the nucleus that artistic interests, he has never sought to test technologies of representation against some sustains, shapes and connects both groups. Each artist chooses to confront a separate set putative human standard. Pitting artist against machine hasn’t been his concern. Instead of intellectual dilemmas: they each produce a representation of a representation developed he seems to test each of his two mediums, to see what each can do.”22 In judging Casa’s with careful reflection and consideration. It’s like comparing a whale and an elephant. work, technical precision should not be the determining factor in inspiring, through his Both are mammals that share similar physical structures, though it may not recognizable rigour, admiration. “The Ambassadors” (1533) painted by Hans Holbein the Younger or in plain sight—they are warm-blooded, birth live offspring and breastfeed; yet, one of the “La Condesa de Vilches” (1821) by Federico de Madrazo are very advanced in terms of organisms has adapted to live in the sea and the other to live on land. correlation with reality, and even go beyond it many ways if we stop to examine the minute Many artists have focused on constructing realities using small edifices, or scenes, and details and notice their precision. The works of the young Andalusian artist contain much photographing models or spatial re-creations that are close to reality. The best example more than mere exactitude; one of the most interesting components is that the works emerge might be that of the Thomas Demand, previously mentioned, and here things get truly from a popular subgenre of photography which is common today and easily recognizable, complicated. The German artist selects an image published in a newspaper of magazine, only differentiated by the unique process of reproduction in pen, which in itself inspires then uses paper and cardboard to build a model of the selected frame (sometimes to admiration, being such a simple, accessible and familiar medium. Depicting a landscape scale), eliminating any superfluous details; after that, he takes a photo of the scene with or portrait with such hyperrealism doesn’t create much commotion because the public normal, neutral lighting. Once the process is finished he destroys the prototype. The photos is familiar with that genre as part of the pictorial tradition, and the final product looking contain the image of an image of an image, reverberations of some public event, moder- more or less like what we see first hand doesn’t seem strange, we’ve been used to it for ated by an aseptic process, appearing before us in its most undramatic version. “In that centuries. Yet, to adopt a new kind of image—purely photographic—disrupts the scheme way, the artist tests the viewer, who has been utterly saturated by the mass consumption of things and seems disconcerting to the observer, who is seduced by something so easily of images produced by the media. Demand suggests that if the viewer is fooled by the recognizable—something that depicts, in all of its complexity, a simple process. images, it is not because they have the effect of presenting reality, but rather because of Regardless of the final reproduction—be it mechanical or manual, digital or chemical—we the speed with which we must look at and perceive the world, especially representations have fully accepted the idea of photography in the same way that we have learned to of the world”23. James Casebere also constructs his own models; with a very resourceful represent a three-dimensional space on a flat surface, both through conventions incor- use of media, he tries to recreate centripetal structures that isolate the spectator’s view and porated into our culture. By way of the established associations for commonplace and force it to center on contemplation. They are empty, isolated and mysterious spaces—just comprehensible images, we understand an image to be photographic just as we see the like the works of Pereniguez. Ambiguous places presented as the setting of some event depth shown by vanishing lines. The fact that establishing such a convention corresponds that has happened or will happen, but which we ignore; one instant among so many of an to the photograph’s traditional format will now seem more and more amusing. If we take unknown narrative. The point of view has a cinematographic angle, and intrudes in the the concepts adopted by certain artists of international renown, such as Thomas Demand scene like an omniscient eye—surpassing Dziga Vertov’s Kino-Pravda (film truth)—and, or James Casebere, who finish their works with the use of a camera, and we line them keeping at an emotional distance from the events, observes them as a witness. Other art- up alongside the creative process of a young artist like José Miguel Pereñíguez, whose ists like Oliver Boberg, Javier Vallhonrat or Jorge Ribalta, also create models to caution the 127
  • 132.
    viewer about deceptiveperceptions of reality. We mustn’t forget that every photograph is is within a still image, a photographic fragment that opens up this “third meaning”, made an artificial construction that evokes some other reality; it’s not reality, but rather a malle- up of signifiers which resist signification”.26 The same Roland Barthes, in his book Camera able representation of it. Lucida, explains further “In the cinema, whose raw material is photographic, the image does If we have already considered the notion of photography as an object, as a performative not, however, have this completeness (which is fortunate for the cinema). Why? Because act or as an intrinsic idea—in this overview of those aspects that go beyond what is strictly the photographic, taken in flux, is impelled, ceaselessly drawn towards other views; in the considered photographic—then we must also examine the image as being somewhat cinema, no doubt, there is always a photographic referent, but this referent shifts, it does enigmatic, connatural to some representations in action taken out of context; because of not make a claim in favor of its reality.”27 the potential for suggestion and ambiguity, this trend is more and more common in the Since the Lumière brothers managed to project moving images in 1895, and even before, art scene. In 1970, Roland Barthes published a text in Cahiers du Cinema entitled “The the fluctuations between film and photography have oscillated back and forth, sharing Third Meaning”24 which analyzed different frames taken from films by the Soviet director some hazy boundaries that still seem unclear. The studies of Muybridge and Marey in the Sergei M. Eisenstein as if they were photographs. They are stilled images suspended in 1880’s would play a decisive role in the creation of the cinema. Such new and dynamic an undecipherable limbo, a series of isolated frames that lead him to propose a third inex- images that flourish on the eve of the twentieth century are quintessential to the modern plicable meaning that dominates our most obtuse senses, a kind of signifier and signified spirit in one particular concept: movement; the idea would be fundamental for Futurism, that are difficult to identify—without knowing the plot the iconic is null; it is found between Cubism, or Marcel Duchamp (We go back to the piece Nude Descending a Staircase from the image and its description, between definition and approximation, without being able to 1912). The instant, captured and suspended, is changing, now it is not one but many. It place it in any exact position. An unnamed disturbance that the French writer would later is fragmented or dissolved in between one moment and another. Nothing is condensed, call punctum. The stilled images provide a broad reading and allow the observer to linger or reflected; it doesn’t try to explain or teach anything. It shows only a trivial trance, one on those elements that relate to his or her own experience. They are like sediments that second of an elaborate situation. Such a fractal reality is not an ideal moment, but any become solid when they are watched for a period of time; we are not able to capture the moment. Once artists had come to the apex of documentary photography (Eugene Smith, long, drawn out movements. These strange images caught in between the cinematographic Robert Frank, Walker Evans or Cartier-Bresson), and classical cinema (Orson Welles, and the photographic possess something indescribable that turns them into hidden carri- Mankiewivz, Billy Wilder, John Ford, Frank Capra, George Cukor or Alfred Hitchkock), ers of their own vestiges. “Other varieties like the video-image could seem confusing with and with each discipline understood to be its own consolidated language, creators began photography supposedly being in the foreground. However, despite some readings of the to rebel against the established norms, and choose other roads less taken. From there connections between photography, video and cinema, the iconic priority of the stilled image we see the deviations that arise in the seventies. In cinema, we see the “Nouvelle Vague” remains. We can already see this in the analysis of cinema in which Eisenstein Roland and the postulates of structuralism introduced by Adams Sitney in 1969, which deviate Barthes works with frames like isolated gems that transmit the obtuse meaning that related toward the experimental. In photography we see the emergence of artists who decide to to the whole story. Moreover, when pitted against the possible influence of the other media, use images as if they were non-photographs. what grants the stilled image the capacity of iconic crystallization is its sedimentary capacity The eighties brought the emergence of artists like Sherrie Levine, who opt decisively that allows it to act as “tableau.”25 Olivier Richon states that, “Barthes proposes to call those for Appropriation Art, an intelligent means of questioning the conditions of an image’s details to be found in the stilled image that resist communication and signification, the reproducibility, challenging some of the considerations of traditional photography; this filmic. The filmic is like a photograph, like a fragment or a fetish that freezes and subverts movement was strongly countered by some theorists (such as Clement Greenberg, who the diegesis of the film. It enables a vertical reading into the semiotics of arrested motion: defends the separate cloistering of each specific media), with an extreme and absurd details of faces, object…in short, an attention upon the make up of the image. The filmic dedication to safeguarding the integrity of each genre. Dominique Barque suggests that 128
  • 133.
    Sherrie Levine isthe artist who went the farthest to radically negate the notions of author, Bowery in Two Inadequate Descriptive Systems from the mid seventies is quite well-known), piece and originality, thus questioning the axioms of authorship and authenticity. If we or Victor Burgin. The connections they make between different scenes that lack sufficient look to Walter Benjam’s proposed definition of authenticity, defined by the here and now indications as to how they should be interpreted or placed, and the loose sentences that that mark the original28, Levine’s images fully comply with that proposition. They are exact accompany those images, invite the viewer to infer new, not yet established meanings. photographs of other photographs, a mise en abîme, difficult to resolve. “Appropriation “The problems in photography today are mostly derived from a sort of scattered confu- Art allowed Levine to explore a connection between the works and artists of her choosing, sion in the area of theory. The series of debates that took place lead to the last set of artistic a connection that has sometimes been called Oedipal. For Levine, such a method has a projects of the seventies, and gave rise to their semiotic, psychoanalytical, and post-structural magical quality: they are two superimposed images that aspire to establish an allegorical arguments. The later response to some of these questions should also be explored, yet, it reading of the work. The viewer must then reconstruct the meaning that these photographs comes in a completely different environment from that in which the discourse originally have for the artist, and the connection they may have to her. (…) By marking the images as arose; so, in a sense, we find ourselves amid a strange kind of anachronism”32, affirms del “stolen” she gives them authenticity, re-establishing that aura that they would have lost if they Rio affirms with great precision, with an understanding that many of the trials and tribula- were simple reproductions, and granting them the status of unique works, as well as goods. tions present in photography today were generated many decades ago, and that they are Her intention is not to deny such concepts, but to underline that dialectic nature”.29 to be resolved in completely unknown and unforeseen circumstances, in a new global In that same vain, we can turn to the Brazilian artist Vik Muniz, who is established in setting that has arisen with the aid of new technological advances and the development New York and creates a very unique kind of Appropriation Art. He takes famous icons from of the internet. This immaterial revolution, characterized by ubiquity and virtuality, has the collective imagination, widely reproduced all over the world, and creates a personal great repercussions for the art world, particularly susceptible to transformation due to its reproduction of the famous image, transforming it into something new, related to the experimental essence. “One important element for young artists, those born in the seventies original representation, but substantially different. In many cases the reproduction is a and the beginning of the eighties, is that they are facing the urgent call for innovation from documentation of the process of creating the image, a kind of performance art that usually the international art community, facing rather tricky challenges like changing the models involves odd, perishable materials, like chocolate, syrup or sugar… “Muniz manages to and systems of traditional art forms: the model of painting, sculpture and architecture. activate our memories using unconscious images that form part of out cultural baggage, System-wide changes of this scope—that will affect the structural principals of the “classic” and his photographs serve both as a catalyst for memory and an element of disruption and visual and spatial disciplines, (…) mean that these structural innovations are that much contrast, given that the deception is revealed at first glance”.30 “His works speak of the more exciting. On one hand, they respond to a need to reconfigure the sensibilities of the permeability of meanings in the world of images, where things are not always what they modern-day viewer, who demand images that correspond to the current visual systems seem. For that reason he often thinks of Goddard’s saying “Ce n’est pas du sange, c’est (graphics, publicity, photojournalism, cinema, videos, and the web…); and on the other du rouge” [this isn’t blood, it’s only red paint]. As we have seen with cinema and television, hand, the more serious art being produced in the last 10 years is also intimately tied to often the real objects are not very convincing when they are shown and don’t seem as they the new technologies that feed into our present imagination”.33 really are. At the same time, there are some very versatile materials that can be used to represent something they’re not, and may even be more believable than the real material they represent”.31 Other categories that have diverged from photography in the last half century include works that combine text and image in conceptual projects of greater scope than mere memory or record. I’m referring to some outstanding examples—without going into too much detail, such as the works of Sophie Calle, Martha Rosler (her piece The 129
  • 134.
    1. Sontag, S. “On Photography.” P. 9. 2. EL CULTURAL, May 5 2008. Interview with Thomas Demand conducted by Javier Hontoria. 3. Lowry, J., Green, D., Campany, D. Foreword. “Where is the photograph?” Photoworks. Brighton, 2003. 4. Del Río, V. “Fotografía Objeto”. P. 75. 5. Krauss, R. “Lo fotográfico. Por una teoría de los desplazamientos” (“Theorie des ecarts”). Editorial Gustavo Gili. Barcelona, 2004. 6. Krauss, R. “Sculpture in the expanded field” is a well-known essay, first published in the spring edition of “OCTOBER”. MIT Press, 1979. 7. Krauss, R. “Sculpture in the expanded field”. P. 30. MIT Press, 1979. 8. Brea, J. L. “La era Postmedia”. Editorial Centro de Arte Salamanca, 2002. 9. Del Río. op. cit. P. 145. 10. Wall J. Señales de indiferencia. (“Marks of indifference”) “Indiferencia y singularidad. La fotografía en el pensamiento artístico contemporáneo”. P. 246-247..MACBA. Barcelona, 1997. 11. Del Río. op. cit. P. 100. 12. Ibid. P. 98. 13. Lowry, J., Green, D., Campany, D. op. cit. 14. Del Río. op. cit. P. 80. 15. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. (“The Work of Art in the Age of Mechanical Reproduction”) “Sobre la fotografía”. P. 108. Pre.Textos. Valencia, 2008. 16. Del Río. op. cit. P. 107. 17. 2: Batchen, G. Fearful Ghost of Former Bloom. “Where is the photograph? P. 21. Photoworks. Brighton, 2003. 18. Dubois, P. Introduction. “El acto fotográfico” (“L’Acte Photographique”). P.11. Paidós. Barcelona, 1986. 19. Lowry, J., Green, D. From presence to the performative: rethinking photographic indexicality. “Where is the photo- graph?”, p. 48. Photoworks. Brighton, 2003. 20. Dubois, P. op. cit. P. 14-15. 21. Lowry, J., Green, D. op. cit. P. 48. 22. Shiff, R. Photographic Soul “Where is the photograph?”. P. 98. Photoworks. Brighton, 2003. 23. Gómez Isla, J. “Fotografía de creación”. Editorial Nerea. San Sebastián, 2005. 24. Barthes, R. “Lo obvio y lo obtuso”. Paidós, 2009. 25. Del Río. op. cit. P. 77. 26. Richon, O. Thinking Things. “Where is the photograph?”. p. 78. Photoworks. Brighton, 2003. 27. Barthes, R. “La Cámara lúcida” (“Camera Lucida”) P. 156. Paidós, Barcelona, 1989. 28. Benjamin, W. La obra de arte en la época de su reproductibilidad técnica. (“The Work of Art in the Age of Mechanical Reproduction”) Sobre la fotografía. Pre.Textos. Valencia, 2008. 29. S. R. Taken from the critical commentary of the piece “Interieurs Parisiens: 1-60 After Atget”, (1997) which belongs to the collection of Fundación Telefónica. www.fundacion.telefonica.com 30. Gómez Isla, J. op, cit. P. 35. 31. C. D.. Taken from the critical commentary of the piece “Chocolate Disaster,” (1999) which belongs to the collection of Fundación Telefónica. www.fundacion.telefonica.com 32. Del Río. op. cit. P. 12. 33. Marín-Medina, J. Wilhelm Sasnal, iconos de lo cotidiano. EL CULTURAL, December 4, 2009. 130