• “Individuals and interactions over processes and tools”
• “Working software over comprehensive
documentation”
• “Customer collaboration over contract negotiation”
• “Responding to change over following a plan”
Manifiesto ágil
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Jeff Sutherland (a guru) states:
“Scrum assumes that the systems development process is
an unpredictable, complicated process that can only be
roughly described as an overall progression.”
“ Scrum is an enhancement of the commonly used
iterative/incremental object-oriented development cycle”
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Principios y valores ágiles
• La prioridad mayor es la satisfacción del cliente haciendo
entregas continuas de software valioso para él
• Los cambios son bienvenidos siempre
• La medida principal de progreso es el software funcionando
• El gestor es un facilitador no un controlador
• Equipos auto-organizados y multidisciplinares
• Inspeccionar y adaptar
• Mejora continua
• Respeto, claridad y comunicación
• Ritmo sostenible
• La arquitectura y diseño emergen
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Declaración de valores
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Declaración de valores
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Nivel de ruido
Fuente: Strategic Management and
Organizational Dynamics by Ralph Stacey in Agile
Software Development with Scrum by Ken
Schwaber and Mike Beedle.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Ágil no es hacer lo que quiera
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Estimación y planificación ágil
TECHNOLOGY
innovaINNOVA TECHNOLOGY
¿Qué es SCRUM?
No es un acrónimo…
TECHNOLOGY
innovaINNOVA TECHNOLOGY
¿Qué es SCRUM?
Es el arte de lo posible
TECHNOLOGY
innovaINNOVA TECHNOLOGY
¿Qué significa SCRUM?
Scrum significa melé
Melé es un tipo de jugada del deporte Rugby, donde todos los jugadores
de ambos equipo se agrupan en una formació, actuando como una
unidad y en la cual lucharán por obtener el balón.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
¿Qué significa SCRUM?
La complejidad de una melé hace que:
Si un miembro del equipo se viene abajo, se cae toda le melé.
En consecuencia, los jugadores deben estar bien coordinados, apoyarse
en sus compañeros para empujar al mismo tiempo y con ello, avanzar a la
misma velocidad.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
¿Cómo la definimos?
La Wikipedia define SCRUM una metodología para la gestión y
desarrollo de SW basada en un proceso iterativo incremental
utilizando comunmente en entornos basados en el desarrollo ágil
de SW.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Scrum en 100 palabras
• Scrum es un proceso ágil que nos permite centrarnos en ofrecer el más alto
valor de negocio en el menor tiempo.
• Nos permite rápidamente y en repetidas ocasiones inspeccionar software
real de trabajo (cada dos semanas o un mes).
• El negocio fija las prioridades. Los equipos se auto-organizan a fin de
determinar la mejor manera de entregar las funcionalidades de más alta
prioridad.
• Cada dos semanas o un mes, cualquiera puede ver el software real
funcionando y decidir si liberarlo o seguir mejorándolo en otro sprint.
Scrum en 100 palabras
Contexto SCRUM
Sólo abarca
prácticas de
gestión sin entrar
en las prácticas de
desarrollo como
puede hacer XP.
Delega completamente en
el equipo la
responsabilidad de decidir
la mejor manera de
trabajar para ser lo más
productivos posibles y, le
da gran protagonismo a las
reuniones que realicen a lo
largo del proyecto.
Sus raíces teóricas
están en las teorías
de la
auto organización.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Modelo de referencia
Roles
Development
Team
Scrum
Master
Product
Owner
Artefactos
Product
Backlog
Sprint
Backlog
Burndown
Chart
Ceremonias
The Daily
Scrum
The Planning
meeting
The Sprint
Review
The
Retrospective
Ken Schwaber: “En Scrum, un grupo en el que se
lleven mal entre ellos, no comprendan el negocio
del cliente y trabajen con malas herramientas...
producirán incrementos periódicos...
de basura. ”
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Roles
Cada persona que interviene en el proceso de creación de un producto tiene
un rol específico en Scrum.
• Rol ≠ puesto en la organización
• Distinguir entre gallinas y cerdos
Chickens
No son parte formal de los procesos, pero deben
ser tenidos en cuenta.
Marcan el rumbo del proyecto.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Chikens
• Usuarios
• Stakeholders
• Managers
Pigs
Están comprometidos con el proyecto y con el
proceso de Scrum.
Hacen que las cosas sean posibles.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Pigs
Dueño de Producto
• Recopila especificaciones
• Gestiona la visión
• Prioriza y gestiona la pila de producto (Backlog)
• Acepta las entregas
• Gestiona el roadmap
• Responsable económico
• Interfaz de la organización con Scrum
• “Cerdo con plumas”Cliente
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Pigs
Scrum Master
Equipo
- Es un facilitador
- Asegura que el proceso se cumple de forma correcta
- Debe ayudar a desbloquear las tareas del equipo
- Mantiene el proceso en marcha
- Estiman el esfuerzo necesario
- Comprometidos con la entrega del producto
terminado
- 5 a 9 personas
- Cubren los roles necesarios para el desarrollo del
proyecto
- Multifuncionales, autónomos y autogestioados
pero responsables ante el dueño del producto
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Ciclo de vida
Retrospective
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Sprints
• En Scrum los proyectos avanzan en una serie de “Sprints”
• La duración típica es 2–4 semanas o a lo sumo un mes calendario
• La duración constante conduce a un mejor ritmo
• El producto es diseñado, codificado y testeado durante el Sprint
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Desarrollo secuencial vs superpuesto
Source: “The New New Product Development Game” by Takeuchi and Nonaka. Harvard
Business Review, January 1986.
Requisitos Diseño Código Test
En lugar de hacer todo de
una cosa a la vez… ...los equipos Scrum
hacen un poco
de todo todo el tiempo
TECHNOLOGY
innovaINNOVA TECHNOLOGY
1. Toma de requisitos al cliente. Para cada requisito principal se crea un
bloque de trabajo, llamado historia
2. El cliente ordena los bloques de trabajo en una pila de producto según su
prioridad de entrega.
3. El equipo de trabajo toma un grupo de historias, con el que trabajan
durante una iteración o sprint.
4. Una vez finalizado un sprint entregan al cliente el resultado del trabajo. Se
vuelve al punto 2º hasta terminar la pila de producto.
Ciclo de vida
Nueva
funcionalidad
Producto. Back
log priorizado
Producto. Back
log seleccionado
Sprint backlog
Revisión diaria
Iteración
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Planificación
Predecir el futuro
es fácil.
Lo difícil es saber
qué es lo que
está pasando
ahora
Ceremonias
Sprint Planning Daily Scrum Sprint Review
Objetivo: Planificación del Sprint Objetivo: Seguimiento del Sprint Objetivo: Revisión del Sprint
Reunión previa al inicio de
cada sprint donde tomando
como base las prioridades y
necesidades del producto se
determina cuáles y cómo van
a ser las funcionalidades que
se deben cubrir con esa
iteración, en esta se genera el
Sprint Backlog
Reunión diaria y breve, de no
más de 15 minutos en las que
todos los integrantes del
equipo dicen las tareas en las
que están trabajando, si se
han encontrado o prevén
encontrarse con algún
impedimento, para poder
actualizar sobre el Sprint
Backlog las tareas realizadas o
los tiempos de trabajo que les
restan.
Esta reunión se realiza al final
del Sprint, de carácter
informal con una duración
máxima de cuatro horas; el
equipo presenta al propietario
del producto el incremento
construido en el Sprint.
Reuniones
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Reuniones
Sprint Retrospective
Reunión que se efectúa al
finalizar el sprint, esta posee
una duración entre 15 a 30
minutos, en ella participa el
ScrumMaster, el product
owner, el equipo y puede
participar los clientes Continuar
haciendo
Dejar de
hacer
Comenzar
a hacer
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Evaluación
Si siempre haces
lo que siempre has hecho,
Casi siempre conseguirás
lo que siempre
has conseguido
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Planificación Sprint
Condiciones para realizar la reunión
• El área de Sistemas u organización tienen determinados los recursos
posibles para realizar el sprint
• El propietario del producto tiene preparado el backlog del mismo
• De ser posible el propietario del producto ya trabajó previamente con el
equipo
• El equipo cuenta con un conocimiento de las tecnologías empleadas y del
negocio del producto, suficiente para comprender los conceptos del
negocio y poder realizar estimaciones asertivas.
Elementos de entrada
• El Producto Backlog
• El producto desarrollado hasta la fecha de esta reunión a través de los
sucesivos incrementos (exceptuando esto si se trata del primer Sprint)
• Puntos sobre las condiciones de negocio del cliente
• Escenario tecnológico empleado
Elementos de salida
• Sprint Backlog
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Daily meeting
• Cada miembro cuenta:
- ¿Qué ha hecho el día
anterior?
- ¿Qué va a hacer?
- ¿Qué problemas o bloqueos
se ha encontrado?
• 15 minutos
• Se realizan diariamente
• La reunión comienza a su hora (9h.)
• Solo hablan los cerdos
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Sprint planning meeting
• Seleccionar el trabajo a realizar
• Identificar todas las tareas del Sprint Backlog
• Lo realiza el equipo basándose en Prioridades marcadas por el
product owner y en los esfuerzos que estas requieren.
• De 2 a 4 horas
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Sprint review meeting
• Revisar el trabajo completado
• Demo
• Entorno a las 2 horas
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Sprint retrospective
• Impresiones sobre el Sprint
• Lo positivo y negativo
• El Scrum Master debe facilitar que el proceso mejore en el próximo
Sprint.
Artefactos
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Artefactos
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Product backlog
• Los requisitos y funcionalidades son capturados como
elementos de una lista para planificar el proyecto.
• Divididos en items autocomprobables.
• No es una lista completa y definitiva. Es sólo una
estimación inicial de los requisitos, importancia y
esfuerzo.
• El Product Owner prioriza.
• Es un documento dinámico que incorpora las
constantes necesidades del sistema y se mantiene
durante todo el ciclo de vida (hasta la retirada del Sist.).
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Sprint backlog
• Se detallan los requisitos del Sprint
• Especifica la serie de tareas que se van a
desarrollar según los requisitos señalados.
• Estas tareas se intentan que no excedan
de las 8 horas de trabajo.
• Las de mayor duración intentar
descomponerlas en Sub-Tareas dentro de
ese rango de tiempo.
• Al final del sprint se busca un incremento
en la funcionalidad.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Burndown chart
Conclusiones
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Conclusiones
• Valor para la organización ante todo,
representado en software funcional
• Es preferible tener el 70% de funcionalidad a
tiempo que tratar de lograr el 100% y fallar.
• No requiere herramientas especiales.
• Requiere disciplina y autogestión.
• Transparencia en los procesos.
TECHNOLOGY
innovaINNOVA TECHNOLOGY
Conclusiones
• Fomenta el aprendizaje.
• Fácil y rápido de aprender e implementar.
• Facilita la mejora continua.
• Incrementa la productividad.
• Metodología sencilla pero efectiva.
• Visibilidad durante todo el proyecto.
• No existe sorpresas.
Scrum no dice como desarrollar,
el equipo de desarrollo escoge
la metodología.
Compañias que aplican Scrum
Más Información…
En Internet…
• www.scrumalliance.org
• www.controlchaos.com
• www.chileagil.cl
• www.proyectosagiles.org
Literatura…
 Agile and Iterative Development: A Manager’s Guide by Craig
Larman
 Agile Estimating and Planning by Mike Cohn
 Agile Project Management with Scrum by Ken Schwaber
 Agile Retrospectives by Esther Derby and Diana Larsen
 Agile Software Development Ecosystems by Jim Highsmith
 Agile Software Development with Scrum by Ken Schwaber and
Mike Beedle
 Scrum and The Enterprise by Ken Schwaber
 User Stories Applied for Agile Software Development by Mike
Cohn
 Artículos semanales en www.scrumalliance.org
Ruegos y Preguntas
La persona razonable se adapta al mundo;
la no razonable insiste en cambiar el mundo. Así
pues, todo progreso depende de las personas no
razonables.
En el momento de la definición…
Lo malo de hacer sugerencias inteligentes es que
uno corre el riesgo de que se le asigne el
proyecto de llevarlas a cabo.
En el momento de la definición…
Para la mente innovadora y creativa,
siempre es posible encontrar diez problemas
para cada solución.
En el momento de la definición…
No dejes para mañana
lo que dejaste para hoy.
En el momento de la definición…
Incorporando nueva gente
a un proyecto atrasado…
Lo atrasarás aun más.
En el momento de la definición…
La gente siempre está dispuesta a haber hecho el
trabajo que ya está terminado.
En el momento de la definición…
Cuando todo falle,
intenta lo que sugirió el jefe del proyecto.
En el momento de la definición…
Si te comprometes a algo que es imposible, sigue
siendo imposible
aún después de tu compromiso.
En el momento de la planificación…
Una estimación exacta
es un contrasentido en los términos.
En el momento de la planificación…
Lo agradable de NO PLANIFICAR
es que los fracasos llegan por sorpresa,
y no están precedidos por semanas
de angustia y depresión.
En el momento de la planificación…
índice
Creative Commons Reconocimiento-NoComercial-CompartirIgual 2.1
© 2012-2013 Alejandro Marín. Usted es libre de copiar, distribuir y comunicar públicamente la obra y hacer obras derivadas bajo las condiciones
siguientes: a) Debe reconocer y citar al autor original. b) No puede utilizar esta obra para fines comerciales (incluyendo su publicación, a
través de cualquier medio, por entidades con fines de lucro). c) Si altera o transforma esta obra o genera una obra derivada, sólo puede
distribuir la obra generada bajo una licencia idéntica a ésta. Al reutilizar o distribuir la obra, tiene que dejar bien claro los términos de la licencia
de esta obra. Alguna de estas condiciones puede no aplicarse si se obtiene el permiso del titular de los derechos de autor. Los derechos
derivados de usos legítimos u otras limitaciones no se ven afectados por lo anterior. Licencia completa en castellano. La información contenida
en este documento y los derivados de éste se proporcionan tal cual son y los autores no asumirán responsabilidad alguna si el usuario o lector
hace mal uso de éstos.
innovaby Alex
TECHNOLOGY
alexismarin.wordpress.com

Gestion proyectos, metodología ágiles y SCRUM

  • 1.
    innovaby Alex TECHNOLOGY Innova Technoloy Virtualización| Soporte informático | Hosting | BYOD | Formación Gestión de proyectos: Metodoloíga ágiles y Scrum
  • 2.
    TECHNOLOGY innovaINNOVA TECHNOLOGY • “Individualsand interactions over processes and tools” • “Working software over comprehensive documentation” • “Customer collaboration over contract negotiation” • “Responding to change over following a plan” Manifiesto ágil
  • 3.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Jeff Sutherland(a guru) states: “Scrum assumes that the systems development process is an unpredictable, complicated process that can only be roughly described as an overall progression.” “ Scrum is an enhancement of the commonly used iterative/incremental object-oriented development cycle”
  • 4.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Principios yvalores ágiles • La prioridad mayor es la satisfacción del cliente haciendo entregas continuas de software valioso para él • Los cambios son bienvenidos siempre • La medida principal de progreso es el software funcionando • El gestor es un facilitador no un controlador • Equipos auto-organizados y multidisciplinares • Inspeccionar y adaptar • Mejora continua • Respeto, claridad y comunicación • Ritmo sostenible • La arquitectura y diseño emergen
  • 5.
  • 6.
  • 7.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Nivel deruido Fuente: Strategic Management and Organizational Dynamics by Ralph Stacey in Agile Software Development with Scrum by Ken Schwaber and Mike Beedle.
  • 8.
  • 9.
  • 10.
  • 11.
    TECHNOLOGY innovaINNOVA TECHNOLOGY ¿Qué esSCRUM? Es el arte de lo posible
  • 12.
    TECHNOLOGY innovaINNOVA TECHNOLOGY ¿Qué significaSCRUM? Scrum significa melé Melé es un tipo de jugada del deporte Rugby, donde todos los jugadores de ambos equipo se agrupan en una formació, actuando como una unidad y en la cual lucharán por obtener el balón.
  • 13.
    TECHNOLOGY innovaINNOVA TECHNOLOGY ¿Qué significaSCRUM? La complejidad de una melé hace que: Si un miembro del equipo se viene abajo, se cae toda le melé. En consecuencia, los jugadores deben estar bien coordinados, apoyarse en sus compañeros para empujar al mismo tiempo y con ello, avanzar a la misma velocidad.
  • 14.
    TECHNOLOGY innovaINNOVA TECHNOLOGY ¿Cómo ladefinimos? La Wikipedia define SCRUM una metodología para la gestión y desarrollo de SW basada en un proceso iterativo incremental utilizando comunmente en entornos basados en el desarrollo ágil de SW.
  • 15.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Scrum en100 palabras • Scrum es un proceso ágil que nos permite centrarnos en ofrecer el más alto valor de negocio en el menor tiempo. • Nos permite rápidamente y en repetidas ocasiones inspeccionar software real de trabajo (cada dos semanas o un mes). • El negocio fija las prioridades. Los equipos se auto-organizan a fin de determinar la mejor manera de entregar las funcionalidades de más alta prioridad. • Cada dos semanas o un mes, cualquiera puede ver el software real funcionando y decidir si liberarlo o seguir mejorándolo en otro sprint. Scrum en 100 palabras
  • 16.
    Contexto SCRUM Sólo abarca prácticasde gestión sin entrar en las prácticas de desarrollo como puede hacer XP. Delega completamente en el equipo la responsabilidad de decidir la mejor manera de trabajar para ser lo más productivos posibles y, le da gran protagonismo a las reuniones que realicen a lo largo del proyecto. Sus raíces teóricas están en las teorías de la auto organización.
  • 17.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Modelo dereferencia Roles Development Team Scrum Master Product Owner Artefactos Product Backlog Sprint Backlog Burndown Chart Ceremonias The Daily Scrum The Planning meeting The Sprint Review The Retrospective
  • 18.
    Ken Schwaber: “EnScrum, un grupo en el que se lleven mal entre ellos, no comprendan el negocio del cliente y trabajen con malas herramientas... producirán incrementos periódicos... de basura. ”
  • 19.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Roles Cada personaque interviene en el proceso de creación de un producto tiene un rol específico en Scrum. • Rol ≠ puesto en la organización • Distinguir entre gallinas y cerdos
  • 20.
    Chickens No son parteformal de los procesos, pero deben ser tenidos en cuenta. Marcan el rumbo del proyecto.
  • 21.
  • 22.
    Pigs Están comprometidos conel proyecto y con el proceso de Scrum. Hacen que las cosas sean posibles.
  • 23.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Pigs Dueño deProducto • Recopila especificaciones • Gestiona la visión • Prioriza y gestiona la pila de producto (Backlog) • Acepta las entregas • Gestiona el roadmap • Responsable económico • Interfaz de la organización con Scrum • “Cerdo con plumas”Cliente
  • 24.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Pigs Scrum Master Equipo -Es un facilitador - Asegura que el proceso se cumple de forma correcta - Debe ayudar a desbloquear las tareas del equipo - Mantiene el proceso en marcha - Estiman el esfuerzo necesario - Comprometidos con la entrega del producto terminado - 5 a 9 personas - Cubren los roles necesarios para el desarrollo del proyecto - Multifuncionales, autónomos y autogestioados pero responsables ante el dueño del producto
  • 25.
  • 26.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Sprints • EnScrum los proyectos avanzan en una serie de “Sprints” • La duración típica es 2–4 semanas o a lo sumo un mes calendario • La duración constante conduce a un mejor ritmo • El producto es diseñado, codificado y testeado durante el Sprint
  • 27.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Desarrollo secuencialvs superpuesto Source: “The New New Product Development Game” by Takeuchi and Nonaka. Harvard Business Review, January 1986. Requisitos Diseño Código Test En lugar de hacer todo de una cosa a la vez… ...los equipos Scrum hacen un poco de todo todo el tiempo
  • 28.
    TECHNOLOGY innovaINNOVA TECHNOLOGY 1. Tomade requisitos al cliente. Para cada requisito principal se crea un bloque de trabajo, llamado historia 2. El cliente ordena los bloques de trabajo en una pila de producto según su prioridad de entrega. 3. El equipo de trabajo toma un grupo de historias, con el que trabajan durante una iteración o sprint. 4. Una vez finalizado un sprint entregan al cliente el resultado del trabajo. Se vuelve al punto 2º hasta terminar la pila de producto.
  • 29.
    Ciclo de vida Nueva funcionalidad Producto.Back log priorizado Producto. Back log seleccionado Sprint backlog Revisión diaria Iteración
  • 30.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Planificación Predecir elfuturo es fácil. Lo difícil es saber qué es lo que está pasando ahora
  • 31.
  • 32.
    Sprint Planning DailyScrum Sprint Review Objetivo: Planificación del Sprint Objetivo: Seguimiento del Sprint Objetivo: Revisión del Sprint Reunión previa al inicio de cada sprint donde tomando como base las prioridades y necesidades del producto se determina cuáles y cómo van a ser las funcionalidades que se deben cubrir con esa iteración, en esta se genera el Sprint Backlog Reunión diaria y breve, de no más de 15 minutos en las que todos los integrantes del equipo dicen las tareas en las que están trabajando, si se han encontrado o prevén encontrarse con algún impedimento, para poder actualizar sobre el Sprint Backlog las tareas realizadas o los tiempos de trabajo que les restan. Esta reunión se realiza al final del Sprint, de carácter informal con una duración máxima de cuatro horas; el equipo presenta al propietario del producto el incremento construido en el Sprint. Reuniones
  • 33.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Reuniones Sprint Retrospective Reuniónque se efectúa al finalizar el sprint, esta posee una duración entre 15 a 30 minutos, en ella participa el ScrumMaster, el product owner, el equipo y puede participar los clientes Continuar haciendo Dejar de hacer Comenzar a hacer
  • 34.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Evaluación Si siemprehaces lo que siempre has hecho, Casi siempre conseguirás lo que siempre has conseguido
  • 35.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Planificación Sprint Condicionespara realizar la reunión • El área de Sistemas u organización tienen determinados los recursos posibles para realizar el sprint • El propietario del producto tiene preparado el backlog del mismo • De ser posible el propietario del producto ya trabajó previamente con el equipo • El equipo cuenta con un conocimiento de las tecnologías empleadas y del negocio del producto, suficiente para comprender los conceptos del negocio y poder realizar estimaciones asertivas. Elementos de entrada • El Producto Backlog • El producto desarrollado hasta la fecha de esta reunión a través de los sucesivos incrementos (exceptuando esto si se trata del primer Sprint) • Puntos sobre las condiciones de negocio del cliente • Escenario tecnológico empleado Elementos de salida • Sprint Backlog
  • 36.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Daily meeting •Cada miembro cuenta: - ¿Qué ha hecho el día anterior? - ¿Qué va a hacer? - ¿Qué problemas o bloqueos se ha encontrado? • 15 minutos • Se realizan diariamente • La reunión comienza a su hora (9h.) • Solo hablan los cerdos
  • 37.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Sprint planningmeeting • Seleccionar el trabajo a realizar • Identificar todas las tareas del Sprint Backlog • Lo realiza el equipo basándose en Prioridades marcadas por el product owner y en los esfuerzos que estas requieren. • De 2 a 4 horas
  • 38.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Sprint reviewmeeting • Revisar el trabajo completado • Demo • Entorno a las 2 horas
  • 39.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Sprint retrospective •Impresiones sobre el Sprint • Lo positivo y negativo • El Scrum Master debe facilitar que el proceso mejore en el próximo Sprint.
  • 40.
  • 41.
  • 42.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Product backlog •Los requisitos y funcionalidades son capturados como elementos de una lista para planificar el proyecto. • Divididos en items autocomprobables. • No es una lista completa y definitiva. Es sólo una estimación inicial de los requisitos, importancia y esfuerzo. • El Product Owner prioriza. • Es un documento dinámico que incorpora las constantes necesidades del sistema y se mantiene durante todo el ciclo de vida (hasta la retirada del Sist.).
  • 43.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Sprint backlog •Se detallan los requisitos del Sprint • Especifica la serie de tareas que se van a desarrollar según los requisitos señalados. • Estas tareas se intentan que no excedan de las 8 horas de trabajo. • Las de mayor duración intentar descomponerlas en Sub-Tareas dentro de ese rango de tiempo. • Al final del sprint se busca un incremento en la funcionalidad.
  • 44.
  • 45.
  • 46.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Conclusiones • Valorpara la organización ante todo, representado en software funcional • Es preferible tener el 70% de funcionalidad a tiempo que tratar de lograr el 100% y fallar. • No requiere herramientas especiales. • Requiere disciplina y autogestión. • Transparencia en los procesos.
  • 47.
    TECHNOLOGY innovaINNOVA TECHNOLOGY Conclusiones • Fomentael aprendizaje. • Fácil y rápido de aprender e implementar. • Facilita la mejora continua. • Incrementa la productividad. • Metodología sencilla pero efectiva. • Visibilidad durante todo el proyecto. • No existe sorpresas.
  • 48.
    Scrum no dicecomo desarrollar, el equipo de desarrollo escoge la metodología.
  • 49.
  • 50.
  • 51.
    En Internet… • www.scrumalliance.org •www.controlchaos.com • www.chileagil.cl • www.proyectosagiles.org
  • 52.
    Literatura…  Agile andIterative Development: A Manager’s Guide by Craig Larman  Agile Estimating and Planning by Mike Cohn  Agile Project Management with Scrum by Ken Schwaber  Agile Retrospectives by Esther Derby and Diana Larsen  Agile Software Development Ecosystems by Jim Highsmith  Agile Software Development with Scrum by Ken Schwaber and Mike Beedle  Scrum and The Enterprise by Ken Schwaber  User Stories Applied for Agile Software Development by Mike Cohn  Artículos semanales en www.scrumalliance.org
  • 53.
  • 54.
    La persona razonablese adapta al mundo; la no razonable insiste en cambiar el mundo. Así pues, todo progreso depende de las personas no razonables. En el momento de la definición…
  • 55.
    Lo malo dehacer sugerencias inteligentes es que uno corre el riesgo de que se le asigne el proyecto de llevarlas a cabo. En el momento de la definición…
  • 56.
    Para la menteinnovadora y creativa, siempre es posible encontrar diez problemas para cada solución. En el momento de la definición…
  • 57.
    No dejes paramañana lo que dejaste para hoy. En el momento de la definición…
  • 58.
    Incorporando nueva gente aun proyecto atrasado… Lo atrasarás aun más. En el momento de la definición…
  • 59.
    La gente siempreestá dispuesta a haber hecho el trabajo que ya está terminado. En el momento de la definición…
  • 60.
    Cuando todo falle, intentalo que sugirió el jefe del proyecto. En el momento de la definición…
  • 61.
    Si te comprometesa algo que es imposible, sigue siendo imposible aún después de tu compromiso. En el momento de la planificación…
  • 62.
    Una estimación exacta esun contrasentido en los términos. En el momento de la planificación…
  • 63.
    Lo agradable deNO PLANIFICAR es que los fracasos llegan por sorpresa, y no están precedidos por semanas de angustia y depresión. En el momento de la planificación…
  • 64.
  • 65.
    Creative Commons Reconocimiento-NoComercial-CompartirIgual2.1 © 2012-2013 Alejandro Marín. Usted es libre de copiar, distribuir y comunicar públicamente la obra y hacer obras derivadas bajo las condiciones siguientes: a) Debe reconocer y citar al autor original. b) No puede utilizar esta obra para fines comerciales (incluyendo su publicación, a través de cualquier medio, por entidades con fines de lucro). c) Si altera o transforma esta obra o genera una obra derivada, sólo puede distribuir la obra generada bajo una licencia idéntica a ésta. Al reutilizar o distribuir la obra, tiene que dejar bien claro los términos de la licencia de esta obra. Alguna de estas condiciones puede no aplicarse si se obtiene el permiso del titular de los derechos de autor. Los derechos derivados de usos legítimos u otras limitaciones no se ven afectados por lo anterior. Licencia completa en castellano. La información contenida en este documento y los derivados de éste se proporcionan tal cual son y los autores no asumirán responsabilidad alguna si el usuario o lector hace mal uso de éstos. innovaby Alex TECHNOLOGY alexismarin.wordpress.com