OBRA:
DEP: Arequipa
PROV: Arequipa Q
DIST: Cerro Colorado
FECHA: martes, 9 de Mayo de 2017
DESCRIPCION UNIDAD
COSTO
UNITARIO
COSTO PARCIAL
1.00 Tuberia 24" HDPE -96 DIAS - RENDIMIENTO: 5 PEGAS / DIA.
1.01 Longitud m
1.02 Total de Tuberia Pza
1.03 Total de Pegas Pga
1.04 Total Accesorios Pza
1.05 Total de Pegas por Accesorios Pga
1.06
1.07 Total Pegas 24" Pga $ 395.52 $ 170,071.63
$ 455.78 $ 195,985.74
2.00 Tuberia 4" HDPE - 8 DIAS - RENDIMIENTO: 18 PEGAS/ DIA.
2.01 Longitud m
2.02 Total de Tuberia Pza
2.03 Total de Pegas Pga
2.04 Total Accesorios Pza
2.05 Total de Pegas por Accesorios Pga
2.06
2.07 Total Pegas 4" Pga $ 127.84 $ 7,926.26
177,997.88
$
ITEM OBREROS UNIDAD CANTIDAD
COSTO HORAS
EXTRA S/.
TOTAL S/.
1.00 Operario Und 1 S/. 14,400.00
2.00 Oficial Und 4 S/. 51,840.00
3.00 Supervisor de Seguridad Und 1 S/. 15,840.00
4.00 Supervisor de Area Und 1 S/. 17,280.00
Total 99,360.00
S/.
ITEM OBREROS UNIDAD CANTIDAD
COSTO HORAS
EXTRA S/.
TOTAL S/.
1.00 Operario Und 1 S/. 1,152.00
2.00 Oficial Und 4 S/. 2,304.00
3.00 Supervisor de Seguridad Und 1 S/. 480.00
4.00 Supervisor de Area Und 1 S/. 480.00
Total 4,416.00
S/.
ITEM DESCRIPCION UNIDAD COSTO DIARIO
S/.
TOTAL S/.
1.00 Equipos y Herramientas Glb S/. 1,050.00
TOTAL 1,050.00
S/.
ITEM DESCRIPCION UNIDAD COSTO DIARIO
S/.
TOTAL S/.
1.00 Movilizacion y desmoviizacion Glb - S/. 1,200.00
Total 1,200.00
S/.
PARTIDA DESCRIPCION UNIDAD COSTO COSTO PARCIAL S/.
1.00 Hospedaje Dia 90.00
S/. 8,640.00
S/.
2.00 Camarotes Und 1,300.00
S/. 3,900.00
S/.
3.00 Frazadas Und 35.00
S/. 350.00
S/.
4.00 Almohadas Pck 16.90
S/. 84.50
S/.
SIN RETROESCAV
CON RETROESCAV
CANTIDAD TOTAL DE DIAS COSTO POR HORA S/.
COSTOS DE EQUIPOS Y HERRAMIENTAS
COSTOS DE MOVILIZACION Y DESMOVILIZACION
COSTOS DE EPPs
COSTO DIARIO S/. HORAS TOTAL DE DIAS
1.00 -
96.00
METRADO
RUC: 20406286909
BHK CONTRATISTAS S.R.L.
DIRECCION: II ETAPA BLOCK A4 NRO. S/N DPTO. 7 C.H. NICOLAS DE PIEROLA
TELEFONOS: 944202490 - 966373835
.
Montaje de Tuberia HDPE
30
62
RESUMEN DE PRESUPUESTO
METRADO
1
3,250
271
270
80
160
-
-
1.00
COSTO POR HORA S/.
430
ANALISIS DE COSTO UNITARIO- TUBERIA 24"
96
2
60
1
S/. 120.00
96
S/. 12.00
96
6
S/. 50.00
S/. 100.00 96
COSTO DIARIO S/.
COSTOS DE MANO DE OBRA
BENEFICIOS
PLANILLA
S/. 90.00 96
TOTAL DE DIAS
S/. 60.00
COSTO DE TALLER / VIVIENDA.
S/. 5.00 96
TOTAL DE HORAS
CANTIDAD
96
S/. 6.00
S/. 5.00
-
3.00
10.00
5.00
T O T A L
S/. 45.00
S/. 110.00 S/. 55.00 96
5.00 Sabanas Und 110.00
S/. 550.00
S/.
8.00 Colchones 1.5 Plaza Und 350.00
S/. 1,750.00
S/.
10.00 Agua 20 Lts Und 24.00
S/. 288.00
S/.
20.00 Cachacos (Delimitacion) Und 30.00
S/. 300.00
S/.
Total 15,862.50
S/.
ITEM DESCRIPCION UNIDAD
COSTO PARCIAL
S/.
TOTAL S/.
1.00 Alimentacion Und S/. 26,880.00
2.00 Grua 5 tn HH S/. 280.00 S/. 215,040.00
3.00 Retroescavadora HH S/. 220.00 S/. 84,480.00
4.00 Equipo HDPE Und S/. 1,956.00 S/. 187,776.00
11.00 Examen Medico Und S/. 2,590.00
12.00 SCTR Und S/. 37.00 S/. 259.00
Total 517,025.00
S/.
554,433.50
S/.
84,480.00
S/.
638,913.50
S/.
ITEM OBREROS UNIDAD CANTIDAD
COSTO HORAS
EXTRA S/.
TOTAL S/.
1.00 Operario Und 1 S/. 1,200.00
2.00 Supervisro de Seguridad Und 1 S/. 1,320.00
3.00 Oficial Und 3 S/. 3,240.00
4.00 Supervisor de Area Und 1 S/. 1,440.00
Total 7,200.00
S/.
ITEM OBREROS UNIDAD CANTIDAD
COSTO HORAS
EXTRA S/.
TOTAL S/.
1.00 Operario Und 1 S/. 96.00
2.00 Oficial Und 2 S/. 96.00
3.00 Supervisor de Seguridad Und 1 S/. 40.00
4.00 Supervisor de Area Und 1 S/. 40.00
Total 272.00
S/.
ITEM DESCRIPCION UNIDAD
COSTO DIARIO
S/.
TOTAL S/.
1.00 Equipos y Herramientas Glb S/. 120.00
TOTAL 120.00
S/.
ITEM DESCRIPCION UNIDAD
COSTO DIARIO
S/.
TOTAL S/.
1.00 Movilizacion y desmoviizacion Glb - S/. 240.00
Total 240.00
S/.
PARTIDA DESCRIPCION UNIDAD
COSTO
UNITARIO S/.
COSTO PARCIAL S/.
1.00 Hospedaje Dia 90.00
S/. 450.00
S/.
2.00 Camarotes Und 1,300.00
S/. 3,900.00
S/.
3.00 Frazadas Und 35.00
S/. 280.00
S/.
4.00 Almohadas Pck 16.90
S/. 67.60
S/.
5.00 Sabanas Und 110.00
S/. 440.00
S/.
8.00 Colchones 1.5 Plaza Und 350.00
S/. 1,400.00
S/.
10.00 Agua 20 Lts Und 24.00
S/. 288.00
S/.
20.00 Cachacos (Delimitacion) Und 30.00
S/. 300.00
S/.
ADICIONAL
Retroescavadora
COSTO TOTAL DE PRODUCCION
COSTOS INDIRECTOS
CANTIDAD
7
768
1
384
370
96
ANALISIS DE COSTO UNITARIO- TUBERIA 4"
COSTOS DE MANO DE OBRA
COSTO DIARIO S/.
BENEFICIOS
PLANILLA
TOTAL DE DIAS
10.00
5.00
12.00
5.00
COSTO TOTAL DE PRODUCCION
TOTAL DE DIAS COSTO POR PERSONA S/.
7
7 96 40
8
S/. 90.00 8
S/. 120.00 S/. 60.00 8
S/. 100.00 S/. 50.00
S/. 110.00 8
S/. 55.00
S/. 45.00
S/. 12.00 8
S/. 6.00 8
S/. 5.00 8
COSTOS DE EPPs
COSTO DIARIO S/.
HORAS
EXTRA
TOTAL DE DIAS
CANTIDAD TOTAL DE HORAS COSTO POR HORA S/.
1.00 - -
S/. 5.00 8
COSTOS DE EQUIPOS Y HERRAMIENTAS
1.00 - -
COSTOS DE MOVILIZACION Y DESMOVILIZACION
CANTIDAD TOTAL DE DIAS COSTO POR HORA S/.
4.00
4.00
4.00
12.00
10.00
COSTO DE TALLER / VIVIENDA.
METRADO
5.00
3.00
8.00
Total 7,125.60
S/.
ITEM DESCRIPCION UNIDAD
COSTO PARCIAL
S/.
TOTAL S/.
1.00 Alimentacion Und S/. 1,920.00
4.00 Equipo HDPE Und S/. 815.00 S/. 6,520.00
11.00 Examen Medico Und S/. 2,220.00
12.00 SCTR Und S/. 37.00 S/. 222.00
Total 10,882.00
S/.
25,839.60
S/.
COSTO TOTAL DE PRODUCCION
6
1 8
6 370
6 8 40
COSTOS INDIRECTOS
CANTIDAD TOTAL DE DIAS COSTO POR PERSONA S/.

Más contenido relacionado

La actualidad más candente

Analisis de costos de partidas
Analisis de costos de partidasAnalisis de costos de partidas
Analisis de costos de partidas
Hector Silva
 
APU-GRASS MUNICIPAL.pdf
APU-GRASS MUNICIPAL.pdfAPU-GRASS MUNICIPAL.pdf
APU-GRASS MUNICIPAL.pdf
ssuser2c77f1
 
Analisisdepreciosunitarios 120807235739-phpapp01
Analisisdepreciosunitarios 120807235739-phpapp01Analisisdepreciosunitarios 120807235739-phpapp01
Analisisdepreciosunitarios 120807235739-phpapp01
Alfredo Ramos
 
Analisis costos unitarios
Analisis costos unitariosAnalisis costos unitarios
Analisis costos unitarios
tod02419
 

La actualidad más candente (20)

Analisis precios unitarios final
Analisis precios unitarios finalAnalisis precios unitarios final
Analisis precios unitarios final
 
Analisis de costos de partidas
Analisis de costos de partidasAnalisis de costos de partidas
Analisis de costos de partidas
 
Apu
ApuApu
Apu
 
Analisis precios unit carretera
Analisis precios unit carreteraAnalisis precios unit carretera
Analisis precios unit carretera
 
APU-GRASS MUNICIPAL.pdf
APU-GRASS MUNICIPAL.pdfAPU-GRASS MUNICIPAL.pdf
APU-GRASS MUNICIPAL.pdf
 
Analisis
AnalisisAnalisis
Analisis
 
C unitarios%20 pavimento.rpt
C unitarios%20 pavimento.rptC unitarios%20 pavimento.rpt
C unitarios%20 pavimento.rpt
 
Analisisdepreciosunitarios 120807235739-phpapp01
Analisisdepreciosunitarios 120807235739-phpapp01Analisisdepreciosunitarios 120807235739-phpapp01
Analisisdepreciosunitarios 120807235739-phpapp01
 
ANÁLISIS DE COSTOS UNITARIOS DE OBRA
ANÁLISIS DE COSTOS UNITARIOS DE OBRA ANÁLISIS DE COSTOS UNITARIOS DE OBRA
ANÁLISIS DE COSTOS UNITARIOS DE OBRA
 
01.acu. pavimentos
01.acu. pavimentos01.acu. pavimentos
01.acu. pavimentos
 
Unitarios aulas 0001
Unitarios aulas   0001Unitarios aulas   0001
Unitarios aulas 0001
 
Presupuesto pdf
Presupuesto pdfPresupuesto pdf
Presupuesto pdf
 
Costos unitarios
Costos unitariosCostos unitarios
Costos unitarios
 
Consumo rendimiento maquinaria
Consumo   rendimiento maquinariaConsumo   rendimiento maquinaria
Consumo rendimiento maquinaria
 
Anal.arq.
Anal.arq.Anal.arq.
Anal.arq.
 
analisis de costos unitarios
analisis de costos unitariosanalisis de costos unitarios
analisis de costos unitarios
 
especificaciones tecnicas
especificaciones tecnicasespecificaciones tecnicas
especificaciones tecnicas
 
03.1 APU CONCRETO 280.pdf
03.1 APU CONCRETO 280.pdf03.1 APU CONCRETO 280.pdf
03.1 APU CONCRETO 280.pdf
 
Analisis costos unitarios
Analisis costos unitariosAnalisis costos unitarios
Analisis costos unitarios
 
Analisis de precios unitarios
Analisis de precios unitariosAnalisis de precios unitarios
Analisis de precios unitarios
 

Similar a Presupuesto montaje-de-tuberia-hdpe

El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014
El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014
El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014
Eduardo Nelson German
 
Presentaciòn de proyecto -D biker - Innovación estratégica de negocios
Presentaciòn de proyecto -D biker - Innovación estratégica de negociosPresentaciòn de proyecto -D biker - Innovación estratégica de negocios
Presentaciòn de proyecto -D biker - Innovación estratégica de negocios
Rafael Trucios Maza
 

Similar a Presupuesto montaje-de-tuberia-hdpe (20)

Plantilla de costos
Plantilla de costosPlantilla de costos
Plantilla de costos
 
Informe 1 drm
Informe 1   drmInforme 1   drm
Informe 1 drm
 
1. presupuesto santa ana tramo i
1.  presupuesto santa ana tramo i1.  presupuesto santa ana tramo i
1. presupuesto santa ana tramo i
 
Plan PerVol del 25 al 31 de enero.pptx
Plan PerVol del 25 al 31 de enero.pptxPlan PerVol del 25 al 31 de enero.pptx
Plan PerVol del 25 al 31 de enero.pptx
 
Costosvarios2011
Costosvarios2011Costosvarios2011
Costosvarios2011
 
COSTO DE PRODUCCIÓN DE CAMOTE.pdf
COSTO DE PRODUCCIÓN DE CAMOTE.pdfCOSTO DE PRODUCCIÓN DE CAMOTE.pdf
COSTO DE PRODUCCIÓN DE CAMOTE.pdf
 
COSTO CAMOTE
COSTO CAMOTECOSTO CAMOTE
COSTO CAMOTE
 
El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014
El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014
El cronograma del Rally Homenaje al 25 de Mayo La Puerta 2014
 
Informe ampliacion presup sshh okk
Informe ampliacion  presup sshh okkInforme ampliacion  presup sshh okk
Informe ampliacion presup sshh okk
 
Cronograma valorizado de obra
Cronograma valorizado de obraCronograma valorizado de obra
Cronograma valorizado de obra
 
Tomate costos
Tomate costosTomate costos
Tomate costos
 
gg.pdf
gg.pdfgg.pdf
gg.pdf
 
Taller III - Giachetti y Rozas
Taller III  - Giachetti y RozasTaller III  - Giachetti y Rozas
Taller III - Giachetti y Rozas
 
Examen individual-ciclograma.
Examen individual-ciclograma.Examen individual-ciclograma.
Examen individual-ciclograma.
 
Analisissubpresupuestovarios
AnalisissubpresupuestovariosAnalisissubpresupuestovarios
Analisissubpresupuestovarios
 
Presentaciòn de proyecto -D biker - Innovación estratégica de negocios
Presentaciòn de proyecto -D biker - Innovación estratégica de negociosPresentaciòn de proyecto -D biker - Innovación estratégica de negocios
Presentaciòn de proyecto -D biker - Innovación estratégica de negocios
 
costo de produccion por HECTAREA.pdf
costo de produccion por HECTAREA.pdfcosto de produccion por HECTAREA.pdf
costo de produccion por HECTAREA.pdf
 
Cronograma gantt puquio
Cronograma gantt puquioCronograma gantt puquio
Cronograma gantt puquio
 
Info 3-ejemplo-s10
Info 3-ejemplo-s10Info 3-ejemplo-s10
Info 3-ejemplo-s10
 
costos mineros.pptxddddddddddddddddddddddddddddddddd
costos mineros.pptxdddddddddddddddddddddddddddddddddcostos mineros.pptxddddddddddddddddddddddddddddddddd
costos mineros.pptxddddddddddddddddddddddddddddddddd
 

Más de Wilson Cordova

Más de Wilson Cordova (16)

St30 manual
St30 manualSt30 manual
St30 manual
 
Pro i-ctc-01-instalacion-geomembrana-v02
Pro i-ctc-01-instalacion-geomembrana-v02Pro i-ctc-01-instalacion-geomembrana-v02
Pro i-ctc-01-instalacion-geomembrana-v02
 
Presupuesto alquiler-de-camion-grua-minera-bateas
Presupuesto alquiler-de-camion-grua-minera-bateasPresupuesto alquiler-de-camion-grua-minera-bateas
Presupuesto alquiler-de-camion-grua-minera-bateas
 
Polystop system flyer
Polystop system flyerPolystop system flyer
Polystop system flyer
 
Mtdrotarypeeler instruction manual (black steel)
Mtdrotarypeeler instruction manual (black steel)Mtdrotarypeeler instruction manual (black steel)
Mtdrotarypeeler instruction manual (black steel)
 
Iso 527-2
Iso 527-2Iso 527-2
Iso 527-2
 
Equipment needed for 8 x12 polystop
Equipment needed for 8 x12 polystopEquipment needed for 8 x12 polystop
Equipment needed for 8 x12 polystop
 
Equipment needed for 4 x6 polystop
Equipment needed for 4 x6 polystopEquipment needed for 4 x6 polystop
Equipment needed for 4 x6 polystop
 
Equipment needed for 3 x4 polystop
Equipment needed for 3 x4 polystopEquipment needed for 3 x4 polystop
Equipment needed for 3 x4 polystop
 
4 8 in mtdmulticlamp instruction manual
4 8 in mtdmulticlamp instruction manual4 8 in mtdmulticlamp instruction manual
4 8 in mtdmulticlamp instruction manual
 
Mtd bar clamp instruction manual
Mtd bar clamp instruction manualMtd bar clamp instruction manual
Mtd bar clamp instruction manual
 
Equipment needed for 6 x8 polystop
Equipment needed for 6 x8 polystopEquipment needed for 6 x8 polystop
Equipment needed for 6 x8 polystop
 
Equipment needed for 3 x4 polystop
Equipment needed for 3 x4 polystopEquipment needed for 3 x4 polystop
Equipment needed for 3 x4 polystop
 
Iso 527-2
Iso 527-2Iso 527-2
Iso 527-2
 
4 8 in mtdmulticlamp instruction manual
4 8 in mtdmulticlamp instruction manual4 8 in mtdmulticlamp instruction manual
4 8 in mtdmulticlamp instruction manual
 
1000219 0 polystop system flyer
1000219 0 polystop system flyer1000219 0 polystop system flyer
1000219 0 polystop system flyer
 

Último

RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADESRECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
yanicsapernia5g
 
Tipos de suelo y su clasificación y ejemplos
Tipos de suelo y su clasificación y ejemplosTipos de suelo y su clasificación y ejemplos
Tipos de suelo y su clasificación y ejemplos
andersonsubero28
 
S01.s1 - Clasificación de las Industrias.pdf
S01.s1 - Clasificación de las Industrias.pdfS01.s1 - Clasificación de las Industrias.pdf
S01.s1 - Clasificación de las Industrias.pdf
SalomeRunco
 
647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf
647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf
647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf
MirkaCBauer
 
UC Fundamentos de tuberías en equipos de refrigeración m.pdf
UC Fundamentos de tuberías en equipos de refrigeración m.pdfUC Fundamentos de tuberías en equipos de refrigeración m.pdf
UC Fundamentos de tuberías en equipos de refrigeración m.pdf
refrielectriccarlyz
 

Último (20)

Balance materia y energia procesos de Secado
Balance materia y energia procesos de SecadoBalance materia y energia procesos de Secado
Balance materia y energia procesos de Secado
 
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADESRECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
RECONOCIMIENTO DE LIPIDOS Y ALGUNAS PROPIEDADES
 
Presentacion Feria Cientifica Proyecto.pptx
Presentacion Feria Cientifica Proyecto.pptxPresentacion Feria Cientifica Proyecto.pptx
Presentacion Feria Cientifica Proyecto.pptx
 
docsity-manzaneo-y-lotizacion para habilitacopm urbana
docsity-manzaneo-y-lotizacion para habilitacopm urbanadocsity-manzaneo-y-lotizacion para habilitacopm urbana
docsity-manzaneo-y-lotizacion para habilitacopm urbana
 
TECNOLOGIA DE CONCRETO 2024 estudiante.pdf
TECNOLOGIA DE CONCRETO 2024 estudiante.pdfTECNOLOGIA DE CONCRETO 2024 estudiante.pdf
TECNOLOGIA DE CONCRETO 2024 estudiante.pdf
 
Tipos de suelo y su clasificación y ejemplos
Tipos de suelo y su clasificación y ejemplosTipos de suelo y su clasificación y ejemplos
Tipos de suelo y su clasificación y ejemplos
 
Diseño digital - M. Morris Mano - 3ed.pdf
Diseño digital - M. Morris Mano - 3ed.pdfDiseño digital - M. Morris Mano - 3ed.pdf
Diseño digital - M. Morris Mano - 3ed.pdf
 
Auditoría de Sistemas de Gestión
Auditoría    de   Sistemas     de GestiónAuditoría    de   Sistemas     de Gestión
Auditoría de Sistemas de Gestión
 
S01.s1 - Clasificación de las Industrias.pdf
S01.s1 - Clasificación de las Industrias.pdfS01.s1 - Clasificación de las Industrias.pdf
S01.s1 - Clasificación de las Industrias.pdf
 
Determinación de espacios en la instalación
Determinación de espacios en la instalaciónDeterminación de espacios en la instalación
Determinación de espacios en la instalación
 
647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf
647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf
647913404-06-Partes-principales-de-las-Perforadoras-manuales-1.pdf
 
INFORME de actividades para pago de servicio
INFORME de actividades para pago de servicioINFORME de actividades para pago de servicio
INFORME de actividades para pago de servicio
 
Myoelectric_Control_for_Upper_Limb_Prostheses.en.es (2).pdf
Myoelectric_Control_for_Upper_Limb_Prostheses.en.es (2).pdfMyoelectric_Control_for_Upper_Limb_Prostheses.en.es (2).pdf
Myoelectric_Control_for_Upper_Limb_Prostheses.en.es (2).pdf
 
entropia y neguentropia en la teoria general de sistemas
entropia y neguentropia en la teoria general de sistemasentropia y neguentropia en la teoria general de sistemas
entropia y neguentropia en la teoria general de sistemas
 
1.1 Los 14 principios del Toyota Way -2024.pdf
1.1 Los 14 principios del Toyota Way -2024.pdf1.1 Los 14 principios del Toyota Way -2024.pdf
1.1 Los 14 principios del Toyota Way -2024.pdf
 
UC Fundamentos de tuberías en equipos de refrigeración m.pdf
UC Fundamentos de tuberías en equipos de refrigeración m.pdfUC Fundamentos de tuberías en equipos de refrigeración m.pdf
UC Fundamentos de tuberías en equipos de refrigeración m.pdf
 
Arquitecto cambio de uso de suelo Limache
Arquitecto cambio de uso de suelo LimacheArquitecto cambio de uso de suelo Limache
Arquitecto cambio de uso de suelo Limache
 
Trabajos Preliminares en Obras de Construcción..pdf
Trabajos Preliminares en Obras de Construcción..pdfTrabajos Preliminares en Obras de Construcción..pdf
Trabajos Preliminares en Obras de Construcción..pdf
 
3er Informe Laboratorio Quimica General (2) (1).pdf
3er Informe Laboratorio Quimica General  (2) (1).pdf3er Informe Laboratorio Quimica General  (2) (1).pdf
3er Informe Laboratorio Quimica General (2) (1).pdf
 
slideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdf
slideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdfslideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdf
slideshare.vpdfs.com_sensores-magneticos-controles-pptx.pdf
 

Presupuesto montaje-de-tuberia-hdpe

  • 1. OBRA: DEP: Arequipa PROV: Arequipa Q DIST: Cerro Colorado FECHA: martes, 9 de Mayo de 2017 DESCRIPCION UNIDAD COSTO UNITARIO COSTO PARCIAL 1.00 Tuberia 24" HDPE -96 DIAS - RENDIMIENTO: 5 PEGAS / DIA. 1.01 Longitud m 1.02 Total de Tuberia Pza 1.03 Total de Pegas Pga 1.04 Total Accesorios Pza 1.05 Total de Pegas por Accesorios Pga 1.06 1.07 Total Pegas 24" Pga $ 395.52 $ 170,071.63 $ 455.78 $ 195,985.74 2.00 Tuberia 4" HDPE - 8 DIAS - RENDIMIENTO: 18 PEGAS/ DIA. 2.01 Longitud m 2.02 Total de Tuberia Pza 2.03 Total de Pegas Pga 2.04 Total Accesorios Pza 2.05 Total de Pegas por Accesorios Pga 2.06 2.07 Total Pegas 4" Pga $ 127.84 $ 7,926.26 177,997.88 $ ITEM OBREROS UNIDAD CANTIDAD COSTO HORAS EXTRA S/. TOTAL S/. 1.00 Operario Und 1 S/. 14,400.00 2.00 Oficial Und 4 S/. 51,840.00 3.00 Supervisor de Seguridad Und 1 S/. 15,840.00 4.00 Supervisor de Area Und 1 S/. 17,280.00 Total 99,360.00 S/. ITEM OBREROS UNIDAD CANTIDAD COSTO HORAS EXTRA S/. TOTAL S/. 1.00 Operario Und 1 S/. 1,152.00 2.00 Oficial Und 4 S/. 2,304.00 3.00 Supervisor de Seguridad Und 1 S/. 480.00 4.00 Supervisor de Area Und 1 S/. 480.00 Total 4,416.00 S/. ITEM DESCRIPCION UNIDAD COSTO DIARIO S/. TOTAL S/. 1.00 Equipos y Herramientas Glb S/. 1,050.00 TOTAL 1,050.00 S/. ITEM DESCRIPCION UNIDAD COSTO DIARIO S/. TOTAL S/. 1.00 Movilizacion y desmoviizacion Glb - S/. 1,200.00 Total 1,200.00 S/. PARTIDA DESCRIPCION UNIDAD COSTO COSTO PARCIAL S/. 1.00 Hospedaje Dia 90.00 S/. 8,640.00 S/. 2.00 Camarotes Und 1,300.00 S/. 3,900.00 S/. 3.00 Frazadas Und 35.00 S/. 350.00 S/. 4.00 Almohadas Pck 16.90 S/. 84.50 S/. SIN RETROESCAV CON RETROESCAV CANTIDAD TOTAL DE DIAS COSTO POR HORA S/. COSTOS DE EQUIPOS Y HERRAMIENTAS COSTOS DE MOVILIZACION Y DESMOVILIZACION COSTOS DE EPPs COSTO DIARIO S/. HORAS TOTAL DE DIAS 1.00 - 96.00 METRADO RUC: 20406286909 BHK CONTRATISTAS S.R.L. DIRECCION: II ETAPA BLOCK A4 NRO. S/N DPTO. 7 C.H. NICOLAS DE PIEROLA TELEFONOS: 944202490 - 966373835 . Montaje de Tuberia HDPE 30 62 RESUMEN DE PRESUPUESTO METRADO 1 3,250 271 270 80 160 - - 1.00 COSTO POR HORA S/. 430 ANALISIS DE COSTO UNITARIO- TUBERIA 24" 96 2 60 1 S/. 120.00 96 S/. 12.00 96 6 S/. 50.00 S/. 100.00 96 COSTO DIARIO S/. COSTOS DE MANO DE OBRA BENEFICIOS PLANILLA S/. 90.00 96 TOTAL DE DIAS S/. 60.00 COSTO DE TALLER / VIVIENDA. S/. 5.00 96 TOTAL DE HORAS CANTIDAD 96 S/. 6.00 S/. 5.00 - 3.00 10.00 5.00 T O T A L S/. 45.00 S/. 110.00 S/. 55.00 96
  • 2. 5.00 Sabanas Und 110.00 S/. 550.00 S/. 8.00 Colchones 1.5 Plaza Und 350.00 S/. 1,750.00 S/. 10.00 Agua 20 Lts Und 24.00 S/. 288.00 S/. 20.00 Cachacos (Delimitacion) Und 30.00 S/. 300.00 S/. Total 15,862.50 S/. ITEM DESCRIPCION UNIDAD COSTO PARCIAL S/. TOTAL S/. 1.00 Alimentacion Und S/. 26,880.00 2.00 Grua 5 tn HH S/. 280.00 S/. 215,040.00 3.00 Retroescavadora HH S/. 220.00 S/. 84,480.00 4.00 Equipo HDPE Und S/. 1,956.00 S/. 187,776.00 11.00 Examen Medico Und S/. 2,590.00 12.00 SCTR Und S/. 37.00 S/. 259.00 Total 517,025.00 S/. 554,433.50 S/. 84,480.00 S/. 638,913.50 S/. ITEM OBREROS UNIDAD CANTIDAD COSTO HORAS EXTRA S/. TOTAL S/. 1.00 Operario Und 1 S/. 1,200.00 2.00 Supervisro de Seguridad Und 1 S/. 1,320.00 3.00 Oficial Und 3 S/. 3,240.00 4.00 Supervisor de Area Und 1 S/. 1,440.00 Total 7,200.00 S/. ITEM OBREROS UNIDAD CANTIDAD COSTO HORAS EXTRA S/. TOTAL S/. 1.00 Operario Und 1 S/. 96.00 2.00 Oficial Und 2 S/. 96.00 3.00 Supervisor de Seguridad Und 1 S/. 40.00 4.00 Supervisor de Area Und 1 S/. 40.00 Total 272.00 S/. ITEM DESCRIPCION UNIDAD COSTO DIARIO S/. TOTAL S/. 1.00 Equipos y Herramientas Glb S/. 120.00 TOTAL 120.00 S/. ITEM DESCRIPCION UNIDAD COSTO DIARIO S/. TOTAL S/. 1.00 Movilizacion y desmoviizacion Glb - S/. 240.00 Total 240.00 S/. PARTIDA DESCRIPCION UNIDAD COSTO UNITARIO S/. COSTO PARCIAL S/. 1.00 Hospedaje Dia 90.00 S/. 450.00 S/. 2.00 Camarotes Und 1,300.00 S/. 3,900.00 S/. 3.00 Frazadas Und 35.00 S/. 280.00 S/. 4.00 Almohadas Pck 16.90 S/. 67.60 S/. 5.00 Sabanas Und 110.00 S/. 440.00 S/. 8.00 Colchones 1.5 Plaza Und 350.00 S/. 1,400.00 S/. 10.00 Agua 20 Lts Und 24.00 S/. 288.00 S/. 20.00 Cachacos (Delimitacion) Und 30.00 S/. 300.00 S/. ADICIONAL Retroescavadora COSTO TOTAL DE PRODUCCION COSTOS INDIRECTOS CANTIDAD 7 768 1 384 370 96 ANALISIS DE COSTO UNITARIO- TUBERIA 4" COSTOS DE MANO DE OBRA COSTO DIARIO S/. BENEFICIOS PLANILLA TOTAL DE DIAS 10.00 5.00 12.00 5.00 COSTO TOTAL DE PRODUCCION TOTAL DE DIAS COSTO POR PERSONA S/. 7 7 96 40 8 S/. 90.00 8 S/. 120.00 S/. 60.00 8 S/. 100.00 S/. 50.00 S/. 110.00 8 S/. 55.00 S/. 45.00 S/. 12.00 8 S/. 6.00 8 S/. 5.00 8 COSTOS DE EPPs COSTO DIARIO S/. HORAS EXTRA TOTAL DE DIAS CANTIDAD TOTAL DE HORAS COSTO POR HORA S/. 1.00 - - S/. 5.00 8 COSTOS DE EQUIPOS Y HERRAMIENTAS 1.00 - - COSTOS DE MOVILIZACION Y DESMOVILIZACION CANTIDAD TOTAL DE DIAS COSTO POR HORA S/. 4.00 4.00 4.00 12.00 10.00 COSTO DE TALLER / VIVIENDA. METRADO 5.00 3.00 8.00
  • 3. Total 7,125.60 S/. ITEM DESCRIPCION UNIDAD COSTO PARCIAL S/. TOTAL S/. 1.00 Alimentacion Und S/. 1,920.00 4.00 Equipo HDPE Und S/. 815.00 S/. 6,520.00 11.00 Examen Medico Und S/. 2,220.00 12.00 SCTR Und S/. 37.00 S/. 222.00 Total 10,882.00 S/. 25,839.60 S/. COSTO TOTAL DE PRODUCCION 6 1 8 6 370 6 8 40 COSTOS INDIRECTOS CANTIDAD TOTAL DE DIAS COSTO POR PERSONA S/.